B.01.02_Abstract_17-B-0008.pdf

PDF 89 KB Posted

Attached to
Oregon Coast Clamshell Maintenance Dredging 2017
Solicitation number
W9127N-17-B-0008
Issued by

About this file

Bid Abstract for W9127N-17-B-0008

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO.2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1 PAGES

5/19/2017 6/28/2017

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY

X (WITHOUT PROFIT) 20% of bid price 20% of bid price

C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED (INCLUDING PROFIT) Amd. 0001 Amd. 0001

6. NUMBER OF ADDENDA ISSUED 1

7A.

ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT No. 1 vs IGE No. 2 vs IGE

0001 Mobilization and Demobilization 1 JOB 614,452.00$ 614,452.00$ 515,000.00$ 515,000.00$ 1,125,000.00$ 1,125,000.00$ -$ -16.2% 83.1% 0002 Dredging and Placement of Materials; Port Orford 25000 CY 7.40$ 185,000.00$ 6.50$ 162,500.00$ 13.25$ 331,250.00$ -$ -12.2% 79.1%

Dredging and Placement of Materials; Port Orford (OPTION)

10000 CY 7.79$ 77,900.00$ 5.60$ 56,000.00$ 15.00$ 150,000.00$ -$ -28.1% 92.6%

0004 Dredging and Placement of Materials; Baker Bay 80000 CY 9.44$ 755,200.00$ 6.50$ 520,000.00$ 11.50$ 920,000.00$ -$ -31.1% 21.8%

Dredging and Placement of Materials; Baker Bay (OPTION)

20000 CY 9.71$ 194,200.00$ 5.60$ 112,000.00$ 10.50$ 210,000.00$ -$ -42.3% 8.1%

Baker Bay; Photogrammetric Scow Load Measurement Testing (OPTION) 1 JOB 22,218.00$ 22,218.00$ 12,000.00$ 12,000.00$ 25,000.00$ 25,000.00$ -$ -46.0% 12.5%

Baker Bay; Photogrammetric Scow Load Measurement Testing (OPTION) 1 JOB 17,388.00$ 17,388.00$ 9,600.00$ 9,600.00$ 20,000.00$ 20,000.00$ -$ -44.8% 15.0%

0008 Dredging and Placement of Materials; Chinook 80000 CY 8.16$ 652,800.00$ 6.50$ 520,000.00$ 12.00$ 960,000.00$ -$ -20.3% 47.1%

Dredging and Placement of Materials; Chinook (OPTION)

20000 CY 8.39$ 167,800.00$ 5.60$ 112,000.00$ 12.00$ 240,000.00$ -$ -33.3% 43.0%

SUBTOTAL FOR MANDATORY LINE ITEMS 2,207,452.00$ 1,717,500.00$ 3,336,250.00$ -$ -22.2% 51.1% SUBTOTAL FOR OPTIONAL LINE ITEMS 479,506.00$ 301,600.00$ 645,000.00$ -$ -37.1% 34.5%

2,686,958.00$ 2,019,100.00$ 3,981,250.00$ -$ -24.9% 48.2%

NSN 7540-01-150-0981 1419-101

ABSTRACT OF OFFERS

W9127N-17-B-0008

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

HME Construction, Inc.

6801 NW Old Lower River Road Vancouver, WA 98660

Oregon Coast Clamshell Maintenance Dredging 2017

7B. DESCRIPTION OF OFFERED ITEM

7C. EST D.

TOTAL

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

J.E. McAmis, Inc.

621 Country Drive Chico, CA 95928

B. BID SECURITY B. BID SECURITY

STANDARD FORM 1419 (10-3)

Sheet1

2017-06-28T16:49:56-0700
BOONE.DAVID.C.1272229755

File details come from the government source that posted it. Updated .