Amd_0001_W9127N-16-B-0001.pdf
PDF 1 MB Posted
- Attached to
- West Coast Hopper Dredging 2016
- Solicitation number
- W9127N-16-B-0001
About this file
W9127N-16-B-0001 Amendment 0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bid_Abstract_16-B-0001.pdf | ||
| Solicitation_Specs_W9127N-16-B-0001.pdf | ||
| Solicitation_Plans_W9127N-16-B-0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
As an amendment to the solicitation the follow ing changes are made:
1. Attachment A34 is updated to incorporate the sieve analysis report for Grays Harbor.
2. Current updated Davis-Bacon Wage Determinations for Oregon, Washington, and California (Attachments A21, A22 and A23 respectively) are incorporated in full and replace the previous versions.
3. The bid opening date is unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 12-Jan-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127N-16-B-0001
X 9B. DATED (SEE ITEM 11)
18-Dec-2015
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
12-Jan-2016
CODE
US ARMY CORPS OF ENGINEERS - CECT-NWP
333 SW FIRST AVE
PORTLAND OR 97204-3495
W9127N 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9127N-16-B-0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
(End of Summary of Changes)
620+
630+
640+
650+
660+
670+
680+
690+
700+
710+
720+00
730+00
0 5
629+
680+
690+
710+
722+00
DD
D D D
D D
D D
D
D
D
SR4-3
SR4-2
SR4-1
SR3-3
SR3-2
SR3-1
SR2-3
SR2-2SR2-1SR1-3
SR1-2
SR1-1
-38
-36 -34
-42
-32
-30
-40
-28
-26 -24
-44
-46
-22
-50 -48
-76
-20
-6
-7
-72 -66
-7 4 -6
-6
-60 -58
-56
-5
-18
-52
-78 -80
-16
-82 -84
-50
-30
-38
-80
-26
-40
-46
-44
-42
-46
-44
-42
-7
-42
-48
-36
-28
-3
-40
-40
-44
-40
-46
-38
-4
-34
-28
-42
-7
-44
-6
-16
-44 -50
-18
-20
-48
-36 -48
-40
-48-50
-40
-54
-30 -42
-40-42
-46
-44
-18
-42
-44
-40
-28
-44
-42 -72
-50
-30
-48 -76
-42
-30
-48
-32
-46
-28
-44 -46
-36
-44
-48
-74
-38
-40
-22
-46 -42
-46
-44
-42
-44
-4
-44
-24
-38
-42
-42 -40
-46
-28
-26
-46
-38
-38
-40
-48
-40
-66
Legend D Actual Core Locations ++ Proposed Core Location
Channel Actual Depth Relative to MLLW -40 to -42 MLLW -42 to -44 MLLW
South Reach
0 1,500 3,000 4,500 6,000750 Feet ±
SR-2
SR-3
SR-1
SR-4
Bathymetric Survey: 24 May 2011
G3ODTDFF
Text Box Figure 2
SAMPLE RE ST'LTS -CO}.IVENT IONAIJS
UP97-Ahtna fixsbfi3ib@
INCORPORATED
Navi-gation ImprMatrix: Sediment Data Re]ease Authori-zed:
Reported: 04/26/12
AnaJ-yte
Client ID: GHNfP SR1-P
ARI ID: 12-5360 UP97A
Date t'lethod Units Rf.
Drni anl- .
Event:
Date Sampled:
Date Recei-ved:
Grays Harbor
NA
04/1,r/72 04/1.L/1"2
Sanple
Total- Sol-ids
Preserved Total- Solids
Totaf Vol-ati.l-e Solids
Su.l-f ide
Total Oroani r: Carbon
04/16/1,2 0476]-2#r
04 /t3/t2 04L372#I
04/1_6/t2 041_61.2#1.
04 /78 /12 041812#1
04/20/1.2 0420]-2#I
EPA 160.3
EPA 160.3
EPA 160.4
LYf| 5tO.Z
Dl"mla 1OQ'lL rur!r!t r/vr
Percent
Percent
Percent mg/kg
Percent
0.01
0.01
0.01 o-zv
0.020
89.00
78.30
1 q'l
71.0
z. o6
RL
U
Analytical reporting limit Undetected aL reported detection limit
Soil Sample Report-UP97 I] fiFh$$#$a . ffiEftL$."rF-F
SAMPI,E RE SUI.TS -CO}.IVENI TONATS
UP9?-Ahtna Arsbfisrb@
INCORPORATED
Navigation ImprMatrix: Sediment, . /\A ,,Data Release Authorizedl L}/\
Reportedz 04/26/12 V/) 'J t,/
Proi ect :
si/ent:
Date Sampled:
Date Received:
C].ient rD: GHNIP SR2-P
ARI ID: 12-6361 UP97B
Date, Method Units
Grays Harbor
NA
a4/71,/1,2 a4/n/12
Analyte RT, Sample
Totai- Sol-ids
Preserved Total Solids
Totai- Vol-atil-e Sofids
Sul-f ide
Total- Organic Carbon
04 /76/12 04I672#L
04/L3112 04131"2#t
04/16/12 04I612#L
04/1"8/1.2 0 41812 # 1
04/20/12 0420t2+r
EPA 160.3
EPA 160.3
EPA 160.4
EPA 37 6.2
Plumb,1981
Percent
Percent
Percent mg/kg
Percent
0.01 n nl
0.0r.
