W9127N-16-R-0076 Rogue River Basin Project Janitorial Services RFP

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9127N-16-R-0076 07-Sep-2016

b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME

10:00 AM 20 Sep 2016

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9127N9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

PATRICK COLLINS

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

W66QKZ60912138

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESS X

WOMEN-OWNED SMALL

BUSINESS (WOSB)

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

US ARMY CORPS OF ENGINEERS

JEFFREY RENNER

PO BOX 2946

PORTLAND OR 97208-2946

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W81WL4 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

ROGUE RIVER BASIN PROJECT

CENWP-OD-R

USACE PORTLAND DISTRICT

100 COLE M RIVERS DRIVE

TRAIL OR 97541-9607

TEL: FAX:

503-808-4605FAX:

TEL: 503-808-4630 SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

SIZE STANDARD:

$18 Million

NAICS:

561720

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF112

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

Section SF 30 - BLOCK 14 CONTINUATION PAGE

INSTRUCTIONS TO OFFERORS

OFFEROR’S CHECKLIST

PROJECT TITLE: Janitorial Services, Rogue River Basin Project, Portland District

SOLICITATION NUMBER: W9127N-16-R-0076

In order for an offer to be considered responsive, the Offeror shall submit the information listed in the checklist below. Failure to submit all the required information prior to the closing of the solicitation will result in the offer being nonresponsive.

Responsive Quote Submission Checklist:

Offeror's Initials of Items

Included in Submission:

1 Signed Standard Form 1449 – Blocks 17 and 30. 1

Signed Amendment(s) if applicable (SF30 Signed and Dated – Block 15):

Bid Schedule: Unit price, Amount, and Appendix C - Pricing

Contractor completed Certifications and Representations Per FAR Clause 52.212-3 (or https://www.sam.gov/), 52.204-7, 52.204-20, 52.209-2, 52.209-11, 52.219-1 Alt 1, and 252.209-7999.

Factor 1- Recent and Relevant Experience Per FAR Clause 52.212-2 Evaluation of Commercial Items

Factor 2 - Past Performance Factor 2 Per FAR Clause 52.212-2 Evaluation of Commercial Items

Offeror’s shall submit their proposal in accordance with Block 8 of the SF1449 and submit electronically to Patrick.Collins@usace.army.mil in a .PDF file. If an offeror is submitting a hard copy, then the offeror shall also include an electronic compact disk as well also in a .PDF format. Hard copies shall be sent to:

USACE, Portland District Attn: CECT-NWP-S, P. Collins Subject: W9127N-16-R-0076, RRB Janitorial Services 333 SW 1st Ave.

Portland, Or 97204-2946

INQUIRIES

All inquiries regarding this solicitation shall be submitted by EMAIL to Patrick Collins Patrick.Collins@usace.army.mil.

NOTE: No response to inquiries will be posted after the Close of Business on the third business day preceding the solicitation due date. All offerors will be held to have reviewed the questions and responses in FedBizOps (www.FBO.gov) prior to bid submission. Nothing in the solicitation is changed unless an amendment is issued.

SITE VISIT

There will be a scheduled site visit on Wednesday 14 September 2016. Interested contractors shall RSVP with Patrick Collins No Later Than 3:00 p.m. 12 September 2016 local time by email at Patrick.Collins@usace.army.mil.

Refer to “W9127N-16-R-0076 Site Visit” in the subject line of your response.

RSVP shall include attendee names and organization name.

In the event that no RSVPs have been received by the suspense time, the site visit will be cancelled and a notice will be posted on www.FBO.gov.

Date: 14 September 2016 Time: 12:30pm Location: Rogue River Basin Project Office

100 Cole M. Rivers Dr.

Trail, OR 97541

Note: Please follow signs for Fish Hatchery and take left at last Y intersection (Fish Hatchery will be on right).

Online maps/GPS sometimes direct to the other side of the river or towards the lake.

Attendance limited to 2 employees per contractor

PPE required: Hardhat, safety toe boots, vest. The Government can provide the hardhat and vest.

Agenda:

Powerhouse Tour 12:30 - 1:00pm Office Tour 1:00 - 1:30pm Riversedge and McGregor Park 1:30 - 2:30 pm.

Takelma Boat Ramp, Day Use, 4 Corners Campground, Lost Creek Trailhead 2:30 - 4:00 pm Lower Elk Creek Trailhead 4:00 – 5:00pm Listed times include driving between locations.

Section SF 1449 - CONTINUATION SHEET

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Job

PROJECT OFFICE JOINT JANITORIAL SERVICES

FFP

Base Year

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.6 FOB: Destination

MILSTRIP: W66QKZ60912138

PURCHASE REQUEST NUMBER: W66QKZ60912138

NET AMT

0002 1 Job

RECREATION JANITORIAL SERVICES

FFP

Base Year

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.4, 5.5, 5.8, 5.9, 5.10, 5.11, 5.12, 5.13, and 5.14 FOB: Destination

0003 1 Job

POWER HOUSE JANITORIAL SERVICES

FFP

Base Year

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.7 FOB: Destination

0004 1 Job

ELK CREEK JANITORIAL SERVICES

FFP

Base Year

Per Performance Work Statement Sections 5.1, 5.2, 5.4, 5.13, and 5.14 FOB: Destination

1001 1 Job

OPTION PROJECT OFFICE JOINT JANITORIAL SERVICES

FFP

Option Year One

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.6 FOB: Destination

1002 1 Job

OPTION RECREATION JANITORIAL SERVICES

FFP

Option Year One

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.4, 5.5, 5.8, 5.9, 5.10, 5.11, 5.12, 5.13, and 5.14

