USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W66QKZ62352300
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This solicitation is amended to extend the due date to 27 September 2016 04:00 PM local time, clarify the Statement of Work for the submittals required w ith the proposal, and clarify the bid schedule. Changes made to the SOW for this amendment are highlighted yellow .
Offerors must acknow ledge the receipt of all solicitation amendments.
All other terms and conditions remain the same.
The POC for this amendment is Patrick Collins 503-808-4594, patrick.collins@usace.army.mil.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 9
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 26-Sep-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0100
X 9B. DATED (SEE ITEM 11)
28-Aug-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
26-Sep-2016
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
FACILITY CODECODE
EMAIL:TEL:
W9127N-16-R-0100
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
AMENDMENT 04
This solicitation is amended to extend the due date to 27 September 2016 04:00 PM local time, clarify the Statement of Work for the submittals required with the proposal, and clarify the bid schedule.
Changes made to the SOW for this amendment are highlighted yellow.
CLIN 0001 pricing must include shipping, if applicable, FOB Destination.
Offerors must acknowledge the receipt of all solicitation amendments.
All other terms and conditions remain the same.
The POC for this amendment is Patrick Collins 503‐808‐4594, patrick.collins@usace.army.mil.
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 15-Sep-2016 10:00 AM to 27-Sep-2016 04:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN extended description has changed from See Statement of Work for details.FOB Destination to Including Shipping FOB DestinationSee Statement of Work for details.FOB Destination.
The following have been modified:
OFFER SUBMISSION INSTRUCTIONS
SUBMISSION
In order for a quote to be considered responsive, the contractor must submit the following information listed below electronically to Patrick.Collins@usace.army.mil no later than 04:00 PM 27 September 2016. Electronic submission is required; however, if the offeror prefers to submit their quotes via mail, the shipping address is listed below. Facsimile (FAX) Proposal responses are NOT accepted.
Department of the Army Corps of Engineers – Portland District Attn: CECT-NWP-S, Patrick Collins 333 SW First Avenue Portland, Oregon 97204-3440
INQUIRIES
All inquiries regarding this solicitation are to be submitted BY EMAIL TO Patrick Collins Patrick.Collins@usace.army.mil.
NOTE: No response to inquiries will be posted after the Close of Business on the third business day preceding the solicitation due date. All bidders will be held to have reviewed the questions and responses in FedBizOps (www.FBO.gov) prior to bid submission. Nothing in the solicitation is changed unless an amendment is issued.
The Government intends to award a contract without discussions, but reserves the right to enter into discussions.
OFFEROR'S CHECKLIST
OFFEROR CHECK LIST
PROJECT TITLE: Truckable Towboat, U.S. Army Corps of Engineers, Portland District John Day Willow Creek Project
SOLICITATION NUMBER: W9127N-16-R-0100
In order for an offer to be considered responsive, the Offeror shall submit the information listed in the checklist below. Failure to submit all the required information prior to the closing of the solicitation will result in the offer being nonresponsive.
Responsive Quote Submission Checklist:
Offeror's Initials of Items
Included in Submission:
1 Reserved. 1
Signed Amendment(s) if applicable (SF30 Signed and Dated – Block 15):
Bid Schedule: Unit price, Amount, and Grand Total
Contractor completed Certifications and Representations Per FAR Clause 52.212-3 (or https://www.sam.gov/), 52.204-17, 52.204-20, 52.209-2, 52.209-11, 252.209- 7992, 252.209-7994, 252.209-7995, 252.209-7996, 252.209-7997, 252.209-7998, and 252.209-7999.
Written specifications of the proposed vessel and general arrangement plan and profile drawing of the pilothouse helm arrangement, decks, engine room, and all major equipment layouts per the SOW.
6 Reserved 6
STATEMENT OF WORK
Description /Specifications New 25’ John Day Work Boat Fabrication
For U.S. Army Corps of Engineers, Portland District
John Day Willow Creek Project
These specifications cover the manufacture, outfitting, and delivery, of one new, complete, ready for fresh water operation, all steel, twin diesel engine powered, propeller driven truckable towboat. The contractor shall provide all labor, material, equipment and engineering necessary to build a current commercially available stock truckable towboat. However, modifications to the design may be made by these specifications. The offeror shall furnish one copy of written specifications, to include the weight of the equipped vessel with fuel, for the proposed vessel;
and a general arrangement plan and profile drawing of the pilothouse helm arrangement, decks, engine room, and all major equipment layouts to the Contracting Officer as part of the Proposal.
