COUGAR SPILLWAY GATE REHAB
Solicitation number
W9127N-16-R-0052
Issued by

About this file

Amendment 0002

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W66QKZ60135952

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

NAME OF PROJECT: COUGAR DAM SPILLWAY GATE REHABILITATION

SEE CONTINUATION PAGES

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Aug-2016

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-R-0052

X 9B. DATED (SEE ITEM 11)

11-Jul-2016

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Aug-2016

CODE

USACE PORTLAND DISTRICT

333 SW 1ST AVE

PORTLAND OR 97204-3440

W9127N 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127N-16-R-0052

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 11-Aug-2016 02:00 PM to 16-Aug-2016 02:00 PM.

The following have been added by full text:

AMENDMENT NO. 0002

Amendment No. 0002 makes the following changes to Solicitation No. W9127N-16-R-0052:

1) Update proposal content limitation. (changes in red)

2) Update table of contents to add Attachments A10 and A11.

3) Add Attachment A10 - Controlled Low Strength Materials to the solicitation.

4) Add Attachment A11 - Asphalt Concrete Pavement to the solicitation.

5) Change the proposal due date from August 11, 2016 to August 16, 2016 at 2:00PM PST. Bidder inquiry is extended to COB August 11, 2016.

6) All other terms and conditions remain unchanged.

SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS

The following have been modified:

BASIS OF AWARD

A. General

(1) The solicitation is restricted to small businesses using Lowest Price Technically Acceptable (LPTA) source selection process for the award of a firm-fixed-price contract. Award will be made at the lowest evaluated price of proposals meeting or exceeding the acceptable standards for non-cost factors. This acquisition will utilize FAR Part 15 LPTA source selection procedures, leading to selection of the proposal representing the best value to the Government.

(2) The Government intends to make an award without discussions, but reserves the right to conduct discussions should discussions prove to be necessary or advantageous to the Government. Because the Government does not intend to hold discussions Offeror’s are encouraged to include their best pricing in their initial proposal.

(3) In the context of this proposal, the “offeror” refers to the proposed prime contractor. A major subcontractor is defined as a subcontractor that the offeror proposes to perform 25% or more of the work required under the solicitation.

(4) All proposals received will stand alone and be considered complete and final. The evaluation board will not consider any information or data incorporated by reference or otherwise referred to. The successful offeror will be selected solely on the basis of the evaluation factors set forth below. Accordingly, proposals submitted in response to this solicitation should provide clear, complete, concise, and straightforward responses to the evaluation factors. Elaborate proposals, color brochures, and other excesses are discouraged.

(5) Joint Ventures (JV) A joint venture is defined as follows: a legal business entity formed between two or more companies (parties) to undertake the performance activities of a contract together. This does not include other arrangements such as “teaming agreements” or “strategic alliance” which are not recognized as bona fide joint ventures for the purposes of this solicitation. A company that is part of a joint venture shall submit a legally binding joint venture agreement. Joint ventures shall include a copy of the legal joint venture agreement signed by an authorized officer from each of the firms comprising the joint venture with the chief executive of each entity identified. If submitting a proposal as a joint venture, the experience and past performance of each of the joint venture partners can be submitted for the joint venture entity. The experience for each joint venture partner will be considered the experience of the joint venture entity. Page and project form limits apply to the joint venture as a whole. Prospective Offeror’s that submit proposals may not change their firm (including Letters of Commitment (LOC) and proposed subcontractors) or their Joint Venture firms, if selected to submit Final Proposal Revisions (FPR).

B. Evaluation Ratings

(1) The principle objective of the evaluation process is to make award of a contract to the responsible Offeror whose proposal is determined to be the “best value” to the Government, price and other factors considered. An evaluation of acceptability will be performed on each proposal in accordance with FAR 15.101-2, Lowest Price Technically Acceptable Source Selection Process. Award will be made on the basis of the low evaluated price of proposals meeting the acceptability standards of non-cost factors. Tradeoffs are not permitted. The failure of a proposal to meet any of the acceptability standards for non-cost factors will result in a technically unacceptable rating and thus preclude award.

(2) A Technical Proposal will be rated as ‘Acceptable’ or ‘Unacceptable’ based upon whether it demonstrates the minimum requirements of the RFP.

Table 1. TECHNICAL Acceptable/Unacceptable RATINGS

RATING DESCRIPTION

Acceptable

Proposal meets the requirements of the solicitation.

Unacceptable

Proposal does not meet the requirements of the solicitation.

Table 2. Past Performance Acceptable/Unacceptable Rating Method

Adjectival Rating DESCRIPTION

Based on the offeror’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the offeror’s performance record is unknown.

Based on the offeror’s performance record, the Government does not have a reasonable expectation that the offeror will be able to successfully perform the required effort.

5. SUBMISSION OF PROPOSALS

A. Administrative Details and General Instructions: Proposals are due no later than the time and date specified in Block 13 of Standard Form 1442.

(1) General Proposal Format. Submit each copy of the proposal in tabbed, 3-ring binders with a “D” ring or locking closures.

Title Page. Each copy must include the Offeror’s name and address, phone number and email address, title of the solicitation, solicitation number and date of submittal clearly identified on the front cover of the binder.

