W9124M22B0001.pdf
PDF 2 MB Posted
- Attached to
- Uplands Requirement
- Solicitation number
- W9124M22B0001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0011672465
PROJECT NO: YL-026-9J
PROJECT TITLE: Training Land Sustainment Uplands Requirement PROJECT LOCATION: Fort Stew art and Hunter Army Airf ield Georgia SET ASIDE: 8(a) competitive NAICS CODE: 238910 Site Preparation Contractors SIZE STANDARD: $16.5 Million MAGNITUDE OF CONSTRUCTION PROJECT: The estimated value of the proposed w ork is betw een $1,000,000 and $6,000,000 All w ork shall be completed per Scope of Work, Terms, Conditions, Provisions, Clauses, Draw ings and Specifications.
SITE VISIT: April 26, 2022 at 1230 Location is as follow :
Range Control parking lot, Intersection of GS HWY 144E and Old Sunbury Road, Fort Stew art, GA. POC is Drew Brow n - cell phone number 912-210-9003 DUE DATE FOR ALL QUESTIONS: April 29, 2022 BID OPENING: May 31, 2022 at 1400 Location: 976 William H. Wilson Ave. Ste. 100 Building 621, Fort Stew art, GA 1st Floor Main Conference Room BID BONDS: Required
** Instructions for the preparation of Bids are located in Section L.
X
MELVIN F. REID 912-767-5997
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS
NEGOTIATED
01-Apr-2022
(RFP)
(IFB)
CALL:
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
See Item 7
2. TYPE OF SOLICITATION
SEALED BID
3. DATE ISSUED
9. FOR INFORMATION A. NAME
SOLICITATION
NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
11. The Contractor shall begin performance w ithin _______10 calendar days and complete it w ithin ________365 calendar days after receiving aw ard, X notice to proceed. This performance period is X mandatory, negotiable. (See _________________________52.211-10
12 A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
X YES NO
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. Sealed offers in original and __________1 copies to perform the w ork required are due at the place specif ied in Item 8 by ___________ local time ______________31 May 2022 (date). If this is a sealed bid solicitation, offers must be publicly opened at that time.
shall be marked to show the offeror's name and address, the solicitation number, and the date and time of fers are due.
B. An offer guarantee X is, is not required.
C. All offers are subject to the (1) w ork requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
D. Offers providing less than _______60 calendar days for Government acceptance after the date offers are due w ill not be considered and w ill be rejected.
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
7. ISSUED BY CODE
MICC - FORT STEWART
976 WILLIAM H. WILSON AVE SUITE 100
FORT STEWART GA 31314
W9124M
PAGE OF PAGES
1 OF
CODE
(Title, identifying no., date):
12B. CALENDAR DAYS
02:00 PM (hour)
Sealed envelopes containing offers
5. REQUISITION/PURCHASE REQUEST NO. 6. PROJECT NO.
8. ADDRESS OFFER TO (If Other Than Item 7)
FAX:TEL: (912)767-8420 TEL: FAX:
W9124M22B0001 101
20B. SIGNATURE
(REV. 4-85)STANDARD FORM 1442 BACK
TO SIGN
NSN 7540-01-155-3212
SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)
CODE FACILITY CODE
17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.
the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS SEE SCHEDULE OF PRICES
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN
OFFER (Type or print)
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
(4 copies unless otherwise specified)
CODE
(Insert any number equal to or greater than
20C. OFFER DATE
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) 41 U.S.C. 253(c)
CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY
(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)
See Item 14
(Include only if different than Item 14)16. REMITTANCE ADDRESS
30B. SIGNATURE
29. AWARD (Contractor is not required to sign this document.)
document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .
gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)
30C. DATE
(Type or print)
TEL: EMAIL:
31B. UNITED STATES OF AMERICA 31C. AWARD DATE
BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
(Contractor is required to sign this28. NEGOTIATED AGREEMENT
(M ust be fully completed by offeror)OFFER
W9124M22B0001
Section A - Solicitation/Contract Form
TABLE OF CONTENTS
PART I – THE SCHEDULE
• SECTION A – Solicitation/Contract Form
• SECTION B – Supplies or Services and Prices/Costs
• SECTION C – Descriptions/Specifications/Statement of Work
• SECTION D – N/A
• SECTION E – Inspection and Acceptance
• SECTION F – Description and Performance
• SECTION G – Contract Administration Data
• SECTION H – Special Contract Requirements
PART II – CONTRACT CLAUSES
SECTION I – Contract Clauses
PART III – LIST OF DOCUMENTS, EXIBITS AND OTHER ATTACHMENTS
SECTION J – List of Exhibits, Attachments, and Appendices
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K – Representations, Certifications and Other Statements of Offerors or
Respondents SECTION L – Solicitation Provisions SECTION M – Evaluation Factors for Award
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job
0001 BASE YEAR TRAINING LAND SUSTAINMENT
FFP
0001 BASE YEAR TRAINING LAND SUSTAINMENT
FOB: Destination
PURCHASE REQUEST NUMBER: 0011672465
PSC CD: 3695
NET AMT
1001 1 Job
OPTION 1001 OPTION YEAR 1 TNG LAND SUSTAINMENT
FFP
1001 OPTION YEAR 1 TNG LAND SUSTAINMENT
FOB: Destination
2001 1 Job
OPTION 2001 OPTION YEAR TNG LAND SUSTAINMENT
FFP
2001 OPTION YEAR TNG LAND SUSTAINMENT
FOB: Destination
3001 1 Job
OPTION 3001 OPTION YEAR 3 TNG LAND SUSTAINMENT
FFP
3001 OPTION YEAR 3 TNG LAND SUSTAINMENT
FOB: Destination
4001 1 Job
OPTION 4001 OPTION YEAR 4 LAND SUSTAINMENT
FFP
4001 OPTION YEAR 4 LAND SUSTAINMENT
FOB: Destination
BID PRICE SCHEDULE
Base
Reference Number
Bid Item Name UM Est.
Qty.Note:
Not guarantee Min or Max Quantity
Item Num ber
UM
Price
Total Bid Item Price
111-01 EROSION CONTROL BLANKET SY 2 0001
112-01 GEOTEXTILE, WOVEN SY 2805 0002
112-02 GEOTEXTILE, NONWOVEN SY 2 0003
113-01 SEDIMENT LOG, 9 INCH LF 300 0004
113-02 SEDIMENT LOG, 12 INCH LF 1770 0005
113-03 SEDIMENT LOG, 20 INCH LF 270 0006
114-01 SILT FENCE, TYPE A LF 1 0007
114-02 SILT FENCE, TYPE B LF 150 0008
114-03 SILT FENCE, TYPE C LF 585 0009
121-01 FINISHED SEEDING, PERMANENT ACR
E
6.79 0010
121-02 FINISHED SEEDING, NATIVE ACR
22.8 0011
121-03 NATIVE RE-VEGETATION ACR
125 0012
131-01 EARTH FILL CY 314 0013
131-02 EARTH FILL WITH COMPACTION CY 2700 0014
132-01 EXCAVATION CY 365 0015
132-02 CLEAN OUT SILT AND SEDIMENT BASINS CY 75 0016
132-03 STRUCTURE REMOVAL CY 27 0017
133-01 DIVERSION & DITCH CUTOUTS LF 725 0018
134-01 SMOOTHING SY 32000 0019
134-02 SMOOTHING WITH AREA COMPACTION SY 50 0020
135-01 HAULING CY/
MI
345 0021
136-01 DEEP HARROWING ACR
2 0022
141-01 AGGREGATE COARSE, GRADED AGGREGATE BASE CO
