Combined Synopsis/Solicitation W9126G19R0060
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Prior_Award_Information.pdf | ||
| Site_Visit_Information.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Army Corps of Engineers, Fort Worth District W9126G-19-R-0060 819 Taylor St., Ft. Worth TX 76102
Combined Synopsis/Solicitation For
Janitorial Services at Sam Rayburn and R.D. Willis Power Plants
1. Overview. This is a combined synopsis/solicitation for commercial items and services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation;
proposals are being requested and a written solicitation will not be issued. The solicitation (W9126G-19-R-0060) is being issued as a Request for Quotation. This notice and the incorporated provisions and clauses are those in effect through the Federal Acquisition Regulations (FAR).
2. SBA Programs. This acquisition is set-aside 100% for Small Business
3. Classification. The North American Industry Classification System (NAICS) code is 561720, Janitorial Services. The Size Standard for NAICS code 561720 is $18 million.
4. Description of services. The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules. Daily work shall be performed at the Sam Rayburn Power Plant (SRPH), located at the Sam Rayburn Dam, approximately 15 highway miles from the town of Jasper, Texas and one afternoon per week at the R.D. Willis Power Plant (RDW), located approximately 14 miles to the west of the town of Jasper, Texas. The distance between the Sam Rayburn Power Plant and the R.D.Willis Power Plants via Road 255 / State Hwy 63 / FM1747 / FM777 is approximately 28 road miles.
The anticipated Period of Performance will be from 01 April, 2019 through 31 March 2020.
5. Contract Information. This combined synopsis & solicitation notice is a request for competitive quotations. Therefore, all capability statements or quotations received prior to the RFQ close date will be considered by the FCC.
FAR Clauses 52.212-1 through 52.212-5 apply to this procurement. For the exact text and wording of clauses and provisions please see http://farsite.hill.af.mil. The Government contemplates an award of a Firm Fixed Priced purchase order contract resulting from this solicitation.
The historical award information for this requirement may be obtained by searching Contract No. W9126G-17-P-0026 in the FBO archived documents.
6. Evaluation Information. The Government will award a single purchase order contract resulting from this RFQ to the responsible offeror whose offer represents the best value in terms of technical capability and price. All non-price factors (i.e., technical capability and past
U.S. Army Corps of Engineers, Fort Worth District W9126G-19-R-0060 819 Taylor St., Ft. Worth TX 76102 performance) are approximately equivalent to price. (See Instructions to Offerors for additional information)
Offerors must be registered in the System for Award Management (SAM) at https://www.sam.gov, in order to be considered for award.
7. Submittals. Offerors must submit representations and certifications in accordance with the provision at FAR 52.212-3 Offeror Representations and Certifications—Commercial Item.
(Accessible at the FAR Site, http://farsite.hill.af.mil)
Submit the following as separate documents in response to this RFQ (See Instructions to Offerors for further information):
a. Vendor Information Sheet
b. Technical Capability Statement
c. Price Quotation (See Bid Schedule)
d. Past Performance (Attachment A)
Offers are due on March 22, 2019 10:00 AM CST. All questions/inquiries must be submitted to the contract officer via electronic mail (e-mail) not later than 10:00 AM CST on March 22, 2019.
Inquiries submitted via telephone calls will be re-directed to an e-mail submission. Submit offers or any questions to the attention of Joe Daniels via email to:
joseph.c.daniels@usace.army.mil. Offerors who fail to complete and submit the requirements above may be considered non-responsive.
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 12 Months $_________________ $__________________
REOCCURING JANITORIAL SERVICES BASE
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2019 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
POC for this action is Joseph Daniels at (817) 886-1139 or joseph.c.daniels@usace.army.mil.
0002 $_________________ $__________________
AS DIRECTED JANITORIAL SERVICES BASE
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2019 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
POC for this action is Joseph Daniels at (817) 886-1139 or joseph.c.daniels@usace.army.mil.
EACH OF THE INDIVIDUAL AS DIRECTED LINE
ITEMS (SEE BID SCHEDULE) SHALL BE
PERFORMED ONLY AS DIRECTED (AD) BY THE
COR (THESE ARE NOT REPETITIVE MONTHLY
WORK) SEE REFERENCE DRAWINGS FOR ROOM
NUMBERS AND PART II, PERFORMANCE
STANDARDS PARAGRAPHS (1.i) and (1.j)
1001 12 Months $_________________ $__________________
OPTION REOCCURING JANITORIAL SERVICES OPT ONE
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2020 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
1002 $_________________ $__________________
OPTION AS DIRECTED JANITORIAL SERVICES OPT ONE
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2020 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
POC for this action is Joseph Daniels at (817) 886-1139 or joseph.c.daniels@usace.army.mil.
EACH OF THE INDIVIDUAL AS DIRECTED LINE
ITEMS (SEE BID SCHEDULE) SHALL BE
PERFORMED ONLY AS DIRECTED (AD) BY THE
COR (THESE ARE NOT REPETITIVE MONTHLY
WORK) SEE REFERENCE DRAWINGS FOR ROOM
2001 12 Months $_________________ $__________________
OPTION REOCCURING JANITORIAL SERVICES OPT TWO
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2021 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
2002 $_________________ $__________________
OPTION AS DIRECTED JANITORIAL SERVICES OPT TWO
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2021 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
POC for this action is Joseph Daniels at (817) 886-1139 or joseph.c.daniels@usace.army.mil.
