UNIT
PRICE TOTAL
1 JB SUM 196,127.00
1 JB SUM 131,889.00
9,500 CY 22.00 209,000.00
8,600 CY 16.13 138,718.00
4,500 TON 59.19 266,355.00
27,000 SY 7.69 207,630.00
28,000 TON 85.27 2,387,560.00
45,000 TON 114.07 5,133,150.00
1 JB SUM* 7,000.00
8,677,429.00
1 JB SUM 6,673.00
4,500 TON 46.48 209,160.00
1 JB SUM* 3,000.00
$218,833.00
ABSTRACT OF OFFERS Page 1 of 3
Solicitation No.: W9126G-15-B-0014 Date Issued: 19 MAY 15 Date Opened: 23 JUN 15 Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement - Houston Ship Channel, Texas, Mid Bay Placement Area and Placement Area 15, Shoreline Stabilization in Chambers County Texas.
TOTAL OPTION NO. 1
Mobilization and Demobilization, Mid Bay Placement Area
Mobilization and Demobilization, PA 15
Excavation for Stone Placement, Mid Bay Placement Area
Stockpile Removed Stone at PA 14**
Number of Amendments Issued: 0001 and 0002
Government Estimate (Without Profit)
NO.
DESCRIPTION QUANTITY
OPTION NO. 1
TOTAL SCHEDULE NO. 1
TOTAL SCHEDULE NO 1 & OPTION NO 1
SCHEDULE NO. 1ITEM
Final As-Built Drawings, Mid Bay and PA 15 Shoreline Stabilization (* Minimum $7,000.00)
Mobilization and Demobilization Marsh Cell M10
Excavation for Stone Placement, PA 15
Riprap (210 to 3,565 lbs), Mid Bay Placement Area and
PA 15
Final As-Built Drawings, Marsh Cell M10 (* Minimum $3,000.00)
0006 Geotextile, Mid Bay and PA 15
Blanket Stone (1/2" to 200 lbs), Mid Bay Placement Area and PA 15
Reuse Removed Stone, Placement at Marsh Cell M10 (Additive to Bid Item 0005) **
$8,896,262.00
TOTAL SCHEDULE NO. 1 & OPTION NO. 1
MARIA E. RODRIGUEZ
CONTRACTING OFFICER
* The apparent low bidder, Bertucci Contracting Company, LLC is 30% below the Government's Estimate. The Corps received a bid from a HubZone Small Business.
The HubZone Small Business concern's offer is more than 10 percent higher than the lowest large business offer, therefore, the HubZone Price Evaluation Preference is NOT applied.
I CERTIFY THAT I HAVE OPENED, READ, AND RECORDED ON THIS ABSTRACT ALL OFFERS RECEIVED IN RESPONSE TO THIS SOLICITATION.
* Denotes the minimum lump sum price allowed on this item.
** Bid Item 0011 represents the same stone tonnage (4,500 tons) as it applies to FAR Clause 52.211-18 VARIATION IN ESTIMATED QUANTITY. Bid Item No. 0011 shall reflect only the difference in cost with respect to Bid Item No. 0005 to place stone removed from the Mid Bay placement area and PA 15 and placing it along Marsh Cell M10 instead of taking the stone to the designated Stockpile Area at PA 14. Any stone stockpiled at the designated Stockpile Area before Option No. 1 has been exercised will remain there. The Contractor will not be required to take previously disposed stone from the Stockpile Area to build the shore protection along Marsh Cell M10 containment dike after the option is exercied, if it is exercised.