Table of Contents. Each binder of the proposal shall contain a detailed table of contents. The complete table of contents shall be included in each binder.

Printed Matter Submissions. Pages containing text are expected to be 8 ½ x 11 inches with at least one-inch margins at the top, bottom, and both sides. Paragraphs should be separated by at least one blank line. A standard 11-point font in either Arial or Times New Roman fonts are required.

Organization charts or schedules. A folded 11” x 17” format may be used. Larger format drawings or tables may be added by folding them to fit within the binder.

All information must be confined to the appropriate volume. If the materials do not fit within a single volume, they should be separated in additional binders, but clearly identified as such. Each volume of the proposal is expected to contain a table of contents, summary section with a brief abstract of the volume, and the narrative discussion.

THE OFFEROR SHALL SUBMIT AN ELECTRONIC VERSION OF EACH PROPOSAL. The electronic version shall be on a readable CD. Any discrepancies between the electronic and paper copies shall give precedence to the paper copy.

(2) Proposal Content Limitations.

The Offeror must confine the proposal to relevant information and documentation sufficient to provide an adequate basis for evaluation. Offeror’s are responsible for including sufficient details, in a concise manner, to permit a complete and accurate evaluation of the proposal. The page count is at the discretion of the offeror, however the proposal may not be more than 25 pages total. The 25 page limit does not include past performance information submitted under Factor 2.

The evaluation panel for the Government is instructed to evaluate the non-price proposal factors on the basis of the information provided. Extraneous information provided in the proposals will not be considered in the evaluations; therefore, the offeror should only provide information that satisfies the solicitation requirements. Merely restating the specifications without sufficient elaboration demonstrates a lack of understanding of the requirement.

DO NOT cross reference past performance information. It is acceptable to repeat data, project information or experience in more than one non-price area as long as it satisfies the requirements of the factor.

Proprietary information must be clearly marked.

B. Content of Proposals: All proposals must be prepared in two (2) volumes: A technical proposal (Volume I) and a price proposal (Volume II). Each of the volumes shall be separate and complete in itself so that evaluation of one may be accomplished independently from evaluation of the other. The technical proposal must not contain reference to price. The narrative and content structure of the proposal shall follow the format shown in the table for Volume I below. Offeror’s who fail to submit a complete proposal may be excluded and thus receive no further consideration for award.

(1) Technical Proposal, Volume I: Provide one (1) original and four (4) copies and one (1) pdf. file on a CD-ROM. Volume I shall consist of information for the three (3) factors listed in tabular form, as noted below. Repeating or restating the specifications without sufficient elaboration will be determined to show a lack of understanding of the requirement.

Volume I – Technical (Non-Price) Factors:

Factor 1: Experience

Factor 2: Past Performance

Factor 3: W o r k P l a n a n d Schedule

(2) Price Proposal, Volume II: The Price Proposal shall be submitted on one (1) original copy and one

(1) pdf. file on a CD-ROM. Contractors shall provide pricing and complete all line items on Standard Form 1442 (SF 1442). Your price proposal must be prepared in accordance with below paragraphs and must include:

Tab 1 - SF1442, Solicitation, Offer, and Award.

The SF1442 shall be filled out completely by the offeror and signed by an official that is authorized to bind the company. The Offeror shall also acknowledge all amendments to the solicitation in accordance with the instructions on the Standard Form 30 or Block 19 of SF1442.

Tab 2 – Section 00010, Proposal Price / Bid Schedule.

The Offeror shall fully complete this section.

Tab 3 - Representations, Certifications and other Statements of Offeror’s.

The Offeror shall complete all representations and certifications in Section 00600 and also ensure current registration and completed/updated Annual Representations and Certifications on the System for Award Management (SAM) website, www.sam.gov.

Tab 4 – Banking and Bonding Points of Contact.

The Government is required to determine Contractor’s responsibility; the Offeror shall provide contact information (company name, point of contact, address, email, and phone number) for the Offeror’s bank and bonding institutions.

Tab 5 - Bid/Offer Guarantee. The Bid Bond shall be at least 20% of the bid price, but shall not exceed $3 million. See FAR Clause 52.228-1 – Bid Guarantee.

C. Submission of Proposals: Proposals must arrive at the location designated in the RFP for receipt of such proposals prior to the time and date established in Block 13, SF 1442. There will not be a public proposal opening. In order for the proposal to be considered, it MUST be prepared in ENGLISH, and must be submitted as a hardcopy original (Volume I and II) and four (4) copies (Technical Volume I only) with the required electronic CD-ROM:

BY HAND OR COURIER TO:

U. S. ARMY CORPS OF ENGINEERS, NWP

Block 300 (10th Floor USACE Security Desk) 333 SW First Avenue Portland, Oregon 97204 Attention: David Dvorak – CECT-NWP-C

MAILING ADDRESS:

U. S. ARMY CORPS OF ENGINEERS, NWP

P. O. Box 2946 Portland, OR 97208-2946 Attention: David Dvorak – CECT-NWP-C

NOTE: E-MAIL SUBMISSIONS WILL NOT BE CONSIDERED. If the electronic CD-ROM proposal differs from the hard copy, the hard copy will take precedence.

