The Dalles 2017 Extended Lock Outage Plan
Scope of work limited to critical items Improve life safety concerns Improve lock reliability Reduce risk of unplanned lock outages Plan for future extended outages 2017 Scope:
Replace downstream gate gudgeon hardware Replace upstream gate Upgrade controls Eliminate operator and interlock safety concerns
BUILDING STRONG®
PORTLAND DISTRICT
Current Issues – DS Gate
Gudgeons (top hinge point) Cathodic protection Vibration
Current Issues US Gate Fracture critical structure Cracked Welds and deformed members Gate is twisted, causing uneven lifting
Current Issues Controls High over voltage at operator panel and interlock failure 2013 – temporary fix installed Wire insulation breakdown 57 year old hardware difficult to maintain – lock reliability – outage concerns image4.jpeg image5.jpeg image6.jpeg image7.jpeg image8.jpeg image9.jpeg image10.jpeg image11.jpeg image12.jpeg image13.jpeg image14.jpeg image15.jpeg image1.jpeg image2.png image3.png