1 JB SUM 200,000.00
1 JB SUM 25,000.00
9,500 CY 51.00 484,500.00
8,600 CY 51.00 438,600.00
4,500 TON 34.00 153,000.00
27,000 SY 9.00 243,000.00
28,000 TON 62.00 1,736,000.00
45,000 TON 71.00 3,195,000.00
1 JB SUM* 10,000.00
6,485,100.00
1 JB SUM 10,000.00
4,500 TON 2.00 9,000.00
1 JB SUM* 7,000.00
$26,000.00
$6,511,100.00
Solicitation No.: W9126G-15-B-0014 Date Issued: 19 MAY 15 Date Opened: 23 JUN 15
Excavation for Stone Placement, PA 15
Stockpile Removed Stone at PA 14**
ITEM SCHEDULE NO. 1
Excavation for Stone Placement, Mid Bay Placement
Mobilization and Demobilization, PA 15
Riprap (210 to 3,565 lbs), Mid Bay Placement Area and
PA 15
QUANTITY
0001 Mobilization and Demobilization, Mid Bay Placement A
DESCRIPTIONNO.
ABSTRACT OF OFFERS (CONT'D) Page 2 of 3
Offeror: #1 - LUHR BROS., INC., PO BOX 50, COUMBIA, IL 62236 Business Size: LARGE BUSINESS
0010 Mobilization and Demobilization Marsh Cell M10
Final As-Built Drawings, Marsh Cell M10 (* Minimum $3,000.00)
TOTAL OPTION NO. 1
Project Title: Unrestricted Procurement - Houston Ship Channel, Texas, Mid Bay Placement Area and Placement Area 15, Shoreline Stabilization in Chambers County Texas.
Issuing Office: USAED-Galveston
OPTION NO. 1
Blanket Stone (1/2" to 200 lbs), Mid Bay Placement Area and PA 15
Geotextile, Mid Bay and PA 15
Reuse Removed Stone, Placement at Marsh Cell M10 (Additive to Bid Item 0005) **
Final As-Built Drawings, Mid Bay and PA 15 Shoreline Stabilization (* Minimum $7,000.00)
TOTAL SCHEDULE NO. 1 & OPTION NO. 1
TOTAL SCHEDULE NO. 1
UNIT
PRICE TOTAL
1 JB SUM 105,138.00
1 JB SUM 94,416.00
9,500 CY 60.00 570,000.00
8,600 CY 60.00 516,000.00
4,500 TON 43.50 195,750.00
27,000 SY 3.25 87,750.00
28,000 TON 154.00 4,312,000.00
45,000 TON 156.00 7,020,000.00
1 JB SUM* 29,569.00
12,930,623.00
1 JB SUM 152,000.00
4,500 TON 69.00 310,500.00
1 JB SUM* 17,250.00
$479,750.00
$13,410,373.00
0002 Mobilization and Demobilization, PA 15
ITEM SCHEDULE NO. 1
TOTAL SCHEDULE NO. 1 & OPTION NO. 1
TOTAL OPTION NO. 1
Final As-Built Drawings, Marsh Cell M10 (* Minimum $3,000.00)
OPTION NO. 1
Final As-Built Drawings, Mid Bay and PA 15 Shoreline Stabilization (* Minimum $7,000.00)
Mobilization and Demobilization Marsh Cell M10
Reuse Removed Stone, Placement at Marsh Cell M10 (Additive to Bid Item 0005) **
Stockpile Removed Stone at PA 14**
Excavation for Stone Placement, Mid Bay Placement Area
NO.