OFFEROR SHALL MARK THE OUTSIDE ENVELOPE(S) AS FOLLOWS:

Envelope(s) shall be plainly marked with the following information:

Solicitation No. W9127N-16-R-0052 Proposal Due Date: ____________________________________

Number of each amendment that has been received: _________

6. EVALUATION FACTORS

Volume I – Technical (Non-Price) Submission Requirements and Evaluation Method:

FACTOR 1 – Experience

Submission Requirements:

The Offeror shall submit information for up to two projects that demonstrates the offeror’s experience rehabilitating spillway tainter gates and the associated mechanical and electrical operating equipment. Information submitted for each project must include the information outlined in Attachment B, Offeror’s Experience Form.

To be evaluated, projects must have been completed or must be substantially complete within five years of the date that proposals are due and be projects valued over $3,000,000.00. Substantially complete is defined as being 75% complete by the date that proposals are due. If an offeror submits a project that it represents is “substantially complete,” the offeror must reasonably explain why the project is considered at least 75% complete. If an offeror submits an ongoing project without providing an accompanying reasonable explanation that explains how the project is at least 75% complete, the Government reserves the right to reject the project.

A maximum of two projects will be evaluated. If an offeror disregards these instructions and submits more than two projects, only the first two projects will be evaluated. Offerors should describe each project with enough detail to ensure that the Government can meaningfully assess whether the projects submitted meet the minimum evaluation criteria outlined below.

Evaluation criteria:

Experience will be rated on an “acceptable” or “unacceptable” basis.

Acceptable: To be determined “acceptable,” the offeror’s proposal must demonstrate that the offeror has experience rehabilitating spillway tainter gates and associated mechanical and electrical operating equipment valued over $3,000,000. To be determined acceptable under this factor, each project submitted does not need to demonstrate all functional categories (structural, mechanical, and electrical work) for each individual project. Rather, to be acceptable an offeror must submit a proposal that includes up to two projects that collectively demonstrate the offeror’s experience with all three discrete categories of work: structural, mechanical, and electrical.

Unacceptable: The offeror’s proposal fails to demonstrate experience rehabilitating spillway tainter gates and associated mechanical and electrical operating equipment valued over $3,000,000. The offeror’s proposal collectively fails to demonstrate experience performing structural, mechanical, and electrical work on spillway tainter gates valued over $3,000,000.

Table 1. TECHNICAL Acceptable/Unacceptable Rating Method

Adjectival Rating DESCRIPTION

FACTOR 2 - PAST PERFORMANCE

The offeror shall provide past performance information for each project listed by the offeror under Factor 1:

Experience. Recent and relevant projects are those projects completed or substantially completed ** within the past five years of the date that the proposals are due that are comparable in size, scope, and complexity with this requirement.

** Substantially completed is defined as having completed more than 75% of the project work at the time proposals are due.

If a completed Contractor Performance Assessment Reporting System (CPARS) evaluation is available, it shall be submitted with the proposal. Do not submit a PPQ when a completed CPARS is available.

Completed PPQs should be submitted with your proposal if a CPARS evaluation is not available. If the offeror is unable to obtain a completed PPQ from a client for a project(s) before proposal closing date, the offeror should complete and submit with the proposal the first page of the PPQ (Attachment A), which will provide contract and client information for the respective project(s). Offeror’s should follow-up with clients/references to ensure timely submittal of questionnaires. If the client requests, questionnaires may be submitted directly to the Government's point of contact, David Dvorak, via email at david.l.dvorak@usace.army.mil prior to proposal closing date. The Offeror shall instruct the clients to refer to the solicitation number in the subject line. The PPQs are Source Selection materials. All successfully submitted PPQs will receive an email confirmation upon receipt. If the offeror does not receive the confirmation, it is their responsibility to follow up to ensure the Government has received the information.

Offeror’s shall not incorporate by reference into their proposal PPQs or CPARS previously submitted for other RFPs. However, this does not preclude the Government from utilizing previously submitted past performance information in the past performance evaluation.

Offeror’s may provide explanation on problems encountered on past projects and the corrective actions taken by the offeror.

In addition to the above, the Government may review other sources of information for evaluating past performance.

Other sources may include, but are not limited to, past performance information retrieved through the PPIRS, including Contractor Performance Assessment Reporting System (CPARS), using all CAGE/DUNS numbers of team members (partnership, joint venture, teaming arrangement, or parent company/subsidiary/affiliate) identified in the Offeror’s proposal, inquiries of owner representative(s),FAPIIS, telephone interviews with organizations familiar with the Offeror’s performance, Government personnel with personal knowledge of the Offeror’s performance capability, and any other known sources not provided by the offeror.

While the Government may elect to consider data from other sources, the burden of providing detailed, current, accurate and complete past performance information rests with the Offeror.

Evaluation Method:

Past Performance will be rated on an “Acceptable” or “Unacceptable” basis.

The past performance evaluation results is an assessment of the offeror’s probability of meeting the minimum past performance solicitation requirements. This assessment is based on the offeror’s record of relevant and recent past performance information that pertain to the project outlined in the solicitation requirements.

