AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

PROJECT TITLE: John Day Avian Array Improvements Phase II

The purpose of this modification is to:

1. Technical specification section 01 11 00.00 25 Paragraph 1.6 has been updated.

2. All other terms and conditions remain unchanged.

POC: Brandon Lasich Email: brandon.m.lasich@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 18-Aug-2017

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-17-R-0066

X 9B. DATED (SEE ITEM 11)

28-Jul-2017

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

18-Aug-2017

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-17-R-0066

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

(End of Summary of Changes)

John Day Avian Array Improvements - Phase II

PROJECT TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00.00 25 CONTRACT ADMINISTRATION DATA

01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS

01 11 00.00 25 SUMMARY OF WORK

01 22 00.00 25 MEASUREMENT AND PAYMENT

01 32 01.00 25 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 25 QUALITY CONTROL

01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)

01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS

01 78 23.00 25 OPERATION AND MAINTENANCE DATA

01 78 39.00 25 PROJECT RECORD DOCUMENTS

DIVISION 05 - METALS

05 50 14.00 25 STRUCTURAL METAL FABRICATIONS

DIVISION 13 - SPECIAL CONSTRUCTION

13 10 11.00 25 SYNTHETIC AVIAN LINE AND RIGGING COMPONENTS

DIVISION 41 - MATERIAL PROCESSING AND HANDLING EQUIPMENT

41 22 23.00 25 WINCH AND SHEAVE ASSEMBLY

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

SECTION 01 11 00.00 25

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

1.2.2 Location

1.3 CONTRACT DRAWINGS

1.4 OCCUPANCY OF PREMISES

1.5 EXISTING WORK

1.6 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section Table of Contents --

SECTION 01 11 00.00 25 Page 1

SECTION 01 11 00.00 25

SUMMARY OF WORK

PART 1 GENERAL

1.1 SUMMARY

This Section provides a summary of the various Contract work elements and their relationship to each other. This summary describes work activities within interim construction completion date. This Section does not provide the technical detail for particular work activities, but describes the work as a whole, providing overall perspective to the separate tasks and their interrelationships. Use this Section in conjunction with all the Specification Sections and the Drawings to establish the total work requirements.

1.2 WORK COVERED BY CONTRACT DOCUMENTS

1.2.1 Project Description

The work includes modifications of the existing Avian Array at John Day Lock and Dam. Modifications include, but not limited to: replacement of avian lines along the Peninsula, Navigation Lock, Spillway, and Powerhouse, installation of winches and sheaves along the spillway, installation of wire rope slings at anchor points, and incidental related work. This effort is to include all associated works required and described within this Contract package.

1.2.2 Location

The work site is located at John Day Lock and Dam. Contractor access to the work site will be from I-84 in Rufus, Oregon.

1.3 CONTRACT DRAWINGS

a. The Drawings that accompany these Specifications are a part thereof.

b. Contract drawings, maps, and Specifications will be furnished to the Contractor without charge per Section 00700 Contract Clause 252.236-7001, CONTRACT DRAWINGS AND SPECIFICATIONS. Reference publications will not be furnished.

c. Immediately check furnished drawings, maps, and specifications and notify the Government of any discrepancies.

1.4 OCCUPANCY OF PREMISES

a.Building(s) will be occupied during performance of work under this Contract.

b. Before work is started, the Contractor must arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.

SECTION 01 11 00.00 25 Page 2

1.5 EXISTING WORK

In addition to Section 00700 Contract Clause 52.236-9, PROTECTION OF

EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND IMPROVEMENTS:

a. Remove or alter existing work in such a manner as to prevent injury or damage to any portion of the existing work to remain.

b. Upon completion of the work, repair or replace portions of existing work, which have been damaged by Contractor's operations, to preconstruction conditions at the expense of the Contractor.