EACH OF THE INDIVIDUAL AS DIRECTED LINE
ITEMS (SEE BID SCHEDULE) SHALL BE
PERFORMED ONLY AS DIRECTED (AD) BY THE
COR (THESE ARE NOT REPETITIVE MONTHLY
WORK) SEE REFERENCE DRAWINGS FOR ROOM
3001 12 Months $_________________ $__________________
OPTION REOCCURING JANITORIAL SERVICES OPT
THREE
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2022 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
3002 $_________________ $__________________
OPTION AS DIRECTED JANITORIAL SERVICES OPT THRE
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2022 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
POC for this action is Joseph Daniels at (817) 886-1139 or joseph.c.daniels@usace.army.mil.
EACH OF THE INDIVIDUAL AS DIRECTED LINE
ITEMS (SEE BID SCHEDULE) SHALL BE
PERFORMED ONLY AS DIRECTED (AD) BY THE
COR (THESE ARE NOT REPETITIVE MONTHLY
WORK) SEE REFERENCE DRAWINGS FOR ROOM
4001 12 Months $_________________ $__________________
OPTION REOCCURING JANITORIAL SERVICES OPT FOUR
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2023 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
4002 $_________________ $__________________
OPTION AS DIRECTED JANITORIAL SERVICES OPT FOUR
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2023 through 31 March
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
POC for this action is Joseph Daniels at (817) 886-1139 or joseph.c.daniels@usace.army.mil.
EACH OF THE INDIVIDUAL AS DIRECTED LINE
ITEMS (SEE BID SCHEDULE) SHALL BE
PERFORMED ONLY AS DIRECTED (AD) BY THE
COR (THESE ARE NOT REPETITIVE MONTHLY
WORK) SEE REFERENCE DRAWINGS FOR ROOM
5001 6 Months $_________________ $__________________
OPTION REOCCURING JANITORIAL SERVICES BASE
TO BE EXERCISED ONLY IF 52.217-8 EXTENSION
IS REQUIRED.
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2024 through 30 September 2024
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
5002 6 $_________________ $__________________
OPTION AS DIRECTED JANITORIAL SERVICES BASE
TO BE EXERCISED ONLY IF 52.217-8 EXTENSION
IS REQUIRED
The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules.
Period of Performance: 01 April 2024 through 30 September 2024
Mail Invoices:
Sam Rayburn Project Office ATTN: Thomas R. Webb 7696 RR 255 West Jasper, TX 75951
POC for this action is Joseph Daniels at (817) 886-1139 or joseph.c.daniels@usace.army.mil.
EACH OF THE INDIVIDUAL AS DIRECTED LINE
ITEMS (SEE BID SCHEDULE) SHALL BE
PERFORMED ONLY AS DIRECTED (AD) BY THE
COR (THESE ARE NOT REPETITIVE MONTHLY
WORK) SEE REFERENCE DRAWINGS FOR ROOM
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 0002 Destination Government Destination Government 1001 Destination Government Destination Government 1002 Destination Government Destination Government 2001 Destination Government Destination Government 2002 Destination Government Destination Government 3001 Destination Government Destination Government 3002 Destination Government Destination Government 4001 Destination Government Destination Government
4002 Destination Government Destination Government 5001 Destination Government Destination Government 5002 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-APR-2019 TO
31-MAR-2020
N/A SAM RAYBURN PROJECT OFC
THOMAS WEBB
7696 RR 255 WEST
JASPER TX 75951
(409) 384-5292 FOB: Destination
967448
0002 POP 01-APR-2019 TO
31-MAR-2020
N/A (SAME AS PREVIOUS LOCATION)
1001 POP 01-APR-2020 TO
31-MAR-2021
N/A (SAME AS PREVIOUS LOCATION)
1002 POP 01-APR-2020 TO
31-MAR-2021
N/A (SAME AS PREVIOUS LOCATION)
2001 POP 01-APR-2021 TO
31-MAR-2022
N/A (SAME AS PREVIOUS LOCATION)
2002 POP 01-APR-2021 TO
31-MAR-2022
N/A (SAME AS PREVIOUS LOCATION)
3001 POP 01-APR-2022 TO
31-MAR-2023
N/A (SAME AS PREVIOUS LOCATION)
3002 POP 01-APR-2022 TO
31-MAR-2023
N/A (SAME AS PREVIOUS LOCATION)
4001 POP 01-APR-2023 TO
31-MAR-2024
N/A (SAME AS PREVIOUS LOCATION)
4002 POP 01-APR-2023 TO
31-MAR-2024
N/A (SAME AS PREVIOUS LOCATION)
5001 POP 01-APR-2024 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
5002 POP 01-APR-2024 TO
30-SEP-2024
N/A (SAME AS PREVIOUS LOCATION)
CONTRACTING OFFICER STATEMENT
Only a warranted Contracting Officer (either PCO or ACO) acting within their delegated limits has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
INSTRUCTIONS TO OFFERORS
INSTRUCTIONS TO OFFERORS
QUOTER DUE DATE/LOCAL TIME: SEE COVER PAGE
POINT OF CONTACT: Joseph Daniels Phone: (817)-886-1139
Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil and joseph.c.daniels@usace.army.mil. Subject line of email MUST include the solicitation number and your Company Name.
For additional help contact your local Association Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free; however, a small fee may be charged for certain services.
Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: http://www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business. DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).
