B08_Bardwell Refuse.pdf
PDF 3 MB Posted
- Attached to
- Bardwell Refuse
- Solicitation number
- W9126G22Q0024
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
W9126G22Q0024
b. TELEPHONE NUMBER 8. OFFER DUE DATE/LOCAL TIME
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W9126G9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
BRIAN EDWARDS
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED OR X
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
US ARMY CORPS OF ENGINEERS FORT WORTH
819 TAYLOR ST, CT OFC RM 2A17
FORT WORTH TX 76102-0300
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE 967419 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
BARDWELL PROJECT OFFICE
JEREMY SPENCER
4000 OBSERVATION DRIVE
ENNIS TX 75119-9563
TEL: (972) 875-5711 FAX: (972) 875-9711
(817) 886-6403FAX:
TEL: SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
X 8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$41,500,000
NAICS:
562111
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF45
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 30 - BLOCK 14 CONTINUATION PAGE
KO STATEMENT
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO)), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Bardwell Refuse Base Year
FFP
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse and garbage disposal services at Bardwell Lake, as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
CS: Brian L. Edwards (817)886-1053, brian.edwards@usace.army.mil
FOB: Destination
PSC CD: S205
NET AMT
OPTION Bardwell Refuse OY1
FFP
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse and garbage disposal services at Bardwell Lake, as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
CS: Brian L. Edwards (817)886-1053, brian.edwards@usace.army.mil
OPTION Bardwell Refuse OY 2
FFP
The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse and garbage disposal services at Bardwell Lake, as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
CS: Brian L. Edwards (817)886-1053, brian.edwards@usace.army.mil
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government BARDWELL PROJECT OFFICE
4000 OBSERVATION DRIVE
ENNIS TX 75119-9563
Government
1001 Destination Government BARDWELL PROJECT OFFICE
4000 OBSERVATION DRIVE
ENNIS TX 75119-9563
Government
2001 Destination Government BARDWELL PROJECT OFFICE
4000 OBSERVATION DRIVE
ENNIS TX 75119-9563
Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-APR-2022 TO
31-MAR-2023
N/A BARDWELL PROJECT OFFICE
JEREMY SPENCER
4000 OBSERVATION DRIVE
ENNIS TX 75119-9563
(972) 875-5711
967419
1001 POP 01-APR-2023 TO
31-MAR-2024
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-APR-2024 TO
31-MAR-2025
N/A (SAME AS PREVIOUS LOCATION)
PWS
PERFORMANCE WORK STATEMENT (PWS)
Refuse and Garbage Disposal Services
Bardwell Lake, Ennis Texas
1. GENERAL: This is a non-personal services contract to provide refuse and garbage disposal services at Bardwell Lake. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform refuse and garbage disposal services at Bardwell Lake, as defined in this Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Scope: Perform refuse and garbage disposal at Bardwell Lake. Services include providing, maintaining, emptying and cleaning of refuse and garbage receptacles at Bardwell Lake. The contractor shall accomplish collection and disposal of refuse and garbage at Bardwell Lake in accordance with the contract, all applicable laws, municipal codes, regulations and/or written directives issued by the Contracting Officer.
1.3 Period of Performance:
Base Year: 1 Apr 2022 – 31 Mar 2023
Option Year 1: 1 Apr 2023 – 31 Mar 2024
Option Year 2: 1 Apr 2024 – 31 Mar 2025
1.4 General Information
1.4.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract. The QCP is to be delivered to the designated COR within 30 days after contract award. Three copies of the QCP shall be submitted to the KO and COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to his QC system.
1.4.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.4.3 Government Holidays:
New Year’s Day Labor Day Martin Luther King Jr.’s Birthday Columbus Day President’s Day Veteran’s Day Memorial Day Thanksgiving Day Independence Day Christmas Day Juneteenth
1.4.4 Hours of Operation: Bardwell Lake are open Monday through Friday, 7:30 A.M. – 4:00 P.M.
1.4.5 Place of Performance: The work to be performed under this contract will be performed at the following locations at Bardwell Lake: Bardwell Lake Office Compound, Waxahachie Creek Park, High View Park, Mott Park, and Love Park.
1.4.6 Type of Contract: The government will award a Firm Fixed Price Contract (FFP)
1.4.7 Security Requirements:
1.4.7.1 AT Level I: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable.
Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
1.4.7.2 General: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks or background investigation and to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office.
Contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
1.4.7.2 b General-b: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
1.4.7.3 Suspicious Activity Reporting Training: The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
1.4.7.4 Escorts: All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
1.4.7.5 E-Verify: The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system.
An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
1.4.7.6 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
1.4.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative (COR), Lake Manager, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
1.4.9 Contracting Officer Representative (COR): A COR will be designated on purchase orders which are equal to or greater than $150,000 or when the complexity of the task necessitates the need for a COR. The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications:
monitor contractor's performance and notifies both the Contracting Officer and contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract or task order.
1.4.10 Contractor Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting
Officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
1.4.11 Identification of Contractor Employees:
“Identification of Contractor Employees in the Federal Workplace (Aug 2008):
(a) The contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, with an identification (ID) badge. The ID badge shall clearly display the contractor’s name and the employee’s name and color photograph. The Contracting Officer or his/her designee shall approve the ID badge before the commencement of contract performance. It is the contractor’s responsibility to ensure that all contractor personnel wear the ID badge at all times when performing work under this contract at a Government facility.
Unless otherwise specified in the contract, each contractor employee shall wear the ID badge in a conspicuous place on the front of their clothing and above their waist, except when safety or health reasons prohibit such placement. This requirement is in addition to any Government facility security provisions that require that a Government-issued security badge also be worn.
1.4.12 Contractor Travel: All travel costs should be included within each line item price in the contractors bid.
1.5 INSPECTIONS
1.5.1 Contractor Quality Control: The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein. The quality control individual, shall verify contract conformance of all work performed, to include reviewing each work leader's daily activity report to ensure that it is legible, understandable, and complete, and to notify the COR or Lake Manager of anything requiring immediate attention. The COR or Lake Manager may request additional quality control personnel at any time he or she feels that the Contractor's work is in danger of nonconformance, at no additional cost to the Government.
1.5.2 Quality Control Report: A Quality Control Report indicating daily activities, shall be submitted for the COR's or Lake Manager’s approval by Monday at 8:30 am for the previous work week. This report shall include (but not limited to) the following:
a. Name of Quality Control Inspector g. Deficiencies encountered
b. Date h. Corrective actions taken
c. Weather i. Safety violations
d. Time In/Time Out for each park j. List of damaged/missing receptacle
e. List of areas services k. Any facilities/areas closed
f. Receptacles not services l. List of non-compactable items
1.5.3 Government Quality Assurance: The Government shall monitor the Contractor's service performance using the random sampling method, as described in attached, "Quality Assurance Surveillance Plan", (QASP). The Government reserves the right to alter or change the type of inspection plan at its discretion at any time, and to make deductions accordingly
1.5.4 Equipment and Supplies: The COR or Lake Manager may inspect required equipment, supplies at any time when in use on Government property. Any individual, crew, or equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the COR or Lake Manager. No such removal shall reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
1.5.5 Contractor Performance Defects, Deficiencies, and Performance: Defects and deficiencies in Contractor performance, and reperformance of same, shall be in accordance with a "Payment Analysis" addressed in the QASP, however, the Government reserves the right to use Contract Clause entitled "Inspection of Services" for this purpose in lieu of the payment analysis.
1.5.6 Performance Evaluation Meetings: The Contractor, his or her superintendent, quality control inspectors, or all, shall meet with the COR or Lake Manager, or his or her representative, periodically as determined necessary by the COR or Lake Manager, in order to discuss performance. However, a meeting shall be held not later than one normal workday after a Contract Deficiency Report (CDR) is issued.
Mutual effort shall be made to resolve any and all problems identified.
1.6 SPECIFICATIONS FOR REFUSE/GARBAGE COLLECTION AND DISPOSAL SERVICE: The work shall consist of furnishing all labor, materials, and equipment necessary to provide, maintain, empty, and service refuse/garbage receptacles, and to pick up other specified refuse/garbage at the project. The number, location of receptacles, and frequencies of required services are provided in Attachments 3 and 4.