1.6 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT

Pursuant to Contract Clause 52.245-1, GOVERNMENT PROPERTY, the Government will furnish unspliced Vectran rope for the following lines to install by the Contractor. Refer to the drawing packet for location and termination configuration per line number:

LINE NO. ROPE DIAMETER FACTORY CUT LENGTH

4 3/16" 2800 Ft

5 3/16" 2800 ft

6 3/16" 2800 ft

7 3/16" 2800 ft

8 3/16" 2800 ft

9 3/16" 2800 ft

10 3/16" 2800 ft

11 3/16" 2800 ft

12 3/16" 2800 ft

13 3/16" 2800 ft

14 3/16" 2800 ft

15 3/16" 2800 ft

16 3/16" 2800 ft

17 3/16" 2800 ft

18 3/16" 2800 ft

19 3/16" 2800 ft

20 3/16" 2800 ft

21 3/16" 2900 ft

22 3/16" 2900 ft

SECTION 01 11 00.00 25 Page 3

LINE NO. ROPE DIAMETER FACTORY CUT LENGTH

23 3/16" 2900 ft

24 3/16" 2900 ft

25 3/16" 2900 ft

26 3/16" 2900 ft

27 3/16" 2900 ft

28 3/16" 2900 ft

29 3/16" 2900 ft

30 3/16" 2900 ft

31 3/16" 2900 ft

32 3/16" 2900 ft

33 3/16" 2900 ft

34 3/16" 2900 ft

35 3/16" 3000 ft

36 3/16" 3000 ft

37 3/16" 3000 ft

38 3/16" 3000 ft

40 3/16" 3000 ft

41 3/16" 3100 ft

42 3/16" 3100 ft

47 3/16" 3200 ft

49 3/16" 3200 ft

50 3/16" 3300 ft

51 3/16" 3300 ft

61 3/16" 3450 ft

62 3/16" 3450 ft

63 3/16" 3350 ft

64 3/16" 3350 ft

65 3/16" 3250 ft

66 3/16" 3250 ft

SECTION 01 11 00.00 25 Page 4

67 3/16" 3150 ft

68 3/16" 3150 ft

69 3/16" 3050 ft

70 3/16" 2950 ft

71 3/16" 2950 ft

72 3/16" 2850 ft

73 3/16" 2850 ft

74 3/16" 2750 ft

75 3/16" 2750 ft

76 3/16" 2750 ft

77 3/16" 2650 ft

78 3/16" 2650 ft

79 3/16" 2650 ft

80 7/64" 2500 ft

81 7/64" 2400 ft

82 7/64" 2200 ft

83 7/64" 2200 ft

84 7/64" 2200 ft

85 7/64" 2200 ft

86 7/64" 2200 ft

87 7/64" 2100 ft

88 7/64" 2100 ft

89 7/64" 2100 ft

90 7/64" 2100 ft

91 7/64" 2100 ft

92 7/64" 2000 ft

93 7/64" 2000 ft

94 7/64" 2000 ft

95 7/64" 2000 ft

SECTION 01 11 00.00 25 Page 5

96 7/64" 2000 ft

97 7/64" 2000 ft

98 7/64" 1900 ft

99 7/64" 1900 ft

100 7/64" 1900 ft

101 7/64" 1900 ft

102 7/64" 1900 ft

103 7/64" 1900 ft

104 7/64" 1900 ft

105 7/64" 1900 ft

106 7/64" 1800 ft

107 7/64" 1800 ft

108 7/64" 1800 ft

109 7/64" 1800 ft

110 7/64" 1700 ft

111 7/64" 1700 ft

112 7/64" 1700 ft

113 7/64" 1700 ft

114 7/64" 1700 ft

115 7/64" 1700 ft

116 7/64" 1700 ft

117 7/64" 1700 ft

118 7/64" 1600 ft

119 7/64" 1600 ft

120 7/64" 1600 ft

121 7/64" 1600 ft

122 7/64" 1600 ft

123 7/64" 1600 ft

124 7/64" 1700 ft

SECTION 01 11 00.00 25 Page 6

125 7/64" 1700 ft

126 7/64" 1700 ft

127 7/64" 1700 ft

128 7/64" 1700 ft

a. Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified and the various quantities will be adjusted when necessary.

b. Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Contractor must furnish any additional quantities required.

PART 2 PRODUCTS - NOT USED

PART 3 EXECUTION - NOT USED

-- End of Section --

SECTION 01 11 00.00 25 Page 7

Technical_Sections.pdf
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00.00 25 - SUMMARY OF WORK
01 11 00.00 25 - SUMMARY OF WORK
PART 1 GENERAL
1.1 SUMMARY
1.2 WORK COVERED BY CONTRACT DOCUMENTS
1.2.1 Project Description
1.2.2 Location
1.3 CONTRACT DRAWINGS
1.4 OCCUPANCY OF PREMISES
1.5 EXISTING WORK
1.6 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
PART 2 PRODUCTS - NOT USED
PART 3 EXECUTION - NOT USED