1003 1 Job

OPTION POWER HOUSE JANITORIAL SERVICES

FFP

Base Year

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.7

1004 1 Job

OPTION ELK CREEK JANITORIAL SERVICES

FFP

Base Year

Per Performance Work Statement Sections 5.1, 5.2, 5.4, 5.13, and 5.14

2001 1 Job

OPTION PROJECT OFFICE JOINT JANITORIAL SERVICES

FFP

Option Year Two

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.6

2002 1 Job

OPTION RECREATION JANITORIAL SERVICES

FFP

Option Year Two

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.4, 5.5, 5.8, 5.9, 5.10, 5.11, 5.12, 5.13, and 5.14

2003 1 Job

OPTION POWER HOUSE JANITORIAL SERVICES

FFP

Option Year Two

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.7

2004 1 Job

OPTION ELK CREEK JANITORIAL SERVICES

FFP

Base Year

Per Performance Work Statement Sections 5.1, 5.2, 5.4, 5.13, and 5.14

3001 1 Job

OPTION PROJECT OFFICE JOINT JANITORIAL SERVICES

FFP

Option Year Three

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.6

3002 1 Job

OPTION RECREATION JANITORIAL SERVICES

FFP

Option Year Three

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.4, 5.5, 5.8, 5.9, 5.10, 5.11, 5.12, 5.13, and 5.14

3003 1 Job

OPTION POWER HOUSE JANITORIAL SERVICES

FFP

Option Year Three

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.7

3004 1 Job

OPTION ELK CREEK JANITORIAL SERVICES

FFP

Base Year

Per Performance Work Statement Sections 5.1, 5.2, 5.4, 5.13, and 5.14

4001 1 Job

OPTION PROJECT OFFICE JOINT JANITORIAL SERVICES

FFP

Option Year Four

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.6

4002 1 Job

OPTION RECREATION JANITORIAL SERVICES

FFP

Option Year Four

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.4, 5.5, 5.8, 5.9, 5.10, 5.11, 5.12, 5.13, and 5.14

4003 1 Job

OPTION POWER HOUSE JANITORIAL SERVICES

FFP

Option Year Four

Per Performance Work Statement Sections 5.1, 5.2, 5.3, 5.7

4004 1 Job

OPTION ELK CREEK JANITORIAL SERVICES

FFP

Base Year

Per Performance Work Statement Sections 5.1, 5.2, 5.4, 5.13, and 5.14

STATEMENT OF WORK

Performance Work Statement for Janitorial Services Rogue Basin Projects, Jackson County, Oregon

Lost Creek Lake and Elk Creek Project

1.0 General Statement. The Contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision, and other items and services necessary to perform janitorial services as defined in this Performance Work Statement (PWS) at the Rogue Basin Project in Oregon. Locations for work to be conducted include: Lost Creek Lake and Elk Creek Project. The Contractor shall perform to the standards in the contract and comply with all local, state, and federal regulations during the services performed.

This firm fixed priced contract is for a one year base period and four one year option years to be exercised at the Government’s discretion.

The Period of Performance is anticipated to be:

Base Year: 18 October 2016 through 17 October 2017 Option Year 1: 18 October 2017 through 17 October 2018 Option Year 2: 18 October 2018 through 17 October 2019 Option Year 3: 18 October 2019 through 17 October 2020 Option Year 4: 18 October 2020 through 17 October 2021

2.0 Definitions. Throughout this PWS terms are defined as follows:

Acceptable Quality Level (AQL): Acceptable Quality Level equals the performance standards listed in 5.1 through 5.12. The Contractor must re-perform all unsatisfactory work unless excused by the QAE.

Contracting Officer (KO): The Government employee who is authorized to enter into, administer, and/or terminate contracts and make related determinations and findings.

Contracting Officer’s Representative (COR): The Government employee who has been authorized in writing as the Contracting Officer’s Representative, acting within the limits of their authority.

Quality Assurance Evaluator (QAE): The Government employees responsible for checking Contractor performance.

Contract Discrepancy Report (CDR): A written record of unsatisfactory performance by the contractor as observed by the QAE.

Rogue Basin Project (RRBP): The destination of where the contract is to take place.

Task Order: order from government depicting quantity and duration of service to be provided.

Personnel Risk Assessment (PRA)

3.0 Government Will Furnish

3.1 The Government shall furnish without cost to the Contractor keys (see section 7.2.3), the normal amounts of utilities, except for telephone service, to be used only in connection with the performance of the work.

The use of areas by the Contractor and the Contractor’s employees shall be limited to the storage of supplies, equipment, and a lunch/break area.

3.2 Waste basket and trash can liners, dispenser soap and hand sanitizer, paper towels, and toilet tissue for use under this contract.

4.0 Contractor Shall Furnish

4.1 The Contractor shall furnish all labor and equipment necessary to perform the work required under these specifications. Equipment shall be industrial grade. Contractor shall provide an equipment list (make, brand, and model) for approval prior to beginning this contract. Any changes to the equipment list throughout the period of this contract shall be submitted to the COR.

4.2 All equipment shall have adequate bumpers and guards to prevent marking or scratching of fixtures, furnishings or building surfaces.

4.3 All electrical equipment used by the Contractor or the Contractor’s employees shall meet all applicable safety requirements. This equipment shall operate at full rated performance levels using existing building circuits. It shall be the responsibility of the Contractor to prevent the operation, or attempted operation, of electrical equipment or combinations of equipment, which require powers exceeding the capacity of existing building circuits.