1.6.1 REFUSE/GARBAGE DISPOSAL Waste generated at Bardwell Lake is typically household-type materials, and may include the following:
1.6.1.1 HAZARDOUS WASTE - The Corps may generate small amounts of hazardous waste at the Project Headquarters which includes the office and maintenance area. Because of the small amount of hazardous wastes being generated, the Corps of Engineers at Bardwell Lake Project qualify as Conditionally Exempt Small Quantity Generator (CESQG). As a CESQG, the small amount of hazardous waste being generated may be accepted at a Type I municipal solid waste site provided the amount of waste does not exceed 220 pounds (100 kilograms) per month, and provided the landfill owner/operator is willing to accept the waste. In accordance with paragraph
1.10 of this contract, it is the contractor's responsibility to verify if the landfill proposed to use is willing to accept these small quantities of municipal hazardous waste. The Contractor shall be required to dispose of the small quantities of municipal hazardous waste placed in solid waste containers at the Project Headquarters and maintenance area compound at Bardwell Lake. The Corps of Engineers shall not place liquid hazardous waste in the solid waste containers and shall not require the Contractor to remove such waste.
1.6.1.2 SPECIAL WASTES - Refuse/Garbage receptacles in public use areas may contain special wastes as defined by the Texas Natural Resources Conservation Commission. Examples of special wastes include (but are not limited to) used oil filters, dead animals, vehicle batteries. If the contractor encounters special wastes, the waste shall be disposed of in accordance with Federal, State, County and Municipal Laws, codes and regulations at no additional charge.
1.6.2 LARGE NON-COMPACTABLE ITEMS - The Contractor shall be required to pick up and dispose of large non-compactable items of refuse/garbage such as, but not limited to, old abandoned appliances, furniture, mattresses, barrels, etc., which are adjacent to the refuse/garbage receptacles. Such items shall be picked up and disposed of no later than the next scheduled collection day following the day the item is discovered at no additional charge.
1.6.3 REFUSE/GARBAGE RECEPTACLE SERVICE - All refuse/garbage receptacles shall be completely emptied on the designated day and in accordance with the approved work schedule. The designated day for service shall be Tuesday. There are no restrictions on the volume, type or the source of the refuse/garbage.
The Contractor shall remove all refuse/garbage in each receptacle and also any within a twenty-foot (20’) area around each receptacle regardless of its volume, type, or source of origin. Burning of trash in the receptacles shall not be permitted. Any refuse/garbage scattered by animals or wind or dropped during emptying and/or hauling operations shall be picked up and disposed of by the Contractor. Contractor shall not be required to service receptacles that are inaccessible because of high water, as determined by COR or Lake Manager. Payment shall be based on actual number of receptacles serviced.
1.6.4 PLACEMENT OF REFUSE/GARBAGE RECEPTACLES - After emptying, each refuse/garbage receptacle shall be replaced in the upright position in its designated location.
1.6.5 LOCATION OF REFUSE/GARBAGE RECEPTACLES –
1.6.5.1 INITIAL PLACEMENT - Locations at which the refuse/garbage receptacles are to be placed initially shall be marked on the ground by the COR. After a trial period, the Contractor may be required by the COR or Lake Manager to relocate some of the receptacles within each park, not to exceed fifteen percent (15%) of the total number by park, one time only, at no additional cost to the Government.
1.6.5.2 FLOODED CONDITIONS - During periods of rising water and/or flooding, the Contractor shall monitor lake level fluctuations and shall move low lying receptacles, which are in danger of submersion, to higher ground. The Government shall not be responsible for any receptacles that may become damaged or missing as result of flooding. Contractor shall be responsible for retrieving receptacles that may have floated into developed and/or undeveloped areas as the result of flooding. Contractor shall also be required to remove visible receptacles from the lake. These receptacles pose a boating hazard and shall be removed within five (5) working days after being reported. There shall be no additional cost to the Government for these actions.
1.6.5.3 CONSTRUCTION OF REFUSE/GARBAGE RECEPTACLES - The Contractor shall be required to furnish refuse/garbage receptacles manufactured to meet the current applicable standards of Municipal Solid Waste Management Regulations, Texas Water Commission.