URSE [GABC]
TN 1700 0023
141-02 AGGREGATE COARSE, #4 TN 1 0024
141-03 AGGREGATE COARSE, #4 MODIFIED TN 2 0025
141-04 AGGREGATE COARSE, #57 TN 3 0026
142-01 RIP RAP, TYPE 1 TN 2 0027
142-02 RIP RAP, TYPE 3 TN 191 0028
142-03 ROCK EMBANKMENT TN 2 0029
151-01 TYPE I SITE PREPARATION (CLEAR AND GRUB) ACR
17 0030
152-01 TYPE II SITE PREPARATION (CLEARING) ACR
35 0031
153-01 TYPE III SITE PREPARATION (MIDSTORY VEGETATION
CONTROL <6" DBH)
ACR
450 0032
154-01 TYPE IV SITE PREPARATION (UNDERSTORY VEGETATI
ON CONTROL)
ACR
75 0033
155-01 TYPE V SITE PREPARATION (FELLING AND BUNCHING
STANDING TIMBER)
CY 20 0034
161-01 INSTALL READY MIX CONCRETE CY 2 0035
161-02 INSTALL READY MIX CONCRETE with FIBER ADDITIVE CY 1 0036
161-03 INSTALL 700 FLEXURAL STRENGTH CONCRETE CY 2 0037
161-04 INSTALL 700 FLEXURAL STRENGTH CONCRETE with FIB
ER ADDITIVE
CY 475 0038
161-05 INSTALL GENERAL CONCRETE CY 3 0039
161-06 INSTALL GENERAL CONCRETE with FIBER ADDITIVE CY 2 0040
161-07 INSTALL EXPANSION JOINTS WITH SEALANT LF 3 0041
161-08 INSTALL SAWED JOINTS WITH SEALANT LF 1 0042
161-09 INSTALL CONTRACTION JOINTS WITH SEALANT LF 225 0043
161-10 INSTALL LONGITUDINAL CONSTRUCTION JOINTS WIT
H SEALANT
LF 2 0044
161-11 INSTALL TRANSVERSE CONSTRUCTION JOINTS WITH S
EALANT
LF 1 0045
161-12 INSTALL REINFORCING STEEL LF 200 0046
161-13 INSTALL WELDED WIRE FABRIC SF 2 0047
161-14 INSTALL 1” DIAMETER DOWEL X 16” LONG EA 50 0048
162-01 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
CC35
SF 2 0049
162-02 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
CC35 WITH AGGREGATE COURSE UNDERLAYMENT
SF 3 0050
162-03 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
CC70
SF 2 0051
162-04 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
CC70 WITH AGGREGATE COURSE UNDERLAYMENT
SF 3 0052
162-05 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
CC90
SF 1 0053
162-06 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
CC90 WITH AGGREGATE COURSE UNDERLAYMENT
SF 1 0054
162-07 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
YSTEM-CC35
SF 3 0055
162-08 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
YSTEM-
SF 2 0056
162-09 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
YSTEM –CC70
SF 2 0057
162-10 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 1 0058
162-11 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
YSTEM –CC90
SF 2 0059
162-12 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 2 0060
171-01 INSTALL GEOCELL SYSTEM SF 200 0061
171-02 INSTALL GEOCELL SYSTEM WITH AGGREGATE COURS
E UNDERLAYMENT
SF 800 0062
171-03 REPLACE/INSTALL GEOCELL SYSTEM SF 400 0063
171-04 REPLACE/INSTALL GEOCELL SYSTEM WITH AGGREGA
TE COURSE UNDERLAYMENT
SF 3 0064
181-01 REINFORCED ROUND CONCRETE PIPE-15" DIAMETER LF 1 0065
181-02 REINFORCED ROUND CONCRETE PIPE-18" DIAMETER LF 2 0066
181-03 REINFORCED ROUND CONCRETE PIPE-24" DIAMETER LF 2 0067
181-04 REINFORCED ROUND CONCRETE PIPE-30" DIAMETER LF 3 0068
181-05 REINFORCED ROUND CONCRETE PIPE-36" DIAMETER LF 40 0069
181-06 REINFORCED ROUND CONCRETE PIPE-42" DIAMETER LF 2 0070
181-07 REINFORCED ROUND CONCRETE FLARED END SECTIO
N-15"
EA 2 0071
181-08 REINFORCED ROUND CONCRETE FLARED END SECTIO
N-18"
EA 2 0072
181-09 REINFORCED ROUND CONCRETE FLARED END SECTIO
N-24"
EA 2 0073
181-10 REINFORCED ROUND CONCRETE FLARED END SECTIO
N-30"
EA 2 0074
181-11 REINFORCED ROUND CONCRETE FLARED END SECTIO
N-36"
EA 2 0075
181-12 REINFORCED ROUND CONCRETE FLARED END SECTIO
N-42"
EA 2 0076
181-13 REINFORCED CONCRETE ELLIPTICAL PIPE 23”X14” LF 2 0077
181-14 REINFORCED CONCRETE ELLIPTICAL PIPE 30”X19” LF 1 0078
181-15 REINFORCED CONCRETE ELLIPTICAL PIPE 38”X24” LF 2 0079
181-16 REINFORCED CONCRETE ELLIPTICAL PIPE 45”X29” LF 3 0080
181-17 REINFORCED CONCRETE ELLIPTICAL PIPE 53”X34” LF 3 0081
181-18 REINFORCED CONCRETE ELLIPTICAL PIPE-
MITERED END SECTION 23”X14”
EA 2 0082
181-19 REINFORCED CONCRETE ELLIPTICAL PIPE-
MITERED END SECTION 30”X19”
EA 2 0083
181-20 REINFORCED CONCRETE ELLIPTICAL PIPE-
MITERED END SECTION 38”X24”
EA 2 0084
181-21 REINFORCED CONCRETE ELLIPTICAL PIPE-
MITERED END SECTION 45”X29”
EA 2 0085
181-22 REINFORCED CONCRETE ELLIPTICAL PIPE-
MITERED END SECTION 53”X34”
EA 2 0086
181-23 ALUMINUM CORRUGATED PIPE, ROUND-18” DIAMETER LF 1 0087
181-24 ALUMINUM CORRUGATED PIPE, ROUND-24” DIAMETER LF 2 0088
181-25 ALUMINUM CORRUGATED PIPE, ROUND-30” DIAMETER LF 3 0089
181-26 ALUMINUM CORRUGATED PIPE, ROUND-36” DIAMETER LF 2 0090
181-27 ALUMINUM CORRUGATED PIPE, ROUND-42” DIAMETER LF 1 0091
181-28 ALUMINUM CORRUGATED PIPE, ARCH 21"X15" LF 3 0092
181-29 ALUMINUM CORRUGATED PIPE, ARCH 28"X20" LF 2 0093
181-30 ALUMINUM CORRUGATED PIPE, ARCH 35"X24" LF 1 0094
181-31 ALUMINUM CORRUGATED PIPE, ARCH 42"X29" LF 1 0095
181-32 ALUMINUM CORRUGATED PIPE, ARCH 49”X33” LF 2 0096
191-01 INSTALL SEIBERT STAKES EA 120 0097
192-01 NON-PREPRICED ITEMS EA 1 0098
Est. Annual Total:
OPTION 1
Number
Bid Item Name UM Est.
Qty.Note:
Not guarantee Min or Max Quantity
Item Num ber
UM
Price
Total Bid
111-01 EROSION CONTROL BLANKET SY 2 1001
112-01 GEOTEXTILE, WOVEN SY 2805 1002
112-02 GEOTEXTILE, NONWOVEN SY 2 1003
113-01 SEDIMENT LOG, 9 INCH LF 300 1004
113-02 SEDIMENT LOG, 12 INCH LF 1770 1005
113-03 SEDIMENT LOG, 20 INCH LF 270 1006
114-01 SILT FENCE, TYPE A LF 1 1007
114-02 SILT FENCE, TYPE B LF 150 1008
114-03 SILT FENCE, TYPE C LF 585 1009
121-01 FINISHED SEEDING, PERMANENT AC
RE
6.79 1010
121-02 FINISHED SEEDING, NATIVE AC
22.8 1011
121-03 NATIVE RE-VEGETATION AC
125 1012
131-01 EARTH FILL CY 314 1013
131-02 EARTH FILL WITH COMPACTION CY 2700 1014
132-01 EXCAVATION CY 365 1015
132-02 CLEAN OUT SILT AND SEDIMENT BASINS CY 75 1016
132-03 STRUCTURE REMOVAL CY 27 1017
133-01 DIVERSION & DITCH CUTOUTS LF 725 1018
134-01 SMOOTHING SY 32000 1019
