Amd_0001_W9127N-16-B-0007.pdf
PDF 1 MB Posted
- Attached to
- Depot Slough Clamshell Maintenance Dredging 2016
- Solicitation number
- W9127N-16-B-0007
About this file
Amendment 0001 W9127N-16-B-0007
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_16-B-0007.pdf | ||
| Solicitation_W9127N-16-B-0007_Plans.pdf | ||
| Solicitation_W9127N-16-B-0007_Specs.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
As an amendment to the solicitation the follow ing changes are made:
1. Draw ing DSC-DSL-000 DWG 2 OF 2 is revised to include Cross Section B-B. The attached revised version is incorporated in full and replaces the previous version in its entirety.
2. Specification Section 01 10 10.00 82 Paragraph 1.2.1 Schedule of Work is revised to read as follow s:
For purposes of this Contract, all w ork must be restricted to the environmentally cleared w ork w indow , along w ith further w ork restrictions as described in the Contracting Section 00800 paragraph 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK.
3. The bid opening date is unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jul-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-B-0007
X 9B. DATED (SEE ITEM 11)
22-Jun-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jul-2016
CODE
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-16-B-0007
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION 00010 - SOLICITATION CONTRACT FORM
The Issued By organization below has been added:
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
The 'issued by' organization has changed from
US ARMY CORPS OF ENGINEERS - CECT-NWP
333 SW FIRST AVE
PORTLAND OR 97204-3495
to
USACE PORTLAND DISTRICT
333 SW 1ST AVE
PORTLAND OR 97204-3440
SECTION 00100 - BIDDING SCHEDULE / INSTRUCTIONS TO BIDDERS
SUBCLIN 0002AA
The cost constraint EST has been added.
SUBCLIN 0002AB
CLIN 0003
(End of Summary of Changes)
Piling
Piling
Piling
Piling
Piling
SUBMARINE PIPELINE
CROSSING AREA
Boat Spike
GAGE
STAFF
OVERHEAD PIPELINE 61.9 FT.
CLEARANCE (MLLW)
B
A
C
D
B
A
C
D
1 3 4 5
21 3 4 5
FILE
NAME
DSC-DSL-000
U S
A R
M Y E
N G
IN
E E
R D
IS
T R
IC
T P
O R
T L
A N
D
C O
R P
S O
F E
N G
IN
E E
R S
P O
R T
L A
N D
O R
E G
O N
D E
S
IG
N E
D B
Y
C H
E C
K E
D B
Y
D R
A W
N B
Y
A W
A R
D D
A T
E
P L
O T
S C
A L E
D E
S
IG
N F
IL
E N
A M
E
S U
B M
IT
T E
D B
Y
C H
IE
F
W A
T E
R W
A Y
S M
A
IN
T S
E C
T
S O
L
IC
IT
A T
IO
N N
O
P L
O T
D A
T E
D S
C -D
S L -0
.D
G N
R M
T
O
US ARMY CORPS
OF ENGINEERS
PORTLAND DISTRICT
D A
T E
A P
P R
M A
R K
D A
T E
A P
P R
M A
R K
N
OF YOUR CONTRACT
SAFETY IS A PART
Y 366,000
X ,3 ,0
X ,3 ,0
Y 366,000
Y 365,000
X ,3 ,0
X ,3 ,0
Y 365,000
50' 50' 100' 150' 200'
X COORDINATE
7307011.34
WORK AREA B-B COORDINATES
7307112.38
7307320.27
7307206.24
7306483.94
7306428.18 364739.27
364651.64
365458.25
365660.06
365664.76
365501.65
Y COORDINATE
B
C
D
M
F
G
H
I
J
K 7307320.27
7307179.96
7307049.00
7306954.19
7306875.09
7306989.56
X COORDINATE Y COORDINATE
366150.63
366232.29
366388.00
366339.84
366157.03
365660.06
X COORDINATE Y COORDINATE
7256057.80 355980.55
7257013.08 361396.95
7259967.48 360875.84
7259012.19 355459.43
NOTES
Elevations are shown thus: +2, indicating height in feet above MLLW.
Control is by USACE and NOS-C&GS.
Datum is Mean Lower Low Water. (MLLW is 4.10 feet below National Geodetic
Soundings are shown in feet and indicate depths below MLLW.
U.S. Survey Feet).
Location of river mile markers and terrain features are approximate.
The information depicted on this map represents the results of surveys made on the dates indicated and can only be considered as indicating the general condition existing at that time.
Hydraulics Committee, Pacific Northwest River Basins Commission.
Aerial photography taken by U.S.D.A. Fall 2009
River mileage conforms to the River Mile Index of the Hydrology and Reference is Navigation Chart Nos. 18581 and 18561.
Coordinates are based on the Lambert Projection for Oregon, North Zone (NAD 83, Northing: 365469 Easting: 7307271
STAFF GAGE AT TOLEDO
Vertical Datum at River Mile 1.8 and 3.98 feet at Toledo, 1947 adjustment.)