Refuse/garbage receptacles shall be factory built steel construction receptacles of good workmanship with a minimum capacity listed in Attachment 3. Maximum capacity will be no more than 1 CY listed in Attachment 3. The distance from the ground to the lip/lid shall not exceed forty-four inches (44") (except for the special eight (8) cubic yard tire receptacle). Each receptacle shall be equipped with plastic or fiberglass lids complete with a handle which can be easily opened manually for depositing refuse. The lids shall be gravity closing and shall not be equipped with a device to hold them open. Receptacles shall be designed and/or equipped to prevent lids from staying in open position. The receptacles shall not be on casters. A specification sheet showing the type of receptacle proposed for use shall be submitted with each bid. No drain holes shall be drilled or cut in the receptacles for any reason and all factories made drain holes shall be plugged. The Contractor shall retain ownership of the receptacles upon completion of this contract. After completion of contract, contractor shall have five (5) working days to remove receptacles.
1.6.6 PAINTING OF REFUSE/GARBAGE RECEPTACLES - The receptacles shall be painted initially before being placed in service. The Contractor shall submit paint color charts to the COR for selection prior to commencement of services. A work schedule must be submitted and approved before repainting of receptacles. All major painting operations to be done by the contractor shall be performed off-site. Touch-ups and minor painting may be performed on-site. Receptacles shall be one neutral/earth tone color such as brown, beige, or green. Repainting will be performed at least annually, or if a receptacle becomes damaged, at the contractor’s expense.
1.6.7 CLEANING REFUSE/GARBAGE RECEPTACLES - All refuse/garbage receptacles shall be cleaned and deodorized prior to being placed in service. Additional cleanings shall be performed in March and July of each year on a date specified by the COR or Lake Manager at no additional cost. When convenient, this date shall coincide with the first scheduled service day of those months. A Material Safety Data Sheet on the cleaning agent and disinfectant along with a work schedule must be submitted and approved before start of this work. Both interior and exterior surfaces shall be cleaned using a cleaning solution and disinfectant.
All cleaning shall be performed offsite. Wastewater shall be disposed of in an appropriate treatment facility.
1.6.8 DEODORIZER/INSECTICIDE TREATMENT - The Contractor shall be required to have each receptacle treated with a COR/Lake Manager-approved deodorizer and insecticide after the first scheduled service of each month, (unless directed otherwise by the COR/Lake Manager) to control odor and pests, at no additional cost. This service shall be performed within one (1) day after the first service. The deodorizer and insecticide shall be applied according to the manufactures written instructions. The Government reserves the right to take samples of solutions for testing if deemed necessary.
1.6.9 MAINTENANCE OF REFUSE/GARBAGE RECEPTACLES - The Contractor shall be responsible for all maintenance and repair of all damages to contractor receptacles, and for repainting them, as necessary, but not less than once annually to maintain a satisfactory appearance. The annual repainting of receptacles shall be accomplished during the first fifteen (15) days of March. A schedule for the annual repainting shall be submitted in writing to the COR for approval within fifteen (15) working days prior to commencement of services. All stolen, burned, or damaged receptacles are the responsibility of the Contractor and shall be replaced, repainted, or repaired within five (5) working days after such damage is reported. No major repairs or repainting of receptacles shall be performed on Government property.
1.6.10 MARKING OF REFUSE/GARBAGE RECEPTACLES - All refuse/garbage receptacles shall be numerically marked by the Contractor on front corner with white numbers a minimum of three-inches (3”) high. The numbering system to be used shall be determined by the COR or Lake Manager. Numbers shall be spray painted on receptacles with the use of stencils. Additionally, each container located in a public use area shall have a 5”x7” decal centered on the front that reads "NOTICE / PRIVATE CONTAINER NO OUTSIDE DUMPING" or similar. Decals shall be submitted for approval prior to placing on containers.
Decals shall be replaced if they become unreadable.
1.6.11 COLLECTION TRUCKS - The use of side-load, or front load packer type trucks only, manufactured for the specific purpose of hauling refuse/garbage, shall be required. The body shall be stationary on the truck chassis and will be power-compaction type equipped for mechanically handling the refuse/garbage receptacles described above. The use of flotation type front tires is recommended. The manufacture, maintenance, and operation of collection trucks shall meet the current applicable standards of Municipal Solid Waste Management Regulations, Texas Water Commission. Contractor shall be responsible for cleanup of any oil or fuel spills resulting from their operation.
1.6.12 FREQUENCY – All receptacles will be serviced every week as indicated on the frequency schedule during the duration of the contract unless otherwise stated.
1.7 GOVERNMENT FURNISHED ITEMS AND SERVICES: The Government will provide the Contractor with the appropriate keys or codes to access the Bardwell Lake Office Compound, and Park Facilities.
