B.01.02_Abstract_16-B-0004.pdf

PDF 47 KB Posted

Attached to
Columbia River Clamshell Maintenance Dredging 2016
Solicitation number
W9127N-16-B-0004
Issued by

About this file

Bid Abstract W9127N-16-B-0004

View the file

Other files

File Type Posted
Amd_0002_W9127N-16-B-0004.pdf PDF
Amd_0001_W9127N-16-B-0004.pdf PDF
Solicitation_W9127N-16-B-0004.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NO 2. DATE ISSUED 3. DATE OPENED PAGE 1 OF 1 PAGES

1/13/2016 2/12/2016

4. ISSUING OFFICE

DISTRICT ENGINEER CONTRACT SPECIALIST SIGNATURE CONTRACTING OFFICER SIGNATURE

PORTLAND DISTRICT, CORPS OF ENGINEERS

P.O. BOX 2946

PORTLAND, OR 97208-2946

5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS

(CHECK A, B, OR C AND COMPLETE NO.1 NO.2 NO.3

D, E, AND F.) A. OFFEROR A. OFFEROR A. OFFEROR

A. HIRED LABOR

B. REASONABLE CONTRACT B. BID SECURITY

X (WITHOUT PROFIT) 20% of bid price 20% of bid price 20% of bid price

C. REASONABLE CONTRACT C. ADDENDA ACKNOWLEDGED C. ADDENDA ACKNOWLEDGED ADDENDA ACKNOWLEDGED (INCLUDING PROFIT) Amd. 0001 and 0002 Amd. 0001 and 0002 Amd. 0001 and 0002

6. NUMBER OF ADDENDA ISSUED 2

7A.

ITEM E. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED D. UNIT F. ESTIMATED NO. QUANTITY UNIT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT PRICE AMOUNT No. 1 vs IGE No. 2 vs IGE No. 3 vs IGE

BIG CLIFF DAM BASE LINE ITEMS

0001 Mobilization and Demobilization 1 JOB 345,271.00$ 345,271.00$ 90,000.00$ 90,000.00$ 97,000.00$ 97,000.00$ 142,000.00$ 142,000.00$ -73.9% -71.9% -58.9% 0002 Dredging and Placement of Materials; Bonneville 1620 MNT 81.27$ 131,657.40$ 50.00$ 81,000.00$ 99.00$ 160,380.00$ 37.95$ 61,479.00$ -38.5% 21.8% -53.3% 0003 Incremental Mobilization to Longview (OPTION) 1 JOB 59,463.00$ 59,463.00$ 24,000.00$ 24,000.00$ 39,000.00$ 39,000.00$ 105,000.00$ 105,000.00$ -59.6% -34.4% 76.6%

Dredging and Placement of Materials; Longview (OPTION)

(INFORMATIONAL CLIN)

0004AA First 2000 Cubic Yards (OPTION) 2000 CY 7.84$ 15,680.00$ 25.00$ 50,000.00$ 13.25$ 26,500.00$ 44.05$ 88,100.00$ 218.9% 69.0% 461.9% 0004AB Over 2000 Cubic Yards (OPTION) 1500 CY 7.84$ 11,760.00$ 20.00$ 30,000.00$ 13.25$ 19,875.00$ 25.60$ 38,400.00$ 155.1% 69.0% 226.5%

SUBTOTAL FOR MANDATORY LINE ITEMS 476,928.40$ 171,000.00$ 257,380.00$ 203,479.00$ -64.1% -46.0% -57.3% SUBTOTAL FOR OPTIONAL LINE ITEMS 86,903.00$ 104,000.00$ 85,375.00$ 231,500.00$ 19.7% -1.8% 166.4%

563,831.40$ 275,000.00$ 342,755.00$ 434,979.00$ -51.2% -39.2% -22.9%

NSN 7540-01-150-0981 1419-101

ABSTRACT OF OFFERS

W9127N-16-B-0004

I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT

ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.

Columbia River Clamshell Dredging 2016

7B. DESCRIPTION OF OFFERED ITEM

7C. EST D.

TOTAL

% IGE

ACCEPTANCE LIMITATION - DAYS

INFORMALITIES

J.E. McAmis, Inc.

621 Country Drive Chico, CA 95928

B. BID SECURITY B. BID SECURITY

Marine Industrial Construction 10050 SW Wilsonville Rd Wilsonville, OR 97070

STANDARD FORM 1419 (10-3)

HME Construction, Inc.

6801 NW Old Lower River Road Vancouver, WA 98660

Sheet1

2016-02-16T09:41:17-0800
BOONE.DAVID.C.1272229755
2016-02-16T09:54:51-0800
BYAM.BARBARA.V.1232155406