A1_Project_Sign.pdf

PDF 388 KB Posted

Attached to
Unnamed Project
Solicitation number
W9127N-09-B-0006
Issued by

About this file

A1 - ARRA Project Sign

View the file

Other files

File Type Posted
Abstract_of_Offers.pdf PDF
A10-Spill_Emergency.pdf PDF
CB-1215-000_Amd_1.pdf PDF
SECTION_SF30_and_Summary.pdf PDF
Solicitation Package.pdf PDF
Subcontracting Letter.pdf PDF
W9127N-09-B-0006-Drawings.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Below are samples of the construc-tion project identification sign showing how this panel is adapt-able for use to identify either military or civil works projects and the Corps of Engineers signature.

The graphic format for this 4’x 6’ sign panel follows the legend guidelines and layout as specified below. The large 4’ x 4’ section of the panel on the right is to be white with black legend. The 2’ x4’ section of the sign on the left with the full Corps signature (reverse version) is to be screen printed Communications Red on the white background.

Legend Group 1:

One- to two-line description of Corps relationship to project.

Color: White Typeface: 1.25" Helvetica Regular Maximum line length: 19”

Legend Group 2:

Division or District Name (optional).

Placed below 10.5” Reverse Signature (6” Castle).

Color: White Typeface: 1.25” Helvetica Regular

Legend Group 3:

One to three-line project title legend describes the work being done under this Contract.

Color: Black Typeface: 3” Helvetica Regular Maximum line length: 42”

Legend Group 4:

One to two-line identification of project or facility (civil works) or name of sponsoring department (Military) Color: Black Typeface: 1.5” Helvetica Regular Maximum line length: 42”

Cross-align the first line of Legend Group 4 with the first line of the Corps Signature (U.S. Army Corps) as shown.

Legend Group 5a-b:

One to five-line identification of prime contractors including: type (architect, general contractor, etc.), corporate for firm name, city, state. Use of Legend Group 5 is optional.

Color: Black Typeface: 1.25” Helvetica Regular Maximum line length: 21”

All typography is flush left and rag right, upper and lower case with initial capitals only as shown.

Letter- and word-spacing to follow Corps standards.

Project Identification Sign

Feedwater Pumps and Piping for Building 195

Design and Construction Supervised by:

US Army Corps of Engineers®

Portland District

Fort Eustis, Virginia

6"

4.5"

4.5"

6"

2.25"

9.5"

1.875" 1.875" 1.875" 1.875"

7.75"

3" 3" 3"21" 42"

4.5"

2"

6.25"

10.5"

2.5"

Architects:

Williams-Russell & Associates Atlanta, Georgia

Sponsored by U.S. Air Force Tactical Air Command

Contractor:

Fenwick Associates, Inc.

Athens, Georgia

3" 21" 1" 21" 2"

US Army Corps of Engineers®

Portland District

6"

1.25"

1.25"

1.25"

1.5"

1.5"

.5"

A1-1

The White House // American Recovery and Reinvestment Act // General Guidelines for Emblem and Logo Applications Page 1

American Recovery and Reinvestment Act General Guidelines for Emblem and Logo Applications Version 1.0 03 / 20 / 09

Projects funded by the American Recovery and Reinvestment Act (ARRA) will bear a newly-designed emblem. The emblem is a symbol of President Obama’s commitment to the American People to invest their tax dollars wisely to put Americans back to work.

The purpose of this document is to provide general guidelines and specifications for using the ARRA emblem and corresponding logomark.

A1-2

The White House // American Recovery and Reinvestment Act // General Guidelines for Emblem and Logo Applications Page 2

Variations and Usage There are two approved “marks” associated with the ARRA. To preserve the integrity of the ARRA emblem and logomark, make sure to apply them correctly. Altering, distorting or recreating the “marks” in any way weaken the power of the image and what it represents.

Layout and design of signs and communication materials will vary, so care must be taken when applying the emblem or logomark.

All projects which are funded by the ARRA should display signage that features the Primary Emblem throughout the construction phase. The signage should be displayed in a prominent location on site. Some exclusions may apply. The Primary Emblem can also be displayed on signs at events or conferences associated with the ARRA or the individual projects funded by the ARRA.

The Primary Emblem should not be displayed at a size less than 6 inches in diameter.

Primary Emblem

Horizontal Logomark

An alternate variation of the emblem exists for use in press releases and other online or offline communications. It should be used to brand the communications piece, but not in reference to the Primary Emblem usage.

A1-3

The White House // American Recovery and Reinvestment Act // General Guidelines for Emblem and Logo Applications Page 4

For information regarding this document, please email:

recoveryquestions@gsa.gov

Please refer to this document as:

General Guidelines for Emblem and Logo Applications, Version 1.0

Contact Information

A1-4

The White House // American Recovery and Reinvestment Act // General Guidelines for Emblem and Logo Applications Page 3

Color All colors in the ARRA logos have precise color references, shown in the color specifications chart below. Always use the exact color values listed. Do not use screens or tints of any of the colors for any part of the logo. The CMYK values should be used for print applications. The RGB and HEX# values should be used for on-screen applications.

COLOR CMYK RGB HEX#

Navy 00 / 00 / 00 / 00 0 / 51 / 102 003366

Red 30 / 100 / 100 / 50 102 / 0 / 0 660000

Green 65 / 25 / 100 / 7 103 / 144 / 62 67903E

Light Blue 67 / 37 / 6 / 00 89 / 141 / 192 598DC0

Clear Space The clear space is shown as the value “X” in this exhibit. The minimum clear space must always be at least “X” on all sides of the logo. Whenever possible, increase the amount of clear space.

X = 1/2 Circle Radius

X

X

X

X

Primary Emblem

Horizontal Logomark

X = Character Height

X

X

X

X

A1-5

One to three l ine project tit le to describe work

One to two line identification of project or

One to five line identification of prime contractors (optional)

One to five line identification of prime contractors (optional)

Design and Construction

Division/District (optional) name of sponsoring department (military)

Supervised by:

A1-6

A1-7

CID_ARRA_ example4.pdf
Page 1
Page 2
Page 3
Page 4
ARRA_emblem_standalone
Page 1

File details come from the government source that posted it. Updated .