The purpose of this Amendment is to update the Statement of Work and extend the proposal due date.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

See page 2

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 15-Aug-2019

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9127819R0074

X 9B. DATED (SEE ITEM 11)

28-Jun-2019

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

15-Aug-2019

CODE

ENDIST MOBILE CONTRACTING DIVISION

109 ST JOSEPH ST

MOBILE AL 36602

W91278 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9127819R0074

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 15-Aug-2019 02:00 PM to 30-Aug-2019 02:00 PM.

(End of Summary of Changes)

The following items are applicable to this modification:

This is a requirement for the procurement and installation of 3-phase 480V, 800A double throw disconnect switch and switchgear trip elements for the J Strom Thurmond Lake Office station service feed and installation of a government furnished 3-phase 480V, 500KVA Emergency Diesel Generator.

1. The purpose of this Amendment is to update the Statement of Work and extend the proposal due date.

2. The Offer Due Date in Block 8 is extended to 30 August 2019, 2:00 p.m. Central Daylight Time.

3. The Projnet system will remain open for Bidder Inquiries until 23 August 2019.

If you have any questions or concerns regarding the Request for Quote, please contact laura.r.knight@usace.army.mil or backup contract specialist joan.a.rensink@usace.army.mil.

Revision 8/15/2019

LIST OF GOVERNMENT FURNISHED EQUPMENT

1. Switchgear Breaker (without trip element)

Eaton Magnum DS, DS6083WEA-3HP6 Estimated $40,000

2. Diesel Generator

Cummins DFEH-8578821, 3 phase 480V, 500KVA Estimated $100,000

3. Cable

XHHW-2, 600V, 750 KCMIL

Estimated $4,000

4. PLC

Eaton 8103, ELC2-PV28NNDR Estimated $30,000

5. Cable

XHHW-2, 600V, 350 KCMIL

Estimated $4,000

SCOPE OF WORK

This Statement of Work describes the specifications for the procurement and installation of 3 phase 480V, 800A double throw disconnect switch and switchgear trip elements for the J Strom Thurmond Lake Office station service feed and installation of a government furnished 3 phase 480V, 500KVA Emergency Diesel Generator.

1.0 GENERAL

J Strom Thurmond with the Us Army Corps of Engineers is a hydroelectric power plant that operates with seven (7) 54 MW generators on the Savannah River in Clarks Hill, SC. The project has recently undergone a 480 V Motor Control Center and Station Service Switchgear upgrade to Eaton branded equipment. The project provides the station service feed to the Project Manager’s Office. There is one feed from the Station Service Switchgear Bus 2 to provide power to the Project Manager’s Office and it is necessary to install another feed from Station Service Switchgear Bus 1. The project has a 480 V Emergency Diesel Generator on site that has never been operated, installed, or commissioned. It is necessary to install the Diesel Generator and terminate to the pre-designated breaker in Station Service Switchgear 2.

2.0 SCOPE

2.1 480 V PMO Feeder Installation

The station service setup at J Strom Thurmond is an Eaton Magnum DS three phase 480V double bus setup. The two busses are tied together via a tie breaker. The existing setup for the

Project Manager’s Office (PMO) station feed is a single feed from Bus 2. See drawings in Appendix A of current switchgear setup. This request for proposal is for the installation of a new feeder from Station Service bus 1 to feed the PMO office transformer. The 65 FT of 750 KCMIL necessary to complete this task will be provided by the government. The contractor will be responsible for providing the grounding conductor for the feeder. A separate grounding conductor is required. A three phase, three position disconnect switch will need to be purchased and installed by the contractor. The new three position disconnect and enclosure must meet the specifications of section 3.0 Materials. The disconnect switch will have a Bus 1 Feed, Bus 2 Feed, and an off position. A new 400 A digitrip element will need to be purchased for the switchgear 2. The trip element will need to meet the specifications listed under section 3.0 Materials. A spare 400 A breaker in the switchgear will be used to terminate the new PMO feeder. The three position disconnect switch will be installed in the switchgear gallery as shown in the drawings in Appendix A. The existing feed to the PMO will be removed from Station Service bus 2 and relocated to the new disconnect switch. The contractor will install new Government furnished feeder cables from Station Service Switchgear 1 and 2 to the new disconnect switch.

The contractor is required to comply with EM385-1-1 and the onsite Hazard Energy Control Program (HECP) to include a 90 minute onsite training session with quiz. All HECP requirements will be followed when working with electrical clearances. USACE personnel will be responsible for de-energizing the equipment, and the contractor will observe a zero voltage state when working on the equipment. The contractor is required to give at least a week notice for when the equipment will need to be de-energized and work will begin. The contractor will be responsible for installing the new 400 A digitrip in place of the existing 200 A trip in breaker 2b of Bus 1 in the Eaton Magnum DS station service switchgear. The contractor will terminate the new cable in the breaker 2b of Switchgear 1. The contractor will be responsible for running new cable in new RMC conduit that will feed into the existing cable tray. The contractor will pull the cable through the existing conduit and new conduit the contractor sets up to the new disconnect switch on the upstream wall in the switchgear gallery. The contractor will be responsible for installing the new disconnect and terminating the new feeder cable.