4.4 Contractor will also furnish all the following items but not limited to: approved cleaning agents, deodorizers, waxes and sealers, all cleaning tools, glass and window cleaning equipment, and cloth towels.

The Contractor shall provide the MSDS list of all chemicals being used on the project and are subject to the Government’s approval.

4.5 The Contractor shall insure that all employees are capable of demonstrating adequate knowledge of chemicals, tools, equipment, and techniques necessary to competently perform the work.

4.6 Upon completion of this contract and prior to final payment being made, the Contractor and the

Contractor’s employees shall vacate such building space within 3 working days after the effective date of completion and within 10 days after completion shall restore the buildings and grounds to their original condition as existed when the Contractor initially occupied the space.

5.0 Performance Standards and Guideline Requirements (Also see Paragraph 6.0)

The Contractor shall maintain the building and grounds listed in Appendix B. Specific recreation area dates for opening and closing may be found in Appendix B. The Contractor shall provide sufficient supplies, materials, and equipment to adequately maintain the premises at an acceptable level of clean as outlined in this contract. The Contractor is responsible for all work areas, janitorial storage areas, recreation areas, powerhouse, offices, kitchens, visitor center, boat ramps, buildings and grounds, and break areas. The Contractor shall maintain these areas in accordance with these guidelines.

The following guidelines describe what is considered clean for intended services under this contract. The Contractor, through innovation, technology, or other means, shall perform the necessary cleaning services in order to meet the quality and performance standards at frequencies determined by the Contract.

The following guidelines are for reference only and final results shall be the determining factor for the success or failure of this contract. Performance shall be based on the Contracting Officer’s or their designated representative’s evaluation of performance and quality results, not the frequency or method of performance.

5.1 Janitorial Specifications

This section contains general specification and work requirements that are applicable to the janitorial work contained in this contract. The items in this section are listed as separate bid items according to location in the Bid Schedule General requirements for all cleanings. During each cleaning the contractor shall:

(1) Insure that each area is clean, sanitary, and fresh smelling. Appearance or smell to the contrary will be considered as evidence of noncompliance with the cleaning specifications

(2) When cleaning restrooms, signs will be posted to inform the public that the area is closed for cleaning and warn of slipping hazards. These signs will be setup to block entrances to restrooms that are being cleaned. Restroom sections will be closed only when actual cleaning is being performed so as to allow minimum “downtime” of facilities and promote optimum use of the facilities to the public. Only when floors are in a safe condition (those that do not pose a slipping hazard), will the contractor reopen restrooms for public use. Remove and return to the storage area all signs used to block the entrance during cleanings. Contractor will supply required signs after COR approval.

(3) Proper etiquette shall be observed when approaching public restrooms, especially vault toilets for servicing. To ensure facility is not occupied, Contractor shall knock on the door, verbally identifying him/her self. Contractor must make appropriate effort to guarantee unit is empty before entering to conduct the cleaning service.

(4) Report all damaged vents, screens, latches, hinges, springs, handles, and toilet paper holders in each restroom to the QAE within 24 hours of discovering the damage. If for any reason a restroom is not suitable for public use it shall be locked and the QAE notified as soon as possible.

(5) Floors. The square footage for all floors is contained in inventory and descriptions, Appendix

G. The areas are broken down as to type of floor. All areas must be cleaned in such a manner as to allow use the following day with no noticeable ill effects. All floors requiring polish and buffing must be stripped and waxed within thirty days of the start of this contract. All stripping, waxing and buffing following the initial stripping will be completed according to contract specification under Section 5. (Powerhouse stripping to be coordinated with COR and identified in the schedule) All carpeted areas will be steam cleaned within thirty days of the start of this contract and as prescribed in Section 5 thereafter.

5.1.1 Disposal of Cleaning Water: Waste cleaning water used to clean the water borne restrooms and vaults shall be disposed of in the water borne toilets only. At no time shall the contractor dispose of wastewater by dumping it on the ground anywhere within the contract area, in the urinals or sinks, or in any of the vault toilets.

5.1.2 Cleaning Frequencies: Frequencies required for each work item are contained in the cleaning schedules in

Appendix B.

5.1.3 Performance Standards: Cleaning specifications for services conducted in each maintenance area are contained in Section 5 Performance Standards and Guideline Requirements.

5.2 Janitorial Services - Office, Shop, Visitor Center, Powerhouse, and Dam Facilities

5.2.1 Carpets: shall be clean and free of dirt, debris, and obvious spots and stains. Carpet vacuuming shall be accomplished as needed to meet the quality standard. The contractor will ensure areas beneath area and throw rugs are serviced and rugs are replaced to their original locations.

5.2.2 Flooring: shall be swept, dust mopped, wet mopped as needed, to ensure they are kept free of dirt, debris, and foreign materials and shall be maintained at a reasonable level of luster necessary to meet the performance standards. This includes areas behind furniture. Floor maintenance includes cost for other services necessary to maintain floors to meet the quality standard. All stairwell transitions within offices shall receive services.

5.2.3 Trash/Recycling: shall be collected from all waste baskets, garbage cans, pencil sharpeners and other trash containers in the areas and removed to an on-site location designated by the COR. Recycling bins shall be emptied into the large bin behind office as designated by the COR. Trash and recycling containers shall be returned to original location, lined and kept free of odors, dirt, stains, and debris. Boxes, cans, paper, etc., placed near a trash receptacle or in the hall and marked “TRASH” shall be removed. Trash and recycling shall be prevented from blowing out of dumpsters and containers when emptying such content into the designated receptacles.