L1".6
0.020
85.20
75.60
1 ?(
0.314
RL
U
Analytical reporting limit Undetected at reported detection l-imit
SoiI Sample Report-UPg'l tg.&€$,*E;# I fc$ffi e{'r#
SN{PLE RE SULES -CON\TENT IOI{IAI,S
UP97-Ahtna Aisbf;srb@
INCORPORATED
Navigation fmprProi ect :
Eizenc :
Date Sampled:
Date Received:
C]-ient ID: GHNIP SR3-P ARI IDz 12-6362 UP97C
Date Mettrod Units
Grays Harbor
NA
04 /r0 /12 04/]-7/1,2
AnaJ.yte RL Sample
Total Solids
Preserved Total Solids
TotaL Vo.Iatife Sofids
Sul-f ide m^!^r n*-^-. ^ ^1rbonr v Lqr v! yarrru uc
04/16/12 EPA 160.3
041.612+t
04/13/12 EPA 160.3
0 41312+ r.
04/L6/t2 EPA 160.4 047612#I
04/t8/12 EPA 376.2 0418I2#1
04/20/12 Plumb,1981 0420r2#7
Percent
Percent
Percent mg/kg
Percent
0.01
0.0r_
0. 0r_
1.03
0. 020
9A.20
89.80
2 .49
0.982
RL
U
Anal-ytical reporting limit Undetected at reported detection ]imit
Soil Sample Report-UP97 **'F{ffi-+ ; k3ffiF+?"'c
SAIVIPLE RE SI'LTS _ COTiIVENT IONALS UP9?-Atrtna f,xsbfisrb@
INCORPORATED
Navigation ImprMatrix: Sedi-ment Data Release Authorized:
Reported: 05/I7 /72
Arralyte
Client ID: GHNIP SR4-P
ARI ID: 12-5363 UP97D
Date Method Units RL
Drn-i anl- .
Event:
Date Sampled:
Date Received:
Grays Harbor
NA
04/L0/L2 04/1r/72
Sample
Total- Soi-ids
Preserved Tota.I Sol-ids
Total- Volatife Sofids
SuLfide
Tota1 Organic Carbon
RL
U
04/76/12 04r672#1, 04/73/L2 o4I31_2#7
04/76/12 04I61_2#I o4/1,8/12 0418L2#1"
04/24/12 0420L2#r
EPA 160.3
EPA 160.3
EPA 160.4
Lv1\ JtO.Z
Pl-umb,198L
Percent
Percent
Percent mq/kq
Percent
0.01
0.01
0.01
6.15
0 .020
14.90
/J.OU
2 .3'7
51. 1 r .1"7
Analrri_ical rannr1- inn Iimif
Undetected at reported detectj-on l-i-mi-t
50J_t Sample KeporE-uvv I
E $Fhii [r'rti.sq ] F*e [+,tr E.S .&eE*ry
P ercent F iner ooooooooa90
6@ F
.trvc.N o
+stC N o- 2Io
I tro=-o,9, oo.No.=(E
(9ILIJJ
@o-oo.9E
_o 6g
.go-g.9Eoo-
(Lc6EaLz-o If+c!EU
(LzI(tI
(LI
Eao-= Io
II
u.stsn.ft,l.* g F
E -,9
0, o6)0) .co'6o.cooo.26(oc)oa'Ee.9.&o'6O t c,o) (5eo:6oI(sanI(s
1totoaI(ltrn'gaoooaE6) oEEo@(o3q)
(gE.9(UI-gE
Nol
FN
l\i n
F{ rn i\ t
(u o+
1rt t!{ f r:
qN
I
C D
?N r:
r !g\
.q q o so
.q a rc(\] c c.i N
\(\l s rt oir=a. (/) o
N
N(!
