WSMR_BLDG_1506_Solicitation_Drawings.pdf

PDF 9 MB Posted

Attached to
WSMR B1506 HVAC Renovation
Solicitation number
W9126G-20-B-0002
Issued by

About this file

This document package includes construction drawings and specifications for renovating the HVAC system in Building 1506 at White Sands Missile Range in New Mexico. The project involves demolishing the existing HVAC equipment, ductwork, piping and controls and replacing them. Key aspects include:

  • The Army Corps of Engineers is soliciting bids for the project under solicitation number W9126G-20-B-0002.

  • Drawings show demolition plans for the basement, first and second floors, and roof as well as new HVAC plans for all levels. Specifications cover items like mechanical, plumbing and controls work.

  • The project involves removing and replacing air handling units, boilers, chillers, VAV terminals, ductwork, piping and controls across three floors of the building to upgrade the HVAC system.

  • Bidders should note requirements for handling refrigerants, fluids and hazardous materials from the existing system and for providing housekeeping pads, seismic bracing and other installation details. Completion is required by January 2021.

View the file

Other files

File Type Posted
C1_Bid Abstract_20B0002.pdf PDF
Site Visit Sign In Sheets.pdf PDF
W9126G20B0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BUILDING 1506 HVAC RENOVATION

WHITE SANDS MISSILE RANGE

WHITE SANDS, NEW MEXICO

PN: 478773

SOLICITATION NO.: W9126G20B0002

US ARMY CORPS

OF ENGINEERS

Ft. Worth District

W H

I T

E

S

A N

D S

N

E W

M

X

I C

O B

U I L D

I N

G

H

V A

C

R

E N

O V

A T

I O

N

P

N

W H

I T

E

S

A N

D S

N

X

I C

O

DATED: JANUARY 2020

SIGNATURES AFFIXED BELOW INDICATE

OFFICIAL RECOMMENDATION AND APPROVAL OF

ALL DRAWINGS IN THIS SET AS INDEXED ON THIS

SHEET.

APPROVAL RECOMMENDED BY:

CHIEF, ENGINEERING BRANCH DATE

This project was designed by the Fort Worth District of the U.S. Army

Corps of Engineers. The initials or signatures and registration designations of individuals appear on these project documents within the scope of their employment as required by ER 1110-1-8152

B U

I L D

I N

G

H

V A

C

R

E N

O V

A T

I O

N

P

N

4 March 2020

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

2/12/2020 11:51:24 AM

W

SM

R B

U

IL

D

IN

G

FY

-4

H

AV

C R

EP

LA

C

EM

EN

T

JA

N

U

AR

Y

W

G

B0

C . M

AC

K

C . M

AC

K

JE

N

N

IF

ER

D

EW

IT

T, R

.A

C H

IE

F, A R

C H

IT

EC

TU

R

AL

S

EC

TI

O N

G-002

IN

D

EX

O

F D

R

AW

IN

G

S D

. W . B

LA

KE

LE

Y, P .E

Project Name

GENERAL

G-001 COVER SHEET

G-002 INDEX OF DRAWINGS

G-101 PROJECT LOCATION AND HAUL ROUTE

G-102 CONTRACTOR LAYDOWN AND STAGING AREA

ARCHITECTURE

AD101 BASEMENT DEMOLITION FLOOR PLAN

AD102 FIRST FLOOR DEMOLITION FLOOR PLAN

AD103 SECOND FLOOR DEMOLITION FLOOR PLAN

AD131 BASEMENT DEMOLITION REFLECTED CEILING PLAN

AD132 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN

AD133 SECOND FLOOR DEMOLITION REFLECTED CEILING PLAN

AD134 ROOF PLAN DEMOLITION

A-101 BASEMENT FLOOR PLAN

A-102 FIRST FLOOR PLAN

A-103 SECOND FLOOR PLAN

A-131 BASEMENT REFLECTED CEILING PLAN

A-132 FIRST FLOOR REFLECTED CEILING PLAN

A-133 SECOND FLOOR REFLECTED CEILING PLAN

MECHANICAL

M-505 MECHANICAL DETAILS

M-506 MECHANICAL DETAILS

M-507 MECHANICAL DETAILS

M-508 MECHANICAL DETAILS

M-601 MECHANICAL SCHEDULE

M-602 MECHANICAL SCHEDULE

M-901 BASEMENT MECHANICAL ISOMETRIC

M-902 FIRST FLOOR MECHANICAL ISOMETRIC

M-903 SECOND FLOOR MECHANICAL ISOMETRIC

MI001 CONTROLS LEGEND

MI002 POINTS LIST INSTRUCTIONS

MI301 VAV AHU-1 & 2 CONTROL SCHEMATIC

MI302 AHU 1 & 2 POINTS SCHEDULE

MI303 VAV AHU 1 & 2 SEQUENCE OF OPERATION

MI304 VAV AHU-3 CONTROL SCHEMATIC

MI305 VAV AHU 3 POINTS SCHEDULE

MI306 VAV AHU 3 SEQUENCE OF OPERATION

MI307 AHU- 4 & 7 CONTROL SCHEMATIC

MI308 AHU-4 & 7 POINT SCHEDULE

MI309 AHU-4 & 7 SEQUENCE OF OPERATION

MI310 VAV AHU-5 & 6 CONTROL SCHEMATIC

MI311 VAV AHU 5 & 6 POINTS SCHEDULE

MI312 AHU-5 & 6 SEQUENCE OF OPERATION

MI313 AHU-8 CONTROL SCHEMATIC

MI314 AHU-8 RTU POINTS SCHEDULE

MI315 AHU-8 RTU SEQUENCE OF OPERATION

MI316 VAV AHU-9 CONTROL SCHEMATIC

MI317 AHU-9 RTU POINTS SCHEDULE

MI318 AHU-9 SEQUENCE OF OPERATION

MI319 VAV TERMINAL UNIT CONTROL SCHEMATIC

MI320 VAV TERMINAL UNIT POINTS

MI321 CHILLED WATER SYSTEM CONTROLS CHILLER-1

MI322 CHILLED WATER SYSTEM POINTS CHILLER-1

MI323 CHILLED WATER SYSTEM CONTROLS CHILLER-2

MI324 CHILLED WATER SYSTEM POINTS CHILLER-2

MI325 HYDRONIC HEATING WATER CONTROLS (LOOP 1)

MI326 HYDRONIC HEATING HOT WATER POINTS (LOOP 1)

MI327 HYDRONIC HEATING WATER CONTROLS (LOOP 2)

MI328 HYDRONIC HEATING HOT WATER POINTS (LOOP 2)

MI329 EXHAUST FAN 6 & 7 CONTROLS

MI330 EXHAUST FAN CONTROLS

MI331 DSS CONTROLS

MI332 UNIT HEATER CONTROLS

MECHANICAL

M-001 MECHANICAL LEGEND

M-101 OVERALL BASEMENT MECHANICAL FLOOR PLAN

M-102 OVERALL FIRST FLOOR MECHANICAL PLAN

M-103 OVERALL SECOND FLOOR MECHANICAL PLAN

M-104 OVERALL ROOF PLAN

MD101 OVERALL BASEMENT DEMOLITION PLAN

MD102 OVERALL FIRST FLOOR DEMOLITION PLAN

MD103 OVERALL SECOND FLOOR DEMOLITION PLAN

MD104 DEMOLITION ROOF PLAN

MH101 BASEMENT HVAC PLAN

MH102 FIRST FLOOR HVAC PLAN

MH103 SECOND FLOOR HVAC PLAN

MP101 BASEMENT HYDRONIC PLAN

MP102 FIRST FLOOR HYDRONIC PLAN

MP103 SECOND FLOOR HYDONIC PLAN

MP-901 HYDRONIC ISOMETRIC

M-201 MECH ELEVATION

M-401 MECHANICAL ROOM PLANS

M-501 CHILLED WATER SYSTEM SCHEMATIC

M-502 CHILLED WATER SYSTEM SCHEMATIC

M-503 HEATING WATER SYSTEM SCHEMATIC

M-504 HEATING WATER SYSTEM SCHEMATIC

ELECTRICAL

E-001 ELECTRICAL LEGEND

ED101 DEMOLITION PLAN - BASEMENT

ED102 DEMOLITION PLAN - 1ST FLOOR

ED103 DEMOLITION PLAN - 2ND FLOOR

ED104 DEMOLITION PLAN - ROOF

EL101 LIGHTING PLAN - BASEMENT

EL102 LIGHTING PLAN - 1ST FLOOR

EL103 LIGHTING PLAN - 2ND FLOOR

EL501 LIGHTING DETAILS 1

EL503 LIGHTING CONTROL WIRING DIAGRAM

EL601 LIGHTING FIXTURE SCHEDULE & CONTROL MATRIX

EP101 POWER PLAN - BASEMENT

EP102 POWER PLAN - 1ST FLOOR

EP103 POWER PLAN - 2ND FLOOR

EP104 POWER PLAN - ROOF

EP401 MECHANICAL EQUIPMENT SCHEDULE

EP601 ELECTRICAL RISER DIAGRAM - SERVICE 1 DEMOLITION

EP602 ELECTRICAL RISER DIAGRAM - SERVICE 2 DEMOLITION

EP603 ELECTRICAL RISER DIAGRAM - NEW WORK 1

EP604 ELECTRICAL RISER DIAGRAM - NEW WORK 2

EP701 ELECTRICAL PANEL SCHEDULE 1

EP702 ELECTRICAL PANEL SCHEDULE 2

EP703 ELECTRICAL PANEL SCHEDULE 3

EP704 ELECTRICAL PANEL SCHEDULE 4

EP705 ELECTRICAL PANEL SCHEDULE 5

EP706 ELECTRICAL PANEL SCHEDULE 6

EP707 ELECTRICAL PANEL SCHEDULE 7

INDEX OF DRAWINGS

CIVIL

CD100 OVERALL DEMOLITION PLAN

CS100 OVERALL SITE PLAN

C-501 CONCRETE PAD DETAILS

PLUMBING

P-001 PLUMBING LEGEND

P-101 NATURAL GAS BASEMENT

P-102 NATURAL GAS FIRST FLOOR

P-103 NATURAL GAS SECOND FLOOR

P-104 NATURAL GAS ROOF

FIRE ALARM

FA001 FIRE ALARM LEGEND

FA101 FIRE ALARM PLAN - BASEMENT

FA102 FIRE ALARM PLAN - 1ST FLOOR

FA103 FIRE ALARM PLAN - 2ND FLOOR

FA501 FIRE ALARM MATRIX

FA601 FIRE RISER DIAGRAM

S-1538

MARTIN LUTHER KING BLVD

D Y

R

S

T

B E

N E

T

S

T

H E

A D

Q U

A R

T E

A

V E

S I O

U X

SAINT LOUIS ST

C R

A I G

MARTIN LUTHER BLVD

W E

S S

O N

B O

M F

O R

D

S

T

R A

M S

Y

NAVAJO ST

ENGINEER DRIVE

G

O

D

D

A

R

D

A

V

E

R I P

L E

Y

S

T

G

O

D

D

A

D

E

PICATINNY AVE

PICATINNY AVE

C R

O Z

I E

R

S

T

D Y

PARSONS ST

B L

A N

HALSEY ST

NOBLE ST

ZEUS ST

P O

L A

R

J U

P I T

MERCURY AVE

R

O

C

K

L

A

E

ROCK ISLAND AVE

H A

L

O

S S

E

S

T

O

S S

E

S

T

H A

A

N

N

I

S

T

E

L

E

T

T

E

R

K

E

N

E

R

O

S

S

F

O

E

T

O

O

E

E

G

O

D

D

A

E

S I E

R R

A

S

T

M

A

R

T

T

H

B

V

D

ABERDEEN AVE

A

B

E

R

D

E

E

T

A

L

E

A

E

R

O

B

E

T

A

L

O

S

A

V

E

T

E

R

R

I

E

DEACON AVE

A E

R O

B E

E

A

V E

V I K

I N

G

S

T

V I K

I N

G

S

T

R I P

L E

Y

S

T

N

I

E

ABERDEEN AVE

N

I

E

N

I

E

H U

G H

WATERTOWN AVE

C R

A

R A

M S

W E

S S

H E

A D

Q U

A R

T E

E

SATURN AVE

T

H

R I P

L E

Y

S

T

R I P

L E

Y

S

T

O

S

O

S

O

S S

E

S

T

H A

D A

L O

K I

S

T

PICATINNY AVE

PICATINNY AVE

PICATINNY AVE

H

A

H

A

D

A

D

A

R

A

V

E

N

E

R

A

V

E

N

E

BE

N

ET

S

T

C R

O

ZI

ER

S

T

C R

O

ZI

ER

S

T

BE

N

ET

S

T

DETROIT ST

FRANKFORD ST

SPRINGFIELD ST

C R

O Z

I E

R

S

T

D Y

ROCK ISLAND AVE

ROCK ISLAND AVE

MILAN ST

D Y

F L

A G

L E

R

S

T

H O

F

S

T

JOLIET ST

RADFORD ST

W

I

N

G

A

S

J

C

I

N

VANGUARD DR

V A

N G

U A

V A

N G

U A

Z E

U

S

D

R

Z E

Z E

H E

R C

U L

P E

R S

H I N

G

D

R

P E

R S

H I N

G

D

R

P E

R S

H

IN

G D

R

Z U

N I D

R

H E

R C

U L

Z U

N I

D

R

Z U

N I

D

R

A T

L A

S

S

T

L O

K I

S

T R

E E

T

LAKE CITY AVE

T-

S-1558

1538A

A R

D E

N N

E S

C O

L U

M B

U S

ANTIETAM

BELLEAU WOOD

COLUMBUS

MARTIN LUTHER BLVD

N A

K T

O N

G

B E

L L

E A

U

W

O O

D

K U

N U

R I

N O

R M

A N

D Y

H U

G H

K U

N U

R I

N O

R M

A N

D Y

ABERDEEN AVE

H I G

H W

WATERTOWN AVE

LAS CRUCES

GATE

EL PASO

GATE

T O

H W

Y

H E

A D

Q U

A R

T E

E

PICATINNY AVE

ROCK ISLAND AVE

SPRINGFIELD ST

DETROIT ST

B E

N E

T

S

T

ABERDEEN AVE

B E

N E

T

S

T

C R

O Z

I E

R

S

T

INDIANA ST

S I O

MARTIN LUTHER KING BLVD

H E

A D

Q U

A R

T E

E

S I O

PROJECT LOCATION/

CONTRACTOR LAYDOWN AREA

WATERTOWN AVE

D Y

FRANKFORD ST

W S

D

G

F Y

H V

P

L A

C E

M E

N T

SHEET

SEQUENCE

NUMBER

1 2 3 4 5

D r a w n b y

D e s i g n e d b y

S u b m i t t e d b y

F i l a m e

D a t e

C o n t r a c t

N o

S o l i c i t a t i o n

U S

A

R M

Y

C

O R

P

F

E

N G

I N

E E

R S

F O

R

H

S

T R

I C

T

T

A Y

L O

R

S

T

F O

R

T H

T

E X

A S

R e v i e w

FORT WORTH DISTRICT

US ARMY CORPS

OF ENGINEERS ®

B R

A N

T

J E

N S

E N

P

E

C H

I E

F

C

I V

C

T I O

N

D

C

B

A

P L

A

L E

P L

T

E

R e v

S y m b o l

D e s c r i p t i o n

T r a c k i n g

N o

A c t i o n D a t e

E N

G I N

E E

R I N

G

C O

N S

T R

U C

T I O

N

D

I V

I S

I O

N

E N

G I N

E E

R I N

G

B

R A

N C

H

J A

N U

A R

Y

W

G

B

G-101

P R

O J E

C

A T

I O

N

A N

D

H

A U

L

R

O U

T E

C L

I F

T O

N

M

A C

K

C L

I F

T O

N

M

A C

K

B R

A N

T

J E

N S

E N

P

E

100'0 50'

NOTES:

1. DELIVERY TRUCKS AND CONSTRUCTION VEHICLES MUST ACCESS

THROUGH THE EL PASO OR LAS CRUCES GATE.

PLAN NORTH

AutoCAD SHX Text S-1733

AutoCAD SHX Text S-1727

AutoCAD SHX Text

AutoCAD SHX Text S-1721

AutoCAD SHX Text

TSC

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text S-1733

AutoCAD SHX Text S-1727

AutoCAD SHX Text

AutoCAD SHX Text S-1721

D

G

F Y

H V

P

L A

C E

M E

N T

SHEET

SEQUENCE

NUMBER

1 2 3 4 5

D r a w n b y

D e s i g n

S u b m i t t e d b y

F i m e

D a t e

C o n t r a c t

N o

S o l i c i t a t i

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

F O

R

S

T R

I C

T

T

A Y

L O

R

S

T

F O

R

T H

T

E X

A S

R e v i e w

FORT WORTH DISTRICT

US ARMY CORPS

OF ENGINEERS ®

B R

A N

T

J E

N S

E N

P

E

C H

I E

F

C

I V

C

T I O

N

D

C

B

A

P L

A

L E

P L

T

E

R e v

S y m b o l

D e s c r i p t i o n

T r a c k i n g

N o

A c t i o n D a t e

E N

G I N

E E

R I N

G

C O

N S

T R

U C

T I O

N

D

I V

I S

I O

N

E N

G I N

E E

R I N

G

B

R A

N C

H

J A

N U

A R

Y

W

G

B

G-102

P R

O J E

C

A T

I O

N

A

N D

L A

Y D

O W

N

A

R E

A

C L

I F

T O

N

M

A C

K

C L

I F

T O

N

M

A C

K

B R

A N

T

J E

N S

E N

P

E

100'0 50'

BUILDING 1506

CONTRACTOR

LAYDOWN

AREA

PLAN NORTH

BUILDING 1506

BENET STREET

DEMO EXISTING CONCRETE PAD

DEMO EXISTING

SHED

W S

D

G

F Y

H V

P

L A

C E

M E

N T

SHEET

SEQUENCE

NUMBER

1 2 3 4 5

D r a w n b y

D e s i g n

S u b m i t t e d b y

F i m e

D a t e

C o n t r a c t

N o

S o l i c i t a t i

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

F O

R

S

T R

I C

T

T

A Y

L O

R

S

T

F O

R

T H

T

E X

A S

R e v i e w

FORT WORTH DISTRICT

US ARMY CORPS

OF ENGINEERS ®

B R

A N

T

J E

N S

E N

P

E

C H

I E

F

C

I V

C

T I O

N

D

C

B

A

P L

A

L E

P L

T

E

R e v

S y m b o l

D e s c r i p t i o n

T r a c k i n g

N o

A c t i o n D a t e

E N

G I N

E E

R I N

G

C O

N S

T R

U C

T I O

N

D

I V

I S

I O

N

E N

G I N

E E

R I N

G

B

R A

N C

H

J A

N U

A R

Y

W

G

B

CD100

O V

E R

A L

L

D

E M

O

P

L A

N

C L

I F

T O

N

M

A C

K

C L

I F

T O

N

M

A C

K

B R

A N

T

J E

N S

E N

P

E

40'0 20'

BUILDING 1506

BENET STREET

NEW CONCRETE PAD - 94" X 153"

(SEE DETAIL B/C-501)

W S

D

G

F Y

H V

P

L A

C E

M E

N T

SHEET

SEQUENCE

NUMBER

1 2 3 4 5

D r a w n b y

D e s i g n

S u b m i t t e d b y

F i m e

D a t e

C o n t r a c t

N o

S o l i c i t a t i

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

F O

R

S

T R

I C

T

T

A Y

L O

R

S

T

F O

R

T H

T

E X

A S

R e v i e w

FORT WORTH DISTRICT

US ARMY CORPS

OF ENGINEERS ®

B R

A N

T

J E

N S

E N

P

E

C H

I E

F

C

I V

C

T I O

N

D

C

B

A

P L

A

L E

P L

T

E

R e v

S y m b o l

D e s c r i p t i o n

T r a c k i n g

N o

A c t i o n D a t e

E N

G I N

E E

R I N

G

C O

N S

T R

U C

T I O

N

D

I V

I S

I O

N

E N

G I N

E E

R I N

G

B

R A

N C

H

J A

N U

A R

Y

W

G

B

CS100

O V

E R

A L

L

S

I T

E

P

L A

N

C L

I F

T O

N

M

A C

K

C L

I F

T O

N

M

A C

K

B R

A N

T

J E

N S

E N

P

E

40'0 20'

CHAMFER EDGE

#4 CONT, TYP

EQUIPMENT

#4 @ 12" OC EW TYP.

NOTES:

1. ANCHOR EQUIPMENT PER MANUFACTURER'S RECOMMENDATIONS.

2. DOWELS MAY BE DRILLED AND EPOXIED IN USING OVERSIZE HOLES. CLEAN AND PREPARE

HOLES PER EPOXY MFR.

3. SEE MECHANICAL SHEETS FOR HOUSEKEEPING PAD LOCATIONS.

4. MECHANICAL EQUIPMENT HOUSEKEEPING PAD SIZE TO SUIT ACTUAL EQUIPMENT FURNISHED

PLUS 6" CLEAR ALL AROUND. EXACT LOCATION PER MECHANICAL EQUIPMENT

REQUIREMENTS.

TYPICAL HOUSEKEEPING PAD

TYPICAL EXTERIOR EQUIPMENT PAD DETAIL

C L

R

SEE MECHANICAL/ELECTRICAL PLAN

SIZE FOR 12" CLEAR

ALL AROUND EQUIPMENT

8"

#5's @ 12" O.C. E.W.

1/2" BITUMINOUS JOINT

FILLER w/ SEALANT

SCALE: N.T.S.

SCALE: N.T.S.

3/4" CHAMFER @

PAD EDGE (TYP.)

M I N

W S

D

G

F Y

H V

P

L A

C E

M E

N T

SHEET

SEQUENCE

NUMBER

1 2 3 4 5

D r a w n b y

D e s i g n

S u b m i t t e d b y

F i m e

D a t e

C o n t r a c t

N o

S o l i c i t a t i

U S

A

R M

Y

C

O R

E

N G

I N

E E

R S

F O

R

S

T R

I C

T

T

A Y

L O

R

S

T

F O

R

T H

T

E X

A S

R e v i e w

FORT WORTH DISTRICT

US ARMY CORPS

OF ENGINEERS ®

B R

A N

T

J E

N S

E N

P

E

C H

I E

F

C

I V

C

T I O

N

D

C

B

A

P L

A

L E

P L

T

E

R e v

S y m b o l

D e s c r i p t i o n

T r a c k i n g

N o

A c t i o n D a t e

E N

G I N

E E

R I N

G

C O

N S

T R

U C

T I O

N

D

I V

I S

I O

N

E N

G I N

E E

R I N

G

B

R A

N C

H

J A

N U

A R

Y

W

G

B

C-501

C O

N C

R E

T

A I L

S

C L

I F

T O

N

M

A C

K

C L

I F

T O

N

M

A C

K

B R

A N

T

J E

N S

E N

P

VEST.

CORR.

JAN

MENS RR

WOMENS RR

BREAK RM

STAIRS

ELEV

ELEV MECH

OFFICE

5W

OFFICE

5E

OFFICE

5B COMPUTER LAB

CLASSROOM

4A

STOR.

4A

OFFICE

OFFICE

2C

CONFERENCE

2B

COPY RM

2A

OFFICE

OFFICE

11CORR.

MECHANICAL RM

CORR.

MECHANICAL RM

COMM RM

17AOFFICE

CORR.

OFFICE

OFFICE

CONFERENCE

OFFICE

MECHANICAL

ROOM

OFFICE

OFFICE

OFFICE

LABORATORY

FREIGHT ELEV

26A

ELEV MECH

26 B

LABORATORY

OFFICE

CORR.

OFFICE

STOR.

26A

STAIRS

30A

VEST

GENERAL ARCHITECTURAL NOTES

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. MATCH EXISITING ADJACENT WALL CONSTRUCTION AND PAINT COLOR.

4. REFER TO SPECIFICATONS FOR HAZMAT REPORT AND ABATEMANT PROCEDURES.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:55:23 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

AD101

BA

SE

M

EN

T

DE

M O

LI

TI

O N

FL

O

O R

PL

AN

M .P

AT

EL

PROJECT NAME

20'8'0 4' 12

3/32" = 1'-0"A1 BASEMENT DEMOLITION FLOOR PLAN

REMOVE EXISTING WALL A/C UNITS

Su bm itt ed b y:

JE

N

N

IF

ER

A

. D eW

IT

T

R .A

C

H

IE

F

AR

C H

IT

EC

TU

R

E

SE

C

TI

BAY AREA

ASSEMBLY AREA

157 C

FREIGHT

ELEVATOR

157 A

STORAGE

157B

ELECTRO-MECH

LAB#2

ELECTRO-MECH

LAB#1

154 B

ELECTRO-MECH

LAB #1

154 A

INSTRUMENT

ROOM/TOOL CRIB

OFFICE

CORR

OFFICE

CORR.

BREAK ROOM

117.

OFFICE

OFFICE

OFFICE

OFFICE

126 A

OFFICE

ELEVATOR

STAIRS

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

103 A

VEST.

CONFERENCE

ROOM

OFFICE

127S

OFFICE

OFFICE

127 A

OFFICE

OFFICE

STAIRS

MENS RR

WOMENS RR

MECHANICAL

ROOM

OFFICE

STAIRS

OFFICE

112A

OFFICE

OFFICE

STOR

VEST.

WOMENS RR

MENS RR

CORRIDOR

VEST.

GENERAL ARCHITECTURAL NOTES

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. MATCH EXISITING ADJACENT WALL CONSTRUCTION AND PAINT COLOR.

4. REFER TO SPECIFICATONS FOR HAZMAT REPORT AND ABATEMANT PROCEDURES.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:55:36 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

AD102

FI

RS

T

FL

O O

R

DE

M O

LI

TI

O N

FL

O

O R

PL

AN

M .P

AT

EL

PROJECT NAME

3/32" = 1'-0"A1 FIRST FLOOR DEMOLITION FLOOR PLAN

REMOVE EXISTING WALL A/C UNITS REMOVE EXISTING WALL A/C UNITS

REMOVE EXISTING WALL A/C UNITS

REMOVE EXISTING

WALL A/C UNITS

REMOVE EXISTING WALL A/C UNITS

Su bm itt ed b y:

JE

N

N

IF

ER

A

. D eW

IT

T

R .A

C

H

IE

F

AR

C H

IT

EC

TU

R

E

SE

C

TI

CORR.

OFFICE

OFFICE

208 A

OFFICE

208 B

OFFICE

206 S

OFFICE

206 N

OFFICE

212 S

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

ROOM

OFFICE

VESTIBULE

WOMENS RR

MENS RR

STAIRS

ELEVATOR

CORR.

OFFICE

228A

OFFICE

227 S

OFFICE

OFFICE

OFFICE

VAULT

STAIRS

MENS RR

WOMENS RR

221OFFICE

219OFFICE

218 A

OFFICE

COMM.

BREAK RM

Room

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORR.

CORR.

CORR.

OPEN TO SAFETY

BAY BELOW

GENERAL ARCHITECTURAL NOTES

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE

DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.

4. REFER TO SPECIFICATIONS FOR HAZMAT REPORT AND ABATEMANT

PROCEDURES.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:55:47 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

AD103

SE

C

O N

D F

LO

O

R D

EM

O

LI

TI

O N

F

LO

O R

P

LA

N M

.P

AT

EL

PROJECT NAME

3/32" = 1'-0"A1 SECOND FLOOR DEMOLITION PLAN

REMOVE EXISTING WALL A/C UNITS

REMOVE EXISTING WALL A/C UNITS

REMOVE EXISTING WALL A/C UNITS

Su bm itt ed b y:

JE

N

N

IF

ER

A

. D eW

IT

T

R .A

C

H

IE

F

AR

C H

IT

EC

TU

R

E

SE

C

TI

VEST.

CORR.

JAN

MENS RR

WOMENS RR

BREAK RM

STAIRS

ELEV

ELEV MECH

OFFICE

5W

OFFICE

5E

OFFICE

5B COMPUTER LAB

CLASSROOM

4A

STOR.

4A

OFFICE

OFFICE

2C

CONFERENCE

2B

COPY RM

2A

OFFICE

OFFICE

11CORR.

MECHANICAL RM

CORR.

MECHANICAL RM

COMM RM

17AOFFICE

CORR.

OFFICE

OFFICE

CONFERENCE

OFFICE

MECHANICAL

ROOM

OFFICE

OFFICE

OFFICE

LABORATORY

FREIGHT ELEV

26A

ELEV MECH

26 B

LABORATORY

OFFICE

CORR.

OFFICE

STOR.

26A

STAIRS

30A

VEST

GENERAL ARCHITECTURAL NOTES

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. MATCH EXISITING ADJACENT WALL CONSTRUCTION AND PAINT COLOR.

4. REFER TO SPECIFICATONS FOR HAZMAT REPORT AND ABATEMANT PROCEDURES.

INDICATES EXISTING GYP BD CEILING TO BE REMOVED AND

REPLACED

INDICATES EXISTING ACOUSTICAL CEILING TO BE REMOVED

AND REPLACED

INDICATES EXISTING STRUCTURE TO REMAIN

REFLECTED CEILING PLAN LEGEND

INDICATES EXISTING DOUBLE ACOUSTICAL CEILING TO BE

REMOVED.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:55:59 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

JE

N

N

IF

ER

A

. D eW

IT

T

R .A

C

H

IE

F

AR

C H

IT

EC

TU

R

E

SE

C

TI

O N

AD131

B

AS

EM

EN

T D

EM

O

LI

TI

O N

R

EF

LE

C

TE

D

C

EI

LI

N

G

PL

AN

A.

AN

YA

EG

BU

N

AM

PROJECT NAME

OPEN TO ABOVE

OPEN TO ABOVE

OPEN TO ABOVE

20'8'0 4' 12

3/32" = 1'-0"A1 BASEMENT DEMOLITION REFLECTED CEILING PLAN

BAY AREA

ASSEMBLY AREA

157 C

FREIGHT

ELEVATOR

157 A

STORAGE

157B

ELECTRO-MECH

LAB#2

ELECTRO-MECH

LAB#1

154 B

ELECTRO-MECH

LAB #1

154 A

INSTRUMENT

ROOM/TOOL CRIB

OFFICE

CORR

OFFICE

CORR.

BREAK ROOM

117.

OFFICE

OFFICE

OFFICE

OFFICE

126 A

OFFICE

ELEVATOR

STAIRS

CORRIDOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

103 A

VEST.

CONFERENCE

ROOM

OFFICE

127S

OFFICE

OFFICE

127 A

OFFICE

OFFICE

STAIRS

MENS RR

WOMENS RR

MECHANICAL

ROOM

OFFICE

STAIRS

OFFICE

112A

OFFICE

OFFICE

STOR

VEST.

WOMENS RR

MENS RR

CORRIDOR

VEST.

GENERAL ARCHITECTURAL

DEMOLITION NOTES

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. MATCH EXISTING ADJACENT WALL CONSTRUCTION AND

PAINT COLOR.

INDICATES EXISTING GYP BD CEILING TO BE REMOVED AND

REPLACED

INDICATES EXISTING ACOUSTICAL CEILING TO BE REMOVED

AND REPLACED

INDICATES EXISTING STRUCTURE TO REMAIN

REFLECTED CEILING PLAN LEGEND

INDICATES EXISTING DOUBLE ACOUSTICAL CEILING TO BE

REMOVED.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:56:10 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L uf t

Su bm itt ed b y:

JE

N

N

IF

ER

A

. D eW

IT

T

R .A

. C H

EI

F, IE

F, A

R C

H

IT

EC

TU

R E

SE

C

TI

O

N

AD132

FI

R

ST

F

LO

O

R D

EM

O

LI

TI

O N

R

EF

LE

C

TE

D

C

EI

LI

N

G

PL

AN

A.

AN

YA

EG

BU

N

AM

PROJECT NAME

20'8'0 4' 12

3/32" = 1'-0"A1 FIRST FLOOR DEMOLITION REFLECTED CEILING PLAN

INDICATES EXISTING GYP BD CEILING TO BE REMOVED AND

REPLACED

INDICATES EXISTING ACOUSTICAL CEILING TO BE REMOVED

AND REPLACED

INDICATES EXISTING STRUCTURE TO REMAIN

REFLECTED CEILING PLAN LEGEND

INDICATES EXISTING DOUBLE ACOUSTICAL CEILING TO BE

REMOVED.

CORR.

OFFICE

OFFICE

208 A

OFFICE

208 B

OFFICE

206 S

OFFICE

206 N

OFFICE

212 S

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

ROOM

OFFICE

VESTIBULE

WOMENS RR

MENS RR

STAIRS

ELEVATOR

CORR.

OFFICE

228A

OFFICE

227 S

OFFICE

OFFICE

OFFICE

VAULT

STAIRS

MENS RR

WOMENS RR

221OFFICE

219OFFICE

218 A

OFFICE

COMM.

BREAK RM

Room

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORR.

CORR.

CORR.

GENERAL ARCHITECTURAL NOTES

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE

DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.

4. REFER TO SPECIFICATIONS FOR HAZMAT REPORT AND ABATEMANT

PROCEDURES.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:56:22 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

JE

N

N

IF

ER

A

. D eW

IT

T

R .A

C

H

IE

F , A

R C

H

IT

EC

TU

R E

SE

C

TI

O

N

AD133

SE

C

O N

D F

LO

O

R D

EM

O

LI

TI

O N

R

EF

LE

C

TE

D

C

EI

LI

N

G P

LA

N

A.

AN

YA

EG

BU

N

AM

PROJECT NAME

20'8'0 4' 12

OPEN TO BELOW

3/32" = 1'-0"A1 SECOND FLOOR DEMOLITION REFLECTED CEILING PLAN

ROOFTOP UNIT TO BE REMOVED COMPLETE.

ROOFTOP UNITS TO BE REMOVED COMPLETE.

GENERAL ARCHITECTURAL NOTES

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE

DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.

4. REFER TO SPECIFICATIONS FOR HAZMAT REPORT AND ABATEMANT

PROCEDURES.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:56:34 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L uf t

AD134

RO

O

F

PL

AN

D

EM

O

LI

TI

O N

M .P

AT

EL

PROJECT NAME

A1 ROOF PLAN DEMOLITION

20'8'0 4' 12

'3/32" = 1'-0"

Su bm itt ed b y:

JE

N

N

IF

ER

A

. D eW

IT

T

R .A

. C H

IE

F, AR

H

IT

EC

TU

R

E

SE

C

TI

M M

OFFICE

STOR.

26A

FREIGHT ELEV

26A

LABORATORY

OFFICE

OFFICE

LABORATORY

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

OFFICE

OFFICE

MECHANICAL

ROOM

MECHANICAL RM

OFFICE

COMM RM

17A

COPY RM

2A

CONFERENCE

2B

MECHANICAL RM

CORR.

WOMENS RR

MENS RR

STAIRS

COMPUTER LAB

4 STOR.

4A

OFFICE

OFFICE

2C

ELEV MECH

ELEV

BREAK RM

STAIRS

STAIRS

30A

ELEV MECH RM

26B

VEST.

OFFICE

5B

OFFICE

5E

OFFICE

5W

OFFICE

CORR.

CORR.

VEST

JAN

LABORATORY

TUNNEL

27A

GENERAL ARCHITECTURAL NOTES

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. MATCH EXISITING ADJACENT WALL CONSTRUCTION AND PAINT COLOR.

4. REFER TO SPECIFICATONS FOR HAZMAT REPORT AND ABATEMANT PROCEDURES.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:54:10 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

JE

N

N

IF

ER

A

. D eW

IT

T, R .A

C

H

IE

F, A

R C

H

IT

EC

TU

R E

SE

C

TI

O

N

A-101

B

AS

EM

EN

T

FL

O O

R P

LA

N

M .P

AT

EL

PROJECT NAME

20'8'0 4' 12

3/32" = 1'-0"A1 BASEMENT FLOOR PLAN

REPLACE GLAZING WHERE

UNIT WAS REMOVED OR,

REPAIR OR REPLACE WINDOW

UNIT TO MATCH EXISTING BASEMENT

LEVEL WINDOWS. PROVIDE SECURITY

SCREENS TO MATCH ADJCENT

EXISTING WINDOWS

ELECTRO-MECH

LAB#1

154 B

ELECTRO-MECH

LAB #1

154 A

INSTRUMENT

ROOM/TOOL CRIB

OFFICE

OFFICE

BREAK ROOM

117.

STOR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

103 A

CONFERENCE

ROOM

OFFICE

127S OFFICE

OFFICE

127 A

OFFICE

OFFICE

126 A

OFFICE

OFFICE

112A

OFFICE

VEST.

WOMENS RR

MENS RR

STAIRS

CORRIDOR

ELEVATOR

OFFICE

OFFICE

STORAGE

157B

FREIGHT

ELEVATOR

157 A

BAY AREA

OFFICE

OFFICE

MENS RR

WOMENS RR

STAIRS

COMM.

STAIRS

ASSEMBLY AREA

157 C

MECHANICAL

ROOM

ELECTRO-MECH

LAB#2

VEST

VEST.

VEST.

CORR.

CORR

CORR

STOR

154 C

Room 112B

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. MATCH EXISTING ADJACENT WALL CONSTRUCTION AND

PAINT COLOR.

GENERAL ARCHITECTURAL

NEW WORK NOTES

SHEET

NUMBER

D ra w n by

D es ig ne d by

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:54:25 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

Su bm itt ed b y:

JE

N

N

IF

ER

D eW

IT

T, R

.A

C H

IE

F, A R

C H

IT

EC

TU

R

E

SE

C

TI

O N

A-102

FI

RS

T

FL

O O

R

PL

AN

M

.P

AT

EL

PROJECT NAME

20'8'0 4' 12

REPLACE GYP BD INTERIOR WALL SURFACE .

PATCH AND PAINT AS REQUIRED. REFER TO

MECHANICAL SHEETS FOR MORE

INFORMATION.

PATCH AND REPAIR WITH MATCHING

CMU BLOCK

REPLACE GYP BD INTERIOR WALL SURFACE .

PATCH AND PAINT AS REQUIRED.REFER TO

MECHANICAL SHEETS FOR MORE INFORMATION.

REPLACE GLAZING WHERE UNIT WAS REMOVED

OR, REPAIR OR REPLACE WINDOW UNIT TO

MATCH EXISTING FIRST FLOOR LEVEL WINDOWS

REPLACE GLAZING WHERE UNIT WAS REMOVED

OR, REPAIR OR REPLACE WINDOW UNIT TO

MATCH EXISTING FIRST FLOOR LEVEL WINDOWS

NTS3/32" = 1'-0"A1 FIRST FLOOR PLAN

REPLACE GLAZING WHERE UNIT WAS REMOVED

OR, REPAIR OR REPLACE WINDOW UNIT TO

MATCH EXISTING FIRST FLOOR LEVEL WINDOWS.

REPLACE GLAZING WHERE UNIT WAS REMOVED

OR, REPAIR OR REPLACE WINDOW UNIT TO

MATCH EXISTING FIRST FLOOR LEVEL WINDOWS

OFFICE

208 A

OFFICE

208 B

OFFICE

206 S

OFFICE

206 N

OFFICE

212 S

ELEVATOR

91 MENS RR

210 VESTIBULE

OFFICE

CONFERENCE

ROOM

OFFICE

204 OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

228A

OFFICE

227 S

OFFICE

OFFICE

OFFICE

218 OFFICE

218 A

OFFICE

BREAK RM

COMM.

OFFICE

STAIRS

WOMENS RR

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CORR.

OFFICE

VAULT

STAIRS

MENS RR

WOMENS RR

CORR.

OPEN TO BELOW

GENERAL ARCHITECTURAL NOTES

1. REFER TO MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL

INFORMATION.

2. EXISTING CONDITIONS, DIMENSIONS SHOWN ON THESE DRAWINGS SHALL

BE FIELD VARIFIED.

3. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE

DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.

4. REFER TO SPECIFICATIONS FOR HAZMAT REPORT AND ABATEMANT

PROCEDURES.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:54:35 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

JE

N

N

IF

ER

A

. D eW

IT

T, R .A

C

H

IE

F, A

R C

H

IT

EC

TU

R E

SE

C

TI

O

N

A-103

SE

CO

ND

F

LO

O

R

PL

AN

M

.P

AT

EL

PROJECT NAME

3/32" = 1'-0"A1 SECOND FLOOR PLAN

20'8'0 4' 12

REPLACE GLAZING WHERE UNIT WAS

REMOVED OR, REPAIR OR REPLACE

WINDOW UNIT TO MATCH EXISTING

SECOND FLOOR LEVEL WINDOWS

REPLACE GLAZING WHERE UNIT WAS

REMOVED OR, REPAIR OR REPLACE WINDOW

UNIT TO MATCH EXISTING SECOND FLOOR LEVEL

WINDOWS

PATCH AND REPAIR WITH MATCHING

CMU BLOCK

INDICATES NEW GYP BD CEILING

INDICATES NEW 2' x 2' ACOUSTICAL CEILING TILES

INDICATES EXISTING STRUCTURE TO REMAIN

REFLECTED CEILING PLAN LEGEND

ELECTRICAL SYMBOLS

WALL MOUNTED FLUORESCENT

LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.

LED LIGHT FIXTURE.

LED LIGHT FIXTURE WITH EMERGENCY BATTERY PACK UNIT.

DESCRIPTIONSYMBOL

WALL MOUNTED LED LIGHT FIXTURE WITH EMERGENCY BATTERY

PACK

LED LIGHT FIXTURE.

2' x 2' LED LIGHT FIXTURE.

2' x 2' LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.

MECHANICAL SYMBOLS

DESCRIPTIONSYMBOL

SUPPLY DIFFUSER

RETURN REGISTER OR GRILLE

EXHAUST REGISTER OR GRILLE

SAFETY DISCONNECT SWITCH

1. ALL ACOUSTICAL CEILING IS AT 9’-0” AFF, UNLESS OTHERWISE NOTED

2. ALL GYPSUM BOARD CEILING IS AT 8’-0” AFF, UNLESS OTHERWISE NOTED

3. PREPARE , PRIME AND PAINT NEW GYPSUM BOARD CEILING SYSTEM

4. FOR SPECIFIC INFORMATION REGARDING ELECTRICAL AND MECHANICAL

REFER TO THOSE SHEETS.

5. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE

DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.

REFLECTED CEILING PLAN NOTES

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:54:51 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

JE

N

N

IF

ER

A

. D eW

IT

T, R .A

C

H

IE

F, A

R C

H

IT

EC

TU

R E

SE

C

TI

O

N

A-131

BA

SE

M

EN

T

RE

FL

EC

TE

D

CE

IL

IN

G

P

LA

N M

.P

AT

EL

PROJECT NAME

20'8'0 4' 12

3/32" = 1'-0"A1 BASEMENT REFLECTED CEILING PLAN

8'-0" AFF

8'-0" AFF

10'-0" AFF 11-8" AFF

1. ALL ACOUSTICAL CEILING IS AT 9’-0” AFF, UNLESS OTHERWISE NOTED

2. ALL GYPSUM BOARD CEILING IS AT 8’-0” AFF, UNLESS OTHERWISE NOTED

3. PREPARE , PRIME AND PAINT NEW GYPSUM BOARD CEILING SYSTEM

4. FOR SPECIFIC INFORMATION REGARDING ELECTRICAL AND MECHANICAL

REFER TO THOSE SHEETS.

5. CONTRACTOR TO VERIFY EXISTING CONDITIONS AND COORDINATE

DEMOLITION WITH CONSTRUCTION FOR EACH DISCIPLINE.

REFLECTED CEILING PLAN NOTESELECTRICAL SYMBOLS

WALL MOUNTED FLUORESCENT

LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.

LED LIGHT FIXTURE.

LED LIGHT FIXTURE WITH EMERGENCY BATTERY PACK UNIT.

DESCRIPTIONSYMBOL

WALL MOUNTED LED LIGHT FIXTURE WITH EMERGENCY BATTERY

PACK

LED LIGHT FIXTURE.

2' x 2' LED LIGHT FIXTURE.

2' x 2' LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.

MECHANICAL SYMBOLS

DESCRIPTIONSYMBOL

SUPPLY DIFFUSER

RETURN REGISTER OR GRILLE

EXHAUST REGISTER OR GRILLE

SAFETY DISCONNECT SWITCH

INDICATES NEW GYP BD CEILING

INDICATES NEW 2' x 2' ACOUSTICAL CEILING TILES

INDICATES EXISTING STRUCTURE TO REMAIN

REFLECTED CEILING PLAN LEGEND

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:55:00 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

JE

N

N

IF

ER

A

. D eW

IT

T, R .A

C

H

IE

F, A

R C

H

IT

EC

TU

R E

SE

C

TI

O

N

A-132

FI

RS

T

FL

O O

R

RE

FL

EC

TE

D

CE

IL

IN

G

P

LA

N M

.P

AT

EL

PROJECT NAME

20'8'0 4' 12

8'-0" AFF

3/32" = 1'-0"1 FIRST FLOOR REFLECTED CEILING PLAN

1. ALL ACOUSTICAL CEILING IS AT 9’-0” AFF, UNLESS OTHERWISE NOTED

2. ALL GYPSUM BOARD CEILING IS AT 8’-0” AFF, UNLESS OTHERWISE NOTED

3. PREPARE , PRIME AND PAINT NEW GYPSUM BOARD CEILING SYSTEM

4. FOR SPECIFIC INFORMATION REGARDING ELECTRICAL AND MECHANICAL

REFER TO THOSE SHEETS.

REFLECTED CEILING PLAN NOTES

INDICATES NEW GYP BD CEILING

INDICATES NEW 2' x 2' ACOUSTICAL CEILING TILES

INDICATES EXISTING STRUCTURE TO REMAIN

REFLECTED CEILING PLAN LEGEND

ELECTRICAL SYMBOLS

WALL MOUNTED FLUORESCENT

LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.

LED LIGHT FIXTURE.

LED LIGHT FIXTURE WITH EMERGENCY BATTERY PACK UNIT.

DESCRIPTIONSYMBOL

WALL MOUNTED LED LIGHT FIXTURE WITH EMERGENCY BATTERY

PACK

LED LIGHT FIXTURE.

2' x 2' LED LIGHT FIXTURE.

2' x 2' LED LIGHT FIXTURE WITH INTEGRAL EMERGENCY BATTERY PACK.

MECHANICAL SYMBOLS

DESCRIPTIONSYMBOL

SUPPLY DIFFUSER

RETURN REGISTER OR GRILLE

EXHAUST REGISTER OR GRILLE

SAFETY DISCONNECT SWITCH

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

1/16/2020 9:55:14 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

A.

AN

YA

EG

BU

N

AM

R .L

U

FT

JE

N

N

IF

ER

A

. D eW

IT

T, R .A

C

H

IE

F, A

R C

H

IT

EC

TU

R E

SE

C

TI

O

N

A-133

SE

CO

ND

F

LO

O

R

RE

FL

EC

TE

D

CE

IL

IN

G

P

LA

N M

.P

AT

EL

PROJECT NAME

3/32" = 1'-0"A1 SECOND FLOOR REFLECTED CEILING PLAN

20'8'0 4' 12

LED TEXT DISPLAYLED

FCP

D DUCT SMOKE DETECTOR.

FLOW SWITCH.

TAMPER SWITCH.

SPRINKLER FLOW ALARM BELL. MOUNTED MINIMUM 8'-0" AFG UNO.

FIRE ALARM/MASS NOTIFICATION CONTROL PANEL AND TRANSCEIVER.

FM

FIRE ALARM/MASS NOTIFICATION SYMBOLS

DESCRIPTIONSYMBOL

FIRE ALARM MANUAL STATION. MOUNTED 42" AFF UNO.

FIRE ALARM/MASS NOTIFICATION VISUAL INDICATOR. WALL MOUNTED 90" AFF OR 6"

BELOW CEILING, WHICHEVER IS LOWER. NUMBER INDICATES MINIMUM CANDELA RATING.

SMOKE DETECTOR.

FIRE ALARM/MASS NOTIFICATION WALL MOUNTED SPEAKER MTD AT 90" AFF.

CFM CEILING MOUNTED FIRE ALARM/MASS NOTIFICATION VISUAL INDICATOR.

BELOW CEILING, WHICHEVER IS LOWER. NUMBER INDICATES MINIMUM CANDELA RATING.

FIRE ALARM/MASS NOTIFICATION CEILING MOUNTED SPEAKER M

SPD SURGE PROTECTION DEVICE

FIRE ALARM/MASS NOTIFICATION WALL MOUNTED SPEAKER MTD AT 90" AFF. WEATHERPROOFWP

LOC LOCAL OPERATOR CONTROL PANEL

FSA FIRE ALARM REMOTE ANNUNCIATOR PANEL

NOTE: ALL FIRE ALARM CONDUIT SHALL BE RED.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

2/11/2020 11:47:11 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

T.

N

G U

YE

N

T.

N

G U

YE

N

D

AR

EN

A

. B R

O W

N , P

E C

H

IE

F, E

LE

C

TR

IC

AL

S

EC

TI

O N

FA001

FI

RE

A

LA

RM

L

EG

EN

D T.

A

VE

R Y, P .E co

OFFICE

5E

CORR.

MECHANICAL RM

OFFICE

14OFFICE

13CONFERENCE

OFFICE

OFFICE

LABORATORY

OFFICE

LABORATORY

OFFICE

OFFICE

OFFICE

CORR.

OFFICE

OFFICE

5W

ELEV MECH

5 ELEV

STAIRS

BREAK RM

OFFICE

5B

COMPUTER LAB

CLASSROOM

4A

STOR.

4A

OFFICE

OFFICE

2C

CONFERENCE

2B

COPY RM

2A

OFFICE

COMM RM

17A

MECHANICAL

ROOM

CORR.

MECHANICAL RM

MENS RR

WOMENS RR

VEST

FREIGHT ELEV

26A

ELEV MECH

26 B

STAIRS

30A

OFFICE

VEST.

JAN

GENERAL SHEET NOTES

1. ALL FIRE ALARM DEVICES INSTALLED SHALL BE IN COMPLIANCE WITH NFPA 72 AND ADA REQUIREMENTS.

2. CONNECT NEW FIRE ALARM DEVICES TO AN EXISTING FIRE ALARM SYSTEM.

3. SEE FIRE ALARM MATRIX ON SHEET FA501.

4. SEE FIRE ALARM RISER DIAGRAM ON SHEET FA601.

3/32" = 1'-0"1 FIRE ALARM PLAN - BASEMENT

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

PLAN NORTH

2/11/2020 11:47:18 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

T.

N

G U

YE

N

T.

N

G U

YE

N

D

AR

EN

A

. B R

O W

N , P

.E C

H

IE

F, E

LE

C

TR

IC

AL

S

EC

TI

O N

FA101

FI

RE

A

LA

RM

P

LA

N

-B

AS

EM

EN

T T.

A

VE

R Y, OFFICE

OFFICE

OFFICE

OFFICE

112A

OFFICE

OFFICE

OFFICE

BREAK ROOM

117.

COMM.

OFFICE

ELECTRO-MECH

LAB#2

ELECTRO-MECH

LAB#1

154 B

ELECTRO-MECH

LAB #1

154 A

INSTRUMENT

ROOM/TOOL CRIB

OFFICE

OFFICE

103 A

OFFICE

127S OFFICE

OFFICE

127 A

OFFICE

OFFICE

126 A

OFFICE

OFFICE

124OFFICE

CONFERENCE

ROOM

VEST.

OFFICE

CORRIDOR

OFFICE

ELEVATOR

STAIRS

244 MENS RR

VEST.

WOMENS RR

CORR.

STAIRS

MENS RR

121WOMENS RR

CORR

VEST

VEST.

ASSEMBLY AREA

157 C

BAY AREA

MECHANICAL

ROOM

FREIGHT

ELEVATOR

157 A

STORAGE

157B

STAIRS

OFFICE

CORR

GENERAL SHEET NOTES

1. ALL FIRE ALARM DEVICES INSTALLED SHALL BE IN COMPLIANCE WITH NFPA 72 AND ADA REQUIREMENTS.

2. CONNECT NEW FIRE ALARM DEVICES TO AN EXISTING FIRE ALARM SYSTEM.

3. SEE FIRE ALARM MATRIX ON SHEET FA501.

4. SEE FIRE ALARM RISER DIAGRAM ON SHEET FA601.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

PLAN NORTH

2/20/2020 1:17:35 PM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

T.

N

G U

YE

N

T.

N

G U

YE

N

D

AR

EN

A

. B R

O W

N , P

.E C

H

IE

F, E

LE

C

TR

IC

AL

S

EC

TI

O N

FA102

FI

RE

A

LA

RM

P

LA

N

-1

ST

F

LO

O R

T.

A

VE

R

Y, OFFICE

OFFICE

260 OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

218 A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

227 S

OFFICE

OFFICE

229OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

212 S

OFFICE

206 N

OFFICE

206 S

OFFICE

208 B

OFFICE

OFFICE

208 A

ELEVATOR

STAIRS

MENS RR

210 WOMENS RR

VESTIBULE

OFFICE

CONFERENCE

ROOM

MENS RR

222WOMENS RR

STAIRS

122 VAULT

BREAK RM

COMM.

CORR.

OPEN TO SAFETY

BAY BELOW

CORR.

OFFICE

228A

2A-8

GENERAL SHEET NOTES

1. ALL FIRE ALARM DEVICES INSTALLED SHALL BE IN COMPLIANCE WITH NFPA 72 AND ADA REQUIREMENTS.

2. CONNECT NEW FIRE ALARM DEVICES TO AN EXISTING FIRE ALARM SYSTEM.

3. SEE FIRE ALARM MATRIX ON SHEET FA501.

4. SEE FIRE ALARM RISER DIAGRAM ON SHEET FA601.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

PLAN NORTH

2/20/2020 1:17:39 PM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

T.

N

G U

YE

N

T.

N

G U

YE

N

D

AR

EN

A

. B R

O W

N , P

.E C

H

IE

F, E

LE

C

TR

IC

AL

S

EC

TI

O N

FA103

FI

R

E

AL

AR

M

P

LA

N -2

N D

F

LO

O R

T.

A

VE

R

Y, ALARM SIGNALS B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA BBA

ALA

RM IN

DIC

ATOR AUDIO

-V

ISUAL

SUPERVISORY IN

DIC

ATOR AUDIO

-V

ISUAL

TROUBLE

IN

DIC

ATOR AUDIO

-V

ISUAL

AUDIO

SPEAKERS-A

LA

RM TONE

FA VISUAL A

PPLIA

NCE C

LE

AR STROBE

NOTIFICATION

APPLIANCES

SIGNAL

BUILDING FACP

& FAA

AUXILARY

FUNCTIONS

SYSTEM INPUTS

SYSTEM OUTPUTS

HVAC SHUTDOW

N

TRANSMIT FIRE

ALARM SIGNAL

ALA

RM

W

ATERFLO

W

SUPERVISORY

TROUBLE

DE-E

NERGIZED D

OOR H

OLD

ER

IN

ITIATE ELE

VATOR FIR

EFIG

HTERS SERVIC

E AND BUILD

IN

G FIR

E ALA

RM SYSTEM

IN

ITIATE ANNOUNCEMENT.

CO D

ETECTIO

N ALA

RM

ROLL

UP FIR

E D

OOR C

LO

SURE. D

OORS C

LO

SED U

PON ALA

RM.

X XCARBON MONOXIDE DETECTOR

SUPERVISORY SIGNALS B C D E F G H I J K L M N O P Q R S T U V W X Y Z AA BBA

DUCT SMOKE DETECTOR X X

NOT TO SCALE1 FIRE ALARM MATRIX

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

2/13/2020 10:17:15 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

T.

N

G U

YE

N

T.

N

G U

YE

N

D

AR

EN

A

. B R

O W

N , P

.E C

H

IE

F, E

LE

C

TR

IC

AL

S

EC

TI

O N

FA501

FI

RE

A

LA

RM

M

AT

RI

X T.

A

VE

R Y, P

PROJECT NAME

EXISTING

FIRE ALARM

PANEL

VESTIBULE 100

TO EXISTING PANEL

AIR HANDLER SHUTDOWN

EXISTING

FIRE ALARM

TRANSCEIVER

VESTIBULE 100

1. SEE MECHENICAL PLAN FOR LOCATION OF AIR HANDLER UNITS.

TO EXISTING FIRE ALARM ANTENNA.

GENERAL NOTES:

D

HIGH BAY 157

AHU-1 1

D

AHU-2 1

D

AHU-3 1

D

AHU-7 1

MECH RM 17 MECH RM 17 MECH RM 9

CO

MECH 9

CO

MECH 16

2 2

CO

HIGH BAY 157

CO

OFFICE 160

CO

OFFICE 257

KEYED NOTES:

1. CONNECT NEW DUCT DETECTORS TO EXISTING FIRE ALARM

CONTROL PANEL IN THE BUILDING.

2. CONNECT NEW CARBON MONOXIDE DETECTORS TO EXISTING

FIRE ALARM CONTROL PANEL IN THE BUILDING.

NOT TO SCALE1 FIRE ALARM RISER DIAGRAM

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

2/20/2020 1:17:42 PM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

T.

N

G U

YE

N

T.

N

G U

YE

N

D

AR

EN

A

. B R

O W

N , P

.E C

H

IE

F, E

LE

C

TR

IC

AL

S

EC

TI

O N

FA601

FI

RE

R

IS

ER

D

IA

G

RA

M

T.

A

VE

R

Y, NG

CD

RS

RL

VTR

FD

CO

WH

WCO

PRV

TPRV

PS

FS

HB

AV

AS

ZZ ZZ

NN NN

CWS

CWR

GENERAL ABBREVIATIONS

PIPING SYSTEMS

PIPING SYMBOLS

VALVES

GENERAL NOTES

BALL VALVE

GATE VALVE

PLUG VALVE

GLOBE VALVE

CHECK VALVE

SOLENOID VALVE

BUTTERFLY VALVE

VENT

NATURAL GAS

CONDENSATE DRAIN

CONDENSER WATER

SUPPLY

CONDENSER WATER

RETURNREFRIGERANT SUCTION

REFRIGERANT LIQUID

CONTINUATION

DROP IN PIPE

VALVE IN RISER

ELBOW

ELBOW UP

ELBOW DOWN

TEE

UNION

UNION, FLANGED

FLOOR DRAIN WITH TRAP

FLOOR DRAIN

WITH

CLEANOUT

FLOOR SINK

WITH

HALF GRATEFLOOR SINK

WITH

FULL GRATE

PIPE PITCH

VENT THRU ROOF

DIRECTION OF FLOW

FLOOR PENETRATION

WALL HYDRANT

WALL CLEANOUT

TOP CONNECTION

BOTTOM CONNECTION

CONCENTRIC REDUCER

ECCENTRIC REDUCER

WATER HAMMER

ARRESTOR/ACCES

S

PRESSURE

REDUCING

VALVE

PRESSURE RELIEF

TEMP & PRESS RELIEF

THERMOMETER

THERMOMETER WELL

PRESSURE GAUGE

WITH

COCK

PRESSURE SWITCH

BALL JOINT

ANCHOR

SOLENOID TWO-WAY

MODULATING TWO-WAY

THREE-WAY

STRAINER W/BLOW-

OFF

AND HOSE

CONNECTION

HOSE BIB

CALIBRATED BALANCING

VALVE

AUTOMATIC BALANCING

VALVE

BOP - BOTTOM OF PIPE ELEV.

E

D

C

B

A

F

G

H

I

IE - INVERT ELEVATION

K

L

AFF - ABOVE FINISHED FLOOR

ALT - ALTERNATE

AP - ACCESS PANEL

CA - COMBUSTION AIR

CAV - CONSTANT AIR VOLUME

CFM - CUBIC FEET PER MINUTE

CL - CENTERLINE

CLG - CEILING

COND - CONDENSATE/CONDENSER

CONN - CONNECTION/CONNECT

COP - CENTER OF PIPE

DB - DRY BULB TEMPERATURE

DDC - DIRECT DIGITAL CONTROL

DTC - DATA TERMINAL CABINET

EL - ELEVATION

EMCS - ENERGY MONITORING

AND CONTROL SYSTEM

ESP - EXTERNAL STATIC

PRESSURE

EWT - ENTERING WATER TEMP.

FA - FIELD ADJUSTABLE

FC - FAIL CLOSED

FD - FLOOR DRAIN

FID - FIELD INTERFACE DEVICE

FLA - FULL LOAD AMPS

FO - FAIL OPEN

GA - GAUGE

HD - HUB DRAIN

LWT - LEAVING WATER TEMP.

N

NA - NOT APPLICABLE

NC - NORMALLY CLOSED

NIC - NOT IN CONTRACT

NO - NORMALLY OPEN

NPS - NOMINAL PIPE SIZE

NPT - NATIONAL PIPE THREAD

NTS - NOT TO SCALE

O

P Pa - PASCALS PaA - PASCALS ABSOLUTE PaG - PASCALS GAUGE

PD - PRESSURE DROP

OC - ON CENTER

OED - OPEN END DUCT

OV - OUTLET VELOCITY

R

RA - RETURN AIR

RPM - REVOLUTIONS PER

MINUTES

SOG - SLAB ON GRADE

SP - STATIC PRESSURE

SV - SUPPLY VALVE

T

TOP - TOP OF PIPE ELEVATION

TOS - TOP OF SLAB/

TOP OF STEEL

TSP - TOTAL STATIC PRESSURE

V

VP - VELOCITY PRESSURE

VTR - VENT THRU ROOF

W

W - WATTS

WB - WET BULB

WC - WATER COLUMN

WG - WATER GAUGE

FLOW SWITCH

EXPANSION LOOP

AIR VENT, AUTOMATIC

AIR VENT, MANUAL

GUIDE

EXPANSION JOINT

FLEXIBLE CONNECTOR

AIR SEPARATOR

FLOW METER, ORIFICE

PRESSURE/TEMPERATURE

TEST PORT)

PETE'S PLUG

DETAIL NO.

REF: DET.NN/MZZ

DETAIL

LOCATION

REFERENCE SYMBOLOGY

DETAIL

LOCATION

B. OVERHEAD PLUMBING EQUIPMENT AND SYSTEMS SHALL BE SUPPORTED

TO MEET ANTI-TERRORISM/FORCE PROTECTION MEASURES OF UFC 4-010-01.

C. ALL FLOOR MOUNTED EQUIPMENT IN MECHANICAL ROOM SHALL BE

MOUNTED ON 6" HIGH HOUSEKEEPING PADS. THESE PADS SHALL EXTEND

6" BEYOND THE FOOTPRINT OF THE EQUIPMENT IN ALL DIRECTIONS.

D. WHERE PIPE SIZES ARE NOT INDICATED, THEY SHALL BE IN

ACCORDANCE WITH THE INTERNATIONAL PLUMBING CODE

(LATEST EDITION). DOMESTIC COLD WATER PIPING SHALL BE

LIMITED TO 5 FPS. DOMESTIC HOT WATER PIPING SHALL BE

LIMITED TO 4 FPS.

E. TRAP PRIMER LINES SHALL BE 1/2" TYPE K COPPER. TRAP PRIMER

VALVES/DISTRIBUTORS SHALL BE PROVIDED FOR ALL FLOOR DRAINS AND

FLOOR SINKS. TRAP PRIMER VALVE/DISTRIBUTORS SHALL BE LOCATED IN

THE NEAREST ACCESSIBLE LOCATION AND PROVIDED WITH ACCESS

PANELS.

A. REFER TO SPECIFICATIONS FOR MATERIALS AND METHODS OF CONSTRUCTION

F. DRAWINGS ARE SCHEMATIC AND ARE TO SHOW DESIGN INTENT, AND IT IS

THE RESPONSIBILITY OF THE CONTRACTOR TO COORDINATE PLACEMENTS.

kW - KILOWATTS

V

G. REFER TO MECHANICAL SHEETS FOR ADDITIONAL DETAILS.

NON-FREEZING WALL

HYDRANT

NFWH

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

2/12/2020 10:57:09 AM

W

SM

R B

LD

G

FY

-4

H

VA

C

R

EP

LA

C

EM

EN

T

JA

N U

AR

Y

W

G

B0

N . B

R O

W N

P .E

N . B

R O

W N

P .E

G

IL

BE

R

T J.

V

AL

LA

, P

.E

C H

IE

F, M

EC

H

AN

IC

AL

S

EC

TI

O

N

P-001

PL

UM

BI

NG

L

EG

EN

D

K.

W

IL

LI

AM

S

P.

E.

UP

2C

CONFERENCE

2B

COMPUTER LAB

CORR.

B-3

B-2

OFFICE

5W

ELEV MECH RM

5A

OFFICE

5B

OFFICE

5E

STORAGE

STAIRWELL

1A

CORR.

MECHANICAL RM

MECHANICAL

ROOM

COMM ROOM

17A

ELEV MECH RM

26B

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

MECHANICAL RM

MENS RR

WOMENS RR

LABORATORY

LABORATORY

STORAGE

4A

OFFICE

CORR.

STAIRWELL

COPY ROOM

2A

VAV-5W

VAV-5E

VAV-5B VAV-4-2 VAV-4 VAV-3 VAV-2C VAV-2B VAV-2A VAV-18

VAV-1

VAV-14VAV-13

VAV-12

VAV-29

VAV-20

VAV-11

VAV-7

VAV-21 VAV-28

VAV-22

VAV-23 VAV-27

VAV-26

VAV-24

VAV-30

VAV-25

B-1

HWP-1

HWP-2

CWP-1

CWP-2

FREIGHT

ELEVATOR

26A

UH-2

UH-1

UH-3

UH-4

1 1/2"ø NG

1/

2" ø

N G

3/4"ø NG

1 2"ø NG

1/ 2" ø N

G

N

EW

O

LD

3/4"ø NG

1/2"ø NG

1. NATURAL GAS PIPE SIZED BASED 2018 IFGC INLET PRESSURE LESS THAN 2 PSI , 0.5 IN. W.C

TABLE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

2/12/2020 10:57:13 AM

W

SM

R B

LD

G

FY

-4

HV

AC

R

EP

LA

CE

M

EN

T

JA

N

U

AR

Y

W

G

B0

N . B

R O

W N

P .E

N . B

R O

W N

P .E

G

IL

BE

R

T J.

V

AL

LA

, P

.E

C H

IE

F, M

EC

H

AN

IC

AL

S

EC

TI

O

N

P-101

NA

TU

RA

L

G

AS

B

AS

EM

EN

T K.

W

IL

LI

AM

S P.

E.

PROJECT NAME

3/32" = 1'-0"P-101

NATURAL GAS BASEMENT PLAN1

20'8'0 4' 12

Keynote Legend

1 SUPPLY UP TO NEXT FLOOR.

2 CONNECT TO EXISTING WATER HEATER.

3 CONNECT TO NEW BOILER.

4 GAS SUPPLY FROM GROUND LEVEL.

5 FROM GAS METER TO BUILDING.

GENERAL NOTES

CH-2

AHU-7

AHU-4 AHU-5 AHU-6

CH-1

STAIRS-1

--1

STAIRS-2

--2

STAIRS

OFFICE

ELECTRO-MECH

LAB#1

154 B

ELETRO-MECH

LAB #1

154 A

INSTRUMENT

ROOM/TOOL CRIB

OFFICE

OFFICE

OFFICE

127S

OFFICE

OFFICE

127 A

OFFICE

OFFICE

126 A

OFFICE

OFFICE

OFFICE

123OFFICE

OFFICE

OFFICE

112B

OFFICE

112A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

103 A

OFFICE

CORRIDOR

Space

MENS RR

WOMENS RR

WOMENS RR

MENS RR

CONFERENCE

ROOM

ELECTRO-MECH

LAB#2

BAY AREA

STORAGE

157B

VAV-108

VAV-107

VAV-109

VAV-106

VAV-112A

VAV-104

VAV-113

VAV-103A

VAV-103

VAV-114 VAV-102

VAV-128

VAV-127S VAV-127

VAV-127A VAV-126 VAV-126A VAV-125

VAV-124

VAV-123

VAV-121

VAV-119

VAV-154B

VAV-154A VAV-151

VAV-152

3/ 4" ø N

G

1/

2" ø

N G

N

EW

O

LD

5 3/4"ø NG

1. NATURAL GAS PIPE SIZED BASED 2018 IFGC INLET PRESSURE LESS THAN 2 PSI , 0.5 IN. W.C

TABLE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

2/12/2020 10:57:17 AM

W

SM

R B

LD

G

FY

-4

HV

AC

R

EP

LA

CE

M

EN

T

JA

N

U

AR

Y

W

G

B0

N . B

R O

W N

P .E

N . B

R O

W N

P .E

G

IL

BE

R

T J.

V

AL

LA

, P

.E

C H

IE

F, M

EC

H

AN

IC

AL

S

EC

TI

O

N

P-102

NA

TU

RA

L

G

AS

F

IR

ST

F

LO

O

R K.

W

IL

LI

AM

S P.

E.

PROJECT NAME

3/32" = 1'-0"P-102

NATURAL GAS FIRST FLOOR PLAN1

20'8'0 4' 12

Keynote Legend

1 FROM GAS METER TO BUILDING.

2 SUPPLY UP TO ROOF.

3 CONNECT TO GAS MAIN.

4 RETURN DOWN TO BASEMENT.

5 SUPPLY UP TO NEXT FLOOR.

AHU-8

208 B

OFFICE

206 S

OFFICE

206 N

OFFICE

212 S

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

228A OFFICE

227 S

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

218 A

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

CONFERENCE

ROOM

CORR.

CORR.

MENS RR

WOMENS RR

WOMENS RR

MENS RR

STAIRS-3

--3

STAIRS-4

--4

VAULT

COMM

VAV-225VAV-227VAV-227

S

VAV-228AVAV-228VAV-229VAV-230VAV-231VAV-202VAV-203VAV-204VAV-212

S

VAV-206

N

VAV-206

S

VAV-208

B

VAV-208A

VAV-208

VAV-210

VAV-205 VAV-214

VAV-216

VAV-218 VAV-218A VAV-219

VAV-222

VAV-224

VAV-258

VAV-256

VAV-257

VAV-251

VAV-252

VAV-253

VAV-259VAV-260VAV-261

VAV-262

OFFICE

208 A

OFFICE

3/4"ø NG

3/4"ø NG

1. NATURAL GAS PIPE SIZED BASED 2018 IFGC INLET PRESSURE LESS THAN 2 PSI , 0.5 IN. W.C

TABLE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

2/12/2020 10:57:21 AM

W

SM

R B

LD

G

FY

-4

HV

AC

R

EP

LA

CE

M

EN

T

JA

N

U

AR

Y

W

G

B0

N . B

R O

W N

P .E

N . B

R O

W N

P .E

G

IL

BE

R

T J.

V

AL

LA

, P

.E

C H

IE

F, M

EC

H

AN

IC

AL

S

EC

TI

O

N

P-103

NA

TU

RA

L

G

AS

S

EC

O

ND

F

LO

O R

K.

W

IL

LI

AM

S

P.

E.

PROJECT NAME

3/32" = 1'-0"P-103

NATURAL GAS SECOND FLOOR PLAN1

20'8'0 4' 12

Keynote Legend

1 PIPE ABOVE CEILING GRID.

2 SUPPLY UP TO ROOF.

3 SUPPLY UP FROM BELOW.

3/4"ø NG

1. NATURAL GAS PIPE SIZED BASED 2018 IFGC INLET PRESSURE LESS THAN 2 PSI , 0.5 IN. W.C

TABLE. CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS.

SHEET

NUMBER

D ra w n by

D es ig ne d by

Su bm itt ed b y:

Sh ee t S iz e

AN

SI

D

D at e:

C on tra ct

N o.

So lic ita tio n N o.

U .S

. A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

FO

R

T W

O R

TH

D

IS

TR

IC

T

TA

YL

O R

S T

FO

R

T W

O R

TH

, T

EX

AS

C he ck ed b y:

US Army Corps of Engineers ®

A

R ev

M ar k D es cr ip tio n Tr ac ki ng N o.

Ac tio n

D at e

EN

G

IN

EE

R

IN

G

C O

N

ST

R U

C

TI

O N

D

IV

IS

IO

N

EN

G

IN

EE

R

IN

G

B R

AN

C

H

PLOT DATE:

2 3 4 5 6 7 8 9 10

B

C

D

E

F

G

Fort Worth District

FILE PATH:

PLAN NORTH

2/12/2020 10:57:23 AM

W

SM

R B

LD

G

FY

-4

HV

AC

R

EP

LA

CE

M

EN

T

JA

N

U

AR

Y

W

G

B0

N . B

R O

W N

P .E

N . B

R O

W N

P .E

G

IL

BE

R

T J.

V

AL

LA

, P

.E

C H

IE

F, M

EC

H

AN

IC

AL

S

EC

TI

O

N

P-104

NA

TU

RA

L

G

AS

R O

O F

K.

W

IL

LI

AM

S

P.

E.

PROJECT NAME

1/8" = 1'-0"1 NATURAL GAS ROOF PLAN

20'8'0 4' 12

Keynote Legend

1 NATURAL GAS FROM BELOW TO AHU, USE EXISTING

PENETRATION.

CHANGE IN DUCT CONSTRUCTION BY

PRESSURE CLASS.

(PRESSURES IN INCHES W.G)

BD

SD

FD-1.5

FD-3

FSD

SS

G

HWS

HWR

CD

F

RS

RL

RD

WH

WCO

PRV

TPRV

HB

2 1

SA

AV

ZZ ZZ

NN NN

CHS

CHR

GENERAL ABBREVIATIONSPIPING SYSTEMS

PIPING SYMBOLS

DAMPERS

GENERAL NOTES

DOMESTIC COLD WATER

DOMESTIC HOT WATER

DOMESTIC HOT

WATER

RETURN

SANITARY SEWER

VENT

NATURAL GAS

CHILLED WATER SUPPLY

CHILLED WATER RETURN

HEATING WATER SUPPLY

HEATING WATER RETURN

CONDENSATE DRAIN

REFRIGERANT SUCTION

REFRIGERANT LIQUID

ROOF DRAIN

DUCTWORK

CONTINUATION

DROP IN PIPE

VALVE IN RISER

ELBOW, 90 DEG.

ELBOW UP, 90 DEG.

ELBOW DOWN, 90 DEG.

TEE

UNION

UNION, FLANGED

FLOOR DRAIN WITH TRAP

PIPE PITCH

DIRECTION OF FLOW

FLOOR PENETRATION

WALL HYDRANT

WALL CLEANOUT

TEE, OUTLET TURNED

DOWNWARD

TEE, OUTLET TURNED

UPWARD

PRESSURE REDUCING

VALVE

PRESSURE RELIEF VALVE

TEMP & PRESS RELIEF

THERMOMETER

BALL JOINT

ANCHOR

HOSE BIB

AFF - ABOVE FINISHED FLOOR

BOD - BOTTOM OF DUCT ELEV.

BOP - BOTTOM OF PIPE ELEV.

CFM - CUBIC FEET PER MINUTE

CL - CENTERLINE

CLG - CEILING

COND- CONDENSATE/CONDENSER

CONN- CONNECTION/CONNECT

DB - DRY BULB TEMPERATURE

DDC - DIRECT DIGITAL CONTROL

DX - DIRECT EXPANSION

EA - EXHAUST AIR

EAT - ENTERING AIR TEMP.

ELEV - ELEVATION

EMCS- ENERGY MONITORING

AND CONTROL SYSTEM

ESP - EXTERNAL STATIC PRESSURE

EWT - ENTERING…