There are two aspects to the past performance evaluation. The first is to evaluate whether the offeror’s present/past performance is relevant or not relevant to the project.

The second aspect of the past performance evaluation is to determine how well the contractor performed on the contracts. The Government will evaluate the offeror’s past performance to ensure previous work performance satisfactorily met the contract requirements, performance schedules, prescribed quality of work, safety requirements, and other customer expectations on these projects.

The Government reserves the right to obtain or verify offeror’s past performance information from references and other sources available to the Government.

Past performance under Factor 2 shall be evaluated using the following rating of an “acceptable” or “unacceptable” basis using the ratings stated in Table 2:

Table 2. PAST PERFORMANCE EVALUATION RATINGS

Acceptable Based on the Offeror’s performance record, the Government has a reasonable expectation that the Offeror will successfully perform the required effort, or the Offeror’s performance record is unknown. (See note below.)

Unacceptable Based on the Offeror’s performance record, the Government has no reasonable expectation that the Offeror will be able to successfully perform the required effort.

Note: In the case of an Offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the Offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the Offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

FACTOR 3 – Work Plan and Schedule

The offeror shall demonstrate its ability to plan, organize, and manage the project and schedule.

The offeror shall submit a work plan explaining the Offeror’s technical approach for completing the project in accordance with the specifications outlined in this solicitation. The plan shall include a detailed narrative that addresses the procedures proposed for the successful completion of the following major features of work:

1. Structural steel fabrication

2. Mechanical hoist system

3. Trunnion bearing system

4. Electrical control system and commissioning

The work plan shall also include the proposed Gantt chart for this project that accounts for the Gate Out of Service Period (GOSP), Final Construction Physical Completion, and Contract End Date contractual milestones. The proposed schedule shall include incidental design, fabrication, shop testing, delivery, assembly/disassembly, installation, and testing.

Evaluation criteria:

Work plan and schedule will be rated on an “acceptable” or “unacceptable” basis.

Acceptable: To be determined “acceptable,” the offeror’s proposed work plan must include the offeror’s plan for completing each feature of work outlined in the submission requirements above and demonstrate a feasible plan for completing the work in accordance with the requirements outlined in the solicitation specifications. The offeror’s work plan must also include a schedule in Gantt chart format for completing the work items outlined in the submission requirements above, and within the timeframes described in the solicitation specifications.

Unacceptable: The offeror’s proposed work plan fails to include all of the features of work included in the submission requirements. The offeror’s proposed work plan is not feasible or fails to demonstrate the ability to complete the work in accordance with the requirements of the solicitation. The offeror’s plan fails to include a schedule in Gantt chart format addressing each of the work items contained in the submission requirements. The offeror’s proposed schedule demonstrates an inability to complete the work within the timeframes described in the solicitation specifications or inability to feasibly complete the work on time.

TECHNICAL Acceptable/Unacceptable RATINGS

Volume II - Price.

Price Evaluation

Award will be made on the basis of the lowest evaluated price (sum of all CLINs) of proposals meeting or exceeding the acceptability standards for non-cost factors.

The Price Proposal will be evaluated to determine fairness and reasonableness. For evaluation purposes, the total evaluated price will be calculated by adding the total price for all optional items to the total price for the basic requirement. Evaluation of options will not obligate the Government to exercise the options.

The Government may determine that a proposal is unacceptable if the prices proposed are materially unbalanced between line items or subline items. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more contract line items is significantly overstated or understated as indicated by the application of cost or price analysis techniques. A proposal may be rejected if the Contracting Officer determines that the lack of balance poses an unacceptable risk to the Government.

(End of Summary of Changes)

TOC-1

Section 00442 - Controlled Low Strength Materials

Description

00442.00 Scope - This work consists of furnishing and placing controlled low-strength materials (CLSM).

00442.01 Definition - Controlled low-strength material is highly flowable lean concrete mix; a mixture of fly ash, cement, fine aggregates, water and admixtures, if necessary.

Materials

00442.10 Materials - Furnish materials meeting the following requirements and as modified in the Special Provisions:

Admixtures Fly Ash ................................................................................................. 02030.10 Portland Cement .................................................................................. 02010.10

00442.11 Fine Aggregates - Furnish fine aggregates that are commercial quality concrete sand.

00442.12 Proportioning of CLSM Mixture - Furnish the following, to the Engineer, prior to using any CLSM on the Project:

• Written certification of proposed CLSM materials proportions and compressive strength.

• 28-day cylinder reports from a trial CLSM batch based on above certification. Include evidence that compressive strength requirements for specific applications are met.

00442.13 Compressive Strength - CLSM shall attain a 28-day compressive strength of 100 psi - 200 psi.

00442.14 Acceptance - Acceptance will be based on the Engineer's review and approval of written certification and trial batch cylinder reports as required by 00442.12.

Measurement

00442.80 Measurement - No measurement of quantities will be made for CLSM.

Payment

00442.90 Payment - No separate or additional payment will be made for CLSM. Payment will be included in payment made for the appropriate items under which this work is required.

A10-1

Section 00744 - Asphalt Concrete Pavement

Description

00744.00 Scope - This work consists of constructing asphalt concrete pavement (ACP) to the lines, grades, thicknesses, and cross sections shown or established.