5.2.4 Windows, glass, and mirrors: shall be clean, free of dirt, grime, streaks, cloudiness, and water spots.

Surrounding areas shall be free of standing water, drips, or watermarks. After cleaning, the windows, glass and mirrors shall be clean, free of dirt, grime, streaks, cloudiness and water spots, and cobwebs.

Surrounding areas including frames shall be cleaned and free of standing water. All interior and exterior windows shall be spot cleaned.

5.2.5 Dusting: shall include desks, chairs, file cabinets, fans, file holders, interpretive displays, blinds, window sills and tracks, fixtures, air vent grills, electronic equipment and other types of office furniture and equipment. Items on desktops are NOT to be disturbed, but should be dusted around. Items on other surfaces may be moved in order to dust but must be replaced to their original position. Dusting shall mean removal of soil from the area.

5.2.6 Walls, doors and interior partitions: including areas behind furniture shall be free of cobwebs, debris, nonpermanent marks, and dirt to a height of 10 feet in all powerhouses. There are no height restrictions for all project offices.

5.2.7 Fluorescent light fixtures: shall be free of dust, dirt, debris, cobwebs, streaks, insects and detergent residue. This includes inside the fixtures.

5.2.8 Concrete entryways: shall be free of dirt, debris, and foreign materials. Exterior doors and walls and areas adjacent to entryways and walk ways shall be free of dirt, debris, spider webs, insect nests and other foreign materials.

5.2.9 Drinking fountains: shall be free of all streaks, stains, scales, scum, rust stains, food debris, dirt, bacteria, odors, and other extraneous matters.

5.2.10 All other spaces or surfaces not specifically mentioned and located in areas covered by this contract shall be free of obvious dirt, debris, streaks, film, and dust.

5.2.11 Restrooms and Wash Stations: shall be cleaned, swept, mopped, and disinfected to maintain all fixtures at a reasonable level of shine and cleanliness. Floors shall be sanitized and maintained to ensure that there is not a buildup of dirt, debris, or bacteria. Partitions and walls shall be free of obvious dirt, graffiti, dust, or any other extraneous matter. Toilet bowls and urinals shall be cleaned and sanitized; after cleaning, the entire surface shall be free from streaks, stains, scale, scum, mineral deposits, rust stains, and other bodily waste products and dirt. Plumbing fixtures shall be free of streaks, stains, scale, scum, urine deposit, and rust stains. Contractor shall ensure that restrooms have a clean and pleasant odor. Restrooms shall be stocked with necessary toilet tissue, paper towels, and hand soap or sanitizer so that there are sufficient supplies until the next scheduled cleaning. Corps employee restrooms will be stocked with 2-ply toilet tissue and all recreation area or public restrooms will be stocked with 1-ply toilet tissue.

5.2.12 Kitchen and Break Rooms: shall be cleaned, swept, mopped, and disinfected. All surfaces including the floor, table, counters, door, window sills, and inside the microwave, shall be free from streaks, stains, scales, scum, rust stains, food debris, dirt, bacteria, odors, and other extraneous matters. The Contractor is responsible for cleaning the sink. Government employees will be responsible to keep the sink free of dishes. In the event that dishes are left in the sink, the Contractor shall move the dishes to the side of the sink. All waste receptacles used for food and trash shall be emptied, cleaned, and sanitized. All other surfaces located in kitchen shall be maintained to ensure compliance with contract requirements.

5.2.13 Janitorial Closets: are available for use by the Contractor without cost for the purpose of storage of her/his materials and equipment, excluding flammable materials. Contractor shall be responsible for the orderliness and cleanliness of these closets and facilities shall be maintained to the same standard of cleanliness as all other areas covered under this contract. The Contractor shall insure that only the items listed in 4.3 – 4.4 are stored in the closets. The Contractor shall insure that all secondary chemical containers are properly labeled. The Government shall not be responsible in any way for damage to the Contractor’s stored supplies, materials, or equipment.

5.2.14 Powerhouse Floors: shall be kept free of dirt, debris, and foreign materials and shall be maintained at a reasonable level of luster necessary to meet the performance standards. Floor maintenance includes cost for other services necessary to maintain floors to meet the quality standard. Powerhouse areas not cleaned include the battery room and oil storage rooms, even if indicated on the drawings. All stairwell transitions within powerhouse from either generator floors, turbine floors, pipe galleries, offices, break rooms or other designated areas shall receive services. The generators do not receive service.

5.3 Periodic Janitorial Services - Office, Shop, Visitor Center, Powerhouse and Dam Facilities

5.3.1 Steam Clean Carpets: shall be steamed as stated in the sections 5.1, 5.6.3, 5.7.8, 5.12.4, 6.3.1. Chairs, rugs, wastebaskets and other small objects are to be picked up by the Contractor so carpet can be cleaned.

Large items such as filing cabinets shall be cleaned around. After cleaning, all carpeted areas shall be free from stains, scales, scum, food debris, dirt, bacteria, odors, and all other extraneous matter. All objects shall be returned to their original location after carpet is cleaned.

5.3.2 Window Surfaces and Interior Glass: Windows will be defined as both sides of the glass and frames of exterior windows, doors, vestibules, etc. that are an integral part of the exterior walls or the building.

Interior glass shall be defined as all glass in interior partitions, wall, doors, displays, and all other glass (excluding restroom mirrors). Wash windows and interior glass shall be defined as complete removal of smudges, tape, oily film, mineral deposit and other types of soil from all glass windows and interior glass.

