Solicitation Number: W9126G 9Q 002 Request for Quotes (RFQ)
This is a combined synopsis/solicitation for commercial services prepared in accordance with the format in Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation;
proposals are being requested and a written solicitation will not be issued.
This solicitation document and incorporated provisions and clauses are those in effect through the Federal Acquisition Regulation (FAR) and Department of Defense FAR Supplement (DFARS).
This acquisition is SET ASIDE 100% for Small Business
NAICS CODE: 562111
SIZE STANDARD: $38.5 Million
Offers for this solicitation are due on December 04 P CST
Email all offers to Anthony.D.Johnson@usace.army.mil and CIV-OPS.Proposals@usace.army.mil
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
Funded Amt:
Benbrook Lake Refuse Disposal- Base Yr
Contractor is to provide all contract work force and equipment required to perform Refuse/Garbage Disposal services at Benbrook Lake as defined in this Performance Work Statement.
Period of Performance: 1 Jan 2019 - 31 Dec 2019
P.O.C: Gloria Gonzales (817)-886-1082 or gloria.gonzales@usace.army.mil
NAICS CD: 562111
, FSC CD: S205
1001 1 Job
OPTION Funded Amt:
Benbrook Lake Refuse Disposal
Option Year 1
Period of Performance: 1 Jan 2020 - 31 Dec 2020
1002 1 Job
OPTION Funded Amt:
Benbrook Lake Refuse Disposal
Option Year 2
Period of Performance: 1 Jan 2021 - 31 Dec 2021
CONTRACTING OFFICER'S STATEMEN
Only a warranted Contracting Officer (either a Procuring Contracting Officer (PCO), or an Administrative Contracting Officer (ACO), acting within their delegated limits, has the authority to issue modifications or otherwise change the terms and conditions of this contract. If an individual other than the Contracting Officer attempts to make changes to the terms and conditions of this contract you shall not proceed with the change and shall immediately notify the Contracting Officer.
INSTRUCTION TO OFFERORS
INSTRUCTIONS TO OFFERORS
QUOTER DUE DATE/LOCAL TIME: SEE COVER PAGE
POINT OF CONTACT: Anthony Johnson Phone: (817)-886-1076
Quotes shall be accepted via “EMAIL ONLY,” no fax, mail, express mail, or hands carry, “NO EXCEPTIONS.” EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil and anthony.d.johnson@usace.army.mil. Subject line of email MUST include the solicitation number and your Company Name.
For additional help contact your local Association Procurement Technical Assistance Centers (PTAC). Centers were created by Congress to assist businesses seeking to compete on federal contracts. Services are generally free; however, a small fee may be charged for certain services.
Please use website http://www.aptac-us.org/new/ to contact a center to assist you in the preparation for a federal contract, registering in SAM or other required systems.
SYSTEM FOR AWARD MANAGEMENT (SAM) is REQUIRED to receive an award on all federal government contracts. Therefore, contractors are encouraged to begin this process sooner rather than later. If already registered, please ensure your registration is ACTIVE. The website to register with SAM is: http://www.sam.gov.
DATA UNIVERSAL NUMBERING SYSTEM (DUNS) is REQUIRED. Dun & Bradstreet (D&B) provides a DUNS Number, a unique nine digit identification number, for each physical location of your business.
DUNS Number assignment is FREE for all businesses required to register with the US Federal government for contracts or grants in the System for Award Management (SAM see below).
Click here to request your D-U-N-S Number via the Web. The website to obtain your DUNS number:
http://fedgov.dnb.com/webform For technical difficulties, contact govt@dnb.com or phone 866-705- 5711.
ONLINE REPRESENTATIONS AND CERTIFICATIONS APPLICATIONS (ORCA)
allows contractors to complete a one-time certification and representations for your use on any solicitation. The website to complete ORCA is available at the System for Award Manager (SAM): http://www.sam.gov. The information previously maintained in CCR, FedReg and ORCA now is contained within the Entity Management area in SAM. Legacy EPLS information resides in the Performance Information area of SAM.
WAGE RATES: The Service Contract Act applies (see attached wage rates).
