B3_Solicitation_Amd4.pdf

PDF 22 KB Posted

Attached to
Anapra Fence Replacement
Solicitation number
W9126G-15-B-0028
Issued by

View the file

Other files

File Type Posted
B3_Solicitation_Amd4_015000.pdf PDF
B3_Solicitation_Amd3.pdf PDF
B3_Solicitation_Amd3_051200.pdf PDF
B3_Solicitation_Amd3_Drawings.pdf PDF
B3_solicitation_AMD2.pdf PDF
B3_solicitation_AMD2_Appendix_V.pdf PDF
B3_solicitation_AMD1.pdf PDF
W9126G-15-B-0028_IFB_Anapra.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment adds paragraph 1.42 to Section 01 00 50 and changes the period of performance from 180 to 210 days after receipt of Notice to Proceed.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 2

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 04-Sep-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9126G-15-B-0028

X 9B. DATED (SEE ITEM 11)

12-Aug-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

04-Sep-2015

CODE

US ARMY CORPS OF ENGINEERS FORT WORTH

819 TAYLOR ST, RM 2A17

FORT WORTH TX 76102-0300

W9126G 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9126G-15-B-0028

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 11 00 - STANDARD FORM (SF) 1442 AND CLIN SCHEDULE

The contractor period of performance end date has increased by 30 days from 180 days to 210 days.

CLIN 0001

The CLIN extended description has changed from Approximately 3850 LF (as delineated in the Work Requirements) of primary fence removal and replacement with primary pedestrian fence along the US/Mexico International Border at Anapra, New Mexico. This includes all components necessary to complete the removal and construction, including all materials (except GFM), labor, and equipment. Other work associated with the construction includes a patrol road, retaining wall, culverts, and vehicle and drainage gates. The contractor is responsible for validating the number of linear feet of fence removal and replacement required prior to submission of a bid. Period of Performance is 180 calendar days after receipt of Notice to Proceed. to Approximately 3850 LF (as delineated in the Work Requirements) of primary fence removal and replacement with primary pedestrian fence along the US/Mexico International Border at Anapra, New Mexico. This includes all components necessary to complete the removal and construction, including all materials (except GFM), labor, and equipment. Other work associated with the construction includes a patrol road, retaining wall, culverts, and vehicle and drainage gates. The contractor is responsible for validating the number of linear feet of fence removal and replacement required prior to submission of a bid. Period of Performance is 210 calendar days after receipt of Notice to Proceed..

SECTION 00 73 00 - SPECIAL CONTRACT REQUIREMENTS

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 210 calendar days after the date the Contractor receives the notice to proceed. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)