2.2 480 V Diesel Generator Installation

The Cummins DFEH-8578821 diesel generator is furnished by the government. The Diesel Generator will be moved by the contractor to its location on the transformer deck. See moving plans submittal in the submittal section. The dimensions of the deck are listed in the drawings of appendix A. The generator is 16,040 lbs dry and will be located on the unloading deck. The power plant staff can assist in lifting the generator on a loading platform on the unloading deck with the power house crane. The project does not have a means to lift or move the generator to the transformer deck location and it will be the contractor’s responsibility to move it to the new location. The required 350 Kcmil cable will be furnished by the government.

The 350 Kcmil cable will be run by the contractor in parallel to achieve the required 600 A rating. The approximate 80 FT of 350 Kcmil needed for this will be supplied by the government.

The contractor will provide the grounding conductor for the parallel feed. A separate grounding conductor per parallel feed is required. It will be necessary to make vertical core drills through 18-24 inches of concrete from the Transformer deck directly below to the Station Service Switchgear. Ground Penetrating Radar (GPR) results must be done on both sides of the surface and be approved by USACE before penetrations begin. The contractor must provide weather sealing on the penetrations on the transformer deck to prevent leakage. Plant raw water and conduit as-built drawings must be reviewed before final drills begin. The contractor will provide the necessary diesel fuel for commissioning and leave a full tank before when the contract is completed. The contractor must commission the generator and have a certified Cummins diesel technician on site during commissioning. The guidelines listed in the diesel generator installation guide must be followed. The contractor will be responsible for mounting the diesel to the deck and placing vibration isolators per the manual. The contractor will make a penetration large enough for two 3 inch 4 inch conduit and two ¾ inch conduit through the deck. The contractor will run the parallel 350 Kcmil conductors from the output of the diesel generator to the switchgear bellow. The conductors will be run in parallel conduits from the switchgear to the diesel generator. The contractor will be responsible for running conduit and terminating on the predesignated 600 A breaker in the switchgear bus 2 position 5C. The contractor will run the remote start for the diesel generator to the remote start output of the station service switchgear.

The remote start control wiring will be run in its own ¾” conduit. The contractor will also run the power for the heaters and battery charger through a ¾” conduit. Power for these terminations can be run from the lighting panel in the switchgear gallery and run through the cable tunnel to the switchgear’s cable tray. Panel PLP2 is a 120/208V panel near the switchgear that will be used to provide power to the Diesel Generator heaters (240V) and battery charger (120V). The battery charger will require a 10A 1pole/single throw breaker and the heaters will require a 30A double pole/double throw breaker installed in panel PLP2. The breakers will be provided by the contractor. The battery charger will also require the installation of a 120V outlet to be installed inside the DG close to the Battery Charger plug for connection. There is a remote annunciation panel included with the diesel generator that will need to be mounted by the contractor bellow the existing power control annunciation panel. Power for remote annunciator will be run from same source as the internal annunciator panel. A battery for the diesel generator will need to be provided by the contractor per the manual.

2.3 Option 1: Program Eaton Switchgear PLC

This option lays out the plans for the contractor to design a program for the existing Eaton PLC in the 480V Station Service Switchgear. The program will be designed by the contractor to act like a transfer switch. When 480 V station feed goes down for more than 10 seconds, the program will shed all loads and start the diesel generator. Critical loads that will be brought in will be MCC U16, Main Unit MCCs (7 MCCs for 7 Units), MCC U12, MCC U10.

These loads will be brought in on bus 2 with the tie breaker open. Permissive will need to be in place to ensure that the main feeder breaker cannot be closed while the diesel generator breaker is closed. There will need logic of the program that will start the generator once a month for 15 minutes to insure the diesel has its prime. When the diesel generator is up to rated voltage the program will sequentially close in essential loads. After power is restored the program will shut off the diesel generator and close back in the plant loads.

3.0 Material Specifications

3.1 480 V Three Position Disconnect Switch

Three Phase non-fusible rated 800A or above. Must be a three pole double throw safety switch. It must have lugs big enough to support 750 KCMIL connections. Must be a NEMA 1 rated or above enclosure.

a. Conduit Fill percentages shall not exceed those specified in the NEC. Conduit to be installed under this contract shall be run exposed for connecting circuits between items of equipment. Conduit, fittings, and accessories shall be installed in accordance with details shown on the drawings and as specified herein.

All conduit bends shall have a radius of not less than 10 times the inside diameter of the conduit.

b. All conduit shall be galvanized rigid.

c. No threadless fittings or running-thread couplings shall be used on conduit

d. Metal conduits shall be cut only with a tool approved for the purpose. Roller-type pipe cutters shall not be used on conduits. All cuts shall be square and the conduit opening shall not be constricted. After cutting and threading, conduit ends shall be reamed to remove rough edges and burrs, and the entire conduit shall be thoroughly cleaned to remove all cuttings, dirt, and oil from its interior. Threads shall be clean cut. Threaded joints in metal conduit and terminations in cast boxes shall have the threads coated with an approved joint compound, and shall be screwed tight to make the joint watertight and to provide electrical continuity of a given conduit system. Suitable watertight conduit hubs and bushings shall be provided where conduit terminates within a box, terminal cabinet, or accessory that has no threaded hub or fitting to receive threaded conduit.

e. All conduit shall be installed in a manner to ensure against trouble from the collection of trapped condensation, and all runs shall be arranged to avoid traps wherever possible.

f. Pull boxes shall be furnished and installed, complete with covers, in conduit runs as required by NFPA 70 and good practice in the trade, regardless of whether the boxes are specified on the drawings

g. Conduit shall be installed with a minimum of bending and cutting. Conduits not dimensioned as to location shall be installed approximately where shown on the drawings with limited adjustment to avoid interference with other work. Conduit shall be rigidly attached with approved supports and anchors to the surface over which it is run. The maximum spacing of supports for the exposed conduit shall be 8 feet. Supports for exposed conduit on concrete surfaces shall be fastened securely to the concrete with approved anchors. Wooden, fibrous, or similar plugs inserted into the concrete will not be accepted.

h. The entire metallic conduit system installed in the powerhouse by the contractor shall be electrically continuous and thoroughly grounded. No welding or brazing of the grounding conductor to the conduit will be allowed. All grounding connections to the conduit shall be made by means of grounding bushings or by an approved pressure type connector.

3.2 Ground-Penetration Radar (GPR)

Ground-penetrating radar test must be performed prior to all core drilling. Core drilling requires a minimum of 12” O.C. apart and 12” from any beam or column.

GPR test must be done on both sides of concrete. GPR results must show rebar on picture results. Energized equipment must be distinguished from rebar on picture results of GPR. The contractor is responsible for showing were the GPR testing was done with pictures and showing where the proposed penetration will be. GPR results will be in either Word or Pdf.

3.3 Diesel Commissioning

All guidelines shown in the “Installation Manual” A040Z642 (Issue 4) by Cummins Power Generation must be followed.

Load testing will be performed with plant loads and must be scheduled a week in advance when no scheduled generation is planned on the loads being tested. Load testing will be done with plant loads. The contractor is required to perform the testing and work with the project on what loads to bring in.

3.4 Digitrip Switchgear Element

Must be compatible with the existing Eaton Magnum DS switchgear with a plug and play design.

4.0 General Contractor on Site Requirements

(a) The Contractor shall be responsible for furnishing employee identification and for requiring each employee to display such identification as may be approved and directed by the Contracting Officer, unless otherwise specified below. All Contractor personnel, prior to engaging in work on project premises, shall be issued an identification card by the Contractor. The I.D. cards shall include the following information:

Name of Contractor Name of Employee Birth date Height Weight Hair color Eye color Recent photo

All prescribed identifications shall be returned immediately to the Contractor upon release of any employee. The Contractor shall supply a complete listing of all personnel and their titles who will be working on the project. This listing shall be revised at a minimum of once weekly and revisions provided. When required by the Contracting Officer, the Contractor shall obtain and submit fingerprints of all persons employed by it or to be employed at the powerhouse.

Contractor personnel shall wear ID badges at all times where they are easily visible, except in s ituations where this would pose a safety hazard.

b) On site work will be 0630 - 1500 EST Monday through Thursday and off on Federal Holidays.

c) Sanitary Facilities - Use of the project restroom by Contractor personnel will not be permitted. Sanitary facilities furnished by the Contractor shall be provided in accordance with EM 385-1-1 and shall be located in areas at locations coordinated and approved by the COR.

The Contractor shall provide freeze protection as needed to prevent any spillage.

d) The Contractor shall furnish utilities required for the performance of work under this contract, except Government-furnished electrical power. Water must be provided by the contractor.

Telephone will not be available for Contractor use.

5.0 Submittals

5.1 Schedule For Work

The contractor shall submit a schedule for accomplishing the work in this contract.

The schedule will not be used by the Government to select a Contractor; rather it will be used to insure that the Contractor is capable of accomplishing the necessary work in the allotted time periods. The Contract duration shall be 180 days after award.

5.2 List of qualifications

The contractor must submit documentation showing at least 5 years of experience with work related to the contract scope. In the submittal the contractor must show they have a Cummins diesel certified contractor that will oversee the generator commissioning.

5.3 List of Materials

A full list of materials that will be used and the specifications showing that section

3.0 has been met.

5.4 GPR Data

Prior to core drilling. Ground Penetrating Radar (GPR) results showing rebar and any obstructions where penetrations will be, must be submitted to USACE for approval.

GPR scan must include each face of the slab to identify rebar locations.

5.5 Accident Prevention Plan

The Contractor shall comply with the safety and health provisions contained herein in addition to those provisions contained in Contract Clause "ACCIDENT PREVENTION" of EM 385-1-1.

5.6 Activity Hazard Analyses

a. The Contractor shall develop Activities Hazard Analyses as part of the Accident Prevention Plan. The procedures shall define how the Contractor will implement the Activity Hazard Analysis in accordance with the criteria in EM 385-1-1 as further described:

b. In accordance with the requirements of EM 385-1-1, the Contractor shall, prior to the beginning of each major phase of work, prepare an Activity Hazard Analyses for that work phase. This analyses shall address the hazards for each activity to be performed in that work phase and shall detail procedures and safeguards necessary to eliminate the hazards or reduce the risks to an acceptable level.

c. The Contractor shall develop this analyses to identify the sequence of work, the specific safety and health hazards anticipated, and the control measures to be implemented to minimize or eliminate each hazard. The Activity Hazard Analyses shall be job specific and shall address the following major points:

(1) Activity being performed (i.e., identify major phase).

(2) Sequence of work.

(3) Hazards to be controlled.

(4) Control measure(s) to mitigate the hazards.

d. A work phase in the analyses is defined as a major operation involving a type of work that presents hazards that must be abated or controlled and that have not been experienced in previous operations, or when a new subcontractor or work crew is to perform work.

e. The analyses for each major work phase will be discussed by the Contractor and Construction Officer's representative. Work shall not proceed on that phase until the Contractor's Activity Hazards Analyses have been accepted by the Contracting Office

5.7 Diesel Generator Moving Plans

The contractor is required to list plans for how to move the diesel generator from the unloading deck to the permanent location on the transformer deck. The contractor will be required to submit the weight and dimensions of the crane (if used) and equipment used to lift and move the generator. This submittal will be required to be approved by USACE at least two weeks before moving the generator.

5.8 Contractor’s Quality Control Plan

The Contractor shall maintain an effective quality control system. The Contractor's system shall encompass all actions involving selection of construction material sources and suppliers, on-site and off-site fabrication of Contractor furnished items to be included in the work, on-site and off- site production of construction materials, work placement procedures, workmanship, inspection, and testing. The system shall provide the necessary supervision, inspection, and tests of all items of work, including that of its suppliers and subcontractors, that will assure the compliance of all work with applicable requirements and drawings in respect to the Contractor furnished equipment, materials, workmanship, construction, finish, functional performance, and identification. The Contractor's system shall encompass all management and supervisory actions taken by its staff that affect quality of the finished construction work, including all inspection controls and tests required for compliance with the contract, except for those inspections and tests specifically reserved to be accomplished by the Government.

6.0 ACCEPTANCE

All parts supplied under this SOW will be covered by the contractor for a one (1) year period.

If deficiencies are found under this scope the contractor will be responsible for repairs or replacement parts without further cost to the government. On site work must begin within 60 days of contract award, and must be completed within 180 days after award of contract.

Appendix A Drawings

712 40 40 50 255 1

4 3

2.4

7.5

7.5 2.5

1.5 7122 112

2 36

51520 4050

53 2 1

3 5 3 712 15 10

712 50 50 50

ST

25 150 150 25 51 1

1?

2 3

7.5

7.5 2.5

2.5 7.5

7.5 2.5

7.5 2.5

7.5 2.5

2.5 7.5

7.5 2.5

2.5 7.5

2.5 7.5

Cont.

7.5 2.5

7.5 2.5

2.5 7.5

2.5 7.5

3 3 3

5 5 5 5 5

15 15

10 10

15 15

10 10

7.5 7.5 7.5 7.5 7.5 7.5

255 1 4 3 1

JB

EL. 233

33 5 5 5

Hour Meter

ST

9400 Globe Center Dr., Suite 121 Morrisville, NC, 27560

CERTIFIED

AS-BUILT

9400 Globe Center Dr., Suite 121 Morrisville, NC, 27560

Appendix A Drawings J Strom Thurmond Diesel Generator and Village Feeder.pdf
Appendix A Drawings J Strom Thurmond Diesel Generator and Village Feeder
Appendix A Drawings J Strom Thurmond Diesel Generator and Village Feeder
Appendix A Drawings J Strom Thurmond Diesel Generator and Village Feeder