Click here to request your D-U-N-S Number via the Web. The website to obtain your DUNS number: http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com or phone 866-705-5711.
WAGE RATES: The Service Contract Act applies (see attached wage rates).
Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned
Required Contractor Item
Complete Bid Schedule(s), Sign SF 1449, Sign Amendments (if applicable) and return
CHECK YOUR QUOTES FOR MATHEMATICAL ERRORS
DO NOT ROUND UP OR DOWN
ANNOTATE UNIT AND TOTAL COSTS TO THE HUNDRETH
POSITION
Complete vendor information sheet or provide a document with similar information
The provisions at 52.212-1, 52.212-3 Alt I, 52.212-5 and apply to this acquisition. Confirm vendor’s 52.212-3 Alt I is updated in SAM on the vendor information sheet.
You must have an active SAM registration prior to award
Submit past performance and technical approach and understanding Documentation IAW Instructions to Offerors.
Ensure former employer returns the form and references the solicitation number and Company Name in the email subject line.
Scan all documents into a single.pdf file. PDF only authorized format
EMAIL your proposal to: CIV-OPS.Proposals@usace.army.mil & joseph.c.daniels@usace.army.mil. Subject line of email must include the solicitation number and Company Name.
COMPARATIVE EVALUATION – FAR 13.106-2 (b)(2)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation that provides the best benefit to the Government, price and other factors considered. Offers will be evaluated by performing a comparative evaluation in accordance with FAR 13.106-2(b)(3) to determine which response represents the “best” as a whole. Comparative Evaluations is the act of comparing two or more offers or proposal in response to the RFP.
Proposals will be evaluated by performing a direct comparison of one offer with another in a uniform manner to determine which provides the government with is needed, as identified in the
RFP.
The comparison also performed to compare each offeror to one another to determine which provides the best benefit to the government. The government reserves the right to consider a response that offers more than the minimum and select that response if it provides a benefit to the government. The government has the discretion to accept other than the lowest priced offeror that provides additional benefits. The government also has the has the discretion to make an award based on whether the lowest priced of the quotations/offers having the highest past performance rating possible represents the best benefit to the government The following factors shall be used to evaluate offers:
Factor 1: Price Prices will be evaluated for fairness and reasonableness through a price analysis that compares the offered prices against each other and the independent government estimate. Award shall not be made to an Offeror’s proposal for goods or services that is found to be unbalanced and/or unreasonably low or high.
Factor 2: Past performance Past Performance Questionnaire forms provided in the solicitation shall be completed and submitted as specified in the Instructions to Offerors. They will be evaluated to assess the degree of confidence the Government has in an Offeror's ability to supply products and services that meet users' needs based on a demonstrated record of recent and relevant work similar to the work described in this solicitation. Recent or relevant work is defined as similar work within the past four (4) years.
The Contracting Officer shall deem the offeror non-responsive if they fail to provide recent and relevant past performance prior to award IAW FAR 52.212-1(b)(11). The offeror must submit a PPQ with a satisfactory or higher rating to be deemed eligible for award.
The Government reserves the right to evaluate past performance based on such information as the contracting officer’s knowledge and previous experience with the item or service being purchased, customer surveys, or other reasonable basis, without the existence of a formal database
Factor 3 – Technical Approach and Understanding of the Work
This factor considers whether the Offeror demonstrates an understanding of the complexity and magnitude of requirements set forth in the Performance Work Statement. At a minimum, the quote shall include a brief narrative (conceptual work plan) that clearly demonstrates an understanding of the requirements of the solicitation. The narrative shall address how the Offeror will perform, develop and implement the work plan. It shall not exceed two pages.
Submission Requirements:
At a minimum, the quote for this factor shall include a brief narrative (conceptual work plan) that clearly demonstrates an understanding of the requirements of the solicitation. The narrative shall address:
1. Work in terms of coordination with outside agencies, contractors, and government personnel to ensure safety, compliance and with federal and state regulations and performance requirements in an efficient manner.
2. Offeror will demonstrate how to manage resources at the work sites during weekdays, weekends, and holidays when applicable.
3. How the contractor will prevent rework and if rework is necessary how it will be addressed.
4. Resources (to include management and administrative) to perform requirements of the Performance Work Statement (PWS).
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
Vendor Information Sheet
IN THE EVENT OF AWARD, ISSUE CONTRACT TO:
COMPANY NAME
POC
(Last, First Middle)
ADDRESS
(Number & Street) (City, State and Zip)
PHONE NUMBER MOBILE
(Area code and number) (Area code and number)
EMAIL ADDRESS___________________________________________
DUNS NUMBER CAGE CODE NUMBER________
SSN/TIN NUMBER or firm’s Tax ID Number (TIN) ______________________________
Vendor’s Online Representation and Certification Application (ORCA) is updated in SAM Yes
No
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil and joseph.c.daniels@usace.army.mil. Ensure the former employer references the solicitation number in the email subject line.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be either positive or negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force?
E VG S M U N
b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)?
E VG S M U N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YES NO
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below.
YES NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements.
E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor.
AFTER COMPLETION, PLEASE EMAIL TO: CIV-OPS.Proposals@usace.army.mil and joseph.c.daniels@usace.army.mil Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary)
BID SCHEDULE
Sam Rayburn / RD Willis Janitorial Services BID SCHEDULE Base Year
Line Description Quantity U/M Unit Price Total Bid
Item Per Year For Year
0001 REOCCURING JANITORIAL
SERVICES BASE YEAR - 01 APRIL
2019 THRU 31 MARCH 2020
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
Use the "Quantity per Year" number multiplied by the Unit Price to determine the "Total Bid for Year" value.
0001AA REMOVE TRASH 12 MO
0001AB CLEAN AND RE-SUPPLY
BATHROOMS
12 MO
0001AC LITTER COLLECTION 12 MO
0001AD CLEAN WATER COOLERS 12 MO
0001AE SWEEP
FLOORS/WALKWAYS/STAIRS AND
VACUUM
12 MO
0001AF SWEEP, WET MOP
FLOORS/STAIRS
12 MO
0001AG SWEEP, WET MOP AND BUFF 12 MO
0001AH SWEEP, WET MOP, BUFF,
VACUUM ELEVATOR CAB
12 MO
0001AJ CLEAN KITCHEN AREAS 12 MO
0001AK CLEAN REFRIGERATORS 12 MO
0001AL SPOT CLEAN 12 MO
0001AM CLEAN FURNITURE 12 MO
0001AM WASH ALL
GLASS/MIRRORS/DOORS
12 MO
0001AN CLEAN ENTRANCE INTERIORS
AND EXTERIORS
12 MO
0001AP LOW DUST 12 MO
0001AQ CLEAN RD WILLIS RESTROOM 12 MO
0001AR CLEAN GENERATOR TOPS (SAM
RAYBURN ONLY)
12 MO
0001AS SWEEP/WET MOP PAINTED
FLOORS & STAIRS AT RD WILLIS
12 MO
0001 Total For BASE YEAR CLIN
Line Description Quantity U/M
Item Per Year Unit Price Total Bid For Year
0002 AS DIRECTED JANITORIAL
2019 THRU 31 MARCH 2020
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
EACH OF THE INDIVIDUAL "AS DIRECTED" LINE ITEMS BELOW SHALL BE
PERFORMED ONLY AS DIRECTED (AD) BY THE COR (THESE ARE NOT REPETITIVE
MONTHLY WORK) SEE REFERENCE DRAWINGS FOR ROOM NUMBERS AND PART II,
PERFORMANCE STANDARDS PARAGRAPHS (1.i) and (1.j)
000201 STRIP & REFINISH ERECTION BAY
FLOOR #402, GENERATOR BAY
FLOOR #401 AND VINYL FLOOR OF
ELEVATOR CAB
2 Job
000202 STRIP & REFINISH THE FIRST AID
ROOM #407 COMBINED WITH THE
FIRST AID ROOM TOILET #408
1 Job
000203 STRIP AND REFINISH THE
LOCKER ROOM #418, SHOWER
ROOM #419, THE TOILET ROOM
#420 AND BOTH SHOWER STALLS
1 Job
000204 STRIP AND REFINISH THE
CONFERENCE ROOM/SPECIALIST
OFFICE #502 COMBINED WITH
THE CONFERENCE ROOM/ LADIES
RESTROOM LOUNGE #514, LOBBY
LADIES RESTROOM #515 AND THE
LOBBY MENS RESTROOM #516
2 Job
000205 STRIP AND REFINISH THE
CONFERENCE ROOM ACCESS
BALCONY HALLWAY
1 Job
000206 STRIP AND REFINISH THE CLERKS
STORAGE ROOM #506 AND THE
OFFICE CORRIDOR #503
1 Job
000207 STRIP AND REFINISH THE
CONTROL ROOM TOILET #520
2 Job
000208 STRIP AND REFINISH THE
ELECTRONIC EQUIPMENT ROOM
#511 COMBINED WITH THE
ELECTRONIC STORAGE ROOM
#512
1 Job
000209 SHAMPOO CARPET,
MAINTENANCE OFFICE
ROOM #409
2 Job
000210 SHAMPOO CARPET, AST. SUPT.
OFFICE ROOM #504
2 Job
000211 SHAMPOO CARPET, PP SUPT.
OFFICE ROOM #507
2 Job
000212 SHAMPOO CONTROL ROOM AND
KITCHEN ROOMS #509 AND #521
2 Job
0002 Total For BASE YEAR CLIN
BASE YEAR - 01 APRIL 2019
THRU 31 MARCH 2019
TOTAL OF ALL LINE ITEMS FOR BASE YEAR
(CLIN 0001 + CLIN 0002)
Sam Rayburn / RD Willis Janitorial Services BID SCHEDULE Option One
1001 REOCCURING JANITORIAL
2020 THRU 31 MARCH 2021
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
1001AA REMOVE TRASH 12 MO
1001AB CLEAN AND RE-SUPPLY
BATHROOMS
12 MO
1001AC LITTER COLLECTION 12 MO
1001AD CLEAN WATER COOLERS 12 MO
1001AE SWEEP
FLOORS/WALKWAYS/STAIRS AND
VACUUM
12 MO
1001AF SWEEP, WET MOP
FLOORS/STAIRS
12 MO
1001AG SWEEP, WET MOP AND BUFF 12 MO
1001AH SWEEP, WET MOP, BUFF,
VACUUM ELEVATOR CAB
12 MO
1001AJ CLEAN KITCHEN AREAS 12 MO
1001AK CLEAN REFRIGERATORS 12 MO
1001AL SPOT CLEAN 12 MO
1001AM CLEAN FURNITURE 12 MO
1001AM WASH ALL
GLASS/MIRRORS/DOORS
12 MO
1001AN CLEAN ENTRANCE INTERIORS
AND EXTERIORS
12 MO
1001AP LOW DUST 12 MO
1001AQ CLEAN RD WILLIS RESTROOM 12 MO
1001AR CLEAN GENERATOR TOPS (SAM
RAYBURN ONLY)
12 MO
1001AS SWEEP/WET MOP PAINTED
FLOORS & STAIRS AT RD WILLIS
1001 Total For CLIN 1001
1002 AS DIRECTED JANITORIAL
2020 THRU 31 MARCH 2021
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
MONTHLY WORK) SEE REFERENCE DRAWINGS FOR ROOM NUMBERS AND PART II,
PERFORMANCE STANDARDS PARAGRAPHS (1.i) and (1.j)
100201 STRIP & REFINISH ERECTION BAY
FLOOR #402, GENERATOR BAY
FLOOR #401 AND VINYL FLOOR OF
ELEVATOR CAB
2 Job
100202 STRIP & REFINISH THE FIRST AID
ROOM #407 COMBINED WITH THE
FIRST AID ROOM TOILET #408
1 Job
100203 STRIP AND REFINISH THE
LOCKER ROOM #418, SHOWER
ROOM #419, THE TOILET ROOM
#420 AND BOTH SHOWER STALLS
1 Job
100204 STRIP AND REFINISH THE
CONFERENCE ROOM/SPECIALIST
OFFICE #502 COMBINED WITH
THE CONFERENCE ROOM/ LADIES
RESTROOM LOUNGE #514, LOBBY
LADIES RESTROOM #515 AND THE
LOBBY MENS RESTROOM #516
2 Job
100205 STRIP AND REFINISH THE
CONFERENCE ROOM ACCESS
BALCONY HALLWAY
1 Job
100206 STRIP AND REFINISH THE CLERKS
STORAGE ROOM #506 AND THE
OFFICE CORRIDOR #503
1 Job
100207 STRIP AND REFINISH THE
CONTROL ROOM TOILET #520
2 Job
100208 STRIP AND REFINISH THE
ELECTRONIC EQUIPMENT ROOM
#511 COMBINED WITH THE
ELECTRONIC STORAGE ROOM
#512
1 Job
100209 SHAMPOO CARPET,
MAINTENANCE OFFICE
ROOM #409
2 Job
100210 SHAMPOO CARPET, AST. SUPT.
OFFICE ROOM #504
2 Job
100211 SHAMPOO CARPET, PP SUPT.
OFFICE ROOM #507
2 Job
100212 SHAMPOO CONTROL ROOM AND
KITCHEN ROOMS #509 AND #521
1002 Total For CLIN 1002
OPTION 1 - 01 APRIL 2020 THRU
31 MARCH 2021
TOTAL OF ALL LINE ITEMS FOR OPTION ONE
(CLIN 1001 + CLIN 1002)
Sam Rayburn / RD Willis Janitorial Services BID SCHEDULE Option Two
2001 REOCCURING JANITORIAL
SERVICES OPTION 2 - 01 APRIL
2021 THRU 31 MARCH 2022
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
2001AA REMOVE TRASH 12 MO
2001AB CLEAN AND RE-SUPPLY
BATHROOMS
12 MO
2001AC LITTER COLLECTION 12 MO
2001AD CLEAN WATER COOLERS 12 MO
2001AE SWEEP
FLOORS/WALKWAYS/STAIRS AND
VACUUM
12 MO
2001AF SWEEP, WET MOP
FLOORS/STAIRS
12 MO
2001AG SWEEP, WET MOP AND BUFF 12 MO
2001AH SWEEP, WET MOP, BUFF,
VACUUM ELEVATOR CAB
12 MO
2001AJ CLEAN KITCHEN AREAS 12 MO
2001AK CLEAN REFRIGERATORS 12 MO
2001AL SPOT CLEAN 12 MO
2001AM CLEAN FURNITURE 12 MO
2001AM WASH ALL
GLASS/MIRRORS/DOORS
12 MO
2001AN CLEAN ENTRANCE INTERIORS
AND EXTERIORS
12 MO
2001AP LOW DUST 12 MO
2001AQ CLEAN RD WILLIS RESTROOM 12 MO
2001AR CLEAN GENERATOR TOPS (SAM
RAYBURN ONLY)
12 MO
2001AS SWEEP/WET MOP PAINTED
FLOORS & STAIRS AT RD WILLIS
2001 Total For CLIN 2001
2002 AS DIRECTED JANITORIAL
SERVICES OPTION 2 - 01 APRIL
2021 THRU 31 MARCH 2022
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
MONTHLY WORK) SEE REFERENCE DRAWINGS FOR ROOM NUMBERS AND PART II,
PERFORMANCE STANDARDS PARAGRAPHS (1.i) and (1.j)
200201 STRIP & REFINISH ERECTION BAY
FLOOR #402, GENERATOR BAY
FLOOR #401 AND VINYL FLOOR OF
ELEVATOR CAB
2 Job
200202 STRIP & REFINISH THE FIRST AID
ROOM #407 COMBINED WITH THE
FIRST AID ROOM TOILET #408
1 Job
200203 STRIP AND REFINISH THE
LOCKER ROOM #418, SHOWER
ROOM #419, THE TOILET ROOM
#420 AND BOTH SHOWER STALLS
1 Job
200204 STRIP AND REFINISH THE
CONFERENCE ROOM/SPECIALIST
OFFICE #502 COMBINED WITH
THE CONFERENCE ROOM/ LADIES
RESTROOM LOUNGE #514, LOBBY
LADIES RESTROOM #515 AND THE
LOBBY MENS RESTROOM #516
2 Job
200205 STRIP AND REFINISH THE
CONFERENCE ROOM ACCESS
BALCONY HALLWAY
1 Job
200206 STRIP AND REFINISH THE CLERKS
STORAGE ROOM #506 AND THE
OFFICE CORRIDOR #503
1 Job
200207 STRIP AND REFINISH THE
CONTROL ROOM TOILET #520
2 Job
200208 STRIP AND REFINISH THE
ELECTRONIC EQUIPMENT ROOM
#511 COMBINED WITH THE
ELECTRONIC STORAGE ROOM
#512
1 Job
200209 SHAMPOO CARPET,
MAINTENANCE OFFICE
ROOM #409
2 Job
200210 SHAMPOO CARPET, AST. SUPT.
OFFICE ROOM #504
2 Job
200211 SHAMPOO CARPET, PP SUPT.
OFFICE ROOM #507
2 Job
200212 SHAMPOO CONTROL ROOM AND
KITCHEN ROOMS #509 AND #521
2002 Total For CLIN 2002
OPTION 2 - 01 APRIL 2021 THRU
31 MARCH 2022
TOTAL OF ALL LINE ITEMS FOR OPTION TWO
(CLIN 2001 + CLIN 2002)
Sam Rayburn / RD Willis Janitorial Services BID SCHEDULE Option Three
3001 REOCCURING JANITORIAL
SERVICES OPTION 3 - 01 APRIL
2022 THRU 31 MARCH 2023
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
3001AA REMOVE TRASH 12 MO
3001AB CLEAN AND RE-SUPPLY
BATHROOMS
12 MO
3001AC LITTER COLLECTION 12 MO
3001AD CLEAN WATER COOLERS 12 MO
3001AE SWEEP
FLOORS/WALKWAYS/STAIRS AND
VACUUM
12 MO
3001AF SWEEP, WET MOP
FLOORS/STAIRS
12 MO
3001AG SWEEP, WET MOP AND BUFF 12 MO
3001AH SWEEP, WET MOP, BUFF,
VACUUM ELEVATOR CAB
12 MO
3001AJ CLEAN KITCHEN AREAS 12 MO
3001AK CLEAN REFRIGERATORS 12 MO
3001AL SPOT CLEAN 12 MO
3001AM CLEAN FURNITURE 12 MO
3001AM WASH ALL
GLASS/MIRRORS/DOORS
12 MO
3001AN CLEAN ENTRANCE INTERIORS
AND EXTERIORS
12 MO
3001AP LOW DUST 12 MO
3001AQ CLEAN RD WILLIS RESTROOM 12 MO
3001AR CLEAN GENERATOR TOPS (SAM
RAYBURN ONLY)
3001AS SWEEP/WET MOP PAINTED
FLOORS & STAIRS AT RD WILLIS
3001 Total For CLIN 3001
3002 AS DIRECTED JANITORIAL
SERVICES OPTION 3 - 01 APRIL
2022 THRU 31 MARCH 2023
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
MONTHLY WORK) SEE REFERENCE DRAWINGS FOR ROOM NUMBERS AND PART II,
PERFORMANCE STANDARDS PARAGRAPHS (1.i) and (1.j)
300201 STRIP & REFINISH ERECTION BAY
FLOOR #402, GENERATOR BAY
FLOOR #401 AND VINYL FLOOR OF
ELEVATOR CAB
2 Job
300202 STRIP & REFINISH THE FIRST AID
ROOM #407 COMBINED WITH THE
FIRST AID ROOM TOILET #408
1 Job
300203 STRIP AND REFINISH THE
LOCKER ROOM #418, SHOWER
ROOM #419, THE TOILET ROOM
#420 AND BOTH SHOWER STALLS
1 Job
300204 STRIP AND REFINISH THE
CONFERENCE ROOM/SPECIALIST
OFFICE #502 COMBINED WITH
THE CONFERENCE ROOM/ LADIES
RESTROOM LOUNGE #514, LOBBY
LADIES RESTROOM #515 AND THE
LOBBY MENS RESTROOM #516
2 Job
300205 STRIP AND REFINISH THE
CONFERENCE ROOM ACCESS
BALCONY HALLWAY
1 Job
300206 STRIP AND REFINISH THE CLERKS
STORAGE ROOM #506 AND THE
OFFICE CORRIDOR #503
1 Job
300207 STRIP AND REFINISH THE
CONTROL ROOM TOILET #520
2 Job
300208 STRIP AND REFINISH THE
ELECTRONIC EQUIPMENT ROOM
#511 COMBINED WITH THE
ELECTRONIC STORAGE ROOM
#512
1 Job
300209 SHAMPOO CARPET,
MAINTENANCE OFFICE
ROOM #409
2 Job
300210 SHAMPOO CARPET, AST. SUPT.
OFFICE ROOM #504
2 Job
300211 SHAMPOO CARPET, PP SUPT.
OFFICE ROOM #507
300212 SHAMPOO CONTROL ROOM AND
KITCHEN ROOMS #509 AND #521
3002 Total For CLIN 3002
OPTION 3 - 01 APRIL 2022 THRU
31 MARCH 2023
TOTAL OF ALL LINE ITEMS FOR OPTION THREE
(CLIN 3001 + CLIN 3002)
Sam Rayburn / RD Willis Janitorial Serv+A1:F12ices BID SCHEDULE Option Four
4001 REOCCURING JANITORIAL
SERVICES OPTION 4 - 01 APRIL
2023 THRU 31 MARCH 2024
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
4001AA REMOVE TRASH 12 MO
4001AB CLEAN AND RE-SUPPLY
BATHROOMS
12 MO
4001AC LITTER COLLECTION 12 MO
4001AD CLEAN WATER COOLERS 12 MO
4001AE SWEEP
FLOORS/WALKWAYS/STAIRS AND
VACUUM
12 MO
4001AF SWEEP, WET MOP
FLOORS/STAIRS
12 MO
4001AG SWEEP, WET MOP AND BUFF 12 MO
4001AH SWEEP, WET MOP, BUFF,
VACUUM ELEVATOR CAB
12 MO
4001AJ CLEAN KITCHEN AREAS 12 MO
4001AK CLEAN REFRIGERATORS 12 MO
4001AL SPOT CLEAN 12 MO
4001AM CLEAN FURNITURE 12 MO
4001AM WASH ALL
GLASS/MIRRORS/DOORS
12 MO
4001AN CLEAN ENTRANCE INTERIORS
AND EXTERIORS
12 MO
4001AP LOW DUST 12 MO
4001AQ CLEAN RD WILLIS RESTROOM 12 MO
4001AR CLEAN GENERATOR TOPS (SAM
RAYBURN ONLY)
12 MO
4001AS SWEEP/WET MOP PAINTED
FLOORS & STAIRS AT RD WILLIS
4001 Total For CLIN 4001
4002 AS DIRECTED JANITORIAL
SERVICES OPTION 4 - 01 APRIL
2023 THRU 31 MARCH 2024
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
MONTHLY WORK) SEE REFERENCE DRAWINGS FOR ROOM NUMBERS AND PART II,
PERFORMANCE STANDARDS PARAGRAPHS (1.i) and (1.j)
400201 STRIP & REFINISH ERECTION BAY
FLOOR #402, GENERATOR BAY
FLOOR #401 AND VINYL FLOOR OF
ELEVATOR CAB
2 Job
400202 STRIP & REFINISH THE FIRST AID
ROOM #407 COMBINED WITH THE
FIRST AID ROOM TOILET #408
1 Job
400203 STRIP AND REFINISH THE
LOCKER ROOM #418, SHOWER
ROOM #419, THE TOILET ROOM
#420 AND BOTH SHOWER STALLS
1 Job
400204 STRIP AND REFINISH THE
CONFERENCE ROOM/SPECIALIST
OFFICE #502 COMBINED WITH
THE CONFERENCE ROOM/ LADIES
RESTROOM LOUNGE #514, LOBBY
LADIES RESTROOM #515 AND THE
LOBBY MENS RESTROOM #516
2 Job
400205 STRIP AND REFINISH THE
CONFERENCE ROOM ACCESS
BALCONY HALLWAY
1 Job
400206 STRIP AND REFINISH THE CLERKS
STORAGE ROOM #506 AND THE
OFFICE CORRIDOR #503
1 Job
400207 STRIP AND REFINISH THE
CONTROL ROOM TOILET #520
2 Job
400208 STRIP AND REFINISH THE
ELECTRONIC EQUIPMENT ROOM
#511 COMBINED WITH THE
ELECTRONIC STORAGE ROOM
#512
1 Job
400209 SHAMPOO CARPET,
MAINTENANCE OFFICE
ROOM #409
2 Job
400210 SHAMPOO CARPET, AST. SUPT.
OFFICE ROOM #504
2 Job
400211 SHAMPOO CARPET, PP SUPT.
OFFICE ROOM #507
2 Job
400212 SHAMPOO CONTROL ROOM AND
KITCHEN ROOMS #509 AND #521
4002 Total For CLIN 4002
OPTION 4 - 01 APRIL 2023 THRU
31 MARCH 2024
TOTAL OF ALL LINE ITEMS FOR OPTION FOUR
(CLIN 4001 + CLIN 4002)
Sam Rayburn / RD Willis Janitorial Services BID SCHEDULE Option Five
5001 REOCCURING JANITORIAL
SERVICES OPTION 5 - 01 APRIL
2024 THRU 30SEPTEMBER 2024
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
5001AA REMOVE TRASH 12 MO
5001AB CLEAN AND RE-SUPPLY
BATHROOMS
12 MO
5001AC LITTER COLLECTION 12 MO
5001AD CLEAN WATER COOLERS 12 MO
5001AE SWEEP
FLOORS/WALKWAYS/STAIRS AND
VACUUM
12 MO
5001AF SWEEP, WET MOP
FLOORS/STAIRS
5001AG SWEEP, WET MOP AND BUFF 12 MO
5001AH SWEEP, WET MOP, BUFF,
VACUUM ELEVATOR CAB
12 MO
5001AJ CLEAN KITCHEN AREAS 12 MO
5001AK CLEAN REFRIGERATORS 12 MO
5001AL SPOT CLEAN 12 MO
5001AM CLEAN FURNITURE 12 MO
5001AM WASH ALL
GLASS/MIRRORS/DOORS
12 MO
5001AN CLEAN ENTRANCE INTERIORS
AND EXTERIORS
12 MO
5001AP LOW DUST 12 MO
5001AQ CLEAN RD WILLIS RESTROOM 12 MO
5001AR CLEAN GENERATOR TOPS (SAM
RAYBURN ONLY)
12 MO
5001AS SWEEP/WET MOP PAINTED
FLOORS & STAIRS AT RD WILLIS
5001 Total For CLIN 5001
5002 AS DIRECTED JANITORIAL
SERVICES OPTION 5 - 01 APRIL
2024 THRU 30SEPTEMBER 2024
Use the Quantity per year and multiply the Unit Price to obtain the Total Cost per year of each Line Item.