1.8 CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES:
1.8.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.
1.8.2 Equipment: The Contractor shall furnish refuse collection receptacles that are manufactured to meet or exceed the current applicable standards of the Municipal Solid Waste Management Regulations set forth by the Texas Water Commission.
1.8.3. Materials: The Contractor shall provide a cleaning agent (along with the corresponding Materials Safety Data Sheet) and disinfectant to ensure adequate maintenance of receptacles.
1.9 APPLICABLE PUBLICATIONS (CURRENT EDITIONS)
1.9.1 The Contractor must abide by all applicable regulations, publications, manuals, and local policies and procedures, including the following:
-EM 385-1-1, Safety and Health Requirements Manual -Municipal Solid Waste Management Regulations, Texas Water Commission
1.10 Attachment/Technical Exhibit List:
1.10.1 Attachment 1/Technical Exhibit 1 – Performance Requirements Summary
1.10.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule
1.10.3 Attachment 3 – Frequency Schedule and Tabulations
1.10.3 Attachment 4 – Maps
TECHNICAL EXHIBIT 1
Performance Requirements Summary
Performance Objective
Standard Performance Threshold Method of
Surveillance
Contractor Submits accurate weekly reports of areas serviced.
100% of reports accurately depict current status
100% inspection, Random inspection, observations, or validated customer complaints
Contractor services all line items ordered on schedule to the contract specifications.
100% of line items ordered serviced on schedule.
100% 100% inspection, Random inspection, observations, or validated
Contractor services all line item ordered on schedule to the contract specifications during Summer Holidays as specified in 6.13.1.
100% of line items ordered serviced on schedule.
inspection, Random inspection, observations, or validated
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To Pre Work Conference
One Pre Work Conference shall be held after award and prior to beginning work.
The meeting shall be held at the Project Office and may be scheduled with the
COR.
Kenneth Myers 469-645-9078 4000 Observation Dr. Ennis, TX 75119
Accident Prevention Plan (see 1.12)
The Accident Prevention Plan shall be submitted with in fifteen (15) days after award and prior to beginning work.
The contractor should maintain one copy of the Accident Prevention Plan in each vehicle. The contractor shall also provide one copy of the Accident Prevention Plan to the COR/Lake Manager and Project Office.
A hard copy or digital copy will be acceptable.
A hard copy may be mailed to:
ATTN:
Kenneth Myers 1801 N. Mill St., Lewisville, TX 75057 A digital copy may be mailed to:
Kenneth.myers@usa ce.army.mil
MSDS Sheets A copy of intended MSDS sheets for each chemical used on the project shall be submitted with the Accident Prevention Plan.
Any time a new chemical is used a MSDS sheet must be submitted prior to use.
The Contractor Shall Maintain a copy of all MSDS sheets and provide one copy to the Project Office and COR/Lake Manager.
A hard copy or
ATTN:
Kenneth Myers 1801 N. Mill St., Lewisville, TX 75057 A digital copy may be mailed to:
Kenneth.myers@usa ce.army.mil
Quality Control Program (QCP See section 5)
The QCP shall be delivered within thirty (30) days after award.
The Contractor shall submit one copy to the KO and COR/Lake Manager.
A hard copy or
ATTN:
Kenneth Myers 1801 N. Mill St., Lewisville, TX 75057 A digital copy may be mailed to:
Kenneth.myers@usa ce.army.mil
Quality Control Report (See section 5.2)
A Quality Control Report indicating daily activities, shall be submitted for the COR's/Lake
The Contractor shall maintain one copy of each Quality Control Report as well as provide the
The Contractor may drop off one copy of the Quality Control Report to the Project Office or email a
A hard copy may be dropped off at:
4000 Observation Dr. Ennis, TX 75119
Deliverable Frequency # of Copies Medium/Format Submit To Manager’s approval by 0830 a.m. of the following week.
COR/Lake Manager one copy of the Quality Control Report.
copy to the COR/Lake Manager and appropriate Project Staff.
A digital copy may be mailed to:
Kenneth.myers@usa ce.army.mil
Invoice An invoice shall be submitted for each month after the work for that month has been completed. If any items were not cleaned that month and are included on the invoice the invoice will be rejected. A corrected invoice shall have to be submitted.
The contractor shall also provide one copy of the invoice to the COR/Lake Manager and Project Office.
A hard copy or
ATTN:
Kenneth Myers 1801 N. Mill St., Lewisville, TX 75057 A digital copy may be mailed to:
Kenneth.myers@usa ce.army.mil
Attachment 3
FREQUENCY SCHEDULE AND TABULATIONS
PARK OR AREA
Dumpster Services (Weekly)
Number of Receptacles
Container Size
Service time per week Notes
Bardwell Lake OFFICE 1 3 YD
High View Park 6 Summer /
4 Winter
3 YD
2 - Summer 1 - Winter
Summer Season
01 APR – 30
SEP/ Winter
Season 01 OCT –
31 MAR
Mott Park 4 Summer /
1 Winter
Summer Season
01 APR – 30
SEP/ Winter
Season 01 OCT –
31 MAR
Waxahachie Creek Park 6 Summer /
1 Winter
Summer Season
01 APR – 30
SEP/ Winter
Season 01 OCT –
31 MAR
Love Park 2 3 YD
Summer Season
01 APR – 30
SEP/ Winter
Season 01 OCT –
31 MAR
SUB-TOTALS
19Summer/ 9Winter
TOTAL
19Summer/
9Winter
W9126G22Q0024
ATTACHMENT 4
MAPS
***See Attached***
BID SCHEDULE
BidSheet / REFUSE DISPOSAL SERVICE CONTRACT
BARDWELL LAKE
0001 BASE YEAR - 1 APRIL 2022 - 31 MARCH 2023
This IGE was developed using historical cost data from previous Contracts in the Dallas/Fort Worth metro area that provide simialr services. This IGE was developed independently and prior to reciept of any contractor proposals.
ITEM
NO
SUPPLIES
QUANTIT
Y
UNIT # PICKUPS
PER
SEASON
UNIT
PRICE
AMOUNT
0001AA SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0001AB SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 6.00 EA 53.00
0001AC SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 4.00 EA 53.00
0001AD SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 6.00 EA 53.00
0001AE SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 2.00 EA 53.00
0001BA WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0001BB WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 4.00 EA 26.00
0001BC WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0001BD WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0001BE WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 2.00 EA 26.00
TOTAL BASE YEAR YEAR (Line Items 0001AA THROUGH 0001BE) Estimated
0002 OPTION YEAR ONE - 1 APRIL 2023 - 31 MARCH 2024
NO
SUPPLIES
QUANTIT
Y
UNIT # PICKUPS
PER
SEASON
UNIT
0002AA SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0002AB SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 6.00 EA 52.00
0002AC SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 4.00 EA 52.00
0002AD SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 6.00 EA 52.00
0002AE SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 2.00 EA 52.00
0002BA WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0002BB WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 4.00 EA 26.00
0002BC WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0002BD WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0002BE WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 2.00 EA 26.00
TOTAL OPTION YEAR 1 (Line Items 0002AA THROUGH 0002BE) Estimated
0003 OPTION YEAR TWO - 1 APRIL 2024 - 31 MARCH 2025
NO
SUPPLIES
QUANTIT
Y
UNIT # PICKUPS
PER
SEASON
UNIT
0003AA SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 27.00
0003AB SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 6.00 EA 53.00
0003AC SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 4.00 EA 53.00
0003AD SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 6.00 EA 53.00
0003AE SUMMER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 2.00 EA 53.00
0003BA WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0003BB WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 4.00 EA 26.00
0003BC WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0003BD WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 1.00 EA 26.00
0003BE WINTER SERVICE 3 YD REFUSE/GARBAGE RECEPTACLES 2.00 EA 26.00
TOTAL OPTION YEAR 2 (Line Items 0003AA THROUGH 0003BE) Estimated
GRAND TOTAL BASE YEAR PLUS OPTIONS 1 & 2 (Line Items 0001AA through 0003BE)
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-23 Prohibition on Contracting for Hardware, Software, and
Services Developed or Provided by Kaspersky Lab and Other Covered Entities
DEC 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
DEC 2021
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
DEC 2021
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations
NOV 2015
52.212-1 Instructions to Offerors--Commercial Products and Commercial Services
DEC 2021
52.212-3 Alt I Offeror Representations and Certifications--Commercial Products and Commercial Services (NOV 2021) Alternate I
OCT 2014
52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-41 Service Contract Labor Standards AUG 2018 52.222-55 Minimum Wages Under Executive Order 13658 NOV 2020 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2017 52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts
SEP 2013
52.223-4 Recovered Material Certification MAY 2008 52.223-9 Estimate of Percentage of Recovered Material Content for
EPA-Designated Items
MAY 2008
52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons.