Below is a checklist to assist you to ensure all the proper documents are returned for consideration on this solicitation. Only those items checked below as “required” must be returned
Required Contractor Item
Complete ALL Bid Schedule(s), Sign SF 1449, Sign Amendments (Blocks 15a-15c) (if applicable) and return
CHECK YOUR QUOTES FOR MATHEMATICAL ERRORS
DO NOT ROUND UP OR DOWN
ANNOTATE UNIT AND TOTAL COSTS TO THE HUNDRETH POSITION
Complete vendor information sheet or provide a document with similar information sign AND date.
The provisions at 52.212-1, 52.212-2, 52.212-3 Alt I, 52.212-5 and apply to this acquisition. Confirm vendor’s 52.212-3 Alt I ORCA is updated in SAM on the vendor information sheet.
You must have an active SAM registration prior to award
Submit past performance and technical approach IAW 52.212-2 Commercial Evaluation Factors.
Ensure former employer returns the form and references the solicitation number and Company Name in the email subject line.
Scan all documents into a single.pdf file. PDF only authorized format
HAND WRITTEN BID SCHEDULES WILL NOT BE ACCEPTED!
EMAIL your proposal to: CIV‐OPS.Proposals@usace.army.mil & anthony.d.johnson@usace.army.mil Subject line of email must include the solicitation number and Company Name.
**Please see clause 52.228-5 Insurance and Insurance MFR for insurance requirements.
Vendor Information Sheet
IN THE EVENT OF AWARD, ISSUE CONTRACT TO:
COMPANY NAME
POC
(Last, First Middle)
ADDRESS
(Number & Street) (City, State and Zip)
PHONE NUMBER MOBILE
(Area code and number) (Area code and number)
EMAIL ADDRESS___________________________________________
DUNS NUMBER CAGE CODE NUMBER________
SSN/TIN NUMBER or firm’s Tax ID Number (TIN) ______________________________
Vendor’s Online Representation and Certification Application (ORCA) is updated in SAM Yes No
52.237-1 SITE VIST
FAR 52.237-1- Highly recommend potential offerors attend a site visit.
Vendors must confirm their intent to attend a conference with the POC listed below prior to attending the event.
Address: Benbrook Lake Office, 7001 Lakeside Dr.
Fort Worth, TX 76132
POC: Jason Owen Contact Info: (817)-292-2400
(817) 822-7685
Email: jason.w.owen@usace.army.mil
Conference: Monday, 3 December 2018 @ 10:00 am CST
PREVIOUS CONTRACT INFORMATION:
Contract #: W9126G-16-C-0011 - $204,158.57 – Base w/ two options Contractor: DAKCO, LLC
INSURANCE
Prior to commencement of work, the Contractor shall furnish the original of his Insurance Certificate directly to the Contracting Officer, Fort Worth District, Corps of Engineers, ATTN: CESWF-CT-S, P.O.
Box 17300, Fort Worth, Texas 76102-0300 and one copy directly to the Lake and Project Office. The Contractor shall maintain, during the entire period of his performance under this contract, the following minimum insurance requirements:
Submit a copy of Insurance Certificate directly to:
Benbrook Project Office, 7001 Lakeside Dr.
Fort Worth, TX 76132
POC: Jason Owen
Or email to: jason.w.owenl@usace.army.mil Phone: (817) 292-2400 X 239 or (817) 822-7685
(a) Comprehensive general liability insurance for bodily injury in the minimum limits of $500,000 per occurrence. No property damage liability is required.
(b) Comprehensive automobile liability insurance covering the operation of all automobiles used in connection with the performance of the contract in the minimum limits of $200,000 per person and $100,000 per accident for bodily injury and $20,000 per accident for property damage.
(c) Workmen's Compensation and Employer's Liability Insurance in the minimum amount of $100,000.00 or in compliance with applicable State statutes.
(d) An endorsement to the effect that any cancellation or any material change adversely affecting the Government's interest shall not be effective until 30 days after the insurer or the Contractor gives written notice to the Contracting Officer.