MONTHLY WORK) SEE REFERENCE DRAWINGS FOR ROOM NUMBERS AND PART II,
PERFORMANCE STANDARDS PARAGRAPHS (1.i) and (1.j)
500201 STRIP & REFINISH ERECTION BAY
FLOOR #402, GENERATOR BAY
FLOOR #401 AND VINYL FLOOR OF
ELEVATOR CAB
2 Job
500202 STRIP & REFINISH THE FIRST AID
ROOM #407 COMBINED WITH THE
FIRST AID ROOM TOILET #408
1 Job
500203 STRIP AND REFINISH THE
LOCKER ROOM #418, SHOWER
ROOM #419, THE TOILET ROOM
#420 AND BOTH SHOWER STALLS
1 Job
500204 STRIP AND REFINISH THE
CONFERENCE ROOM/SPECIALIST
OFFICE #502 COMBINED WITH
THE CONFERENCE ROOM/ LADIES
RESTROOM LOUNGE #514, LOBBY
LADIES RESTROOM #515 AND THE
LOBBY MENS RESTROOM #516
2 Job
500205 STRIP AND REFINISH THE
CONFERENCE ROOM ACCESS
BALCONY HALLWAY
1 Job
500206 STRIP AND REFINISH THE CLERKS
STORAGE ROOM #506 AND THE
OFFICE CORRIDOR #503
1 Job
500207 STRIP AND REFINISH THE
CONTROL ROOM TOILET #520
2 Job
500208 STRIP AND REFINISH THE
ELECTRONIC EQUIPMENT ROOM
#511 COMBINED WITH THE
ELECTRONIC STORAGE ROOM
#512
1 Job
500209 SHAMPOO CARPET,
MAINTENANCE OFFICE
ROOM #409
2 Job
500210 SHAMPOO CARPET, AST. SUPT.
OFFICE ROOM #504
2 Job
500211 SHAMPOO CARPET, PP SUPT.
OFFICE ROOM #507
2 Job
500212 SHAMPOO CONTROL ROOM AND
KITCHEN ROOMS #509 AND #521
5002 Total For CLIN 5002
OPTION 5 - 01 APRIL 2024 THRU
30SEPTEMBER 2024
TOTAL OF ALL LINE ITEMS FOR OPTION FIVE
(CLIN 5001 + CLIN 5002)
PWS
ATTACHMENT 1
JANITORIAL SERVICES (CLEANING/LITTER PICK-UP)
AT
SAM RAYBURN AND R.D. WILLIS POWER PLANTS, JASPER, TEXAS
NOTE: This Section is divided into two parts: Part I, Performance Work Statement; and
Part II, Specific Work Instructions/Work area description
PART I
General: This is a non-personal services contract to provide janitorial services at Sam Rayburn Power House (SRPH) and RD Willis Power Plant. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government
PERFORMANCE WORK STATEMENT
1. GENERAL REQUIREMENT:
a. The Contractor shall furnish, all necessary labor, transportation, equipment, materials/supplies, and supervision to perform non-personal custodial services in the manner, location and frequency set forth in the following paragraphs and schedules. Daily work shall be performed at the Sam Rayburn Power Plant (SRPH), located at the Sam Rayburn Dam, approximately 15 highway miles from the town of Jasper, Texas and one afternoon per week at the R.D. Willis Power Plant (RDW), located approximately 14 miles to the west of the town of Jasper, Texas. The distance between the Sam Rayburn Power Plant and the R.D.Willis Power Plants via Road 255 / State Hwy 63 / FM1747 / FM777 is approximately 28 road miles.
b. The work is to be performed at the Power Plants and adjacent, parking areas and access roads. Since many of the areas to be serviced are frequented by the public, very high standards of performance shall be required of the Contractor.
c. The R.D. Willis Power Plant is an unmanned and normally unattended facility, therefore to gain access to perform janitorial services at RDW. The contractor shall coordinated for access one afternoon per week ether on Wednesday or Thursday. Arrangements must be made to work at RDW on ether day of the week. Coordination will need to be done on a case by case basis. All work at RDW shall be performed between the hours of 1:00 p.m. and 4:30 p.m. unless otherwise approved. The Contractor shall be required to provide sufficient personnel to perform all scheduled work at RDW within the 3.5 hour time frame allowed each week. Government personnel will be available at the RDW site, on the date service is to be performed, and to provide access to the power plant and perform contract inspection.
d. Work at Sam Rayburn Power Plant shall be performed five days per week normally, (Monday thru Friday) except on Government Holidays and weekends.
e. These specifications are written to identify both generic and specific work items. Where conditions are noted to be unique to a specific power plant, a site identifier is provided to that location by SRPH or RDW. Much of this specification is of a general nature and applies to all work performed by this contract, regardless of location.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.