1. DESCRIPTION OF WORK
1.1 The vessel shall comply with all current U.S. Coast Guard Regulations for Uninspected Towing Vessels, US Army Corps of Engineers Safety Manual (EM 385-1-1), Federal and State environmental requirements with respect to a vessel’s function, construction and equipment outfitting.
1.2 The vessel shall be newly manufactured and constructed from a commercial design, stock model, and shall be built entirely of steel (see 2.1.1) by a proven manufacturer regularly engaged in the manufacture of truckable welded steel towboats. A custom built boat is not desired but modifications to the stock model design will be permitted and shall be made by the manufacturer to comply with these specifications.
1.3 The vessel is to be used as a push boat in a fresh water environment and shall reflect that type of construction inside and out. The vessel's hull shall be properly reinforced for operations on inland waterways of the Columbia River in the Pacific Northwest.
1.4 The general layout of the vessel shall incorporate a fully enclosed pilot house, engine room access hatches and a walking space all around the outside of the vessel. The engines shall be installed under the deck in a separate watertight compartment. A watertight tank compartment or lazarette shall be aft of the engine compartment to suit trim of the vessel. The pilot house shall have a watertight access door to the outside. The pilot house and deck house shall have windows on the forward, aft, port and starboard sides.
1.5 All welding shall be accomplished in accordance with the recommendations of the manufacturer of the material used in the construction of the vessel. All sharp and /or rough edges shall be ground round and smooth and all weld splatter and slag shall be removed. All exterior seams and butts shall be flush and smooth and the hull plating shall be shrunk as required to remove all ripples and make fair.
2. TOWBOAT SPECIFICATIONS (Minimum Requirements)
2.1. Hull
2.1.1. Length: 25 ½ Feet (maximum)
2.1.2. Width: 12 – 14 Feet
2.1.3. Depth: 5 Feet
2.1.4. Freeboard: 15” fully loaded in fresh water
2.1.5. Weight: 40,000 lb.’s (maximum)
2.1.6. Material: ASTM A-36 steel
2.1.7. Shell Plating: 1/4” steel plate (minimum)
2.1.8. Bulwarks: Continuous all around hull.
2.1.9. Handrail: Port, Starboard and aft of the vessel. Port and starboard handrail shall have a 36” opening for loading and offloading personnel with 2 lengths of stainless steel chain between the openings.
2.1.10. Rub Bars: Down each side of hull
2.1.11. Bulkheads: Two watertight transverse bulkheads shall be installed, one forward of the engine room and one aft of the engine room.
2.1.12. Hatches: Watertight hatches in deck: two into engine compartment and one into forward compartment. In engine room one watertight hatch in forward collision bulkhead into forward compartment and one watertight hatch in aft bulkhead into aft rudder/ballast compartment.
2.2. Push-knees: Push knees shall be 9 feet overall height faced with a minimum of 2 inch thick rubber pads.
2.3. Bitts: One 5 inch (minimum) OD double towing bitt aft, one 4 inch OD single head bitt forward, and four 4 inch OD single quarter bitts. Head bitt and tow bitt must penetrate deck and be welded to the hull.
2.4. Lifting Eyes: Four permanent eye straps welded to the hull, suitably sized for lifting the vessel. Picking / Lifting eyes are also required on the pilothouse and superstructure section (if equipped) to ensure the truckable capability of the vessel. Ensure handrail is not impacted by picking of the vessel.
2.5. Winches: Two main deck 5 ton manual wire winches bow mounted.
2.6. Pilot House
2.6.1. Floor Height: Pilothouse deck must be a minimum of 7’ from water level at maximum draft.
2.6.2. Eye Level: Minimum of 14’ standing inside the pilothouse.
2.6.3. Handrail: Shall be installed on the stairs and elevated platform leading into the pilothouse.
2.6.4. Dimensions: Sloping forward window and visor around roofline. Watertight steel door.
2.6.5. Windows: Stationary front window shall be tilted forward with windshield wiper. Horizontal sliding side windows, vertical sliding rear windows with one mounted in the pilot house door. All windows made of tempered safety glass. Pilot house windows shall be tinted (in accordance to Coast Guard specifications).
2.7. Engine: Two diesel engines, 250 HP minimum each operated at an intermediate duty rating, mounted on vibration isolators.
2.8. Engine Room Ventilation: External air to engine room – two J box vents.
2.9. Exhaust: Must be heat insulated in engine room. Exposed exhaust pipes top side must be guarded against accidental touching. Mufflers must meet residential standard. Exhaust pipes shall extend above the pilothouse and not impede the view of the pilot.
2.10. Transmission: Two Twin Disc, 1 speed forward and 1 speed reverse reduction gears, or approved equal.
Propeller shafts shall be made of 2 ½” Stainless steel.
2.11. Engine Cooling: Engine shall be cooled by keel coolers, size determined by manufacturer recommendation for operating in water temperature up to 78 degrees.
2.12. Controls & Steering
2.12.1. Steering: Two hydraulic pumps, one driven off each engine. Control valve and flow regulator mounted in engine room. Steering and jog stick provided in the pilothouse.
2.12.2. Controls: Engine controls shall be located in the pilothouse. Start/stop/emergency engine shutdown in engine room and pilothouse.
2.13. Propellers (Bronze): 4 blades per propeller with a minimum of 30” diameter.
2.14. Shaft Seals: Dripless mechanical shaft seals or equivalent to meet industry standards.
2.15. Rudders: Two main steering rudders and four flanking rudders. Rudder skegs must support full weight of boat to protect rudders/propellers.
2.16. Propeller Guards: Vessel shall be equipped with a propeller, rudder and shaft guard “stump jumper”, for both port and starboard propellers. Guard design shall be submitted for review and approval prior to fabrication and installation.
2.17. Fuel Tank: Minimum of 350 gallons with emergency fuel shut off above the weather deck.
2.18. Engine Access: Shipping access to engine room, must be large enough to remove engines, and watertight.
2.19. Electric
2.19.1. Batteries: Two 12-volt heavy-duty 8D marine batteries mounted in Coast Guard approved engine room battery box.
2.19.2. Lights: LED lights installed in the pilothouse and engine room. Two aft facing LED (500 watt equivalent) working lights. Two forward facing LED (500 watt equivalent) working lights.
Navigation and towing lights per COLREGS 72 inland rules. One 8 inch (minimum) search light mounted on pilothouse.
2.20. Instrumentation & Other equipment
2.20.1. Pilothouse: Rudder angle indicators for both standard and flanking rudders. Engine tachometer, oil pressure, water temperature, and volt meter for each engine in pilothouse and in engine room.
Audible and visual alarm for low oil and high temperature. Coolant tank and fuel tank level indicators. 12-volt electric or air signal horn per COLREGS 72 inland rules.
2.20.2. Electronics: VHF marine radio with hailer with antenna. Depth sounder with a hull mounted transducer.
2.20.3. Bilge Pump: Two (minimum) 12-volt 1,200 GPH pump.
2.21. Paint: All plates and shapes shall be blasted and coated with a pre- construction primer. Exterior hull, decks and pilot house shall be coated with two-part epoxy anti-corrosive steel primer (international Coatings 300V or equivalent). Hull, decks, and house shall then be coated with one coat of International Interthane 990, or equivalent marine topcoat. Engine Room shall be coated with two-part epoxy topcoat.
Non skid to be applied to the main deck and top of engine cover and flying bridge. The paint system shall be formulated for the marine environment and have superior anti-corrosive, coverage, and impact resistance properties. Colors: hull black, superstructure white, decks and engine room gray. Anodes shall be installed on hull below the waterline. Anti-fouling coating shall be applied to the hull with International Interspeed 6400NA (red in color) or equivalent.
2.22. Safety & Security: All engine room vents fitted with solid closing flaps to stop air flow. Pilothouse and engine room all lockable from outside with two sets of keys provided.
2.23. Tech Manuals: Three sets each – operating instructions, maintenance/service, and parts. (English)
2.24. Drawings: Must provide 3 sets of as-built drawings of hull, pilothouse, superstructure (if equipped), propeller shafts, seals, propellers, rudders; fuel, hydraulic, and electrical systems; showing full details of the construction of the vessel.
2.25. Delivery: FOB Destination. Safe and timely delivery of the towboat to Rufus Oregon. The John Day Structural Crew will provide crane support during the unloading of the boat from the trailer including all required equipment, spreader bars and slings as needed.
3. WARRANTY & TRIALS
3.1. Warranty
Builder to warrant workmanship and equipment installation for one (1) year (minimum or longer if builder’s standard practice). Builder to provide all equipment and materials warranty/guarantee documents to purchaser at point of delivery.
3.2. Sea Trial
The vessel must undergo an in-water fresh water sea trial observed by a representative of the Contracting Officer, that demonstrates that hull, mechanical, and electrical systems function properly and that the vessel meets minimum freeboard requirements.
3.2.1. Trials
General:
The trials described in these paragraphs shall be conducted in the presence of the Contracting Officer or an authorized representative, who shall be notified of the date set for the trials at least 10 working days in advance. Two sea trails shall be conducted, one pre-delivery, conducted near the contractors build site and one post-delivery near Rufus Oregon.
Should any defects develop during the trials, the contractor shall immediately correct deficiencies, after which the boat shall again be operated under the same working conditions until found satisfactory by the Contracting Officer or representative. Upon completion of the trials, the Contractor shall open for inspection such items of machinery and piping which, in the opinion of the Contracting Officer or representative, have demonstrated indications of misalignment, need of adjustment, cleaning or other preparation/attention for satisfactory performance.
The Contractor shall bear all expenses of these trials, including the furnishing of all necessary instruments, scales, grease, supplies, lubricating and fuel oils, and mechanics, technicians and operating personnel. The test data consisting of all readings taken shall be compiled in a log by the Contractor. Two copies of the logs and the calculations and results of the appropriate data for the vessel shall be furnished to the Contracting Officer.
Subsequent to preliminary trials and preliminary acceptance by the Government, the Contractor shall dry dock the vessel or provide crane support for inspection of the underwater hull appendages by the Contracting Officer or their designated representative. Subsequent to the final trails near Rufus Oregon, the John Day Structural Crew will provide crane support to conduct the final inspection of the underwater hull appendages by the Contracting Officer or their designated representative.
After satisfactory completion of the preliminary and final trials and inspection of the completed boat, acceptance by the government shall be made.
Preliminary / Final Trials
Dock Trials:
Upon delivery and assembly of the boat as required by the contract, the machinery, equipment and appliances shall be tested at the site of delivery for a continuous period of not less than four hours to demonstrate their suitability for the purpose intended and to check installation and make adjustments. The propelling engines shall be operated at the dock with as much load as practicable for a continuous period of no less than four hours with no unsatisfactory performance. Dock tests of all installed equipment shall be to the satisfaction of the Contracting Officer or representative.
Operational Trials
- Free Running: Following satisfactory completion of the dock trials specified above, the boat shall be operated for a continuous period of not less than four (4) hours with no engine overheating or other unsatisfactory performances. During this time all phases of engine and steering controls shall be operated through their full range with the vessel fully loaded. Test weights shall be provided if necessary to simulate this loading.
During this trial, the boat shall be operated for periods of not less than 15 minutes each at full, three-quarter, half, and one-quarter speeds; as well as maneuvered from hard-over to hard-over, be brought to a crash stop, and brought from full engine speed ahead to full engine speed astern, and the time of each of the maneuvers recorded.
- Towing/Pushing: Following satisfactory completion of the Free Running trial specified above, the boat shall be similarly operated for an additional continuous period of not less than four (4) hours, while towing and pushing a barge loaded in a manner that simulates normal working conditions.
During each trial, the following data (at a minimum) shall be recorded: the RPM of each propeller; time over the course; oil pressure and consumption, engine jacket water temperature; fuel consumption; and any other data required by the Contracting Officer or his representative. Engine data shall be recorded separately for each propulsion engine.
In addition to the above data for each trial, the following general information shall be furnished:
Outside air temperature Engine room temperature (hatch closed) Date of trials Signature of data takers and observers
4. ANTITERRORISM/OPERATION SECURITY REQUIREMENTS
4.1. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
4.2. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.