A glass cleaning chemical, window squeegee tool with rubber blade, clean sponge, and synthetic fiber cloth shall be used. Low abrasive pumice powder or another commercial product may be used to remove mineral deposits if glass surfaces are not permanently scratched or marred. Care shall be taken not to scratch windows that have tinted film applied to their surfaces. The glass shall be rinsed to remove any detergent solution residue. After washing, the glass areas shall be free of foreign materials, smudges, oily film, tape and all other type of soil, streaks and watermarks. Glass cleaner, splash and drip marks shall be removed from all adjacent surfaces. All surfaces shall have a streak and spot free finish. Windows and interpretive display glass shall be clean, free of dirt, grime, streaks, cloudiness, and water spots.

Surrounding areas shall be free of standing water, drips, or watermarks. All windows shall be cleaned internally and externally as stated in the schedule and spot cleaned during general cleaning. After cleaning, the windows shall be clean, free of dirt, grime, streaks, cloudiness and water spots, and cobwebs.

Surrounding areas shall be free of standing water.

5.3.3 Wax-buff floors: Service is to all hard floors (tile restroom floor are not covered under this section). Prior to being wax-buffed, the floor surface shall be swept, mopped and be free of any dirt or nonpermanent stains. The wax used shall be compatible with the floor surface. All areas accessible to the floor machine shall be wax-buffed. Chairs, trash receptacles, etc. shall be moved or tilted where necessary to be wax-buffed underneath. All items shall be returned to their original location upon completion. After wax-buffing, the entire floor shall have a uniform glossy appearance, free of scuff marks, heel marks, and other stains and shall have a uniform coating of floor finish. All wax-buff solution shall be removed from baseboards, furniture, trash receptacles, etc.

5.3.4 Strip, Wax and Buff all hard floors: Service is to all hard floors (tile restroom floors are not covered under this section). The contractor shall strip all waxable floors with a commercial stripping agent to remove all old sealer, wax, dirt, stains, etc. Chairs, trash receptacles, etc. shall be moved or tilted where necessary to be wax-buffed underneath. All items shall be returned to their original location upon completion. Wax floors with one (1) coat of commercial non-skid floor wax. After waxing and buffing, the entire floor shall have a uniform glossy appearance and shall have a uniform coating of floor finish. Floor shall be buffed to a clean streak and spot free shine.

5.3.5 Clean and Buff all tile floors: Floors shall be deep cleaned with a non-abrasive cleaning product that will clean and brighten tile and grout surfaces free of all film, mineral deposits, stains, soap scum and foreign material. A soft non-abrasive buffing pad may be used to complete this work, all surfaces shall have a streak and spot free finish.

5.4 Janitorial Services - Recreation Areas and Facilities

5.4.1 Litter Removal: The Contractor shall remove all litter within the areas identified in Appendix B, Grounds

Site Maps in accordance with approved schedules.

The Contractor shall be responsible for the removal of all collected trash to designated collection containers in or adjacent to the areas where work is performed. The Contractor or the Contractor’s employees shall immediately pick up any trash that may fall onto the facility or grounds during the removal of such collected trash to the designated collection containers. Collection containers shall be closed to prevent trash from being blown around the facility or grounds. All waste water shall be neutralized and shall be disposed of only in areas approved by the COR.

Concrete surfaces, including sidewalks, entryways, and pads around and inside kiosks, shall be kept free of litter, all dirt, debris, and stains. Detergent solutions used to clean concrete surfaces shall be of a mixture so as not to kill grass or vegetation adjacent to the surface.

Remote access sites will be shown in Appendix D for Lost Creek Lake and Appendix E for Elk Creek under the correct map. Refer to Appendix B for frequency of cleaning.

5.4.2 Trash Cans: All trash shall be collected from trash cans and removed to a location designated by the COR.

The inside of all trash cans and bear-proof trash containers shall be lined and kept free of odors, dirt, stains, and debris. Boxes, cans, paper, etc., placed near a trash can shall be removed. Trash shall be prevented from blowing out of dumpsters and containers when emptying such content into the designated receptacles.

Grounds within a 15 foot radius around trash cans shall be kept free of cigarette butts, cans, bottle caps, paper, fish waste, and other litter.

All trash cans shall be placed upright, with secure lids and returned to their original locations regardless of where the cans were found when the pickup was made.

Trash can numbers, types, and location may vary throughout the summer recreation season.

5.4.3 Picnic Tables and Electric cooking tops in group sites: A thorough cleaning of picnic tables and cooking tops will occur according to task schedule. Cleaning picnic tables includes the top, benches, and legs, shall be free of stains, dirt, insect nests, or accumulation of debris. Cleaning cooking tops includes the top, sides, and roof structures. A detergent shall be used in this cleaning, but it shall not be used so as to damage/stain or kill the grass or other vegetation under or near the table. Grounds surrounding each facility, for a 15 foot width, shall be free of cigarette butts, bottle caps, fish waste, and other litter. Group picnic sites are identified in appendix B.

5.4.4 Drinking fountains: Drinking fountains will receive a thorough monthly cleaning. Only spot checks will be performed daily and any issues should be taken care of at that time. Drinking fountains shall be free of all streaks, stains, scales, scum, rust stains, food debris, dirt, bacteria, odors, and other extraneous matters.

The base of the drinking fountains shall be free of rocks, cigarette butts, bottle caps, fish waste, paper, and other litter within a 15 foot radius.