NOTE:
(1) It is recommended that the contractor furnish a copy of the foregoing requirements to his insurance company in order to assure that an Insurance Certificate is issued meeting the minimum requirements shown. The Insurance Certificate shall also show the contract number to which it applies as well as a brief description and location of the work.
NAVFAC/USACE PAST PERFORMANCE QUESTIONAIRE (Form PPQ-0) CONTRACT INFORMATION (Contractor to complete Blocks 1-4)
1. Contractor Information Firm name: CAGE Code:
Address: DUNS Number:
Phone Number:
Email Address:
Point of Contact: Contact Phone Number:
2. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain) Percent of Project work performed:
If subcontractor, who was the prime (Name/Phone #):
3. Contract Information Contract Number:
Delivery/Task Order Number (if applicable):
Contract type: Firm Fixed Price Cost Reimbursement Other (please specify):
Contract Title:
Contract Location:
Award Date (mm/dd/yy):
Contract Completion Date (mm/dd/yy):
Actual Completion Date (mm/dd/yy) Explain Differences:
Original Contract Price (Award Amount):
Final contract Price (to include all modifications, if applicable):
Explain Differences:
4. Project Description:
Complexity of Work High Med Routine How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)
CLIENT INFORMATION (Client to complete Blocks 5-8)
5. Client Information Name:
Title:
Phone Number:
Email Address:
6. Describe the client’s role in the project:
7. Date Questionnaire was completed (mm/dd/yy):
8. Client’s Signature:
NOTE: NAVFAC/USACE REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNARIE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNARIE TO USACE WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON USACE SOLICITATION. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO USACE. PLEASE CONTACT THE OFFEROR FOR USACE POC INFORMATION. THE GOVERNMENT
RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.
AFTER COMPLETION, PLEASE EMAIL TO: CIV‐OPS.Proposals@usace.army.mil and anthony.d.johnson@usace.army.mil. Ensure the former employer references the solicitation number in the email subject line.
ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT
YOUR EVALUATIONOF THE CONTRACTOR’S PERFORMANCE
RATING DEFINITION NOTE
(E) Exceptional Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable No information or did not apply to your contract
Rating will be neither positive or negative.
TO BE COMPLETED BY CLIENT
PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS
YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.
1. QUALITY
a) Quality of technical data/report preparation efforts E VG S M U N
b) Ability to meet quality standards for technical performance E VG S M U N
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance.
E VG S M U N
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
E VG S M U N
2. SCHEDULE/TIMELINESS OF PERFORMANCE:
a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract E VG S M U N
3. CUSTOMER SATISFACTION:
a) To what extent were the end users satisfied with the project? E VG S M U N
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer? E VG S M U N
d) Overall customer satisfaction E VG S M U N
4. MANAGEMENT/PERSONNEL/LABOR
a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and /or labor force? E VG S M U N
b) Ability to hire, apply, and retain qualified workforce to this effort E VG S M U N
c) Government Property Control E VG S M U N
d) Knowledge/expertise demonstrated by contractor personnel E VG S M U N
e) Utilization of Small Business concerns E VG S M U N
f) Ability to simultaneously manage multiple projects with multiple disciplines E VG S M U N
g) Ability to assimilate and incorporate changes in requirement and/or priority, including planning, execution and response to Government changes
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program) E VG S M U N
5. COST/FINANCIAL MANAGEMENT
a) Ability to meet the terms and conditions within the contractually agree price(s)? E VG S M U N
b) Contractor Proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports.
Budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
d) In the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section. YES NO
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are
YES NO
there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
f) Have there been any indication that the contractor has had any financial problems? If yes, please explain below. YES NO
6. SAFETY/SECURITY
a) To What extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements, regarding housekeeping, safety, correction of noted deficiencies, etc.)