if
=n u?N nn N rt a
=6oiI r @r@o
Nc., Nri \
N ()N
-i N
F o a
EE
@o t N o u?N q a
C o6oo
K o@N@ a\ F tri t?o s
N C i N ct \(o o a q o'F a
F E
!tm
X N
N l ni \l:
N rq(a C( a r i\ a?o caoLL
N
X N
Irt c\l roF
D ats€ r.l rt rlrl t r
E 6O U
D z
No oo9T ooooo q$ q c.,l tt a?F
Noi
(f) u:o i c')
3o g,F o oPr5 t o t-ci N a tr gE E o o ro-o
N a to r, tl il d)(5 o oAs8^S i\ N i a
;zoe(E a o'\tt oe'=Ec,N6o.oa
(L()o0-zI o0.zI ti\ IraT
2Ig trlIxzT z?
IIzI
I
NNNs6
1rtt i\rlI,r=I
1zT
Eo>g.
E
E n
F c
(d o
.4,,l F w
'4 ;i co
.9.N I u) o -o,':
c.c, i.u
E
K o
6P aE
.S '6 z.
E b oo' P
F s
E g
8b g2odntg9 Rectangle g2odntg9 Rectangle g2odntg9 Rectangle g2odntg9 Polygonal Line g2odntg9 Polygonal Line g2odntg9 Polygonal Line g2odntg9 Text Box Reference Sample g2odntg9 Text Box Crossover Reach Sample- DISREGARD
Ahtna Gravs Harbor Navigation lmprovement Project
Atterberg Limits xoE50 F
P- 40 o .A tr3u d
40 60
Liquid Limit
'GHNIP
SR3.2P .GHNIP SR4.2P
Sample ldentification As-Received
Moisture Content
Plasticity lndex
Liquid Limit
Plastic Limit
USCS
GHNIP SR3-2P 9.99 NA NA NA Non Plastic
GHNIP SR4-2P 29.16 NA NA NA Non Plastic titr=-tW$ : ffiWmffi?
Ahtna Grays Harbor Navigation lmprovement Project
Soil Classification Modified ASTM D2487
ARI ID Client lD Group Symbol Group Name
R GHNIP SR3-2P SP Poorlv Graded Sand S GHNIP SR4.2P SP-SM Poorlv Graded Sand with Silt
UP97
i#y\E#s : #wcsi*s
General Decision Number: OR160002 01/08/2016 OR2
Superseded General Decision Number: OR20150002
State: Oregon
Construction Types: Heavy Dredging
Counties: Oregon Statewide.
STATEWIDE
SELF-PROPELLED HOPPER DREDGING
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/08/2016
SUOR1991-002 09/01/1991
STATEWIDE
Rates Fringes
Self-Propelled Hopper Dredge, Drag Tender............$ 8.78 4.23+a
FOOTNOTE: a. Nine paid holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Paul Hall's Birthday (August 20th), Veterans Day, Thanksgiving Day and Christmas Day.
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
General Decision Number: WA160003 01/08/2016 WA3
Superseded General Decision Number: WA20150003
State: Washington
Construction Types: Heavy Dredging
Counties: Washington Statewide.
STATEWIDE
SELF-PROPELLED HOPPER DREDGING
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor
SUWA1993-015 09/01/1991
Rates Fringes
Self-Propelled Hopper Dredge, Drag Tender............$ 8.78 4.23+a
FOOTNOTE:
a. Nine paid holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Paul Hall's Birthday (August 20th), Veterans Day, Thanksgiving Day and Christmas Day.
WELDERS - Receive rate prescribed for craft performing cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
General Decision Number: CA160006 01/08/2016 CA6
Superseded General Decision Number: CA20150006
State: California
Construction Type: Heavy Hopper Dredge Work
Counties: California Statewide.
HOPPER DREDGE CONSTRUCTION PROJECTS
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis-Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor
SUCA1985-002 01/01/1985
Rates Fringes
Self-Propelled Hopper Dredge Drag tender.................$ 8.78 4.23
FOOTNOTE: Nine paid holidays: New Year's Day, Washington's Birthday, Memorial Day, Independence Day, Labor Day, Paul Hall's Birthday (Aug. 20th), Veterans Day, Thanksgiving Day and Christmas Day.
WELDERS - Receive rate prescribed for craft performing cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the
08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
| geotech data for South Reach from 2012 deepening study - elevation -40 t....pdf |
| Figure 2 - South Reach |
| South Reach sediment conventionals |
| South Reach grain-size distribution graphs |
| South Reach grain-size distribution table |
| South Reach 3 and 4 - Atterberg Limits |
File details come from the government source that posted it. Updated .