JUN 2016
52.223-17 Affirmative Procurement of EPA-Designated Items in Service and Construction Contracts
AUG 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.237-2 Protection Of Government Buildings, Equipment, And
Vegetation
APR 1984
52.242-15 Stop-Work Order AUG 1989 52.242-17 Government Delay Of Work APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7004 Antiterrorism Awareness Training for Contractors. FEB 2019 252.204-7008 Compliance With Safeguarding Covered Defense Information
Controls
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation
MAY 2021
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements NOV 2020 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation that provides the best benefit to the Government, price and other factors considered.
Offers will be evaluated by performing a comparative evaluation in accordance with FAR 13.106-2(b)(3) to determine which response represents the “best” as a whole. Comparative Evaluations is the act of comparing two or more offers in response to the RFQ.
Quotes are first evaluated to ensure all RFQ submission requirements are met. If the Quotes will be evaluated by performing a direct comparison of one offer with another in a uniform manner to determine which provides the Government with is needed, as identified in the RFP. If the RFP submission requirements have not been met, the Contracting Officer shall deem the offeror non-responsive The comparison also performed to compare each offeror to one another to determine which provides the best benefit to the Government. The Government reserves the right to consider a response that offers more than the minimum and select that response if it provides a benefit to the Government.
The Government has the discretion to accept other than the lowest priced offeror that provides additional benefits.
The Government also has the discretion to make an award based on whether the lowest priced of the quotations/offers having the highest past performance rating possible represents the best benefit to the Government.
The following factors shall be used to evaluate offers:
FACTOR 1: PRICE
Prices will be evaluated for fairness and reasonableness through a price analysis that compares the offered prices against each other and the independent Government estimate. Award shall not be made to an Offeror’s for goods or services that is found to be unbalanced and/or unreasonably low or high.
FACTOR 2: PAST PERFORMANCE
Past Performance Questionnaire (PPQ) forms provided in the solicitation shall be completed and submitted as specified in the Instructions to Offerors. They will be evaluated to assess the degree of confidence the Government has in an Offeror's ability to supply products and services that meet users' needs based on a demonstrated record of recent and relevant work similar to the work described in this solicitation. Recent or relevant work is defined as similar work within the past four (4) years.
The Contracting Officer shall deem the offeror non-responsive if they fail to provide recent and relevant past performance prior to award IAW FAR 52.212-1(b)(10). If for any reason the contractor does NOT have recent or relevant past performance, they are still required to submit a PPQ with a brief narrative explaining “No Recent or
Relevant Past Performance. An offeror that submits a PPQ that is deemed neither recent nor relevant will be treated as “NEUTRAL”. An offeror must submit one PPQ to be deemed eligible for award.
The Government reserves the right to evaluate past performance based on such information as the contracting officer’s knowledge and previous experience with the item or service being purchased, customer surveys, or other reasonable basis, without the existence of a formal database.
SUBMISSION REQUIREMENTS:
At a minimum, the quote for this factor shall include a brief narrative (conceptual work plan) that clearly demonstrates an understanding of the requirements of the solicitation. The narrative shall at minimum address:
1. Work in terms of coordination with outside agencies, contractors, and Government personnel to ensure safety, compliance and with federal and state regulations and performance requirements in an efficient manner.
2. Offeror will demonstrate how to manage resources at the work sites during weekdays, weekends, and holidays when applicable.
3. How the contractor will prevent rework and if rework is necessary how it will be addressed.
4. Resources (to include management and administrative) to perform requirements of the Performance Work Statement (PWS).
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
FAILURE TO SUBMIT ALL TO SUBMSSION REQIREMENTS FOR
SOLICTATION WILL RESULT IN A NON-RESPONSIVE QUOTE AND
OFFEROR WILL NOT BE CONSIDERED FOR AWARD
(End of provision)
52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL PRODUCTS AND COMMERCIAL
SERVICES (NOV 2021)
(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights-
(1) Within a reasonable time after the defect was discovered or…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .