Performance Work Statement for Upgrade of Tenney Walk-In Chamber.
1.0 Requirements Overview
The cooling and heating capability of a 10'X10' walk-in chamber (Mfr. – Tenney, Model # WITR) will be increased in order to achieve a minimum average of 2°C/minute cooling and heating rate (while the chamber is empty). The current cooling rate of the chamber is less than .5°C/minute, with the heating rate at less than 1°C/min. In order to achieve the requested rates, a few modifications will be required which could include, but not limited to, compressor replacement, new blower/circulation fans, evaporator updates and new/additional heating elements. The physical structure of the chamber and the system controllers should remain unmodified and will be integrated into the upgraded chamber. When the project is complete, the chamber will be controlled solely by its current integrated controller, maintain its current temperature range of -45°C to +82°C with a humidity range of 20-95 percent (in dry bulb range of +20°C to +82°C), and meet the minimum average temperature ramp rate of 2°C/minute (within the temperature range of 70°C to -40°C). The contractor shall be responsible to provide all materials, tools, and labor required to remove the current parts and to upgrade the system.
2.0 Performance
• The chamber upgrade will be performed on a 10’X10’ Tenney Chamber
(Model WITR; S/N 0712000051).
• The replacement refrigeration pack/skid shall be located in the rear of the chamber and must be no larger than 64” L X 44” W.
• Cooling within the temperature range of 70°C to -40°C at a minimum average rate of 2°C/min.
• Heating within the temperature range of -40°C to 70°C at a minimum average rate of 2°C/min.
• The chamber will be controlled solely by its current integrated controller.
• The chamber will maintain its current temperature range of -45°C to +82°C with a humidity range of 20-95% (in dry bulb range of +20°C to +82 °C).
3.0 Documentation
• Manufacturer manuals/operating Instructions, functional descriptions, parts lists, recommended spares, listing of consumables, technical data/specification sheets, maintenance instructions, troubleshooting guide, and accessory list shall be provided via one printed hardcopy and one electronic format.
• Electronic documentation provided via removable storage media (thumb/jump drive, PDF or on a CD) shall be provided in either Microsoft Word or Adobe format.
4.0 Delivery and Installation
• All equipment shall be delivered to the PSCC testing facility located in building 2, bay 5 at Tobyhanna Army Depot (11 Hap Arnold Blvd., Tobyhanna, PA 18466) at the contractor’s expense. The contractor shall indicate if item will be delivered to ground level via the shipping company (i.e., crane-equipped truck), or if item will be delivered to dock level. Note.
Dock door size is 8 feet wide by 10 feet high.
• As part of contract proposal, the contractor shall provide a detailed listing of all installation requirements to include, as a minimum, utility, floor-space, foundation, and clearance requirements.
• The government will provide a clear path for the removal and installation of the new refrigeration components in the rear of the chamber.
• The contractor shall connect the electrical input to the existing disconnect switch. The final water, air and drain connections shall be connected by the government to inputs of the new system provided by the contractor.
• The contractor shall be responsible to provide all materials, tools, and labor required to remove the current parts and upgrade the system.
• Deliveries shall be made between the hours of 7 a.m. and 4 p.m., Monday through Friday, excluding all Federal holidays, on a date that is mutually agreed upon by PSCC and the contractor.
• Work hours shall be limited to the hours of 7 a.m. and 4 p.m., Monday through Friday, excluding all Federal holidays, on a date that is mutually agreed upon by PSCC and the contractor.
• The contractor shall provide a pre-delivery notice to the Government Contracting Officer’s Representative (COR) or on-site Contracting Officer’s Technical Representative.
• The government will move the crated system from the delivery dock area to the installation location or from ground-level to the installation location, if necessary
• The contractor shall dispose of all packaging material.
• All parts and equipment removed/replaced from the system will remain property of the government.
• All work, including acceptance testing and training, shall be accomplished within the period of performance.