00744.01 Abbreviations:

HMAC - Hot Mix Asphalt Concrete

MAMD - Moving Average Maximum Density

RAM - Recycled Asphalt Material

TSR - Tensile Strength Ratio

VFA - Voids Filled with Asphalt

VMA - Voids in Mineral Aggregate

WMAC - Warm Mix Asphalt Concrete

00744.02 Definitions:

Asphalt Concrete Pavement - Uniformly coated mixture of asphalt cement, graded aggregate, and additives as required. The use of ACP in this section refers to either hot mix or warm mix asphalt concrete.

Hot Mix Asphalt Concrete - A hot plant mixed ACP.

Level 1 ACP - ACP for use in applications with very low traffic and only limited exposure to trucks.

Level 2 ACP - ACP for use in applications with low traffic volumes and low volume truck traffic.

Level 3 ACP - ACP for use in applications exposed to moderate truck traffic.

Recycled Asphalt Material - The combination of reclaimed asphalt pavement (RAP) and recycled asphalt shingles (RAS).

Warm Mix Asphalt Concrete - An asphalt concrete mix following all requirements of HMAC, except that through use of approved additives or processes, it is mixed, placed, and compacted at lower temperatures.

Materials

00744.10 Aggregate - Furnish new aggregate, RAP aggregate, and RAS aggregate meeting the following requirements:

(a) New Coarse and Fine Aggregates - Produce coarse and fine aggregate from crushed rock or other inert material of similar characteristics.

Blend sand is allowed for Levels 1, 2, and 3 mixes. Do not use more than 6 percent natural or uncrushed blend sand, by weight, in the total aggregate. Provide a means of verifying and documenting the amount of blend sand added to the aggregate.

Testing of aggregates for soundness, durability, and harmful substances will be at the discretion and expense of the Agency.

A11-1

(1) Soundness - Provide coarse and fine aggregate with a weighted loss not exceeding 12 percent when subjected to five cycles of the soundness test using sodium sulfate solution according to AASHTO T 104.

(2) Durability - Provide aggregate not exceeding the following maximum values:

Test Test Method Aggregates ODOT AASHTO Coarse

Abrasion T 96 30.0% Degradation

Passing No. 20 sieve TM 208 30.0% Sediment Height TM 208 3.0"

(3) Fractured Faces - Provide crushed aggregate with not less than the minimum number of fractured faces as determined by AASHTO T 335 as follows:

Percent of Fracture (by Weight)

Material Retained on 1", 3/4", 1/2" Material Retained and No. 4 Sieve on No. 8 sieve

Type of Mix (two fractured faces) (one fractured face)

All ACP 75 75

(4) Harmful Substances - Do not exceed the following maximum values:

Test Test Method Aggregates ODOT AASHTO Coarse Fine

Lightweight pieces T 113 1.0% Wood Particles TM 225 0.10% Elongated Pieces TM 229 10.0% (at a ratio of 5:1) Plasticity Index T 90 0 or NP Sand Equivalent T 176 45 min.

(b) Reclaimed Asphalt Pavement - RAP material used in the production of new ACP is optional. No more than 30 percent RAP material will be allowed in the new ACP pavement. Use RAP aggregates in the ACP that are no larger than the specified maximum allowable aggregate size before entering the cold feed. Blend the RAP material with new aggregate to provide a mixture conforming to the JMF within the tolerances specified.

(c) Recycled Asphalt Shingles - RAS used in the production of new ACP is optional. Either manufacturer waste (post-manufacturer) RAS or tear-off (post-consumer) RAS may be used.

Manufacturer waste RAS is processed asphalt shingle material derived from manufacturer's shingle scrap. Tear-off RAS is processed asphalt shingle material derived from shingle scrap removed from structures. All percentages are based upon dry weights for calculations.

(1) Processing Shingles - Process the RAS by grinding at ambient temperature so that 100 percent of the shredded pieces are less than 1/2 inch in any dimension and that 90 percent are less than 3/8 inch in any dimension when sampled according to AASHTO T 2 and tested according to AASHTO T 27. Sample and test the processed RAS for gradation at a frequency of one test for every 50 tons of RAS processed.

A11-2

(2) Harmful Substances - Certify that the RAS does not contain asbestos fibers according to the policies and procedures established by the Department of Environmental Quality. Test deleterious materials according to ODOT TM 335 at a frequency of one test for every 50 tons of RAS material. Limit the percentage of deleterious materials to 1.0 percent. If fine aggregate is added as an anti-clumping agent, sample and test processed RAS for harmful substances before adding the fine aggregates.

(3) Anti-Clumping Additive - Fine aggregate meeting the requirements of 00744.10(a) may be added to the RAS in a quantity not to exceed 4 percent by weight of RAS to keep the material workable and to prevent conglomeration of the shingle particles in the stockpile.

Include these added fine aggregates in the mix design. RAS may also be blended with RAP in controlled percentages to preclude clumping. Do not contaminate stockpiled RAS with dirt or other foreign materials.

(4) Allowable Percentages - No more than 5.0 percent RAS by total weight of aggregate is allowed in ACP mixtures. Restrict the maximum allowable percentage of asphalt binder replacement to 20.0 percent for base courses and 15.0 percent for wearing courses in ACP containing only RAS.

