This document package includes construction drawings and specifications for renovating the HVAC system in Building 1506 at White Sands Missile Range in New Mexico. The project involves demolishing the existing HVAC equipment, ductwork, piping and controls and replacing them. Key aspects include:
-
The Army Corps of Engineers is soliciting bids for the project under solicitation number W9126G-20-B-0002.
-
Drawings show demolition plans for the basement, first and second floors, and roof as well as new HVAC plans for all levels. Specifications cover items like mechanical, plumbing and controls work.
-
The project involves removing and replacing air handling units, boilers, chillers, VAV terminals, ductwork, piping and controls across three floors of the building to upgrade the HVAC system.
-
Bidders should note requirements for handling refrigerants, fluids and hazardous materials from the existing system and for providing housekeeping pads, seismic bracing and other installation details. Completion is required by January 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| C1_Bid Abstract_20B0002.pdf | ||
| Site Visit Sign In Sheets.pdf | ||
| W9126G20B0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 1506 HVAC RENOVATION
WHITE SANDS MISSILE RANGE
WHITE SANDS, NEW MEXICO
PN: 478773
SOLICITATION NO.: W9126G20B0002
US ARMY CORPS
OF ENGINEERS
Ft. Worth District
W H
I T
E
S
A N
D S
N
E W
M
X
I C
O B
U I L D
I N
G
H
V A
C
R
E N
O V
A T
I O
N
P
N
W H
I T
E
S
A N
D S
N
X
I C
O
DATED: JANUARY 2020
SIGNATURES AFFIXED BELOW INDICATE
OFFICIAL RECOMMENDATION AND APPROVAL OF
ALL DRAWINGS IN THIS SET AS INDEXED ON THIS
SHEET.
APPROVAL RECOMMENDED BY:
CHIEF, ENGINEERING BRANCH DATE
This project was designed by the Fort Worth District of the U.S. Army
Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152
B U
I L D
I N
G
H
V A
C
R
E N
O V
A T
I O
N
P
N
4 March 2020
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
2/12/2020 11:51:24 AM
W
SM
R B
U
IL
D
IN
G
FY
-4
H
AV
C R
EP
LA
C
EM
EN
T
JA
N
U
AR
Y
W
G
B0
C . M
AC
K
C . M
AC
K
JE
N
N
IF
ER
D
EW
IT
T, R
.A
C H
IE
F, A R
C H
IT
EC
TU
R
AL
S
EC
TI
O N
G-002
IN
D
EX
O
F D
R
AW
IN
G
S D
. W . B
LA
KE
LE
Y, P .E
Project Name
GENERAL
G-001 COVER SHEET
G-002 INDEX OF DRAWINGS
G-101 PROJECT LOCATION AND HAUL ROUTE
G-102 CONTRACTOR LAYDOWN AND STAGING AREA
ARCHITECTURE
AD101 BASEMENT DEMOLITION FLOOR PLAN
AD102 FIRST FLOOR DEMOLITION FLOOR PLAN
AD103 SECOND FLOOR DEMOLITION FLOOR PLAN
AD131 BASEMENT DEMOLITION REFLECTED CEILING PLAN
AD132 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN
AD133 SECOND FLOOR DEMOLITION REFLECTED CEILING PLAN
AD134 ROOF PLAN DEMOLITION
A-101 BASEMENT FLOOR PLAN
A-102 FIRST FLOOR PLAN
A-103 SECOND FLOOR PLAN
A-131 BASEMENT REFLECTED CEILING PLAN
A-132 FIRST FLOOR REFLECTED CEILING PLAN
A-133 SECOND FLOOR REFLECTED CEILING PLAN
MECHANICAL
M-505 MECHANICAL DETAILS
M-506 MECHANICAL DETAILS
M-507 MECHANICAL DETAILS
M-508 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULE
M-602 MECHANICAL SCHEDULE
M-901 BASEMENT MECHANICAL ISOMETRIC
M-902 FIRST FLOOR MECHANICAL ISOMETRIC
M-903 SECOND FLOOR MECHANICAL ISOMETRIC
MI001 CONTROLS LEGEND
MI002 POINTS LIST INSTRUCTIONS
MI301 VAV AHU-1 & 2 CONTROL SCHEMATIC
MI302 AHU 1 & 2 POINTS SCHEDULE
MI303 VAV AHU 1 & 2 SEQUENCE OF OPERATION
MI304 VAV AHU-3 CONTROL SCHEMATIC
MI305 VAV AHU 3 POINTS SCHEDULE
MI306 VAV AHU 3 SEQUENCE OF OPERATION
MI307 AHU- 4 & 7 CONTROL SCHEMATIC
MI308 AHU-4 & 7 POINT SCHEDULE
MI309 AHU-4 & 7 SEQUENCE OF OPERATION
MI310 VAV AHU-5 & 6 CONTROL SCHEMATIC
MI311 VAV AHU 5 & 6 POINTS SCHEDULE
MI312 AHU-5 & 6 SEQUENCE OF OPERATION
MI313 AHU-8 CONTROL SCHEMATIC
MI314 AHU-8 RTU POINTS SCHEDULE
MI315 AHU-8 RTU SEQUENCE OF OPERATION
MI316 VAV AHU-9 CONTROL SCHEMATIC
MI317 AHU-9 RTU POINTS SCHEDULE
MI318 AHU-9 SEQUENCE OF OPERATION
MI319 VAV TERMINAL UNIT CONTROL SCHEMATIC
MI320 VAV TERMINAL UNIT POINTS
MI321 CHILLED WATER SYSTEM CONTROLS CHILLER-1
MI322 CHILLED WATER SYSTEM POINTS CHILLER-1
MI323 CHILLED WATER SYSTEM CONTROLS CHILLER-2
MI324 CHILLED WATER SYSTEM POINTS CHILLER-2
MI325 HYDRONIC HEATING WATER CONTROLS (LOOP 1)
MI326 HYDRONIC HEATING HOT WATER POINTS (LOOP 1)
MI327 HYDRONIC HEATING WATER CONTROLS (LOOP 2)
MI328 HYDRONIC HEATING HOT WATER POINTS (LOOP 2)
MI329 EXHAUST FAN 6 & 7 CONTROLS
MI330 EXHAUST FAN CONTROLS
MI331 DSS CONTROLS
MI332 UNIT HEATER CONTROLS
MECHANICAL
M-001 MECHANICAL LEGEND
M-101 OVERALL BASEMENT MECHANICAL FLOOR PLAN
M-102 OVERALL FIRST FLOOR MECHANICAL PLAN
M-103 OVERALL SECOND FLOOR MECHANICAL PLAN
M-104 OVERALL ROOF PLAN
MD101 OVERALL BASEMENT DEMOLITION PLAN
MD102 OVERALL FIRST FLOOR DEMOLITION PLAN
MD103 OVERALL SECOND FLOOR DEMOLITION PLAN
MD104 DEMOLITION ROOF PLAN
MH101 BASEMENT HVAC PLAN
MH102 FIRST FLOOR HVAC PLAN
MH103 SECOND FLOOR HVAC PLAN
MP101 BASEMENT HYDRONIC PLAN
MP102 FIRST FLOOR HYDRONIC PLAN
MP103 SECOND FLOOR HYDONIC PLAN
MP-901 HYDRONIC ISOMETRIC
M-201 MECH ELEVATION
M-401 MECHANICAL ROOM PLANS
M-501 CHILLED WATER SYSTEM SCHEMATIC
M-502 CHILLED WATER SYSTEM SCHEMATIC
M-503 HEATING WATER SYSTEM SCHEMATIC
M-504 HEATING WATER SYSTEM SCHEMATIC
ELECTRICAL
E-001 ELECTRICAL LEGEND
ED101 DEMOLITION PLAN - BASEMENT
ED102 DEMOLITION PLAN - 1ST FLOOR
ED103 DEMOLITION PLAN - 2ND FLOOR
ED104 DEMOLITION PLAN - ROOF
EL101 LIGHTING PLAN - BASEMENT
EL102 LIGHTING PLAN - 1ST FLOOR
EL103 LIGHTING PLAN - 2ND FLOOR
EL501 LIGHTING DETAILS 1
EL503 LIGHTING CONTROL WIRING DIAGRAM
EL601 LIGHTING FIXTURE SCHEDULE & CONTROL MATRIX
EP101 POWER PLAN - BASEMENT
EP102 POWER PLAN - 1ST FLOOR
EP103 POWER PLAN - 2ND FLOOR
EP104 POWER PLAN - ROOF
EP401 MECHANICAL EQUIPMENT SCHEDULE
EP601 ELECTRICAL RISER DIAGRAM - SERVICE 1 DEMOLITION
EP602 ELECTRICAL RISER DIAGRAM - SERVICE 2 DEMOLITION
EP603 ELECTRICAL RISER DIAGRAM - NEW WORK 1
EP604 ELECTRICAL RISER DIAGRAM - NEW WORK 2
EP701 ELECTRICAL PANEL SCHEDULE 1
EP702 ELECTRICAL PANEL SCHEDULE 2
EP703 ELECTRICAL PANEL SCHEDULE 3
EP704 ELECTRICAL PANEL SCHEDULE 4
EP705 ELECTRICAL PANEL SCHEDULE 5
EP706 ELECTRICAL PANEL SCHEDULE 6
EP707 ELECTRICAL PANEL SCHEDULE 7
INDEX OF DRAWINGS
CIVIL
CD100 OVERALL DEMOLITION PLAN
CS100 OVERALL SITE PLAN
C-501 CONCRETE PAD DETAILS
PLUMBING
P-001 PLUMBING LEGEND
P-101 NATURAL GAS BASEMENT
P-102 NATURAL GAS FIRST FLOOR
P-103 NATURAL GAS SECOND FLOOR
P-104 NATURAL GAS ROOF
FIRE ALARM
FA001 FIRE ALARM LEGEND
FA101 FIRE ALARM PLAN - BASEMENT
FA102 FIRE ALARM PLAN - 1ST FLOOR
FA103 FIRE ALARM PLAN - 2ND FLOOR
FA501 FIRE ALARM MATRIX
FA601 FIRE RISER DIAGRAM
S-1538
MARTIN LUTHER KING BLVD
D Y
R
S
T
B E
N E
T
S
T
H E
A D
Q U
A R
T E
A
V E
S I O
U X
SAINT LOUIS ST
C R
A I G
MARTIN LUTHER BLVD
W E
S S
O N
B O
M F
O R
D
S
T
R A
M S
Y
NAVAJO ST
ENGINEER DRIVE
G
O
D
D
A
R
D
A
V
E
R I P
L E
Y
S
T
G
O
D
D
A
D
E
PICATINNY AVE
PICATINNY AVE
C R
O Z
I E
R
S
T
D Y
PARSONS ST
B L
A N
HALSEY ST
NOBLE ST
ZEUS ST
P O
L A
R
J U
P I T
MERCURY AVE
R
O
C
K
L
A
E
ROCK ISLAND AVE
H A
L
O
S S
E
S
T
O
S S
E
S
T
H A
A
N
N
I
S
T
E
L
E
T
T
E
R
K
E
N
E
R
O
S
S
F
O
E
T
O
O
E
E
G
O
D
D
A
E
S I E
R R
A
S
T
M
A
R
T
T
H
B
V
D
ABERDEEN AVE
A
B
E
R
D
E
E
T
A
L
E
A
E
R
O
B
E
T
A
L
O
S
A
V
E
T
E
R
R
I
E
DEACON AVE
A E
R O
B E
E
A
V E
V I K
I N
G
S
T
V I K
I N
G
S
T
R I P
L E
Y
S
T
N
I
E
ABERDEEN AVE
N
I
E
N
I
E
H U
G H
WATERTOWN AVE
C R
A
R A
M S
W E
S S
H E
A D
Q U
A R
T E
E
SATURN AVE
T
H
R I P
L E
Y
S
T
R I P
L E
Y
S
T
O
S
O
S
O
S S
E
S
T
H A
D A
L O
K I
S
T
PICATINNY AVE
PICATINNY AVE
PICATINNY AVE
H
A
H
A
D
A
D
A
R
A
V
E
N
E
R
A
V
E
N
E
BE
N
ET
S
T
C R
O
ZI
ER
S
T
C R
O
ZI
ER
S
T
BE
N
ET
S
T
DETROIT ST
FRANKFORD ST
SPRINGFIELD ST
C R
O Z
I E
R
S
T
D Y
ROCK ISLAND AVE
ROCK ISLAND AVE
MILAN ST
D Y
F L
A G
L E
R
S
T
H O
F
S
T
JOLIET ST
RADFORD ST
W
I
N
G
A
S
J
C
I
N
VANGUARD DR
V A
N G
U A
V A
N G
U A
Z E
U
S
D
R
Z E
Z E
H E
R C
U L
P E
R S
H I N
G
D
R
P E
R S
H I N
G
D
R
P E
R S
H
IN
G D
R
Z U
N I D
R
H E
R C
U L
Z U
N I
D
R
Z U
N I
D
R
A T
L A
S
S
T
L O
K I
S
T R
E E
T
LAKE CITY AVE
T-
S-1558
1538A
A R
D E
N N
E S
C O
L U
M B
U S
ANTIETAM
BELLEAU WOOD
COLUMBUS
MARTIN LUTHER BLVD
N A
K T
O N
G
B E
L L
E A
U
W
O O
D
K U
N U
R I
N O
R M
A N
D Y
H U
G H
K U
N U
R I
N O
R M
A N
D Y
ABERDEEN AVE
H I G
H W
WATERTOWN AVE
LAS CRUCES
GATE
EL PASO
GATE
T O
H W
Y
H E
A D
Q U
A R
T E
E
PICATINNY AVE
ROCK ISLAND AVE
SPRINGFIELD ST
DETROIT ST
B E
N E
T
S
T
ABERDEEN AVE
B E
N E
T
S
T
C R
O Z
I E
R
S
T
INDIANA ST
S I O
MARTIN LUTHER KING BLVD
H E
A D
Q U
A R
T E
E
S I O
PROJECT LOCATION/
CONTRACTOR LAYDOWN AREA
WATERTOWN AVE
D Y
FRANKFORD ST
W S
D
G
F Y
H V
P
L A
C E
M E
N T
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D r a w n b y
D e s i g n e d b y
S u b m i t t e d b y
F i l a m e
D a t e
C o n t r a c t
N o
S o l i c i t a t i o n
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
F O
R
H
S
T R
I C
T
T
A Y
L O
R
S
T
F O
R
T H
T
E X
A S
R e v i e w
FORT WORTH DISTRICT
US ARMY CORPS
OF ENGINEERS ®
B R
A N
T
J E
N S
E N
P
E
C H
I E
F
C
I V
C
T I O
N
D
C
B
A
P L
A
L E
P L
T
E
R e v
S y m b o l
D e s c r i p t i o n
T r a c k i n g
N o
A c t i o n D a t e
E N
G I N
E E
R I N
G
C O
N S
T R
U C
T I O
N
D
I V
I S
I O
N
E N
G I N
E E
R I N
G
B
R A
N C
H
J A
N U
A R
Y
W
G
B
G-101
P R
O J E
C
A T
I O
N
A N
D
H
A U
L
R
O U
T E
C L
I F
T O
N
M
A C
K
C L
I F
T O
N
M
A C
K
B R
A N
T
J E
N S
E N
P
E
100'0 50'
NOTES:
1. DELIVERY TRUCKS AND CONSTRUCTION VEHICLES MUST ACCESS
THROUGH THE EL PASO OR LAS CRUCES GATE.
PLAN NORTH
AutoCAD SHX Text S-1733
AutoCAD SHX Text S-1727
AutoCAD SHX Text
AutoCAD SHX Text S-1721
AutoCAD SHX Text
TSC
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text
WV
AutoCAD SHX Text S-1733
AutoCAD SHX Text S-1727
AutoCAD SHX Text
AutoCAD SHX Text S-1721
D
G
F Y
H V
P
L A
C E
M E
N T
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D r a w n b y
D e s i g n
S u b m i t t e d b y
F i m e
D a t e
C o n t r a c t
N o
S o l i c i t a t i
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
F O
R
S
T R
I C
T
T
A Y
L O
R
S
T
F O
R
T H
T
E X
A S
R e v i e w
FORT WORTH DISTRICT
US ARMY CORPS
OF ENGINEERS ®
B R
A N
T
J E
N S
E N
P
E
C H
I E
F
C
I V
C
T I O
N
D
C
B
A
P L
A
L E
P L
T
E
R e v
S y m b o l
D e s c r i p t i o n
T r a c k i n g
N o
A c t i o n D a t e
E N
G I N
E E
R I N
G
C O
N S
T R
U C
T I O
N
D
I V
I S
I O
N
E N
G I N
E E
R I N
G
B
R A
N C
H
J A
N U
A R
Y
W
G
B
G-102
P R
O J E
C
A T
I O
N
A
N D
L A
Y D
O W
N
A
R E
A
C L
I F
T O
N
M
A C
K
C L
I F
T O
N
M
A C
K
B R
A N
T
J E
N S
E N
P
E
100'0 50'
BUILDING 1506
CONTRACTOR
LAYDOWN
AREA
PLAN NORTH
BUILDING 1506
BENET STREET
DEMO EXISTING CONCRETE PAD
DEMO EXISTING
SHED
W S
D
G
F Y
H V
P
L A
C E
M E
N T
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D r a w n b y
D e s i g n
S u b m i t t e d b y
F i m e
D a t e
C o n t r a c t
N o
S o l i c i t a t i
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
F O
R
S
T R
I C
T
T
A Y
L O
R
S
T
F O
R
T H
T
E X
A S
R e v i e w
FORT WORTH DISTRICT
US ARMY CORPS
OF ENGINEERS ®
B R
A N
T
J E
N S
E N
P
E
C H
I E
F
C
I V
C
T I O
N
D
C
B
A
P L
A
L E
P L
T
E
R e v
S y m b o l
D e s c r i p t i o n
T r a c k i n g
N o
A c t i o n D a t e
E N
G I N
E E
R I N
G
C O
N S
T R
U C
T I O
N
D
I V
I S
I O
N
E N
G I N
E E
R I N
G
B
R A
N C
H
J A
N U
A R
Y
W
G
B
CD100
O V
E R
A L
L
D
E M
O
P
L A
N
C L
I F
T O
N
M
A C
K
C L
I F
T O
N
M
A C
K
B R
A N
T
J E
N S
E N
P
E
40'0 20'
BUILDING 1506
BENET STREET
NEW CONCRETE PAD - 94" X 153"
(SEE DETAIL B/C-501)
W S
D
G
F Y
H V
P
L A
C E
M E
N T
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D r a w n b y
D e s i g n
S u b m i t t e d b y
F i m e
D a t e
C o n t r a c t
N o
S o l i c i t a t i
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
F O
R
S
T R
I C
T
T
A Y
L O
R
S
T
F O
R
T H
T
E X
A S
R e v i e w
FORT WORTH DISTRICT
US ARMY CORPS
OF ENGINEERS ®
B R
A N
T
J E
N S
E N
P
E
C H
I E
F
C
I V
C
T I O
N
D
C
B
A
P L
A
L E
P L
T
E
R e v
S y m b o l
D e s c r i p t i o n
T r a c k i n g
N o
A c t i o n D a t e
E N
G I N
E E
R I N
G
C O
N S
T R
U C
T I O
N
D
I V
I S
I O
N
E N
G I N
E E
R I N
G
B
R A
N C
H
J A
N U
A R
Y
W
G
B
CS100
O V
E R
A L
L
S
I T
E
P
L A
N
C L
I F
T O
N
M
A C
K
C L
I F
T O
N
M
A C
K
B R
A N
T
J E
N S
E N
P
E
40'0 20'
CHAMFER EDGE
#4 CONT, TYP
EQUIPMENT
#4 @ 12" OC EW TYP.
NOTES:
1. ANCHOR EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS.
2. DOWELS MAY BE DRILLED AND EPOXIED IN USING OVERSIZE HOLES. CLEAN AND PREPARE
HOLES PER EPOXY MFR.
3. SEE MECHANICAL SHEETS FOR HOUSEKEEPING PAD LOCATIONS.
4. MECHANICAL EQUIPMENT HOUSEKEEPING PAD SIZE TO SUIT ACTUAL EQUIPMENT FURNISHED
PLUS 6" CLEAR ALL AROUND. EXACT LOCATION PER MECHANICAL EQUIPMENT
REQUIREMENTS.
TYPICAL HOUSEKEEPING PAD
TYPICAL EXTERIOR EQUIPMENT PAD DETAIL
C L
R
SEE MECHANICAL/ELECTRICAL PLAN
SIZE FOR 12" CLEAR
ALL AROUND EQUIPMENT
8"
#5's @ 12" O.C. E.W.
1/2" BITUMINOUS JOINT
FILLER w/ SEALANT
SCALE: N.T.S.
SCALE: N.T.S.
3/4" CHAMFER @
PAD EDGE (TYP.)
M I N
W S
D
G
F Y
H V
P
L A
C E
M E
N T
SHEET
SEQUENCE
NUMBER
1 2 3 4 5
D r a w n b y
D e s i g n
S u b m i t t e d b y
F i m e
D a t e
C o n t r a c t
N o
S o l i c i t a t i
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
F O
R
S
T R
I C
T
T
A Y
L O
R
S
T
F O
R
T H
T
E X
A S
R e v i e w
FORT WORTH DISTRICT
US ARMY CORPS
OF ENGINEERS ®
B R
A N
T
J E
N S
E N
P
E
C H
I E
F
C
I V
C
T I O
N
D
C
B
A
P L
A
L E
P L
T
E
R e v
S y m b o l
D e s c r i p t i o n
T r a c k i n g
N o
A c t i o n D a t e
E N
G I N
E E
R I N
G
C O
N S
T R
U C
T I O
N
D
I V
I S
I O
N
E N
G I N
E E
R I N
G
B
R A
N C
H
J A
N U
A R
Y
W
G
B
C-501
C O
N C
R E
T
A I L
S
C L
I F
T O
N
M
A C
K
C L
I F
T O
N
M
A C
K
B R
A N
T
J E
N S
E N
P
VEST.
CORR.
JAN
MENS RR
WOMENS RR
BREAK RM
STAIRS
ELEV
ELEV MECH
OFFICE
5W
OFFICE
5E
OFFICE
5B COMPUTER LAB
CLASSROOM
4A
STOR.
4A
OFFICE
OFFICE
2C
CONFERENCE
2B
COPY RM
2A
OFFICE
OFFICE
11CORR.
MECHANICAL RM
CORR.
MECHANICAL RM
COMM RM
17AOFFICE
CORR.
OFFICE
OFFICE
CONFERENCE
OFFICE
MECHANICAL
ROOM
OFFICE
OFFICE
OFFICE
LABORATORY
FREIGHT ELEV
26A
ELEV MECH
26 B
LABORATORY
OFFICE
CORR.
OFFICE
STOR.
26A
STAIRS
30A
VEST
GENERAL ARCHITECTURAL NOTES
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. MATCH EXISITING ADJACENT WALL CONSTRUCTION AND PAINT COLOR.
4. REFER TO SPECIFICATONS FOR HAZMAT REPORT AND ABATEMANT PROCEDURES.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:55:23 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
AD101
BA
SE
M
EN
T
DE
M O
LI
TI
O N
FL
O
O R
PL
AN
M .P
AT
EL
PROJECT NAME
20'8'0 4' 12
3/32" = 1'-0"A1 BASEMENT DEMOLITION FLOOR PLAN
REMOVE EXISTING WALL A/C UNITS
Su bm itt ed b y:
JE
N
N
IF
ER
A
. D eW
IT
T
R .A
C
H
IE
F
AR
C H
IT
EC
TU
R
E
SE
C
TI
BAY AREA
ASSEMBLY AREA
157 C
FREIGHT
ELEVATOR
157 A
STORAGE
157B
ELECTRO-MECH
LAB#2
ELECTRO-MECH
LAB#1
154 B
ELECTRO-MECH
LAB #1
154 A
INSTRUMENT
ROOM/TOOL CRIB
OFFICE
CORR
OFFICE
CORR.
BREAK ROOM
117.
OFFICE
OFFICE
OFFICE
OFFICE
126 A
OFFICE
ELEVATOR
STAIRS
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
103 A
VEST.
CONFERENCE
ROOM
OFFICE
127S
OFFICE
OFFICE
127 A
OFFICE
OFFICE
STAIRS
MENS RR
WOMENS RR
MECHANICAL
ROOM
OFFICE
STAIRS
OFFICE
112A
OFFICE
OFFICE
STOR
VEST.
WOMENS RR
MENS RR
CORRIDOR
VEST.
GENERAL ARCHITECTURAL NOTES
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. MATCH EXISITING ADJACENT WALL CONSTRUCTION AND PAINT COLOR.
4. REFER TO SPECIFICATONS FOR HAZMAT REPORT AND ABATEMANT PROCEDURES.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:55:36 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
AD102
FI
RS
T
FL
O O
R
DE
M O
LI
TI
O N
FL
O
O R
PL
AN
M .P
AT
EL
PROJECT NAME
3/32" = 1'-0"A1 FIRST FLOOR DEMOLITION FLOOR PLAN
REMOVE EXISTING WALL A/C UNITS REMOVE EXISTING WALL A/C UNITS
REMOVE EXISTING WALL A/C UNITS
REMOVE EXISTING
WALL A/C UNITS
REMOVE EXISTING WALL A/C UNITS
Su bm itt ed b y:
JE
N
N
IF
ER
A
. D eW
IT
T
R .A
C
H
IE
F
AR
C H
IT
EC
TU
R
E
SE
C
TI
CORR.
OFFICE
OFFICE
208 A
OFFICE
208 B
OFFICE
206 S
OFFICE
206 N
OFFICE
212 S
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
ROOM
OFFICE
VESTIBULE
WOMENS RR
MENS RR
STAIRS
ELEVATOR
CORR.
OFFICE
228A
OFFICE
227 S
OFFICE
OFFICE
OFFICE
VAULT
STAIRS
MENS RR
WOMENS RR
221OFFICE
219OFFICE
218 A
OFFICE
COMM.
BREAK RM
Room
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORR.
CORR.
CORR.
OPEN TO SAFETY
BAY BELOW
GENERAL ARCHITECTURAL NOTES
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE
DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.
4. REFER TO SPECIFICATIONS FOR HAZMAT REPORT AND ABATEMANT
PROCEDURES.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:55:47 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
AD103
SE
C
O N
D F
LO
O
R D
EM
O
LI
TI
O N
F
LO
O R
P
LA
N M
.P
AT
EL
PROJECT NAME
3/32" = 1'-0"A1 SECOND FLOOR DEMOLITION PLAN
REMOVE EXISTING WALL A/C UNITS
REMOVE EXISTING WALL A/C UNITS
REMOVE EXISTING WALL A/C UNITS
Su bm itt ed b y:
JE
N
N
IF
ER
A
. D eW
IT
T
R .A
C
H
IE
F
AR
C H
IT
EC
TU
R
E
SE
C
TI
VEST.
CORR.
JAN
MENS RR
WOMENS RR
BREAK RM
STAIRS
ELEV
ELEV MECH
OFFICE
5W
OFFICE
5E
OFFICE
5B COMPUTER LAB
CLASSROOM
4A
STOR.
4A
OFFICE
OFFICE
2C
CONFERENCE
2B
COPY RM
2A
OFFICE
OFFICE
11CORR.
MECHANICAL RM
CORR.
MECHANICAL RM
COMM RM
17AOFFICE
CORR.
OFFICE
OFFICE
CONFERENCE
OFFICE
MECHANICAL
ROOM
OFFICE
OFFICE
OFFICE
LABORATORY
FREIGHT ELEV
26A
ELEV MECH
26 B
LABORATORY
OFFICE
CORR.
OFFICE
STOR.
26A
STAIRS
30A
VEST
GENERAL ARCHITECTURAL NOTES
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. MATCH EXISITING ADJACENT WALL CONSTRUCTION AND PAINT COLOR.
4. REFER TO SPECIFICATONS FOR HAZMAT REPORT AND ABATEMANT PROCEDURES.
INDICATES EXISTING GYP BD CEILING TO BE REMOVED AND
REPLACED
INDICATES EXISTING ACOUSTICAL CEILING TO BE REMOVED
AND REPLACED
INDICATES EXISTING STRUCTURE TO REMAIN
REFLECTED CEILING PLAN LEGEND
INDICATES EXISTING DOUBLE ACOUSTICAL CEILING TO BE
REMOVED.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:55:59 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
JE
N
N
IF
ER
A
. D eW
IT
T
R .A
C
H
IE
F
AR
C H
IT
EC
TU
R
E
SE
C
TI
O N
AD131
B
AS
EM
EN
T D
EM
O
LI
TI
O N
R
EF
LE
C
TE
D
C
EI
LI
N
G
PL
AN
A.
AN
YA
EG
BU
N
AM
PROJECT NAME
OPEN TO ABOVE
OPEN TO ABOVE
OPEN TO ABOVE
20'8'0 4' 12
3/32" = 1'-0"A1 BASEMENT DEMOLITION REFLECTED CEILING PLAN
BAY AREA
ASSEMBLY AREA
157 C
FREIGHT
ELEVATOR
157 A
STORAGE
157B
ELECTRO-MECH
LAB#2
ELECTRO-MECH
LAB#1
154 B
ELECTRO-MECH
LAB #1
154 A
INSTRUMENT
ROOM/TOOL CRIB
OFFICE
CORR
OFFICE
CORR.
BREAK ROOM
117.
OFFICE
OFFICE
OFFICE
OFFICE
126 A
OFFICE
ELEVATOR
STAIRS
CORRIDOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
103 A
VEST.
CONFERENCE
ROOM
OFFICE
127S
OFFICE
OFFICE
127 A
OFFICE
OFFICE
STAIRS
MENS RR
WOMENS RR
MECHANICAL
ROOM
OFFICE
STAIRS
OFFICE
112A
OFFICE
OFFICE
STOR
VEST.
WOMENS RR
MENS RR
CORRIDOR
VEST.
GENERAL ARCHITECTURAL
DEMOLITION NOTES
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. MATCH EXISTING ADJACENT WALL CONSTRUCTION AND
PAINT COLOR.
INDICATES EXISTING GYP BD CEILING TO BE REMOVED AND
REPLACED
INDICATES EXISTING ACOUSTICAL CEILING TO BE REMOVED
AND REPLACED
INDICATES EXISTING STRUCTURE TO REMAIN
REFLECTED CEILING PLAN LEGEND
INDICATES EXISTING DOUBLE ACOUSTICAL CEILING TO BE
REMOVED.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:56:10 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L uf t
Su bm itt ed b y:
JE
N
N
IF
ER
A
. D eW
IT
T
R .A
. C H
EI
F, IE
F, A
R C
H
IT
EC
TU
R E
SE
C
TI
O
N
AD132
FI
R
ST
F
LO
O
R D
EM
O
LI
TI
O N
R
EF
LE
C
TE
D
C
EI
LI
N
G
PL
AN
A.
AN
YA
EG
BU
N
AM
PROJECT NAME
20'8'0 4' 12
3/32" = 1'-0"A1 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN
INDICATES EXISTING GYP BD CEILING TO BE REMOVED AND
REPLACED
INDICATES EXISTING ACOUSTICAL CEILING TO BE REMOVED
AND REPLACED
INDICATES EXISTING STRUCTURE TO REMAIN
REFLECTED CEILING PLAN LEGEND
INDICATES EXISTING DOUBLE ACOUSTICAL CEILING TO BE
REMOVED.
CORR.
OFFICE
OFFICE
208 A
OFFICE
208 B
OFFICE
206 S
OFFICE
206 N
OFFICE
212 S
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
ROOM
OFFICE
VESTIBULE
WOMENS RR
MENS RR
STAIRS
ELEVATOR
CORR.
OFFICE
228A
OFFICE
227 S
OFFICE
OFFICE
OFFICE
VAULT
STAIRS
MENS RR
WOMENS RR
221OFFICE
219OFFICE
218 A
OFFICE
COMM.
BREAK RM
Room
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORR.
CORR.
CORR.
GENERAL ARCHITECTURAL NOTES
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE
DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.
4. REFER TO SPECIFICATIONS FOR HAZMAT REPORT AND ABATEMANT
PROCEDURES.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:56:22 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
JE
N
N
IF
ER
A
. D eW
IT
T
R .A
C
H
IE
F , A
R C
H
IT
EC
TU
R E
SE
C
TI
O
N
AD133
SE
C
O N
D F
LO
O
R D
EM
O
LI
TI
O N
R
EF
LE
C
TE
D
C
EI
LI
N
G P
LA
N
A.
AN
YA
EG
BU
N
AM
PROJECT NAME
20'8'0 4' 12
OPEN TO BELOW
3/32" = 1'-0"A1 SECOND FLOOR DEMOLITION REFLECTED CEILING PLAN
ROOFTOP UNIT TO BE REMOVED COMPLETE.
ROOFTOP UNITS TO BE REMOVED COMPLETE.
GENERAL ARCHITECTURAL NOTES
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE
DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.
4. REFER TO SPECIFICATIONS FOR HAZMAT REPORT AND ABATEMANT
PROCEDURES.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:56:34 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L uf t
AD134
RO
O
F
PL
AN
D
EM
O
LI
TI
O N
M .P
AT
EL
PROJECT NAME
A1 ROOF PLAN DEMOLITION
20'8'0 4' 12
'3/32" = 1'-0"
Su bm itt ed b y:
JE
N
N
IF
ER
A
. D eW
IT
T
R .A
. C H
IE
F, AR
H
IT
EC
TU
R
E
SE
C
TI
M M
OFFICE
STOR.
26A
FREIGHT ELEV
26A
LABORATORY
OFFICE
OFFICE
LABORATORY
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
OFFICE
OFFICE
MECHANICAL
ROOM
MECHANICAL RM
OFFICE
COMM RM
17A
COPY RM
2A
CONFERENCE
2B
MECHANICAL RM
CORR.
WOMENS RR
MENS RR
STAIRS
COMPUTER LAB
4 STOR.
4A
OFFICE
OFFICE
2C
ELEV MECH
ELEV
BREAK RM
STAIRS
STAIRS
30A
ELEV MECH RM
26B
VEST.
OFFICE
5B
OFFICE
5E
OFFICE
5W
OFFICE
CORR.
CORR.
VEST
JAN
LABORATORY
TUNNEL
27A
GENERAL ARCHITECTURAL NOTES
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. MATCH EXISITING ADJACENT WALL CONSTRUCTION AND PAINT COLOR.
4. REFER TO SPECIFICATONS FOR HAZMAT REPORT AND ABATEMANT PROCEDURES.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:54:10 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
JE
N
N
IF
ER
A
. D eW
IT
T, R .A
C
H
IE
F, A
R C
H
IT
EC
TU
R E
SE
C
TI
O
N
A-101
B
AS
EM
EN
T
FL
O O
R P
LA
N
M .P
AT
EL
PROJECT NAME
20'8'0 4' 12
3/32" = 1'-0"A1 BASEMENT FLOOR PLAN
REPLACE GLAZING WHERE
UNIT WAS REMOVED OR,
REPAIR OR REPLACE WINDOW
UNIT TO MATCH EXISTING BASEMENT
LEVEL WINDOWS. PROVIDE SECURITY
SCREENS TO MATCH ADJCENT
EXISTING WINDOWS
ELECTRO-MECH
LAB#1
154 B
ELECTRO-MECH
LAB #1
154 A
INSTRUMENT
ROOM/TOOL CRIB
OFFICE
OFFICE
BREAK ROOM
117.
STOR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
103 A
CONFERENCE
ROOM
OFFICE
127S OFFICE
OFFICE
127 A
OFFICE
OFFICE
126 A
OFFICE
OFFICE
112A
OFFICE
VEST.
WOMENS RR
MENS RR
STAIRS
CORRIDOR
ELEVATOR
OFFICE
OFFICE
STORAGE
157B
FREIGHT
ELEVATOR
157 A
BAY AREA
OFFICE
OFFICE
MENS RR
WOMENS RR
STAIRS
COMM.
STAIRS
ASSEMBLY AREA
157 C
MECHANICAL
ROOM
ELECTRO-MECH
LAB#2
VEST
VEST.
VEST.
CORR.
CORR
CORR
STOR
154 C
Room 112B
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. MATCH EXISTING ADJACENT WALL CONSTRUCTION AND
PAINT COLOR.
GENERAL ARCHITECTURAL
NEW WORK NOTES
SHEET
NUMBER
D ra w n by
D es ig ne d by
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:54:25 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
Su bm itt ed b y:
JE
N
N
IF
ER
D eW
IT
T, R
.A
C H
IE
F, A R
C H
IT
EC
TU
R
E
SE
C
TI
O N
A-102
FI
RS
T
FL
O O
R
PL
AN
M
.P
AT
EL
PROJECT NAME
20'8'0 4' 12
REPLACE GYP BD INTERIOR WALL SURFACE .
PATCH AND PAINT AS REQUIRED. REFER TO
MECHANICAL SHEETS FOR MORE
INFORMATION.
PATCH AND REPAIR WITH MATCHING
CMU BLOCK
REPLACE GYP BD INTERIOR WALL SURFACE .
PATCH AND PAINT AS REQUIRED.REFER TO
MECHANICAL SHEETS FOR MORE INFORMATION.
REPLACE GLAZING WHERE UNIT WAS REMOVED
OR, REPAIR OR REPLACE WINDOW UNIT TO
MATCH EXISTING FIRST FLOOR LEVEL WINDOWS
REPLACE GLAZING WHERE UNIT WAS REMOVED
OR, REPAIR OR REPLACE WINDOW UNIT TO
MATCH EXISTING FIRST FLOOR LEVEL WINDOWS
NTS3/32" = 1'-0"A1 FIRST FLOOR PLAN
REPLACE GLAZING WHERE UNIT WAS REMOVED
OR, REPAIR OR REPLACE WINDOW UNIT TO
MATCH EXISTING FIRST FLOOR LEVEL WINDOWS.
REPLACE GLAZING WHERE UNIT WAS REMOVED
OR, REPAIR OR REPLACE WINDOW UNIT TO
MATCH EXISTING FIRST FLOOR LEVEL WINDOWS
OFFICE
208 A
OFFICE
208 B
OFFICE
206 S
OFFICE
206 N
OFFICE
212 S
ELEVATOR
91 MENS RR
210 VESTIBULE
OFFICE
CONFERENCE
ROOM
OFFICE
204 OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
228A
OFFICE
227 S
OFFICE
OFFICE
OFFICE
218 OFFICE
218 A
OFFICE
BREAK RM
COMM.
OFFICE
STAIRS
WOMENS RR
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORR.
OFFICE
VAULT
STAIRS
MENS RR
WOMENS RR
CORR.
OPEN TO BELOW
GENERAL ARCHITECTURAL NOTES
1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL
BE FIELD VARIFIED.
3. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE
DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.
4. REFER TO SPECIFICATIONS FOR HAZMAT REPORT AND ABATEMANT
PROCEDURES.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:54:35 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
JE
N
N
IF
ER
A
. D eW
IT
T, R .A
C
H
IE
F, A
R C
H
IT
EC
TU
R E
SE
C
TI
O
N
A-103
SE
CO
ND
F
LO
O
R
PL
AN
M
.P
AT
EL
PROJECT NAME
3/32" = 1'-0"A1 SECOND FLOOR PLAN
20'8'0 4' 12
REPLACE GLAZING WHERE UNIT WAS
REMOVED OR, REPAIR OR REPLACE
WINDOW UNIT TO MATCH EXISTING
SECOND FLOOR LEVEL WINDOWS
REPLACE GLAZING WHERE UNIT WAS
REMOVED OR, REPAIR OR REPLACE WINDOW
UNIT TO MATCH EXISTING SECOND FLOOR LEVEL
WINDOWS
PATCH AND REPAIR WITH MATCHING
CMU BLOCK
INDICATES NEW GYP BD CEILING
INDICATES NEW 2' x 2' ACOUSTICAL CEILING TILES
INDICATES EXISTING STRUCTURE TO REMAIN
REFLECTED CEILING PLAN LEGEND
ELECTRICAL SYMBOLS
WALL MOUNTED FLUORESCENT
LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.
LED LIGHT FIXTURE.
LED LIGHT FIXTURE WITH EMERGENCY BATTERY PACK UNIT.
DESCRIPTIONSYMBOL
WALL MOUNTED LED LIGHT FIXTURE WITH EMERGENCY BATTERY
PACK
LED LIGHT FIXTURE.
2' x 2' LED LIGHT FIXTURE.
2' x 2' LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.
MECHANICAL SYMBOLS
DESCRIPTIONSYMBOL
SUPPLY DIFFUSER
RETURN REGISTER OR GRILLE
EXHAUST REGISTER OR GRILLE
SAFETY DISCONNECT SWITCH
1. ALL ACOUSTICAL CEILING IS AT 9’-0” AFF, UNLESS OTHERWISE NOTED
2. ALL GYPSUM BOARD CEILING IS AT 8’-0” AFF, UNLESS OTHERWISE NOTED
3. PREPARE , PRIME AND PAINT NEW GYPSUM BOARD CEILING SYSTEM
4. FOR SPECIFIC INFORMATION REGARDING ELECTRICAL AND MECHANICAL
REFER TO THOSE SHEETS.
5. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE
DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.
REFLECTED CEILING PLAN NOTES
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:54:51 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
JE
N
N
IF
ER
A
. D eW
IT
T, R .A
C
H
IE
F, A
R C
H
IT
EC
TU
R E
SE
C
TI
O
N
A-131
BA
SE
M
EN
T
RE
FL
EC
TE
D
CE
IL
IN
G
P
LA
N M
.P
AT
EL
PROJECT NAME
20'8'0 4' 12
3/32" = 1'-0"A1 BASEMENT REFLECTED CEILING PLAN
8'-0" AFF
8'-0" AFF
10'-0" AFF 11-8" AFF
1. ALL ACOUSTICAL CEILING IS AT 9’-0” AFF, UNLESS OTHERWISE NOTED
2. ALL GYPSUM BOARD CEILING IS AT 8’-0” AFF, UNLESS OTHERWISE NOTED
3. PREPARE , PRIME AND PAINT NEW GYPSUM BOARD CEILING SYSTEM
4. FOR SPECIFIC INFORMATION REGARDING ELECTRICAL AND MECHANICAL
REFER TO THOSE SHEETS.
5. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE
DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.
REFLECTED CEILING PLAN NOTESELECTRICAL SYMBOLS
WALL MOUNTED FLUORESCENT
LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.
LED LIGHT FIXTURE.
LED LIGHT FIXTURE WITH EMERGENCY BATTERY PACK UNIT.
DESCRIPTIONSYMBOL
WALL MOUNTED LED LIGHT FIXTURE WITH EMERGENCY BATTERY
PACK
LED LIGHT FIXTURE.
2' x 2' LED LIGHT FIXTURE.
2' x 2' LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.
MECHANICAL SYMBOLS
DESCRIPTIONSYMBOL
SUPPLY DIFFUSER
RETURN REGISTER OR GRILLE
EXHAUST REGISTER OR GRILLE
SAFETY DISCONNECT SWITCH
INDICATES NEW GYP BD CEILING
INDICATES NEW 2' x 2' ACOUSTICAL CEILING TILES
INDICATES EXISTING STRUCTURE TO REMAIN
REFLECTED CEILING PLAN LEGEND
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:55:00 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
JE
N
N
IF
ER
A
. D eW
IT
T, R .A
C
H
IE
F, A
R C
H
IT
EC
TU
R E
SE
C
TI
O
N
A-132
FI
RS
T
FL
O O
R
RE
FL
EC
TE
D
CE
IL
IN
G
P
LA
N M
.P
AT
EL
PROJECT NAME
20'8'0 4' 12
8'-0" AFF
3/32" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN
1. ALL ACOUSTICAL CEILING IS AT 9’-0” AFF, UNLESS OTHERWISE NOTED
2. ALL GYPSUM BOARD CEILING IS AT 8’-0” AFF, UNLESS OTHERWISE NOTED
3. PREPARE , PRIME AND PAINT NEW GYPSUM BOARD CEILING SYSTEM
4. FOR SPECIFIC INFORMATION REGARDING ELECTRICAL AND MECHANICAL
REFER TO THOSE SHEETS.
REFLECTED CEILING PLAN NOTES
INDICATES NEW GYP BD CEILING
INDICATES NEW 2' x 2' ACOUSTICAL CEILING TILES
INDICATES EXISTING STRUCTURE TO REMAIN
REFLECTED CEILING PLAN LEGEND
ELECTRICAL SYMBOLS
WALL MOUNTED FLUORESCENT
LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.
LED LIGHT FIXTURE.
LED LIGHT FIXTURE WITH EMERGENCY BATTERY PACK UNIT.
DESCRIPTIONSYMBOL
WALL MOUNTED LED LIGHT FIXTURE WITH EMERGENCY BATTERY
PACK
LED LIGHT FIXTURE.
2' x 2' LED LIGHT FIXTURE.
2' x 2' LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.
MECHANICAL SYMBOLS
DESCRIPTIONSYMBOL
SUPPLY DIFFUSER
RETURN REGISTER OR GRILLE
EXHAUST REGISTER OR GRILLE
SAFETY DISCONNECT SWITCH
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
1/16/2020 9:55:14 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
A.
AN
YA
EG
BU
N
AM
R .L
U
FT
JE
N
N
IF
ER
A
. D eW
IT
T, R .A
C
H
IE
F, A
R C
H
IT
EC
TU
R E
SE
C
TI
O
N
A-133
SE
CO
ND
F
LO
O
R
RE
FL
EC
TE
D
CE
IL
IN
G
P
LA
N M
.P
AT
EL
PROJECT NAME
3/32" = 1'-0"A1 SECOND FLOOR REFLECTED CEILING PLAN
20'8'0 4' 12
LED TEXT DISPLAYLED
FCP
D DUCT SMOKE DETECTOR.
FLOW SWITCH.
TAMPER SWITCH.
SPRINKLER FLOW ALARM BELL. MOUNTED MINIMUM 8'-0" AFG UNO.
FIRE ALARM/MASS NOTIFICATION CONTROL PANEL AND TRANSCEIVER.
FM
FIRE ALARM/MASS NOTIFICATION SYMBOLS
DESCRIPTIONSYMBOL
FIRE ALARM MANUAL STATION. MOUNTED 42" AFF UNO.
FIRE ALARM/MASS NOTIFICATION VISUAL INDICATOR. WALL MOUNTED 90" AFF OR 6"
BELOW CEILING, WHICHEVER IS LOWER. NUMBER INDICATES MINIMUM CANDELA RATING.
SMOKE DETECTOR.
FIRE ALARM/MASS NOTIFICATION WALL MOUNTED SPEAKER MTD AT 90" AFF.
CFM CEILING MOUNTED FIRE ALARM/MASS NOTIFICATION VISUAL INDICATOR.
BELOW CEILING, WHICHEVER IS LOWER. NUMBER INDICATES MINIMUM CANDELA RATING.
FIRE ALARM/MASS NOTIFICATION CEILING MOUNTED SPEAKER M
SPD SURGE PROTECTION DEVICE
FIRE ALARM/MASS NOTIFICATION WALL MOUNTED SPEAKER MTD AT 90" AFF. WEATHERPROOFWP
LOC LOCAL OPERATOR CONTROL PANEL
FSA FIRE ALARM REMOTE ANNUNCIATOR PANEL
NOTE: ALL FIRE ALARM CONDUIT SHALL BE RED.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
2/11/2020 11:47:11 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
T.
N
G U
YE
N
T.
N
G U
YE
N
D
AR
EN
A
. B R
O W
N , P
E C
H
IE
F, E
LE
C
TR
IC
AL
S
EC
TI
O N
FA001
FI
RE
A
LA
RM
L
EG
EN
D T.
A
VE
R Y, P .E co
OFFICE
5E
CORR.
MECHANICAL RM
OFFICE
14OFFICE
13CONFERENCE
OFFICE
OFFICE
LABORATORY
OFFICE
LABORATORY
OFFICE
OFFICE
OFFICE
CORR.
OFFICE
OFFICE
5W
ELEV MECH
5 ELEV
STAIRS
BREAK RM
OFFICE
5B
COMPUTER LAB
CLASSROOM
4A
STOR.
4A
OFFICE
OFFICE
2C
CONFERENCE
2B
COPY RM
2A
OFFICE
COMM RM
17A
MECHANICAL
ROOM
CORR.
MECHANICAL RM
MENS RR
WOMENS RR
VEST
FREIGHT ELEV
26A
ELEV MECH
26 B
STAIRS
30A
OFFICE
VEST.
JAN
GENERAL SHEET NOTES
1. ALL FIRE ALARM DEVICES INSTALLED SHALL BE IN COMPLIANCE WITH NFPA 72 AND ADA REQUIREMENTS.
2. CONNECT NEW FIRE ALARM DEVICES TO AN EXISTING FIRE ALARM SYSTEM.
3. SEE FIRE ALARM MATRIX ON SHEET FA501.
4. SEE FIRE ALARM RISER DIAGRAM ON SHEET FA601.
3/32" = 1'-0"1 FIRE ALARM PLAN - BASEMENT
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
PLAN NORTH
2/11/2020 11:47:18 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
T.
N
G U
YE
N
T.
N
G U
YE
N
D
AR
EN
A
. B R
O W
N , P
.E C
H
IE
F, E
LE
C
TR
IC
AL
S
EC
TI
O N
FA101
FI
RE
A
LA
RM
P
LA
N
-B
AS
EM
EN
T T.
A
VE
R Y, OFFICE
OFFICE
OFFICE
OFFICE
112A
OFFICE
OFFICE
OFFICE
BREAK ROOM
117.
COMM.
OFFICE
ELECTRO-MECH
LAB#2
ELECTRO-MECH
LAB#1
154 B
ELECTRO-MECH
LAB #1
154 A
INSTRUMENT
ROOM/TOOL CRIB
OFFICE
OFFICE
103 A
OFFICE
127S OFFICE
OFFICE
127 A
OFFICE
OFFICE
126 A
OFFICE
OFFICE
124OFFICE
CONFERENCE
ROOM
VEST.
OFFICE
CORRIDOR
OFFICE
ELEVATOR
STAIRS
244 MENS RR
VEST.
WOMENS RR
CORR.
STAIRS
MENS RR
121WOMENS RR
CORR
VEST
VEST.
ASSEMBLY AREA
157 C
BAY AREA
MECHANICAL
ROOM
FREIGHT
ELEVATOR
157 A
STORAGE
157B
STAIRS
OFFICE
CORR
GENERAL SHEET NOTES
1. ALL FIRE ALARM DEVICES INSTALLED SHALL BE IN COMPLIANCE WITH NFPA 72 AND ADA REQUIREMENTS.
2. CONNECT NEW FIRE ALARM DEVICES TO AN EXISTING FIRE ALARM SYSTEM.
3. SEE FIRE ALARM MATRIX ON SHEET FA501.
4. SEE FIRE ALARM RISER DIAGRAM ON SHEET FA601.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
PLAN NORTH
2/20/2020 1:17:35 PM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
T.
N
G U
YE
N
T.
N
G U
YE
N
D
AR
EN
A
. B R
O W
N , P
.E C
H
IE
F, E
LE
C
TR
IC
AL
S
EC
TI
O N
FA102
FI
RE
A
LA
RM
P
LA
N
-1
ST
F
LO
O R
T.
A
VE
R
Y, OFFICE
OFFICE
260 OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
218 A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
227 S
OFFICE
OFFICE
229OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
212 S
OFFICE
206 N
OFFICE
206 S
OFFICE
208 B
OFFICE
OFFICE
208 A
ELEVATOR
STAIRS
MENS RR
210 WOMENS RR
VESTIBULE
OFFICE
CONFERENCE
ROOM
MENS RR
222WOMENS RR
STAIRS
122 VAULT
BREAK RM
COMM.
CORR.
OPEN TO SAFETY
BAY BELOW
CORR.
OFFICE
228A
2A-8
GENERAL SHEET NOTES
1. ALL FIRE ALARM DEVICES INSTALLED SHALL BE IN COMPLIANCE WITH NFPA 72 AND ADA REQUIREMENTS.
2. CONNECT NEW FIRE ALARM DEVICES TO AN EXISTING FIRE ALARM SYSTEM.
3. SEE FIRE ALARM MATRIX ON SHEET FA501.
4. SEE FIRE ALARM RISER DIAGRAM ON SHEET FA601.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
PLAN NORTH
2/20/2020 1:17:39 PM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
T.
N
G U
YE
N
T.
N
G U
YE
N
D
AR
EN
A
. B R
O W
N , P
.E C
H
IE
F, E
LE
C
TR
IC
AL
S
EC
TI
O N
FA103
FI
R
E
AL
AR
M
P
LA
N -2
N D
F
LO
O R
T.
A
VE
R
Y, ALARM SIGNALS B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA BBA
ALA
RM IN
DIC
ATOR AUDIO
-V
ISUAL
SUPERVISORY IN
DIC
ATOR AUDIO
-V
ISUAL
TROUBLE
IN
DIC
ATOR AUDIO
-V
ISUAL
AUDIO
SPEAKERS-A
LA
RM TONE
FA VISUAL A
PPLIA
NCE C
LE
AR STROBE
NOTIFICATION
APPLIANCES
SIGNAL
BUILDING FACP
& FAA
AUXILARY
FUNCTIONS
SYSTEM INPUTS
SYSTEM OUTPUTS
HVAC SHUTDOW
N
TRANSMIT FIRE
ALARM SIGNAL
ALA
RM
W
ATERFLO
W
SUPERVISORY
TROUBLE
DE-E
NERGIZED D
OOR H
OLD
ER
IN
ITIATE ELE
VATOR FIR
EFIG
HTERS SERVIC
E AND BUILD
IN
G FIR
E ALA
RM SYSTEM
IN
ITIATE ANNOUNCEMENT.
CO D
ETECTIO
N ALA
RM
ROLL
UP FIR
E D
OOR C
LO
SURE. D
OORS C
LO
SED U
PON ALA
RM.
X XCARBON MONOXIDE DETECTOR
SUPERVISORY SIGNALS B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA BBA
DUCT SMOKE DETECTOR X X
NOT TO SCALE1 FIRE ALARM MATRIX
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
2/13/2020 10:17:15 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
T.
N
G U
YE
N
T.
N
G U
YE
N
D
AR
EN
A
. B R
O W
N , P
.E C
H
IE
F, E
LE
C
TR
IC
AL
S
EC
TI
O N
FA501
FI
RE
A
LA
RM
M
AT
RI
X T.
A
VE
R Y, P
PROJECT NAME
EXISTING
FIRE ALARM
PANEL
VESTIBULE 100
TO EXISTING PANEL
AIR HANDLER SHUTDOWN
EXISTING
FIRE ALARM
TRANSCEIVER
VESTIBULE 100
1. SEE MECHENICAL PLAN FOR LOCATION OF AIR HANDLER UNITS.
TO EXISTING FIRE ALARM ANTENNA.
GENERAL NOTES:
D
HIGH BAY 157
AHU-1 1
D
AHU-2 1
D
AHU-3 1
D
AHU-7 1
MECH RM 17 MECH RM 17 MECH RM 9
CO
MECH 9
CO
MECH 16
2 2
CO
HIGH BAY 157
CO
OFFICE 160
CO
OFFICE 257
KEYED NOTES:
1. CONNECT NEW DUCT DETECTORS TO EXISTING FIRE ALARM
CONTROL PANEL IN THE BUILDING.
2. CONNECT NEW CARBON MONOXIDE DETECTORS TO EXISTING
FIRE ALARM CONTROL PANEL IN THE BUILDING.
NOT TO SCALE1 FIRE ALARM RISER DIAGRAM
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
2/20/2020 1:17:42 PM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
T.
N
G U
YE
N
T.
N
G U
YE
N
D
AR
EN
A
. B R
O W
N , P
.E C
H
IE
F, E
LE
C
TR
IC
AL
S
EC
TI
O N
FA601
FI
RE
R
IS
ER
D
IA
G
RA
M
T.
A
VE
R
Y, NG
CD
RS
RL
VTR
FD
CO
WH
WCO
PRV
TPRV
PS
FS
HB
AV
AS
ZZ ZZ
NN NN
CWS
CWR
GENERAL ABBREVIATIONS
PIPING SYSTEMS
PIPING SYMBOLS
VALVES
GENERAL NOTES
BALL VALVE
GATE VALVE
PLUG VALVE
GLOBE VALVE
CHECK VALVE
SOLENOID VALVE
BUTTERFLY VALVE
VENT
NATURAL GAS
CONDENSATE DRAIN
CONDENSER WATER
SUPPLY
CONDENSER WATER
RETURNREFRIGERANT SUCTION
REFRIGERANT LIQUID
CONTINUATION
DROP IN PIPE
VALVE IN RISER
ELBOW
ELBOW UP
ELBOW DOWN
TEE
UNION
UNION, FLANGED
FLOOR DRAIN WITH TRAP
FLOOR DRAIN
WITH
CLEANOUT
FLOOR SINK
WITH
HALF GRATEFLOOR SINK
WITH
FULL GRATE
PIPE PITCH
VENT THRU ROOF
DIRECTION OF FLOW
FLOOR PENETRATION
WALL HYDRANT
WALL CLEANOUT
TOP CONNECTION
BOTTOM CONNECTION
CONCENTRIC REDUCER
ECCENTRIC REDUCER
WATER HAMMER
ARRESTOR/ACCES
S
PRESSURE
REDUCING
VALVE
PRESSURE RELIEF
TEMP & PRESS RELIEF
THERMOMETER
THERMOMETER WELL
PRESSURE GAUGE
WITH
COCK
PRESSURE SWITCH
BALL JOINT
ANCHOR
SOLENOID TWO-WAY
MODULATING TWO-WAY
THREE-WAY
STRAINER W/BLOW-
OFF
AND HOSE
CONNECTION
HOSE BIB
CALIBRATED BALANCING
VALVE
AUTOMATIC BALANCING
VALVE
BOP - BOTTOM OF PIPE ELEV.
E
D
C
B
A
F
G
H
I
IE - INVERT ELEVATION
K
L
AFF - ABOVE FINISHED FLOOR
ALT - ALTERNATE
AP - ACCESS PANEL
CA - COMBUSTION AIR
CAV - CONSTANT AIR VOLUME
CFM - CUBIC FEET PER MINUTE
CL - CENTERLINE
CLG - CEILING
COND - CONDENSATE/CONDENSER
CONN - CONNECTION/CONNECT
COP - CENTER OF PIPE
DB - DRY BULB TEMPERATURE
DDC - DIRECT DIGITAL CONTROL
DTC - DATA TERMINAL CABINET
EL - ELEVATION
EMCS - ENERGY MONITORING
AND CONTROL SYSTEM
ESP - EXTERNAL STATIC
PRESSURE
EWT - ENTERING WATER TEMP.
FA - FIELD ADJUSTABLE
FC - FAIL CLOSED
FD - FLOOR DRAIN
FID - FIELD INTERFACE DEVICE
FLA - FULL LOAD AMPS
FO - FAIL OPEN
GA - GAUGE
HD - HUB DRAIN
LWT - LEAVING WATER TEMP.
N
NA - NOT APPLICABLE
NC - NORMALLY CLOSED
NIC - NOT IN CONTRACT
NO - NORMALLY OPEN
NPS - NOMINAL PIPE SIZE
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
O
P Pa - PASCALS PaA - PASCALS ABSOLUTE PaG - PASCALS GAUGE
PD - PRESSURE DROP
OC - ON CENTER
OED - OPEN END DUCT
OV - OUTLET VELOCITY
R
RA - RETURN AIR
RPM - REVOLUTIONS PER
MINUTES
SOG - SLAB ON GRADE
SP - STATIC PRESSURE
SV - SUPPLY VALVE
T
TOP - TOP OF PIPE ELEVATION
TOS - TOP OF SLAB/
TOP OF STEEL
TSP - TOTAL STATIC PRESSURE
V
VP - VELOCITY PRESSURE
VTR - VENT THRU ROOF
W
W - WATTS
WB - WET BULB
WC - WATER COLUMN
WG - WATER GAUGE
FLOW SWITCH
EXPANSION LOOP
AIR VENT, AUTOMATIC
AIR VENT, MANUAL
GUIDE
EXPANSION JOINT
FLEXIBLE CONNECTOR
AIR SEPARATOR
FLOW METER, ORIFICE
PRESSURE/TEMPERATURE
TEST PORT)
PETE'S PLUG
DETAIL NO.
REF: DET.NN/MZZ
DETAIL
LOCATION
REFERENCE SYMBOLOGY
DETAIL
LOCATION
B. OVERHEAD PLUMBING EQUIPMENT AND SYSTEMS SHALL BE SUPPORTED
TO MEET ANTI-TERRORISM/FORCE PROTECTION MEASURES OF UFC 4-010-01.
C. ALL FLOOR MOUNTED EQUIPMENT IN MECHANICAL ROOM SHALL BE
MOUNTED ON 6" HIGH HOUSEKEEPING PADS. THESE PADS SHALL EXTEND
6" BEYOND THE FOOTPRINT OF THE EQUIPMENT IN ALL DIRECTIONS.
D. WHERE PIPE SIZES ARE NOT INDICATED, THEY SHALL BE IN
ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE
(LATEST EDITION). DOMESTIC COLD WATER PIPING SHALL BE
LIMITED TO 5 FPS. DOMESTIC HOT WATER PIPING SHALL BE
LIMITED TO 4 FPS.
E. TRAP PRIMER LINES SHALL BE 1/2" TYPE K COPPER. TRAP PRIMER
VALVES/DISTRIBUTORS SHALL BE PROVIDED FOR ALL FLOOR DRAINS AND
FLOOR SINKS. TRAP PRIMER VALVE/DISTRIBUTORS SHALL BE LOCATED IN
THE NEAREST ACCESSIBLE LOCATION AND PROVIDED WITH ACCESS
PANELS.
A. REFER TO SPECIFICATIONS FOR MATERIALS AND METHODS OF CONSTRUCTION
F. DRAWINGS ARE SCHEMATIC AND ARE TO SHOW DESIGN INTENT, AND IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE PLACEMENTS.
kW - KILOWATTS
V
G. REFER TO MECHANICAL SHEETS FOR ADDITIONAL DETAILS.
NON-FREEZING WALL
HYDRANT
NFWH
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
2/12/2020 10:57:09 AM
W
SM
R B
LD
G
FY
-4
H
VA
C
R
EP
LA
C
EM
EN
T
JA
N U
AR
Y
W
G
B0
N . B
R O
W N
P .E
N . B
R O
W N
P .E
G
IL
BE
R
T J.
V
AL
LA
, P
.E
C H
IE
F, M
EC
H
AN
IC
AL
S
EC
TI
O
N
P-001
PL
UM
BI
NG
L
EG
EN
D
K.
W
IL
LI
AM
S
P.
E.
UP
2C
CONFERENCE
2B
COMPUTER LAB
CORR.
B-3
B-2
OFFICE
5W
ELEV MECH RM
5A
OFFICE
5B
OFFICE
5E
STORAGE
STAIRWELL
1A
CORR.
MECHANICAL RM
MECHANICAL
ROOM
COMM ROOM
17A
ELEV MECH RM
26B
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
MECHANICAL RM
MENS RR
WOMENS RR
LABORATORY
LABORATORY
STORAGE
4A
OFFICE
CORR.
STAIRWELL
COPY ROOM
2A
VAV-5W
VAV-5E
VAV-5B VAV-4-2 VAV-4 VAV-3 VAV-2C VAV-2B VAV-2A VAV-18
VAV-1
VAV-14VAV-13
VAV-12
VAV-29
VAV-20
VAV-11
VAV-7
VAV-21 VAV-28
VAV-22
VAV-23 VAV-27
VAV-26
VAV-24
VAV-30
VAV-25
B-1
HWP-1
HWP-2
CWP-1
CWP-2
FREIGHT
ELEVATOR
26A
UH-2
UH-1
UH-3
UH-4
1 1/2"ø NG
1/
2" ø
N G
3/4"ø NG
1 2"ø NG
1/ 2" ø N
G
N
EW
O
LD
3/4"ø NG
1/2"ø NG
1. NATURAL GAS PIPE SIZED BASED 2018 IFGC INLET PRESSURE LESS THAN 2 PSI , 0.5 IN. W.C
TABLE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
2/12/2020 10:57:13 AM
W
SM
R B
LD
G
FY
-4
HV
AC
R
EP
LA
CE
M
EN
T
JA
N
U
AR
Y
W
G
B0
N . B
R O
W N
P .E
N . B
R O
W N
P .E
G
IL
BE
R
T J.
V
AL
LA
, P
.E
C H
IE
F, M
EC
H
AN
IC
AL
S
EC
TI
O
N
P-101
NA
TU
RA
L
G
AS
B
AS
EM
EN
T K.
W
IL
LI
AM
S P.
E.
PROJECT NAME
3/32" = 1'-0"P-101
NATURAL GAS BASEMENT PLAN1
20'8'0 4' 12
Keynote Legend
1 SUPPLY UP TO NEXT FLOOR.
2 CONNECT TO EXISTING WATER HEATER.
3 CONNECT TO NEW BOILER.
4 GAS SUPPLY FROM GROUND LEVEL.
5 FROM GAS METER TO BUILDING.
GENERAL NOTES
CH-2
AHU-7
AHU-4 AHU-5 AHU-6
CH-1
STAIRS-1
--1
STAIRS-2
--2
STAIRS
OFFICE
ELECTRO-MECH
LAB#1
154 B
ELETRO-MECH
LAB #1
154 A
INSTRUMENT
ROOM/TOOL CRIB
OFFICE
OFFICE
OFFICE
127S
OFFICE
OFFICE
127 A
OFFICE
OFFICE
126 A
OFFICE
OFFICE
OFFICE
123OFFICE
OFFICE
OFFICE
112B
OFFICE
112A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
103 A
OFFICE
CORRIDOR
Space
MENS RR
WOMENS RR
WOMENS RR
MENS RR
CONFERENCE
ROOM
ELECTRO-MECH
LAB#2
BAY AREA
STORAGE
157B
VAV-108
VAV-107
VAV-109
VAV-106
VAV-112A
VAV-104
VAV-113
VAV-103A
VAV-103
VAV-114 VAV-102
VAV-128
VAV-127S VAV-127
VAV-127A VAV-126 VAV-126A VAV-125
VAV-124
VAV-123
VAV-121
VAV-119
VAV-154B
VAV-154A VAV-151
VAV-152
3/ 4" ø N
G
1/
2" ø
N G
N
EW
O
LD
5 3/4"ø NG
1. NATURAL GAS PIPE SIZED BASED 2018 IFGC INLET PRESSURE LESS THAN 2 PSI , 0.5 IN. W.C
TABLE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
2/12/2020 10:57:17 AM
W
SM
R B
LD
G
FY
-4
HV
AC
R
EP
LA
CE
M
EN
T
JA
N
U
AR
Y
W
G
B0
N . B
R O
W N
P .E
N . B
R O
W N
P .E
G
IL
BE
R
T J.
V
AL
LA
, P
.E
C H
IE
F, M
EC
H
AN
IC
AL
S
EC
TI
O
N
P-102
NA
TU
RA
L
G
AS
F
IR
ST
F
LO
O
R K.
W
IL
LI
AM
S P.
E.
PROJECT NAME
3/32" = 1'-0"P-102
NATURAL GAS FIRST FLOOR PLAN1
20'8'0 4' 12
Keynote Legend
1 FROM GAS METER TO BUILDING.
2 SUPPLY UP TO ROOF.
3 CONNECT TO GAS MAIN.
4 RETURN DOWN TO BASEMENT.
5 SUPPLY UP TO NEXT FLOOR.
AHU-8
208 B
OFFICE
206 S
OFFICE
206 N
OFFICE
212 S
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
228A OFFICE
227 S
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
218 A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CONFERENCE
ROOM
CORR.
CORR.
MENS RR
WOMENS RR
WOMENS RR
MENS RR
STAIRS-3
--3
STAIRS-4
--4
VAULT
COMM
VAV-225VAV-227VAV-227
S
VAV-228AVAV-228VAV-229VAV-230VAV-231VAV-202VAV-203VAV-204VAV-212
S
VAV-206
N
VAV-206
S
VAV-208
B
VAV-208A
VAV-208
VAV-210
VAV-205 VAV-214
VAV-216
VAV-218 VAV-218A VAV-219
VAV-222
VAV-224
VAV-258
VAV-256
VAV-257
VAV-251
VAV-252
VAV-253
VAV-259VAV-260VAV-261
VAV-262
OFFICE
208 A
OFFICE
3/4"ø NG
3/4"ø NG
1. NATURAL GAS PIPE SIZED BASED 2018 IFGC INLET PRESSURE LESS THAN 2 PSI , 0.5 IN. W.C
TABLE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
2/12/2020 10:57:21 AM
W
SM
R B
LD
G
FY
-4
HV
AC
R
EP
LA
CE
M
EN
T
JA
N
U
AR
Y
W
G
B0
N . B
R O
W N
P .E
N . B
R O
W N
P .E
G
IL
BE
R
T J.
V
AL
LA
, P
.E
C H
IE
F, M
EC
H
AN
IC
AL
S
EC
TI
O
N
P-103
NA
TU
RA
L
G
AS
S
EC
O
ND
F
LO
O R
K.
W
IL
LI
AM
S
P.
E.
PROJECT NAME
3/32" = 1'-0"P-103
NATURAL GAS SECOND FLOOR PLAN1
20'8'0 4' 12
Keynote Legend
1 PIPE ABOVE CEILING GRID.
2 SUPPLY UP TO ROOF.
3 SUPPLY UP FROM BELOW.
3/4"ø NG
1. NATURAL GAS PIPE SIZED BASED 2018 IFGC INLET PRESSURE LESS THAN 2 PSI , 0.5 IN. W.C
TABLE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS.
SHEET
NUMBER
D ra w n by
D es ig ne d by
Su bm itt ed b y:
Sh ee t S iz e
AN
SI
D
D at e:
C on tra ct
N o.
So lic ita tio n N o.
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
FO
R
T W
O R
TH
D
IS
TR
IC
T
TA
YL
O R
S T
FO
R
T W
O R
TH
, T
EX
AS
C he ck ed b y:
US Army Corps of Engineers ®
A
R ev
M ar k D es cr ip tio n Tr ac ki ng N o.
Ac tio n
D at e
EN
G
IN
EE
R
IN
G
C O
N
ST
R U
C
TI
O N
D
IV
IS
IO
N
EN
G
IN
EE
R
IN
G
B R
AN
C
H
PLOT DATE:
2 3 4 5 6 7 8 9 10
B
C
D
E
F
G
Fort Worth District
FILE PATH:
PLAN NORTH
2/12/2020 10:57:23 AM
W
SM
R B
LD
G
FY
-4
HV
AC
R
EP
LA
CE
M
EN
T
JA
N
U
AR
Y
W
G
B0
N . B
R O
W N
P .E
N . B
R O
W N
P .E
G
IL
BE
R
T J.
V
AL
LA
, P
.E
C H
IE
F, M
EC
H
AN
IC
AL
S
EC
TI
O
N
P-104
NA
TU
RA
L
G
AS
R O
O F
K.
W
IL
LI
AM
S
P.
E.
PROJECT NAME
1/8" = 1'-0"1 NATURAL GAS ROOF PLAN
20'8'0 4' 12
Keynote Legend
1 NATURAL GAS FROM BELOW TO AHU, USE EXISTING
PENETRATION.
CHANGE IN DUCT CONSTRUCTION BY
PRESSURE CLASS.
(PRESSURES IN INCHES W.G)
BD
SD
FD-1.5
FD-3
FSD
SS
G
HWS
HWR
CD
F
RS
RL
RD
WH
WCO
PRV
TPRV
HB
2 1
SA
AV
ZZ ZZ
NN NN
CHS
CHR
GENERAL ABBREVIATIONSPIPING SYSTEMS
PIPING SYMBOLS
DAMPERS
GENERAL NOTES
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT
WATER
RETURN
SANITARY SEWER
VENT
NATURAL GAS
CHILLED WATER SUPPLY
CHILLED WATER RETURN
HEATING WATER SUPPLY
HEATING WATER RETURN
CONDENSATE DRAIN
REFRIGERANT SUCTION
REFRIGERANT LIQUID
ROOF DRAIN
DUCTWORK
CONTINUATION
DROP IN PIPE
VALVE IN RISER
ELBOW, 90 DEG.
ELBOW UP, 90 DEG.
ELBOW DOWN, 90 DEG.
TEE
UNION
UNION, FLANGED
FLOOR DRAIN WITH TRAP
PIPE PITCH
DIRECTION OF FLOW
FLOOR PENETRATION
WALL HYDRANT
WALL CLEANOUT
TEE, OUTLET TURNED
DOWNWARD
TEE, OUTLET TURNED
UPWARD
PRESSURE REDUCING
VALVE
PRESSURE RELIEF VALVE
TEMP & PRESS RELIEF
THERMOMETER
BALL JOINT
ANCHOR
HOSE BIB
AFF - ABOVE FINISHED FLOOR
BOD - BOTTOM OF DUCT ELEV.
BOP - BOTTOM OF PIPE ELEV.
CFM - CUBIC FEET PER MINUTE
CL - CENTERLINE
CLG - CEILING
COND- CONDENSATE/CONDENSER
CONN- CONNECTION/CONNECT
DB - DRY BULB TEMPERATURE
DDC - DIRECT DIGITAL CONTROL
DX - DIRECT EXPANSION
EA - EXHAUST AIR
EAT - ENTERING AIR TEMP.
ELEV - ELEVATION
EMCS- ENERGY MONITORING
AND CONTROL SYSTEM
ESP - EXTERNAL STATIC PRESSURE
EWT - ENTERING…