b) Contractor complied with all security requirements for the project and personnel security requirements. E VG S M U N
7. GENERAL
a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues)
b) Compliance with contractual terms/provisions (explain if specific issues)
E VG S M U N
c) Would you hire or work with this firm again? (If no, please explain below)
YES NO
d) In Summary, provide an overall rating for the work performed by this contractor. E VG S M U N
AFTER COMPLETION, PLEASE EMAIL TO: CIV‐OPS.Proposals@usace.army.mil and anthony.d.johnson@usace.army.mil Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (Please attach additional pages in necessary)
PWS
PERFORMANCE WORK STATEMENT (PWS)
Refuse Disposal at Benbrook Lake
1. GENERAL: This is a non-personal services contract to provide Refuse/Garbage Removal Services at Benbrook Lake. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: Contractor is to provide all contract work force and equipment required to perform Refuse/Garbage Disposal services at Benbrook Lake as defined in this Performance Work Statement, except for those items specified as government furnished property and services. General requirements include providing and placing dumpsters for use in public parks, and removal of accumulated waste as specified below.
1.2 Scope of Work: This is a Purchase Order Contract. Work will consist of furnishing all labor, materials, fuel, and equipment necessary to perform specified refuse services in public use areas at the lake. Contractor's work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, and management necessary to accomplish the required services. Contractor shall assure that all work is accomplished in accordance with the contract specifications, all applicable laws, municipal codes, regulations and/or written directives issued by the Contracting Officer. The areas covered, number of facilities, and frequencies of services are provided in the attached tabulation of park areas & facilities, frequency schedules, and park maps.
1.3 Project Descriptions and Information:
1.3.1 Location: Benbrook Lake is located entirely in Tarrant County. The Project Headquarters is located at 7001 Lakeside Dr., Fort Worth, Texas 76132, phone 817-292-2400. The lake is generally bounded on the west by Hwy 377, by FM 1187 on the South, Old Granbury Road on the East, and by Lakeside Drive on the North. Office hours are from 7:30 a.m. to 4:00 p.m. Monday thru Friday.
1.3.2 Climate: The climate in Tarrant County, Texas is generally mild with hot summers and cool winters.
Extreme temperatures, snowfall, rainfall, and drought conditions are experienced regularly. Recorded temperatures range from a maximum of 115 degrees Fahrenheit to a minimum of minus 4 degrees Fahrenheit, with a mean annual temperature of 65 degrees Fahrenheit. The average length of an annual growing season is 230 days. Annual mean precipitation is 31.3 inches.
1.4 Frequency of Service: The required frequency of service is provided in the list of attachments, Frequency Schedules, for each service required. It may become necessary for the Contracting Officer's Representative (COR), or Lake Manager when applicable, to decrease service frequencies in any or all parks or portions of parks. Payment for decreased services shall be adjusted according to the unit price shown on the bid schedule. It may become necessary at any time during the duration of this contract for the COR or Lake Manager to close any park or portion of a park and delete any subsequent service for the closed park or area.
1.5 Flood or Construction Activities, and Park Closures: The Government may, at any time during the duration of this contract, close any park or portion of a park, for reasons such as flooding or construction activities, and delete any subsequent service in the closed park or area. The Contractor shall be given notification as soon as possible to prepare for either contingency. This decrease shall be deducted from the monthly invoice and paid for in accordance with the bid schedule.
1.6 Preferred Sequence for Work Schedules: The COR or Lake Manager shall provide the Contractor with a preferred sequence, or order, of parks and/or areas in which work is to be accomplished. The Contractor shall be required to submit a work schedule for the Refuse/Garbage Service, complete with approximate times for beginning and ending of each pickup listed by parks or areas. The schedules must be submitted within ten (10) working days after the preferred sequence has been issued, but no later than five (5) working days prior to the beginning of Refuse/Garbage Services. This schedule is extremely important as it controls the time at which the quality assurance inspections are performed, ensuring that said inspections are done only after the required service has been completed. Any variation or unforeseen change, such as being ahead or behind the approved schedule, must be reported immediately by phone or in person. Any proposed change to an approved schedule must be submitted in writing and approved by the Contracting Officer or COR or Lake Manager in advance of actual schedule changes.