5.0 Acceptance testing
• Acceptance testing will occur on-site within 5 business days following installation and can occur concurrently with training. Acceptance testing will be observed by the Government Contracting Officer’s Representative (COR) or on-site Contracting Officer’s Technical Representative (COTR) and will require the contractor to demonstrate successful operation of the unit, including features/functionality listed under performance section of this document.
Cooling within the full temperature range of 70°C to -40°C at a minimum rate of 2°C/min.
Heating within the full temperature range of -40°C to 70°C at a minimum rate of 2°C/min.
Test the full range of temperature (-45°C to +82°C) and humidity (20- 95%) as specified by the original equipment manufacturer.
6.0 Training
• Training will be provided within 5 business days following installation, and can occur concurrently with acceptance testing. The training will have an approximate class size of five personnel. Training must include:
Hands-on, step-by-step instructions with references to applicable user manual information and test method standards listed herein.
Instruction on the systems safety procedures and features.
Instruction geared specifically toward system maintenance and upkeep.
This training shall acquaint system users/maintainers with the preventative measures necessary to provide optimum performance and maximum system life.
7.0 Safety Requirements
• Personnel are required to follow all safety rules and regulations while on site, which includes wearing proper Personal Protective Equipment (PPE) including, but not limited to, safety shoes, safety glasses, gloves, etc., and following Lockout/Tagout Procedures.
• All equipment provided shall meet or exceed applicable safety standards and requirements.
8.0 Personnel Preparedness
• Personnel working on retrofit should have a skilled working knowledge of equipment and instrumentation and be prepared with the necessary tools to perform the installation.
9.0 Warranty
• The contractor shall provide a minimum of one (1) year warranty on parts and on-site labor for all performance requirements.
• The contractor shall provide a listing of all procedure that need to be carried out as part of preventative maintenance (PM) and the suggested frequency of the PM.
10.0 Period of Performance
• The period of performance shall not exceed 120 days after contract award date.
11.0 Antiterrorism (AT)/Operations Security (OPSEC) Requirements
11.1 Antiterrorism (AT) Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training prior to contract report date. This training is required for any additional or new contractor employees, who start after that period. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee, to the COR/POC within 10 calendar days after completion of training by all employees and subcontractor personnel. AT level I awareness training is available at the following website:
https://jkodirect.jten.mil for CAC holders. Non-CAC holders may go to http://jko.jten.mil/courses/atl1/launch.html for their training.
11.2 Access and general protection/security policy and procedures.
Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce https://jkodirect.jten.mil/ http://jko.jten.mil/courses/atl1/launch.html must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
11.3 Access and General Protection/Security Policy and Procedures.
Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by the government representative), or, at OCONUS locations, in accordance with status of forces agreements and other theater regulations.
11.4 iWATCH Army Training. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH Army Program.
This will consist of utilizing the tools and media products on the informational iWATCH Army website to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR/POC. The iWATCH training is available at the following website:
https://myarmyonesource.com select Family Programs and Services, in the drop down boxes select: Go To, iWATCH Army –“See Something, Say Something”, and select iWatch Training for Contractors. This training shall be completed prior to entering the facility to start work, and the COR/POC will be notified within 10 calendar days of start date. The contractor shall notify the COR/POC within 10 calendar days of the completed training for any new employees or subcontractor personnel.
https://myarmyonesource.com/
| 1.0 Requirements Overview |
| 2.0 Performance |
| The chamber upgrade will be performed on a 10’X10’ Tenney Chamber (Model WITR; S/N 0712000051). |
| The replacement refrigeration pack/skid shall be located in the rear of the chamber and must be no larger than 64” L X 44” W. |
| Cooling within the temperature range of 70 C to -40 C at a minimum average rate of 2 C/min. |
| Heating within the temperature range of -40 C to 70 C at a minimum average rate of 2 C/min. |
| The chamber will be controlled solely by its current integrated controller. |
| The chamber will maintain its current temperature range of -45 C to +82 C with a humidity range of 20-95% (in dry bulb range of +20 C to +82 C). |
| 3.0 Documentation |
| Manufacturer manuals/operating Instructions, functional descriptions, parts lists, recommended spares, listing of consumables, technical data/specification sheets, maintenance instructions, troubleshooting guide, and accessory list shall be provided... |
| Electronic documentation provided via removable storage media (thumb/jump drive, PDF or on a CD) shall be provided in either Microsoft Word or Adobe format. |
| 4.0 Delivery and Installation |
| All equipment shall be delivered to the PSCC testing facility located in building 2, bay 5 at Tobyhanna Army Depot (11 Hap Arnold Blvd., Tobyhanna, PA 18466) at the contractor’s expense. The contractor shall indicate if item will be delivered to g... |
| As part of contract proposal, the contractor shall provide a detailed listing of all installation requirements to include, as a minimum, utility, floor-space, foundation, and clearance requirements. |
| The government will provide a clear path for the removal and installation of the new refrigeration components in the rear of the chamber. |
| The contractor shall connect the electrical input to the existing disconnect switch. The final water, air and drain connections shall be connected by the government to inputs of the new system provided by the contractor. |
| The contractor shall be responsible to provide all materials, tools, and labor required to remove the current parts and upgrade the system. |
| Deliveries shall be made between the hours of 7 a.m. and 4 p.m., Monday through Friday, excluding all Federal holidays, on a date that is mutually agreed upon by PSCC and the contractor. |
| Work hours shall be limited to the hours of 7 a.m. and 4 p.m., Monday through Friday, excluding all Federal holidays, on a date that is mutually agreed upon by PSCC and the contractor. |
| The contractor shall provide a pre-delivery notice to the Government Contracting Officer’s Representative (COR) or on-site Contracting Officer’s Technical Representative. |
| The government will move the crated system from the delivery dock area to the installation location or from ground-level to the installation location, if necessary |
| The contractor shall dispose of all packaging material. |
| All parts and equipment removed/replaced from the system will remain property of the government. |
| All work, including acceptance testing and training, shall be accomplished within the period of performance. |
| 5.0 Acceptance testing |
| Acceptance testing will occur on-site within 5 business days following installation and can occur concurrently with training. Acceptance testing will be observed by the Government Contracting Officer’s Representative (COR) or on-site Contracting Of... |
| Cooling within the full temperature range of 70 C to -40 C at a minimum rate of 2 C/min. |
| Heating within the full temperature range of -40 C to 70 C at a minimum rate of 2 C/min. |
| Test the full range of temperature (-45 C to +82 C) and humidity (20-95%) as specified by the original equipment manufacturer. |
| 6.0 Training |
| Training will be provided within 5 business days following installation, and can occur concurrently with acceptance testing. The training will have an approximate class size of five personnel. Training must include: |
| Hands-on, step-by-step instructions with references to applicable user manual information and test method standards listed herein. |
| Instruction on the systems safety procedures and features. |
| Instruction geared specifically toward system maintenance and upkeep. This training shall acquaint system users/maintainers with the preventative measures necessary to provide optimum performance and maximum system life. |
| 7.0 Safety Requirements |
| Personnel are required to follow all safety rules and regulations while on site, which includes wearing proper Personal Protective Equipment (PPE) including, but not limited to, safety shoes, safety glasses, gloves, etc., and following Lockout/Tagou... |
| All equipment provided shall meet or exceed applicable safety standards and requirements. |
| 8.0 Personnel Preparedness |
| Personnel working on retrofit should have a skilled working knowledge of equipment and instrumentation and be prepared with the necessary tools to perform the installation. |
| 9.0 Warranty |
| The contractor shall provide a minimum of one (1) year warranty on parts and on-site labor for all performance requirements. |
| The contractor shall provide a listing of all procedure that need to be carried out as part of preventative maintenance (PM) and the suggested frequency of the PM. |
| 10.0 Period of Performance |
| 11.0 Antiterrorism (AT)/Operations Security (OPSEC) Requirements |