Blanket Stone (1/2" to 200 lbs), Mid Bay Placement Area and PA 15
Excavation for Stone Placement, PA 15
Riprap (210 to 3,565 lbs), Mid Bay Placement Area and
PA 15
DESCRIPTION
TOTAL SCHEDULE NO. 1
Offeror: #2 - SHORELINE FOUNDATION, INC. 2781 SW 56TH AVENUE, PEMBROKE PARK, FL 33023 Business Size: SMALL BUSINESS
QUANTITY
Mobilization and Demobilization, Mid Bay Placement
0006 Geotextile, Mid Bay and PA 15
1 JB SUM 175,000.00
1 JB SUM 12,786.00
9,500 CY 20.00 190,000.00
8,600 CY 20.00 172,000.00
4,500 TON 10.00 45,000.00
27,000 SY 5.00 135,000.00
28,000 TON 73.50 2,058,000.00
45,000 TON 75.50 3,397,500.00
1 JB SUM* 7,000.00
6,192,286.00
1 JB SUM 10,000.00
4,500 TON 5.00 22,500.00
1 JB SUM* 3,000.00
$35,500.00
Business Size: LARGE BUSINESS
ITEM SCHEDULE NO. 1
NO. DESCRIPTION QUANTITY
TOTAL SCHEDULE NO. 1
Reuse Removed Stone, Placement at Marsh Cell M10 (Additive to Bid Item 0005) **
TOTAL OPTION NO. 1
Final As-Built Drawings, Mid Bay and PA 15 Shoreline Stabilization (* Minimum $7,000.00)
Final As-Built Drawings, Marsh Cell M10 (* Minimum $3,000.00)0012
Blanket Stone (1/2" to 200 lbs), Mid Bay Placement Area and PA 15
Mobilization and Demobilization Marsh Cell M10
Riprap (210 to 3,565 lbs), Mid Bay Placement Area and
PA 15
Geotextile, Mid Bay and PA 15
Excavation for Stone Placement, PA 15
OPTION NO. 1
ABSTRACT OF OFFERS (CONT'D) Page 3 of 3
Mobilization and Demobilization, PA 15
Offeror: *#3 - BERTUCCI CONTRACTING COMPANY, LLC, PO BOX 10582, JEFFERSON, LOUISIANA 70181
Stockpile Removed Stone at PA 14**
Excavation for Stone Placement, Mid Bay Placement Area
Solicitation No.: W9126G-15-B-0014 Date Issued: 19 MAY 15 Date Opened: 23 JUN 15
Issuing Office: USAED-Galveston Project Title: Unrestricted Procurement - Houston Ship Channel, Texas, Mid Bay Placement Area and Placement Area 15, Shoreline Stabilization in Chambers County
Mobilization and Demobilization, Mid Bay Placement Area
$6,227,786.00
UNIT
PRICE TOTAL
1 JB SUM 702,000.00
1 JB SUM 226,000.00
9,500 CY 20.50 194,750.00
8,600 CY 14.50 124,700.00
4,500 TON 10.00 45,000.00
27,000 SY 7.00 189,000.00
28,000 TON 150.00 4,200,000.00
45,000 TON 140.00 6,300,000.00
1 JB SUM* 7,000.00
11,988,450.00
1 JB SUM 234,000.00
4,500 TON 20.50 92,250.00
1 JB SUM* 3,000.00
$329,250.00
$12,317,700.00
Offeror: #4 - AQUA TERRA CONTRACTING, LLC, 1400 EVERMAN PKWY, SUITE 127, FORT WORTH, TEXAS 76140 Business Size: SMALL BUSINESS/HUBZONE
QUANTITY
Mobilization and Demobilization, Mid Bay Placement A
Final As-Built Drawings, Marsh Cell M10 (* Minimum $3,000.00)
Final As-Built Drawings, Mid Bay and PA 15 Shoreline Stabilization (* Minimum $7,000.00)
TOTAL SCHEDULE NO. 1
NO. DESCRIPTION
OPTION NO. 1
0002 Mobilization and Demobilization, PA 15
0004 Excavation for Stone Placement, PA 15 0003 Excavation for Stone Placement, Mid Bay Placement
A
Geotextile, Mid Bay and PA 15
Riprap (210 to 3,565 lbs), Mid Bay Placement Area and
PA 15
TOTAL SCHEDULE NO. 1 & OPTION NO. 1
TOTAL SCHEDULE NO. 1 & OPTION NO. 1
ITEM SCHEDULE NO. 1
TOTAL OPTION NO. 1
Stockpile Removed Stone at PA 14**
Blanket Stone (1/2" to 200 lbs), Mid Bay Placement Area and PA 15
0010 Mobilization and Demobilization Marsh Cell M10
Reuse Removed Stone, Placement at Marsh Cell M10 (Additive to Bid Item 0005) **