1.7 Workday: Services scheduled to be performed may not commence before 7:00am, and must be completed by 4:00p.m. on all scheduled workdays. Any variation from this schedule must be approved in advance by the COR or Lake Manager. If for any reason the day's required service cannot be completed by the designated time, the Contractor must notify the COR or Lake Manager by 3:00p.m. of that day, either by phone or in person, (followed in writing), advising him/her of the facilities not serviced and the reason work was not completed. Should the COR or Lake Manager allow, and non-completion is very infrequent, services not completed may be rescheduled for the following day if it is an unscheduled workday. Otherwise, deductions in payment for services not performed shall be made in accordance with the bid schedule and the Payment Analysis.
1.8 Typical Drawings: The specification requirements shall override all typical drawings. Typical drawings are not to scale, nor are they intended to depict all facilities at the lake. Therefore, typical drawings are in the list of attachments and are included for general information purposes only.
1.9 Permits - The contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, County, and Municipal laws, codes, and regulations in connection with the performance of the work specified under this contract. All requirements of Municipal Solid Waste Management Regulations, Texas Department of Health Resources, as amended shall be met.
1.10 Disposal - All current requirements of Municipal Solid Waste Management Regulations, Texas Water Commission, shall be met and maintained. No disposal area shall be provided on Government land. All refuse/garbage collected by the Contractor must be removed from Government land and disposed of in private or public disposal areas at the Contractor's expense. The Contractor must make all the necessary arrangements, obtain permits required, and make all payments for use of the disposal area. The Contractor must furnish the Contracting Officer a letter from the owner of the disposal area/landfill that is proposed to use stating that the Contractor is authorized to use the disposal area. If the proposed disposal area is not presently being utilized as a State authorized City or County garbage disposal area, the Contractor must furnish the COR or Lake Manager a letter from the Texas Water Commission approving the area for refuse/garbage disposal. This approval shall be required even if the Contractor owns the land.
1.11 Award of Other Contracts: The services provided under this contract shall be independent of all services provided under other contracts, at this project or any other project, at which the Contractor may receive award.
1.12 Safety Requirements: Contractor shall develop and submit a written detailed Accident Prevention Plan within fifteen (15) days after award and prior to beginning work. This plan must indicate in detail the general policies and procedures for safe operation in the accomplishment of this contract. The plan shall include an “Activity Hazard Analysis” as defined in Section 01.A.09 of Safety Manual stated below. The Safety Plan and Hazard Analysis shall show how the Contractor intends to perform services in full compliance with the safety requirements set forth in the most current EM 385-1-1, entitled Safety and Health Requirements Manual, copies of which are available on the Corps of Engineers web page at http://www.usace.army.mil/SafetyandOccupationalHealth/EM38511,2008BeingRevised.aspx
2. DEFINITIONS: For this contract the following terms shall relate as follows:
2.1 Project: Means Benbrook Lake and related features.
2.2 Government: Means the Government of the United States of America.
2.3 Contracting Officer: Means the person executing this contract on behalf of the Government and does not include the Contracting Officer's Representative (COR).
2.4 COR: Means the person authorized in writing as the Authorized Representative of the Contracting Officer, acting within the limits of his authority.
2.5 Contractor: Means the company structure, including all partners, officers, and employees with interest in this contract.
2.6 Lake Manager. The Lake Manager is not empowered to make any contractual commitments or to authorize any contractual changes on the Government’s behalf. The Lake Manager is responsible for ensuring proper Government surveillance of the contractor’s performance, coordination and communication with the contractor and the KO, and for receiving required contractual documents, such as the QCP and safety plan. The Lake Manager assists the KO by providing local supervision of the contract, the contractor’s performance, and QA oversight, and resolves issues that may arise. For unresolved issues, the Lake Manager will document the issues and forward to the KO for resolution.
2.7 Quality Control: The term "Quality Control" refers to action taken by the Contractor and/or their personnel to document, inspect, and control performance of services to insure they meet the specifications and requirements of this contract.
2.8 Quality Assurance: The term "Quality Assurance" refers to action taken by the Government to insure the Contractor's quality control system is functioning and effective and that the Contractor is providing services which are in accordance with this contract.
2.9 Quality Assurance Surveillance (QASP): A Quality Assurance Surveillance Plan is a plan developed by the Government depicting how Quality Assurance shall be controlled.