5.4.5 All Restrooms: shall be cleaned, swept, mopped, and disinfected to maintain all fixtures at a reasonable level of shine and cleanliness. Floors and shower stalls shall be sanitized and maintained to ensure that there is not a buildup of dirt, debris, or bacteria. There should be no standing or extra water on floor after cleaning. Partitions, screens, doors, windows, ceilings, recesses, eave joints, and interior and exterior walls shall be free of obvious dirt, graffiti, dust, insect nests, cobwebs or any other extraneous matter. Toilet bowls, interior and exterior of toilet risers, and urinals, sinks and showers shall be cleaned, sanitized, and descaled; after cleaning, the entire surface shall be free from streaks, stains, scale, scum, mineral deposits, rust stains, and other bodily waste products and dirt. Catch baskets and wire screens beneath drain covers shall be free of all debris including hair – all parts of the drain shall be disinfected and replaced in proper position. All screws shall be tightened to preclude removal by the public. At no time, will a drain be left unattended with its cover removed. Drains shall be cleaned as often as needed to ensure proper drain function.

All marks of vandalism and graffiti readily removable without damage to the paint shall be removed.

Drains sidewalks and entryways adjacent to restrooms shall be kept free of all dirt, debris, and stains. The grounds surrounding each facility, a 15 foot radius, shall be free of cigarette butts, bottle caps, fish waste, paper, and other litter. Restroom trashcan service shall include those trash cans within the restroom, storage room, and those upon attached sidewalk. Restroom trashcans shall be clean and free of odor on inside and outside. Contractor shall ensure that restrooms have a clean and pleasant odor. Restrooms shall be stocked with necessary toilet tissue, paper towels, and hand soap or sanitizer so that there are sufficient supplies for each day.

5.4.6 Pipe chases and storage rooms are available for use by the Contractor without cost for the purpose of storage of his materials and equipment, excluding flammable materials. Contractor shall be responsible for the orderliness and cleanliness of these closets and facilities shall be maintained to the same standard of cleanliness as all other areas covered under this contract. Contractor materials shall in no way block government access to storage areas for maintenance of electrical, sewage, or water systems. All marked setbacks will be observed.

5.4.7 Entryways: shall be free of dirt, debris, and foreign materials. Exterior doors and walls and areas adjacent to entryways and walk ways shall be free of dirt, debris, spider webs, insect nests and other foreign materials.

5.4.8 Group Shelter and picnic areas: There is currently one (1) shelter located in Rivers Edge Park and two group picnic areas in McGregor Park. The contractor shall clean all foreign material from shelter floors, posts, ceilings, eves, trusses, supports, fascia board, and picnic tables. The Contractor shall pick up all litter, foodstuffs, and all other foreign material from tables and dispose of properly. Clean all foreign material from all surfaces of picnic table; tops seats, and supports with a cleaning detergent. Rinse and dry tables to a clean, streak and spot free finish. Remove all standing water on the floor or pad after cleaning.

Clean floors by sweeping to remove all foreign material. Contractor is required to remove all tape, staples, nails, tacks, string, rope, and signs that have been attached to the structure by the public. Contractor is required to have the cleaning of the shelter complete by no later than 11:00 am of each scheduled workday.

Failure to complete this work by the required time will constitute non-performance by the contractor.

5.5 Periodic Janitorial Service - Recreation Areas and Facilities

5.5.1 Grout: shall be cleaned to bring back to original color and condition. Grout shall be cleaned in manner as to not undermine it. Grout shall be treated with grout sealer. Restrooms receiving this annual cleaning are identified in Appendix B.

5.5.2 Strip-Seal Floor Finish: shall be stripped of old wax, re-waxed and polished as stated in Appendix B.

Chairs, wastebaskets and other small objects shall be picked up by Contractor. Large items such as filing cabinets shall be worked around. After being stripped, waxed and buffed, the entire floor shall have a uniform glossy appearance, free of old wax, scuff marks, heel marks, and other nonpermanent stains, and shall have a uniform coating of floor finish. All wax-buff solution shall be removed from baseboards, furniture, trash receptacles, etc.

5.6 Cleaning Project Office: The project office area shall be defined as all offices, downstairs and upstairs, reception area, lobby, downstairs kitchen and hallway and entrance area to the warehouse. In each area, service shall include, empty all waste containers, dust bookcases, map and drawing cabinets, shelves, chairs, window sills, conference tables and any other furniture (except desktops as defined otherwise) clean drinking fountains, telephones, microwaves (to include both inside and outside), ovens, refrigerators (excluding inside), and other similar surfaces. All walls, moldings, ceilings, and hanging light fixtures shall be maintained clean of dust and cobwebs. In all restrooms, floors will be cleaned and sanitized as described above. Toilets, urinals, sinks, mirrors, lunchroom tables, dispensers, partitions, stalls and doors, and all other fixtures will be cleaned and sanitized. Supplies of hand soap, bars and dispenser type, hand sanitizer, shall be replenished in addition to paper towels, and toilet tissue as often as necessary to insure that supplies in the container are never entirely depleted. The supplies will be supplied to the contractor by the government.

General janitorial services shown under daily services shall be performed two days (Tuesday and Thursday) continuous through the term of this contract and option years. Services may be performed between the hours of 5:30 pm the scheduled day until 7:00 am the following morning.