SCALE IN FEET
LEGEND
Primary Control Point
Aids to Navigation
Lighthouses
Lights
Lighted Ranges
Lighted Buoys
Benchmarks
Gages Staff Recording
Front Rear
Straight Tidal
FLOOD
EBB
Port
Rear
Port
Fixed
Front
Junction
Starboard 43
Flashing, FLOW
Coordinated Survey Points
Uncoordinated Survey Points
Dredging Ranges
Flow Arrows
Harbor Lines
State Boundary
Aids to Navigation
Lighthouses
Lights
Lighted Ranges
Lighted Buoys
Unlighted Buoys
Daybeacons
Seasonal Lights and Lighted Dredging Ranges
Staff Recording
Front Rear
Straight Tidal
River Mileage from Mouth
FLOOD
EBB
Port
Rear
Port
Fixed Occulting
Front
Starboard Mid Channel Junction
Starboard 43
Flashing, FLOW
DWG 2 OF 2
M A
IN
T E
N A
N C
E D
R E
D G
IN
G
D E
P O
T S
L O
U G
H C
L A
M S
H E
L L
D E
P O
T S
L O
U G
H
T S
G
T M
H
T S
G
K A
R L
A G E
L L
IS
W
N -1
-B -0
8 8 8 7 7 7 6 5 5 4 5 5 4 4 4 4 4 4 1 2
0 1 1
+0
7 6 3 4 6 7 8 7 6 7 7 6 4 4 4 4 4 3 3 3 3 4 4 5 5 5 5 4 4 3 3 4 5 6 5 4 4 5 5
21110+0+1+1+1+000011112
7889101010111111121110
8 8 7 7 7 6 5 5 6 7 7 6 7 7 7 7 7 7 7 8 9 8 10 7 8 8 7 7 8 8 8 8 8 8 8 8 8 8 8 7 7 7 7 7 7 7 7 7 7 7 7 7 7 8 7 7 8 8 7 7 7 7 7 7 7 8 8 9 9 9 9 8 8 8
+2
+2
+1
+1
+0
+0
+0
+0
+0
776666554445 55666
4444444444455666677777891088101112121091111111312121111109
8 8 8 7 7 6 6 7 7 8 8 9 9 9 91010 9 9 9 9101111121313121111111110 9 9 9 9 8 8 8 8 8 8 8 8 8 7 8 7 7 7 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 9 8 8 8 8 8 8 9
+0
+0
8888777766666666666666666777777777777777776766777777777888891011111112121313131114121314131212111198
8 8 8 7 7 6 7 8 8 9 9 91010101010101010101011111313131311111212111110101010 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 8 8 8 8 8 8 9 9 8 8 8 8 8 7 7 6
9988888787777777777777787887777777777777778778888777777788889101011111212131312131212131213121211988
8 8 8 7 7 7 8 9 910101011111111111111111111111111111111121211111111111111111111111111111111101010101011101010 9 9 9 9 9 9 9 9 9 91010 9 9 9 9 9 9 9 9 9 9 9 9 8 8 8 8 8 8 8
99999998888888888888888888888888888888888888888898888888889991010111112131212121212121212111211119788
8 8 7 7 81010101011111212121212121211111110101010101010101010101010101010 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 8 8 9 8 8 8 8 8 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 9 8
N
Y COORDINATEX COORDINATE
O
P
V
U
T
Q
R
S
A B D
E
F
J
K
L M
N
Q
R
S
T
V
U
P
O
COORDINATES
SOUTH PLACEMENT SITE
COORDINATES
NORTH PLACEMENT SITE
C
00+12+38
CENTERLINE AT APPROX
A-A AND B-B CROSSES
BOUNDARY LINE OF AREAS
04-FEB-2016
SURVEY DATE
7258594.68 369397.10
7259549.32 374813.62
7262503.63 374292.00
7261548.99 368875.48
7306879.61 365393.30
A
E 7307084.75 365983.67
WORK AREA A-A COORDINATES
G
H
I
K
L
N
7306345.91 364797.31 D 7307112.38 365664.76
DREDGE SURVEY
DETERMINED BY PRE
ACTUAL DEPTHS TO BE
ODMDS-S
ODMDS-N
NORTH AND SOUTH
YAQUINA BAY ODMDS
A
A
-J
U L -2
CENTROID IS 86700 ft
00+12+38 TO ODMDS-S
AREA AT CENTERLINE AT RM
DISTANCE FROM DREDGE
CENTROID IS 88850 ft
00+12+38 TO ODMDS-S
AREA AT CENTERLINE AT RM
DISTANCE FROM DREDGE
S O
U T
H
N O
R T
H
7 8
19 20
22 23
32 33
38 39
43 44
52 53
58 29
64 65 66
7 8
19 20
22 23
32 33
38 39
43 44
52 53
58 29
64 65 66
N
PROXIMITY TO DREDGE AREAS
YAQUINA BAY ODMDS LAYOUT
NOT TO SCALE
SLOUGH
DEPOT
S A
M P
L E L
A Y
O U
T D
R A
W
IN
G X
X -X
X -X
X
CL
N.T.S.
REQUIRED DREDGING DEPTH
MAXIMUM PAY OVERDEPTH
MAXIMUM DREDGING DEPTH
-12ft. MLLW
-14 ft. MLLW
-10ft. MLLW
12ft CONTOUR MLLW
10ft CONTOUR MLLW
DREDGE SURVEY
DETERMINED BY PRE
ACTUAL DEPTHS TO BE
RIVER MILE: 00+07+00
CROSS SECTION A - A
100' 100'
CL
N.T.S.
REQUIRED DREDGING DEPTH
MAXIMUM PAY OVERDEPTH
MAXIMUM DREDGING DEPTH
-12ft. MLLW
-14 ft. MLLW
-10ft. MLLW
12ft CONTOUR MLLW
10ft CONTOUR MLLW
DREDGE SURVEY
DETERMINED BY PRE
ACTUAL DEPTHS TO BE
RIVER MILE: 00+17+95
CROSS SECTION B - B
B
B
70.6' 90.3'
NOT TO SCALE
-J
U L -1
00+00+00
AREA A-A
LIMIT
PROJECT
LOWER
00+20+00
AREA B-B
LIMIT
PROJECT
UPPER
A M
E N
D M
E N
T
A
D D
E D A
N I
N F
O R
M A
T
IO
N A
L C
R O
S S S
E C
T
IO
N F
O R W
O R
K A
R E
A B -B
File details come from the government source that posted it. Updated .