When RAS is used in conjunction with RAP, restrict the maximum allowable percentage of binder replacement to 30.0 percent for base courses and 25.0 percent for wearing courses.

(5) Establishing Mix Design Inputs - For ACP mixtures containing RAS or RAM, following any addition of fine aggregate as an anti-clumping agent, test the material according to ODOT TM 319 to establish the asphalt content, material specific gravities, and gradation.

Develop mixture designs according to the ODOT Contractor Mix Design Guidelines for Asphalt Concrete.

Blend the RAS or RAM with new aggregate to provide a mixture conforming to the JMF within the tolerances specified.

00744.11 Asphalt Cement and Additives - Furnish the following asphalt cement and additives:

(a) Asphalt Cement - Provide asphalt cement conforming to the requirement of ODOT's publication "Standard Specifications for Asphalt Materials". Copies of the publication are available from ODOT's website. The applicable specifications are those contained in the current publication on the date the Project is advertised. Use the grade of asphalt that is specified in the Special Provisions.

(b) Asphalt Cement Additives - Use standard recognized asphalt cement additive products that are of known value for the intended purpose and approved for use on the basis of laboratory tests and capable of being thoroughly mixed. Do not use asphalt cement additives that have detrimental effects on the asphalt material. Do not use silicones as an additive. Add the following asphalt cement additives when required by the JMF:

• Anti-stripping asphalt cement additives to prevent stripping or separation of asphalt coatings from aggregates to satisfy the TSR specified in 00744.13.

• Asphalt cement admixtures used to aid in the mixing or use of asphalt mixes or for experimental purposes.

When WMAC is used, select one of the WMAC technologies and process and additive types identified on ODOT's publication "Approved WMAC Technologies".

Submit the proposed WMAC technology to be used and a plan for its implementation at the pre-construction conference.

A11-3

Comply with the manufacturer's recommendations for incorporating additives and WMAC technologies into the mix. Comply with manufacturer's recommendations regarding receiving, storing, and delivering the additives.

00744.12 Mix Type and Broadband Limits - Furnish the mix type specified in the Contract Documents within the broadband limits according to following:

(a) Mix Type - Furnish the types of ACP shown or as directed. When the plans allow an option of two types for a course of pavement, use only one type throughout the course.

(b) Broadband Limits - Provide a JMF for the specified mix type within the control points listed below:

3/4" ACP 1/2" ACP 3/8" ACP

Sieve Size Control Points (% passing by Weight)

Control Points (% passing by Weight)

Control Points (% passing by Weight)

Min. Max. Min. Max. Min. Max.

1" 100

3/4" 90 100 100

1/2" 90 90 100 100

3/8" 90 90 100

No. 4 90

No. 8 23 49 28 58 32 67

No. 200 2.0 8.0 2.0 10.0 2.0 10.0

00744.13 Job Mix Formula Requirements - Provide a JMF for the Project meeting the following criteria and that was either developed or verified within 3 years of the date the Contract was advertised:

Level 1 Level 2 Level 3

Design Method Superpave Superpave Superpave Compaction Level 65 Gyrations 65 Gyrations 80 Gyrations Air Voids, % 3.5 4.0 4.0 VMA, % minimum 1/2 inch - 14.0 3/4 inch - 13.0 3/4 inch - 13.0

3/8 inch - 15.0 1/2 inch - 14.0 1/2 inch - 14.0 3/8 inch - 15.0 3/8 inch - 15.0

VMA, % maximum min + 2.0% min + 2.0% min + 2.0% P No. 200 / Eff. AC ratio 0.8 to 1.6 0.8 to 1.6 0.8 to 1.6 TSR, % minimum 80 80 80

VFA, % 70 - 80 65 - 78 65 - 75

3/8 inch: 70 - 80 3/8 inch: 70 - 80 3/8 inch: 70 - 80

Develop the JMF according to the ODOT Contractor Mix Design Guidelines for Asphalt Concrete; or verify according to the ODOT Mix Design Verification process. Submit the proposed JMF and supporting data to the Engineer for review at least 10 calendar days before anticipated use. If acceptable, written acceptance will be provided. Perform a new TSR if the source of the asphalt cement changes.

For Level 3 wearing course mixes, include the results of the performance testing as outlined in the latest ODOT Contractor Mix Design Guidelines for Asphalt Concrete in the mix design submittal.

A11-4

Issue a separate JMF for WMAC. Do not use RAS in WMAC mixes with minimum compaction temperatures less than 260 °F.

When WMAC is used, provide the following information in addition to the requirements listed for

ACP:

• WMAC technology and WMAC additives information.

• WMAC technology manufacturer's established recommendations of usage.

• WMAC technology manufacturer's established target rate for water and additives, the acceptable variation for production, and documentation showing the impact of excessive production variation.

• WMAC technology material safety data sheets if applicable.

• Temperature range for mixing.

• Temperature range for compacting.

• Except for foaming technology, asphalt binder performance grade test data of the asphalt binder and chemical additive at the manufacturer's recommended dosage rate.

• Except for foaming technology, WMAC mixture performance test results. Perform testing for foaming technology on the production mix on specimens compacted at WMAC compaction temperatures.

00744.14 Tolerances and Limits - Produce and place ACP within the following JMF tolerances and limits:

ACP Type Gradation Constituent 3/4" 1/2" 3/8"

1" JMF ± 5% *

3/4" 90 - 100% JMF ± 5% *

1/2" JMF ± 5% 90 - 100% JMF ± 5% *

3/8" 90 - 100%

No. 4 JMF ± 5% JMF ± 5% JMF ± 5%

No. 8 JMF ± 4% JMF ± 4% JMF ± 4%

No. 30 JMF ± 4% JMF ± 4% JMF ± 4%

No. 200 JMF ± 2.0% JMF ± 2.0% JMF ± 2.0%

* Maximum not to exceed 100%

Constituent of Mixture ACP All Types

Asphalt Cement - AASHTO T 308 (Ignition) and ODOT TM 323 JMF ± 0.50%

RAP Content - ODOT TM 321 JMF ± 2.0%

RAS Content - ODOT TM 321 JMF 1.0%

RAM Content - ODOT TM 321 JMF 2.0%

Moisture content at time of discharge from the mixing plant - AASHTO T 329 0.80% max.

When a JMF tolerance applies to a constituent, full tolerance will be given even if it exceeds the control points established in 00744.12(b). Full tolerance will be given for RAP, RAS, or RAM content even if it exceeds the limits established in 00744.10.

A11-5

00744.16 Sampling and Testing - For each 1,000 tons of placement, have a CAT-I perform a minimum of one of each of the following test methods as modified in the MFTP:

• Asphalt Content - AASHTO T 308 with ODOT TM 323 determined Calibration Factor

• Gradation - AASHTO T 30

• Mix Moisture - AASHTO T 329

• Maximum Specific Gravity - AASHTO T 209

When less than 1,000 tons of mix is placed in a day, perform a minimum of one series of tests per day. Provide test results to the Engineer by the middle of the following work shift.

If less than three samples are obtained on a project, the Contractor may supplement test results with the Engineer's approval by:

• Accelerating testing.

• Providing test results from other projects with the same JMF within the past 120 days of first date of JMF production.

• Testing back up samples.

Provide a minimum of three test results. Provide samples or split samples to the Engineer when requested.

00744.17 Acceptance - If the average for each mix gradation constituent and asphalt content is within the specification limits, the material will be accepted. If the average asphalt content or one or more gradation constituents is not within the specification limits, the material will be accepted according to 00150.25.

Equipment

00744.23 Pavers - Provide pavers that are:

• Self-contained, self-propelled, supported on tracks or wheels, none of which contact the mixture being placed.

• Equipped with augers and a screed or strike-off assembly, heated if necessary, which:

• Can spread and finish the ACP to a uniform texture, in the specified widths, thicknesses, lines, grades and cross sections.

• Will not segregate, tear, shove or gouge the ACP.

• Equipped with a paver control system which:

• Controls the ACP placement to specified slope and grade.

• Maintains the paver screed in proper position.

• Provides the specified results through mechanical sensors and sensor-directed devices actuated from independent line and grade control references.

00744.24 Compactors - Provide self-propelled steel-wheeled or vibratory rollers specifically designed to compact ACP and capable of reversing without backlash. Provide a sufficient number of appropriately weighted rollers to compact the mixture. Equip vibratory rollers with amplitude and frequency controls. Do not operate in vibratory mode for lifts thinner than two times the maximum aggregate size for the type of ACP being compacted.

Labor

00744.30 Quality Control Personnel - Provide technicians having CAgT, CAT-I, CDT, and CMDT technical certifications.

A11-6

Construction

00744.40 Season and Temperature Limitations - Place ACP when the temperature of the surface that is to be paved is not less than the temperature indicated:

Nominal Compacted All Levels Level 1 and Level 2 Level 3 Thickness of Individual Lifts and Courses as Travel Lane All Other shown on the typical All Courses Wearing Course Courses section of the plans

Surface From To From To From To Temperature* Inclusive Inclusive Inclusive

Less than 2 inches 60 F All Year** 3/15 9/30 All Year** 2 inches - 2 1/2 inches 50 F All Year** 3/15 9/30 All Year** Greater than 2 1/2 inches 40 F All Year** 3/15 9/30 All Year**

Temporary 40 F All Year** All Year** All Year**

* Do not use field burners or other devices to heat the pavement surface to the specified minimum temperature.

** If placing ACP between March 15 and September 30, temperature requirement may be lowered 5 F.

00744.41 Mixing Temperatures - Produce ACP within the temperature ranges recommended by the asphalt cement supplier for the grade of asphalt being used on the Project.

Establish the allowable mixing and placement temperature ranges by the JMF. Measure the mixture temperature at the discharge of the mixer. Measure the placement temperature behind the paver.

The allowable production temperatures may be adjusted based on the asphalt cement supplier's recommendation if approved by the Engineer. The maximum mixture temperature and the minimum placement temperature shall be as follows:

Temperature, F

Type Maximum Minimum Behind at Mixer Paver

HMAC 350 240

WMAC 275 215

Within the above limits, the Contractor with approval of the Engineer, or the Engineer may adjust this temperature in 10 F increments from the JMF as follows:

• Up - If the aggregate coating, moisture content, workability or compaction requirements are not attained.

• Down - If the aggregate coating, moisture content, workability and compaction requirements are attained.

00744.42 Tack Coat - Construct a tack coat before placing each lift of ACP according to Section 00730. A tack coat is not required before placing ACP on aggregate base.

Treat all paved surfaces on and against which ACP is to be placed with an asphalt tack coat according to Section 00730. Before applying the tack coat, clean and dry the surface to be tacked.

A11-7

Remove all loose material that will reduce adhesion of the tack by brooming, flushing with water, or other approved methods.

00744.43 Hauling, Depositing, and Placing - Haul, deposit, and place ACP according to the following:

(a) Hauling - Cover ACP if rain is encountered any time between loading and placement.

ACP will be rejected before placing if one or more of the following occurs:

• Below temperature limit specified in 00744.41.

• Slumping or separating.

• Solidifying.

Dispose of rejected loads at no additional cost to the Agency.

Deliver the mixture to the paving machine at a rate that provides continuous operation of the paving machine, except for unavoidable delay or breakdown. If excessive stopping of the paving machine occurs during paving operations, the Engineer may suspend paving operations until the mixture delivery rate matches the paving machine operation.

(b) Depositing - Deposit ACP from the hauling vehicles so segregation is prevented.

(c) Placing - Alternative equipment and means may be allowed by the Engineer if the use of a paver is impractical.

Do not place ACP during rain or other adverse weather conditions, unless allowed by the Engineer. ACP in transit at the time adverse conditions occur may be placed if:

• It has been covered during transit.

• The ACP temperature is satisfactory.

• It is placed on a foundation free from pools or flow of water.

Place the mixture in the number of lifts and courses, and to the compacted thickness for each lift and course, as shown. Place each course in one lift unless otherwise specified. Do not exceed a compacted thickness of 4 inches for any lift. Limit the minimum lift thickness to twice the maximum aggregate size in the mix.

00744.44 Longitudinal Joints - At longitudinal joints, bond, compact and finish the new ACP equal to the ACP against which it is placed.

(a) Location - Place the ACP in panel widths which hold the number of longitudinal joints to a minimum. Offset the longitudinal joints in one panel by at least 6 inches from the longitudinal joints in the panel immediately below.

(1) Base Course - Place base course longitudinal joints within 12 inches of the edge of a lane, or within 12 inches of the center of a lane, except in irregular areas, unless otherwise shown.

(2) Wearing Course - Construct longitudinal joints at either lane lines or fog lines, or as shown or directed.

A11-8

(b) Drop-offs:

• Provide warning signs and markings according to Section 00225 where abrupt or sloped edge drop-offs 1 inch or more in height occur.

• Protect edges from being broken down.

If unable to complete the pavement without drop-offs according to 00744.44(c) do the following:

• Construct and maintain a wedge of ACP at a slope of 1V:10H or flatter along the exposed longitudinal joint.

• Remove and dispose of the wedge before continuing paving operations.

• Construct, maintain, remove, and dispose of the temporary wedge at no additional cost to the Agency. ACP for the temporary wedge will be paid for at the pay item price.

(c) Placing Under Traffic - When placing ACP pavement under traffic, schedule work for the nominal thickness being laid as follows:

(1) More Than 2 Inches - Schedule work so at the end of each working shift the full width of the area being paved, including shoulders, is completed to the same elevation with no longitudinal drop-offs, unless approved.

(2) Less Than or Equal to 2 Inches - Schedule work so that at the end of each working shift one panel of new travel lane pavement does not extend beyond the adjoining panel of new travel lane pavement more than the distance normally covered by each shift. At the end of each week complete the full width of the area to be paved, including shoulders, to the same elevation with no longitudinal drop-offs.

00744.45 Transverse Joints:

(a) Travel Lanes - Construct transverse joints on the travel lane portion of all specified pavement courses, except leveling courses, as follows:

(1) Temporary End Panel - Maintain pavement depth, line and grade at least 4 feet beyond the selected transverse joint location, and from that point, wedge down on the appropriate slope until the top of the course being laid meets the underlying surface (assuming a pavement course thickness of 2 inches) as follows:

• For wedges that will be under traffic for less than 24 hours, construct an 8 foot long wedge (1V:50H taper rate).

• For wedges that will be under traffic for 24 hours or longer, construct a 25 foot long wedge (1V:160H taper rate).

• Construct, maintain, remove, and dispose of the temporary wedge at no additional cost to the Agency. ACP for the temporary wedge will be paid for at the pay item price.

When the pavement course thickness is different than the above 2 inch example, use the appropriate taper rate to compute the length of the wedge. The wedge length plus the 4 feet or longer panel form the temporary end panel.

(2) Vertical Face - After the mixture has reached the required density:

• Provide a smooth, vertical face the full depth of the course being laid at the location selected for the joint by sawing, cutting or other approved method.

A11-9

• Remove the ACP material from the joint to the end of the panel. If removed before resuming paving beyond the joint, reconstruct the temporary end panel immediately by placing a bond-breaker…