5.6.1 Daily Project Office Cleaning

a. Clean all exterior and interior window surfaces of the front glass door and the adjacent windows on each side of the front glass door.

b. Sweep all hard floors and stairways

c. Spot clean carpets

d. Empty all trash and recycling receptacles

e. Clean water fountain

f. Remove all cobwebs

g. Clean downstairs kitchen and cooking area

5.6.2 Weekly Project Office Cleaning

a. Sweep and clean the front and rear entrances to project office

b. Clean and dust office area and all office furniture

c. Wet mop and dry buff floors

d. Vacuum all carpets

5.6.3 Quarterly Project Office Cleaning

a. Shampoo/steam clean carpets

b. Wax buff floors (excluding restrooms)

c. Wash the interior and exterior of all windows

d. Wash doors, frames, sills and walls

5.6.4 Annual Project Office Cleaning

Strip, wax and buff all hard floors

5.6.5 Daily Project Office Restroom Cleaning

a. Empty trash receptacles

b. Restock dispensers

c. Clean and sanitize sinks and counters

d. Clean mirrors

e. Clean fixtures and furniture

f. Clean and sanitize commodes and urinals

h. Clean and sanitize doors and partitions

i. Sweep floors

5.6.6 Weekly Project Office Restroom Cleaning

Sweep and wet mop floors

5.6.7 Quarterly Project Office Restrooms Cleaning

Scrub clean floors

5.6.8 Weekly Project Office Public Restroom Cleaning

a. Empty trash receptacles

b. Restock dispensers

c. Clean and sanitize sinks and counters

d. Clean mirrors

e. Clean fixtures

f. Clean and sanitize commodes and urinals

h. Clean and sanitize doors and partitions

i. Sweep and wet mop floors

j. Clean drinking fountain

5.6.9 Quarterly Project Office Public Restroom Cleaning

Scrub clean restroom floor

5.6.10 Daily Project Office Lunch Room

a. Sweep and wet mop floor

b. Clean sinks and counters

c. Clean exterior and interior of microwave ovens

d. Clean drinking fountain

e. Clean tops of all tables and chairs

f. Restock paper towel dispenser

5.6.11 Quarterly Project Office Lunch Room Cleaning

Wax buff floor

5.6.12 Annual Project Office Lunch Room Cleaning

Strip, wax and buff floor

5.7 Cleaning of Powerhouse

Areas covered under this section include but are not limited to Powerhouse levels Mezzanine, Main level, Lower level and Ground level. Areas include control room office, floors, kitchen, restroom and stairs. In each area, service shall include: empty all waste containers, dust bookcases, computer equipment, printers, shelves, chairs, tables, and any other furniture (except desktops); clean drinking fountains, telephones, microwaves, ovens, refrigerators, and other similar surfaces. All walls, moldings, ceilings, and hanging light fixtures shall be maintained clean of dust and cobwebs. Restroom floors will be cleaned and sanitized.

Toilets, urinals, sinks, mirrors, showers, dispensers, partitions, stalls and doors, and all other fixtures will be cleaned and sanitized. Supplies of hand soap, both bar and dispenser type shall be replenished in addition to paper towels, and toilet tissue as often as necessary to insure that supplies in the container are never entirely depleted. These supplies will be supplied to the contractor by the government.

General janitorial services shown under daily services shall be performed two days (Tuesday and

Thursday) continuous through the term of this contract and option years. Services may be performed between the hours of 5:30 pm the scheduled day until 7:00 am the following morning.

5.7.1 Daily Cleaning

a. Sweep Mezzanine and Main floor

b. Sweep stairs from Mezzanine level to Main level

c. Clean drinking fountains

d. Empty Main level and office trash and recycling receptacles

5.7.2 Mezzanine and Main Level Annual Cleaning

Strip, wax and buff all hard floors

5.7.3 Weekly Cleanings

a. Sweep all stairs joining Main level to Lower and Ground levels

b. Empty all trash receptacles

c. Sweep floors on Lower and Ground Level

d. Clean both sides of glass doors

5.7.4 All Levels Monthly Cleaning

a. Wet mop and dry buff floors

5.7.5 All Levels Annual Cleaning

a. Strip, wax and buff all hard floors

5.7.6 Daily Control Room Cleaning

a. Empty all trash receptacles

b. Vacuum carpet

c. Spot clean carpet

d. Clean drinking fountain

5.7.7 Weekly Control Room Cleaning

a. Sweep and wet mop floor

b. Dust furniture

c. Remove all cobwebs

5.7.8 Monthly Unit Control Room

Carpet steaming/shampoo

5.7.9 Monthly Unit Control Room and Station Service Cleaning

a. Wet mop and dry buffing

b. Wash doors and frames

5.7.10 Annual Unit Control Room and Station Service Cleaning

Strip, wax and buff all hard floors

5.7.11 Daily Kitchen Cleaning

a. Empty all trash and recycling receptacles

b. Sweep floor

c. Clean sink and cooking area

d. Clean fixtures and furniture

5.7.12 Weekly Kitchen Cleaning

Wet mop floor

5.7.13 Quarterly Kitchen Cleaning

a. Wet mop and dry buff floor

b. Wash doors and frames

5.7.14 Annual Kitchen Cleaning

Strip, wax and buff floor

5.7.15 Daily Restroom Cleaning

a. Empty trash receptacles

b. Restock Dispensers

c. Clean and sanitize sinks and counters

d. Wash mirrors

e. Wash fixtures and furniture

f. Clean and sanitize commodes and urinals

g. Clean and sanitize doors and partitions

h. Sweep floors

5.7.16 Weekly Restroom Cleaning

a. Scrub, clean and sanitize shower

b. Sweep and wet mop floor

5.7.17 Quarterly Restroom Cleaning

Scrub clean restroom floor

Recreation Area Restrooms and picnic areas are to be cleaned on a Daily or bi-weekly Schedule as designated in Appendix B

5.8 Cleaning Rivers Edge Park

5.8.1 Daily Restroom Cleaning

a. Empty trash receptacles

b. Restock Dispensers

c. Clean and sanitize sinks and counters

d. Clean and sanitize commodes and urinals

f. Clean and sanitize doors and partitions

g. Sweep and mop floors

5.8.2 Quarterly Restroom Cleaning

Scrub clean restroom floor

5.8.3 Daily Group Shelter Cleaning

a. Remove all debris from tables and concrete slab

b. Sweep entire concrete slab area beneath the shelter

c. Empty trash receptacles

5.9 Cleaning Takelma Boat Launch Restroom

5.9.1 Daily Restroom Cleaning

a. Empty trash receptacles

b. Restock dispensers

c. Clean and sanitize commodes and urinals

d. Clean and sanitize doors and partitions

e. Remove cobwebs from interior of restrooms

f. Sweep and wet mop floors

5.10 Cleaning Takelma Day Use Area Restroom

5.10.1 Daily Restroom Cleaning

a. Restock Dispensers

b. Clean and sanitize commodes and urinals

c. Clean and sanitize doors and partitions

d. Remove cobwebs from interior of restrooms

e. Sweep and wet mop floors

5.11 Cleaning McGregor Park Restroom

5.11.1 Daily Restroom Cleaning

a. Empty trash receptacles

b. Restock dispensers

c. Clean and sanitize commodes and urinals

d. Clean and sanitize doors and partitions

e. Remove cobwebs from interior of restrooms

f. Sweep and wet mop floors

g. Clean mirrors

5.11.2 Group Picnic Areas Daily Cleaning

There are two (2) shelters located in McGregor Park. The contractor shall clean all foreign material from

Sheltered Picnic table floors, posts, ceilings, eves, trusses, fascia boards, supports, and boards. Clean and sanitize all cooking surfaces, seats, and tabletops. Clean all electrical cooking elements so as to be free of all foreign material. All stainless steel surfaces shall be cleaned and sanitized to a streak and spot free finish.

5.12 Cleaning McGregor Park Visitor Center

5.12.1 Weekly Visitor Center Cleaning (May 15 through November 15) (Public use and office area)

a. Sweep and wet mop all hard floors

b. Vacuum carpet

c. Remove all cobwebs

d. Clean fixtures and furniture

e. Empty all trash receptacles

f. Clean interior and exterior of all glass doors

5.12.2 Quarterly Visitor Center Cleaning (Dec 1 through April 30) (Public use area and office)

a. Sweep and wet mop all hard floors

b. Vacuum carpet

c. Remove all cobwebs

d. Empty all trash receptacles

e. Clean interior and exterior of all glass doors

f. Clean fixtures and furniture

5.12.3 Annual Visitor Center Cleaning (Public use area and office)

a. Wash the interior and exterior of all glass windows and doors

b. Wash all glass display cabinets

c. Remove all cobwebs

5.12.4 Annual Visitor Center Cleaning (Public use area and Office)

a. Shampoo/steam clean carpets

b. Strip and seal tile in lobby area

5.12.5 Weekly Visitor Center Restroom Cleaning (May 15 through November 15)

a. Empty trash receptacles

b. Restock dispensers

c. Clean and sanitize sinks and counters

d. Wash mirrors

e. Wash fixtures and furniture

f. Clean and sanitize commodes and urinals

g. Clean and sanitize doors and partitions

h. Sweep and wet mop floors

5.12.6 Quarterly Visitor Center Restroom Cleaning (Dec 1 through April 30)

a. Empty trash receptacles

b. Restock dispensers

c. Clean and sanitize sinks and counters

d. Clean mirrors

e. Clean fixtures and furniture

f. Clean and sanitize commode and urinals

g. Clean and sanitize doors and partitions

h. Sweep and wet mop floors

5.12.7 Annual Visitor Center Restroom Cleaning

a. Scrub clean restroom floors

5.13 Cleaning of Vault Restrooms (CXT)

5.13.1 Vault Restroom Cleaning. All Vault restrooms shall be cleaned according to frequencies outlined in Appendix B, weekly and daily cleaning schedule. Vaults shall be cleaned and sanitized with a germicidal product approved by the COR prior to use.

(1) Vault building exterior. The contractor shall clean and remove all graffiti and other foreign material from the walls, and sweep the eves to remove all spiders and their webs, insects and their nests, and all other foreign material. Remove all foreign material from all surfaces of toilet cover, seat, and toilet seat riser. Clean and sanitize all surfaces to maintain a clean fresh smelling sanitary finish. Contractor is required to check and remove all foreign material, insects and spiders form the inside top of the toilet riser to the underside of vault entrance. All interior and exterior surfaces shall be cleaned of graffiti, mildew, dirt, debris, webs, and any other foreign material.

(2) Floors. Sweep floors to remove all foreign material. Remove all graffiti, gum and other stubborn foreign material from the floor and drains without scratching or marring floor surfaces. Clean and sanitize by the use of wet mop and squeegee. Dry all floor surfaces to a streak and spot free shine. Contractor will maintain a clean, fresh-smelling, and sanitary finish on all floors.

(3) Restocking Dispensers. Install a full supply of toilet tissue, paper towels, hand soap or sanitizer, and any other materials necessary for the operation of the vault restroom. Ensure that all toilet tissue and other materials are in sufficient quantities so as not to run out before the next service of the restroom.

(4) Walls, Partitions, Ceilings, Door(s), Vents, and Skylights. Remove all foreign material and graffiti.

Clean, rinse and dry all surfaces to maintain a clean, fresh-smelling, and sanitary condition. All surfaces will have a streak and spot free finish.

(5) Vault Toilets. Remove all foreign material from all vault toilet surfaces. Clean and sanitize all surfaces including the seats, pedestal, and inner neck of opening…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .