AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
PROJECT TITLE: BLUE RIVER EMERGENCY DIESEL GENERATOR REPLACEMENT
1. The purpose of this amendment is to update the technical specifications.
2. Section 31 00 00.00 25 Paragraph 1.3 has been updated.
3. All other terms and conditions remain unchanged.
POC for this ammendment is Derek Caputi, derek.caputi@usace.army.mil.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 30-Aug-2017
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N17B0019
X 9B. DATED (SEE ITEM 11)
04-Aug-2017
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
30-Aug-2017
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N17B0019
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
Blue River Emergency Diesel Generator (EDG) Replacement
PROJECT TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00.00 25 CONTRACT ADMINISTRATION DATA
01 10 10.00 25 CONTRACTOR'S OPERATIONS AND REQUIREMENTS
01 11 00.00 25 SUMMARY OF WORK
01 22 00.00 25 MEASUREMENT AND PAYMENT
01 32 01.00 25 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 35 26.00 25 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 25 QUALITY CONTROL
01 45 00.15 25 RESIDENT MANAGEMENT SYSTEM CONTRACTOR MODE (RMS CM)
01 57 19.00 25 TEMPORARY ENVIRONMENTAL CONTROLS
01 78 23.00 25 OPERATION AND MAINTENANCE DATA
01 78 39.00 25 PROJECT RECORD DOCUMENTS
DIVISION 02 - EXISTING CONDITIONS
02 82 14.00 25 ASBESTOS ABATEMENT WORK
02 83 13.00 20 LEAD IN CONSTRUCTION
DIVISION 03 - CONCRETE
03 30 00.00 25 CAST-IN-PLACE CONCRETE
DIVISION 04 - MASONRY
04 20 00.00 25 MASONRY
DIVISION 05 - METALS
05 50 00.00 28 METAL: STAIR RAILS AND FLOOR GRATING
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 72 20.00 28 GRAVITY-TYPE ROOF VENTILATORS
07 92 00.00 28 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13.00 28 STEEL DOORS AND FRAMES
08 33 23.00 28 OVERHEAD COILING DOORS
08 71 00.00 28 DOOR HARDWARE
08 91 00.00 28 METAL WALL LOUVERS
DIVISION 09 - FINISHES
09 90 00.10 28 PAINTS AND COATINGS
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19.10 28 PRE-ENGINEERED METAL BUILDING SYSTEMS
DIVISION 26 - ELECTRICAL
26 05 00.00 40 COMMON WORK RESULTS FOR ELECTRICAL
26 05 19.00 25 INSULATED WIRE AND CABLE
PROJECT TABLE OF CONTENTS Page 1
26 05 48.00 25 SEISMIC PROTECTION FOR ELECTRICAL AND MECHANICAL EQUIPMENT
26 08 00.00 25 APPARATUS INSPECTION AND TESTING
26 08 02.00 26 DIESEL ENGINE-GENERATOR COMMISSIONING
26 28 01.00 25 COORDINATED POWER SYSTEM PROTECTION
26 32 14.00 25 DIESEL-GENERATOR SET
26 36 00.00 25 AUTOMATIC TRANSFER SWITCH AND BY-PASS/ISOLATION SWITCH
26 51 00.00 25 LIGHTING
DIVISION 27 - COMMUNICATIONS
27 21 10.00 40 FIBER OPTIC DATA TRANSMISSION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00.00 25 EARTHWORK
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 31 13.53 25 HIGH-SECURITY CHAIN LINK FENCES AND GATES
DIVISION 33 - UTILITIES
33 71 02.00 25 UNDERGROUND ELECTRICAL DISTRIBUTION
-- End of Project Table of Contents --
PROJECT TABLE OF CONTENTS Page 2
SECTION TABLE OF CONTENTS
DIVISION 31 - EARTHWORK
SECTION 31 00 00.00 25
EARTHWORK
PART 1 GENERAL
1.1 REFERENCES
1.2 DEFINITIONS
1.2.1 Satisfactory Materials
1.2.2 Unsatisfactory Materials
1.2.3 Degree of Compaction
1.2.4 Hard/Unyielding Materials
1.2.5 Rock
1.2.6 Unstable Material
1.2.7 Select Granular Material
1.2.7.1 Structural Fill
1.2.8 Initial Backfill Material
1.3 SYSTEM DESCRIPTION
1.3.1 Classification of Excavation
1.3.1.1 Common Excavation
1.3.1.2 Rock Excavation
1.3.2 Blasting
1.4 SUBMITTALS
PART 2 PRODUCTS
2.1 BURIED WARNING AND IDENTIFICATION TAPE
2.1.1 Warning Tape for Metallic Piping
2.1.2 Detectable Warning Tape for Non-Metallic Piping
2.2 DETECTION WIRE FOR NON-METALLIC PIPING
PART 3 EXECUTION
3.1 GENERAL EXCAVATION
3.1.1 Ditches, Gutters, and Channel Changes
3.1.2 Drainage Structures
3.1.3 Drainage
3.1.4 Underground Utilities
3.1.5 Structural Excavation
3.2 GROUND SURFACE PREPARATION
3.2.1 General Requirements
3.2.2 Frozen Material
3.3 UTILIZATION OF EXCAVATED MATERIALS
3.4 BURIED TAPE AND DETECTION WIRE
3.4.1 Buried Warning and Identification Tape
3.4.2 Buried Detection Wire
3.5 BACKFILLING AND COMPACTION
3.5.1 Trench Backfill
3.5.1.1 Replacement of Unyielding Material
3.5.1.2 Replacement of Unstable Material
SECTION 31 00 00.00 25 Page 1
3.5.1.3 Bedding and Initial Backfill
3.5.2 Backfill for Appurtenances
3.6 SPECIAL REQUIREMENTS
3.6.1 Electrical Distribution System
3.7 SUBGRADE PREPARATION
3.7.1 Construction
3.7.2 Compaction
3.8 FINISHING
3.8.1 Subgrade and Embankments
3.8.2 Grading Around Structures
3.9 TESTING
3.9.1 Fill and Backfill Material Gradation
3.9.2 In-Place Densities
3.9.3 Check Tests on In-Place Densities
3.9.4 Optimum Moisture and Laboratory Maximum Density
3.9.5 Tolerance Tests for Subgrades
3.10 DISPOSITION OF SURPLUS MATERIAL
-- End of Section Table of Contents --
SECTION 31 00 00.00 25 Page 2
1.2.7 Select Granular Material
1.2.7.1 Structural Fill
a. Dense-Graded Aggregate should be used under all structures and pavements, and conform to following sieve analysis:
Sieve Size Percent Passing by Weight
1 inch 100
3/4 inches 90 - 100
3/8 inches 55 - 75
1/4 inches 40 - 60
No. 10 20 - 30
No. 200 0-5
b. Fracture of rounded rock must be determined according to ASTM D5821.
Provide at least one fractured face on 70 percent of the particles retained on the 1/4 inch sieve.
c. Submit all aggregate tests prior to placement.
1.2.8 Initial Backfill Material
Initial backfill consists of select granular material or satisfactory materials free from rocks 1 inches or larger in any dimension or free from rocks of such size as recommended by the pipe manufacturer, whichever is smaller.
1.3 SYSTEM DESCRIPTION
a. Hand-Auger borings are shown on the drawings. Surface elevations are as indicated on the drawings. The subsoil investigation concluded that 18 to 24 inches of Sandy SILT (fill) was underlain by hard rock.
Hard rock will be encountered at 18 to 24 inches below existing surface elevations, as shown on the drawings, within the area of the new building excavation. Ground water is not anticipated to be encountered. Pipes or other artificial obstructions, except those indicated, are not anticipated to be encountered. These data represent the best subsurface information available; however, variations may exist in the subsurface between boring locations.
Rock excavation in the area of the new pre-engineered metal building is minimally expected. Careful note should be given to drawing C-003 and the sections and details provided therein.
Sections A, B, and C demonstrate the new foundation and footings for the new building and contrast with the approximate location of bedrock and elevation 1370.
b. No explorations were performed outside of the building footprint, trenching and other excavations outside of the building footprint may encounter rock in the limits of excavation.
SECTION 31 00 00.00 25 Page 5
(1) Rock excavation for installation of fence posts shall be per paragraph 3.2, POST INSTALLATION of section 32 31 13.53 25, HIGH-SECURITY CHAIN LINK FENCES AND GATES. Depth of rock for fence post installation is assumed at 18 to 24 inches below existing surface elevations, similar to what is expected for the new building per paragraph 1.3.a above.
(2) Rock excavation for the ductbank work is only minimally expected to provide for proper sloping of the installed ductbank.
Rock depth is anticipated at 18" below existing surface elevation. Reference Details 1 & 2 of E-502 and section
33 71 02.00 25, UNDERGROUND ELECTRICAL DISTRIBUTION.
(3) Depth of rock in the area of the CMU wall is assumed at 18 to 24 inches below existing surface elevations, similar to what is expected for the new building per paragraph 1.3.a above. Rock excavation for the CMU wall is assumed to only be required per the Contractor provided shop drawings detailing the footings and/or foundation of the CMU wall noted in section 04 20 00.00 25, MASONRY.
c. For bidding purposes, assume that rock excavation will be required for all excavations greater than 18" below existing surface elevations.
1.3.1 Classification of Excavation
1.3.1.1 Common Excavation
Include common excavation with the satisfactory removal and disposal of all materials not classified as rock excavation.
1.3.1.2 Rock Excavation
Submit notification of encountering rock in the project. Include rock excavation with blasting, excavating, grading, disposing of material classified as rock, and the satisfactory removal and disposal of boulders 1/2 cubic yard or more in volume; solid rock; rock material that is in ledges, bedded deposits, and unstratified masses, which cannot be removed without systematic drilling and blasting; firmly cemented conglomerate deposits possessing the characteristics of solid rock impossible to remove without systematic drilling and blasting; and hard materials (see Definitions). Include the removal of any concrete or masonry structures, except pavements, exceeding 1/2 cubic yard in volume that may be encountered in the work in this classification. If at any time during excavation, the Contractor encounters material that may be classified as rock excavation, uncover such material and notify the Contracting Officer.
Do not proceed with the excavation of this material until the Contracting Officer has classified the materials as common excavation or rock excavation and has taken cross sections as required. Failure on the part of the Contractor to uncover such material, notify the Contracting Officer, and allow ample time for classification and cross sectioning of the undisturbed surface of such material will cause the forfeiture of the Contractor's right of claim to any classification or volume of material to be paid for other than that allowed by the Contracting Officer for the areas of work in which such deposits occur.
1.3.2 Blasting
Blasting will not be permitted. Remove material in an approved manner.
SECTION 31 00 00.00 25 Page 6
| A.02.02 W9127N17B0019 Amendment 0002 Blue River EDG |
| Technical_Sections |
| PROJECT TABLE OF CONTENTS |
| DIVISION 31 - EARTHWORK |
| 31 00 00.00 25 - EARTHWORK |
| 31 00 00.00 25 - EARTHWORK |
| PART 1 GENERAL |
| 1.2 DEFINITIONS |
| 1.2.7 Select Granular Material |
| 1.2.7.1 Structural Fill |
1.2.8 Initial Backfill Material
| 1.3 SYSTEM DESCRIPTION |
| 1.3.1 Classification of Excavation |
| 1.3.1.1 Common Excavation |
| 1.3.1.2 Rock Excavation |
1.3.2 Blasting
| [2]: [2] |
| Amd0002: AMD #0002 |