2.10 Contract Deficiency Report (CDR): The Contract Deficiency Report is a written record of unsatisfactory performance by the Contractor as observed by the Quality Assurance Inspector, issued to the Contractor when the number of rejects exceeds the acceptable quality level.
3. FACILITIES AND EQUIPMENT
3.1 Equipment Storage: Other than dumpsters, no Government space or facilities shall be provided under this contract for either equipment or supplies.
3.2 Point of Contact Requirements: The Contractor shall provide to the COR or Lake Manager a local telephone number with electronic mailbox and a point of contact on a twenty four (24) hour basis for discussion of any contractual matters.
3.3 Communication: The Contractor shall provide mobile cellular telephones in all Contractor supervisory and quality control vehicles for communication purposes with Government personnel. All other Contractor vehicles shall be equipped with either a 2-way mobile radio or cellular mobile phone.
3.4 Safeguarding Public Property: The Contractor shall cooperate with Government personnel in safeguarding public property. The Contractor shall be responsible for reporting acts of vandalism, larceny, or pilferage to the COR or Lake Manager as part of the Contractor's quality control reports.
3.5 Damage to Government and Private Property: The Contractor shall be responsible for restoring any Government property damaged as a result of his or her operation. Contractor shall also be responsible for any damage to private property and injury to any person as a result of his or her operation. The Contractor shall notify the COR or Lake Manager immediately of damage to Government or private property, or injury to any person resulting from his or her operation. Contractor shall be charged for damage to Government property at replacement or repair cost.
3.6 Equipment: The Contractor shall furnish equipment necessary to accomplish all of the work required by this contract within the time frames specified. All equipment shall be presented to the COR or Lake Manager for his or hers approval prior to commencement of services to ensure compliance with specifications.
3.6.1 Quantity and Quality of Equipment: The Contractor shall utilize equipment that equals or exceeds the quantity and quality set forth in this solicitation and evaluated by the Government for award of the contract. If the Contractor demonstrates that the requirements of this contract can be met with less equipment or a different kind of equipment after work is started, the amount and/or type of equipment may be modified upon written approval of the Contracting Officer. If the Contractor is unable to accomplish work in accordance with the requirements of this contract within the times specified, contractor shall immediately obtain additional equipment necessary to fulfill the requirements of this contract.
3.6.2 Condition of Equipment: All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Corps of Engineers Safety and Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment.
3.6.3 Safety Inspections: The Contractor shall present all equipment to the COR or Lake Manager for inspection whenever equipment is initially brought to the project. The Contractor shall notify the COR or Lake Manager at least two (2) days prior to bringing equipment on site so that the time and place of these inspections may be scheduled. No equipment shall be used on the project prior to passing inspection. The COR or Lake Manager may inspect equipment at any time it is operated on Government property. Any equipment found deficient shall be taken out of service immediately until faulty conditions have been corrected and approved by the COR or Lake Manager.
3.6.4 Vehicles: All vehicles utilized under this contract shall be presentable, serviceable, and shall comply with safety standards as required by the State of Texas. All Contractor vehicles shall be identified with company name or logo conspicuously displayed on door panels.
4. PERSONNEL
4.1 Minimum Manpower Requirements: The Contractor shall provide an adequate number of fully qualified personnel to perform the specified services properly and efficiently within the time limits specified
4.2 Employee Conduct: The Contractor shall be responsible for seeing that his or her employees strictly comply with all Federal, State, and Municipal laws. Any illegal or criminal activity may result in the removal of Contractor employee/employees and/or termination of the contract. No alcohol shall be consumed by Contractor or Contractor employees while on the job site.
4.3 Removal of Contractor’s Employees: The Contracting Officer, COR, or Lake Manager may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, in the opinion of the COR or Lake Manager, who is incompetent or who endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform the required work.
Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or telephonic, and shall be confirmed in writing as soon as possible. No such removal, however, shall reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement shall be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
4.4 Supervision: The Contractor shall give his or her personal superintendence to this contract. Contractor shall appoint in writing, subject to the approval of the COR or Lake Manager, a minimum of one (1) foreman/superintendent. The superintendent shall be present whenever work specified herein is being performed, and have full authority and power to act for the Contractor on items pertaining to overall work performance, management, coordination, and supervision. This individual may also serve as the one Quality Control inspector, provided that his or hers job performance in each category is maintained at an acceptable level to the COR or Lake Manager. However, neither the foreman/ superintendent nor the Quality Control inspector may be working members of a crew performing any of the scheduled services. For the purpose of this contract, it is intended that these shall be administrative positions whose responsibility is to ensure compliance with contract specifications. The superintendent and/or quality control personnel shall be required to have a copy of the contract in their possession at all times for referral concerning questions of Contractor responsibility. In addition, the Contractor shall designate a responsible employee to act as work leader, and to complete a daily activity report.
4.5 Quality Control: The Contractor is responsible for insuring that all work performed under this contract, including that performed by subcontractors, is in accordance with the specifications. To accomplish this, the Prime Contractor shall appoint in writing, subject to the approval of the COR or Lake Manager, one (1) Quality Control Inspector.
Requirements for Quality Control shall be set forth in Part 5, "Inspections - Quality Control".
4.6 Contractor Clothing Requirements: See EM 385-1-1, Section 5, for additional restrictions on clothing.
4.7 Security Requirements:
4.7.1 AT Level 1 Training: All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, controlled access areas, or require network access, shall complete AT Level I awareness training within 30 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR or to the contracting officer (if a COR is not assigned), within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website:
http://jko.jten.mil/courses/atl1/launch.html; or it can be provided by the RA ATO in presentation form which will be documented via memorandum.
4.7.2 General Security Protection, Policy, and Procedures: All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
4.7.3 Access: Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05 / AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
4.7.4 Suspicious Activity Reporting Training: The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
4.7.5 Escorts: All contract employees, including subcontractor employees who are not in possession of the appropriate security clearance or access privileges, will be escorted in areas where they may be exposed to classified and/or sensitive materials and/or sensitive or restricted areas.
4.7.6 E-Verify: The Contractor must pre-screen Candidates using the E-verify Program
(http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award.
4.7.7 Key Control: The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the Contractor by the Government shall be duplicated. The Contractor shall develop procedures covering key control that shall be included in the Quality Control Plan. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrences of lost or duplicate keys/key cards to the Contracting Officer. The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees. The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the Contracting Officer.
4.8 Post Award Conference/Periodic Progress Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contract administration office in accordance with Federal Acquisition Regulation Subpart 42.5. The Contracting Officer, Contracting Officer’s Representative (COR), Lake Manager, and other Government personnel, as appropriate, may meet periodically with the contractor to review the contractor's performance. At these meetings the Contracting Officer will apprise the contractor of how the Government views the contractor's performance and the contractor will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
4.9 Contracting Officer Representative (COR): A COR will be designated on purchase orders which are equal to or greater than $150,000 or when the complexity of the task necessitates the need for a COR. The (COR) will be identified by separate letter. The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the contractor performs the technical requirements of the contract: perform inspections necessary in connection with contract performance:
maintain written and oral communications with the contractor concerning technical aspects of the contract: issue written interpretations of technical requirements, including Government drawings, designs, specifications: monitor contractor's performance and notifies both the Contracting Officer and contractor of any deficiencies; coordinate availability of government furnished property, and provide site entry of contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the contractor, states the responsibilities and limitations of the COR, especially with regard to changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the contract or task order.
4.10 Contractor Key Personnel: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract.
4.11 Identification of Contractor Employees:
“Identification of Contractor Employees in the Federal Workplace (Aug 2008):
(a) The contractor shall provide each of its employees who will be involved in the performance of the contract, on a Government facility, with an identification (ID) badge. The ID badge shall clearly display the contractor’s name and the employee’s name and color photograph. The Contracting Officer or his/her designee shall approve the ID badge before the commencement of contract performance. It is the contractor’s responsibility to ensure that all contractor personnel wear the ID badge at all times when performing work under this contract at a Government facility. Unless otherwise specified in the contract, each contractor employee shall wear the ID badge in a conspicuous place on the front of their clothing and above their waist, except when safety or health reasons prohibit such placement. This requirement is in addition to any Government facility security provisions that require that a Government-issued security badge also be worn.
4.12 Contractor Travel: All travel costs should be included within each line item price in the contractors bid.
5. INSPECTIONS
5.1 Contractor Quality Control: The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein. The quality control individual, shall verify contract conformance of all work performed, to include reviewing each work leader's daily activity report to ensure that it is legible, understandable, and complete, and to notify the COR or Lake Manager of anything requiring immediate attention. The COR or Lake Manager may request additional quality control personnel at any time he or she feels that the Contractor's work is in danger of nonconformance, at no additional cost to the Government.
5.2 Quality Control Report: A Quality Control Report indicating daily activities, shall be submitted for the COR's or Lake Manager’s approval by Monday at 8:30 am for the previous work week. This report shall include (but not limited to) the following:
a. Name of Quality Control Inspector g. Deficiencies encountered
b. Date h. Corrective actions taken
c. Weather i. Safety violations
d. Time In/Time Out for each park j. List of damaged/missing receptacle
e. List of areas services k. Any facilities/areas closed
f. Receptacles not services l. List of non compactable items
5.3 Government Quality Assurance: The Government shall monitor the Contractor's service performance using the random sampling method, as described in attached, "Quality Assurance Surveillance Plan", (QASP). The Government reserves the right to alter or change the type of inspection plan at its discretion at any time, and to make deductions accordingly
5.4 Equipment and Supplies: The COR or Lake Manager may inspect required equipment, supplies at any time when in use on Government property. Any individual, crew, or equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the COR or Lake Manager. No such removal shall reduce the Contractor's obligation to perform all work required within the time scheduled under this contract.
This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.
5.5 Contractor Performance Defects, Deficiencies, and Performance: Defects and deficiencies in Contractor performance, and reperformance of same, shall be in accordance with a "Payment Analysis" addressed in the QASP, however, the Government reserves the right to use Contract Clause entitled "Inspection of Services" for this purpose in lieu of the payment analysis.
5.6 Performance Evaluation Meetings: The Contractor, his or her superintendent, quality control inspectors, or all, shall meet with the COR or Lake Manager, or his or her representative, periodically as determined necessary by the COR or Lake Manager, in order to discuss performance. However, a meeting shall be held not later than one normal workday after a Contract Deficiency Report (CDR) is issued. Mutual effort shall be made to resolve any and all problems identified.
6. SPECIFICATIONS FOR REFUSE/GARBAGE COLLECTION AND DISPOSAL SERVICE: The work shall consist of furnishing all labor, materials, and equipment necessary to provide, maintain, empty, and service refuse/garbage receptacles, and to pick up other specified refuse/garbage at the project. The number, location of receptacles, and frequencies of required services are provided in Attachments 3 and 4.
6.1 REFUSE/GARBAGE DISPOSAL Waste generated at Benbrook Lake is typically household-type materials, and may include the following:
6.1.1 HAZARDOUS WASTE - The Corps may generate small amounts of hazardous waste at the Project
Headquarters which includes the office and maintenance area. Because of the small amount of hazardous wastes being generated, the Corps of Engineers at Benbrook Project qualifies as a Conditionally Exempt Small Quantity Generator (CESQG). As a CESQG, the small amount of hazardous waste being generated may be accepted at a Type I municipal solid waste site provided the amount of waste does not exceed 220 pounds (100 kilograms) per month, and provided the landfill owner/operator is willing to accept the waste. In accordance with paragraph 1.10 of this contract, it is the contractor's responsibility to verify if the landfill proposed to use is willing to accept these small quantities of municipal hazardous waste. The Contractor shall be required to dispose of the small quantities of municipal hazardous waste placed in solid waste containers at the Project Headquarters and maintenance area compound at Benbrook Lake. The Corps of Engineers shall not place liquid hazardous waste in the solid waste containers and shall not require the Contractor to remove such waste.
6.1.2 SPECIAL WASTES -…