134-02 SMOOTHING WITH AREA COMPACTION SY 50 1020
345 1021
136-01 DEEP HARROWING AC
2 1022
141-01 AGGREGATE COARSE, GRADED AGGREGATE BASE CO
TN 1700 1023
141-02 AGGREGATE COARSE, #4 TN 1 1024
141-03 AGGREGATE COARSE, #4 MODIFIED TN 2 1025
141-04 AGGREGATE COARSE, #57 TN 3 1026
142-01 RIP RAP, TYPE 1 TN 2 1027
142-02 RIP RAP, TYPE 3 TN 191 1028
142-03 ROCK EMBANKMENT TN 2 1029
151-01 TYPE I SITE PREPARATION (CLEAR AND GRUB) AC
17 1030
152-01 TYPE II SITE PREPARATION (CLEARING) AC
35 1031
AC
RE
450 1032
154-01 TYPE IV SITE PREPARATION (UNDERSTORY VEGETATI
ON CONTROL)
AC
75 1033
CY 20 1034
161-01 INSTALL READY MIX CONCRETE CY 2 1035
161-02 INSTALL READY MIX CONCRETE with FIBER ADDITIVE CY 1 1036
161-03 INSTALL 700 FLEXURAL STRENGTH CONCRETE CY 2 1037
161-04 INSTALL 700 FLEXURAL STRENGTH CONCRETE with FI
BER ADDITIVE
CY 475 1038
161-05 INSTALL GENERAL CONCRETE CY 3 1039
161-06 INSTALL GENERAL CONCRETE with FIBER ADDITIVE CY 2 1040
161-07 INSTALL EXPANSION JOINTS WITH SEALANT LF 3 1041
161-08 INSTALL SAWED JOINTS WITH SEALANT LF 1 1042
161-09 INSTALL CONTRACTION JOINTS WITH SEALANT LF 225 1043
161-10 INSTALL LONGITUDINAL CONSTRUCTION JOINTS WIT
H SEALANT
LF 2 1044
161-11 INSTALL TRANSVERSE CONSTRUCTION JOINTS WITH S
LF 1 1045
161-12 INSTALL REINFORCING STEEL LF 200 1046
161-13 INSTALL WELDED WIRE FABRIC SF 2 1047
161-14 INSTALL 1” DIAMETER DOWEL X 16” LONG EA 50 1048
SF 2 1049
SF 3 1050
162-03 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
SF 2 1051
SF 3 1052
162-05 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
SF 1 1053
SF 1 1054
162-07 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 3 1055
CC35 WITH AGGREGATE COURSE UNDERLAYMENT
SF 2 1056
162-09 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 2 1057
CC70 WITH AGGREGATE COURSE UNDERLAYMENT
SF 1 1058
162-11 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 2 1059
CC90 WITH AGGREGATE COURSE UNDERLAYMENT
SF 2 1060
171-01 INSTALL GEOCELL SYSTEM SF 200 1061
SF 800 1062
171-03 REPLACE/INSTALL GEOCELL SYSTEM SF 400 1063
SF 3 1064
181-01 REINFORCED ROUND CONCRETE PIPE-15" DIAMETER LF 1 1065
181-02 REINFORCED ROUND CONCRETE PIPE-18" DIAMETER LF 2 1066
181-03 REINFORCED ROUND CONCRETE PIPE-24" DIAMETER LF 2 1067
181-04 REINFORCED ROUND CONCRETE PIPE-30" DIAMETER LF 3 1068
181-05 REINFORCED ROUND CONCRETE PIPE-36" DIAMETER LF 40 1069
181-06 REINFORCED ROUND CONCRETE PIPE-42" DIAMETER LF 2 1070
EA 2 1071
EA 2 1072
181-09 REINFORCED ROUND CONCRETE FLARED END SECTIO
EA 2 1073
EA 2 1074
181-11 REINFORCED ROUND CONCRETE FLARED END SECTIO
EA 2 1075
EA 2 1076
181-13 REINFORCED CONCRETE ELLIPTICAL PIPE 23”X14” LF 2 1077
181-14 REINFORCED CONCRETE ELLIPTICAL PIPE 30”X19” LF 1 1078
181-15 REINFORCED CONCRETE ELLIPTICAL PIPE 38”X24” LF 2 1079
181-16 REINFORCED CONCRETE ELLIPTICAL PIPE 45”X29” LF 3 1080
181-17 REINFORCED CONCRETE ELLIPTICAL PIPE 53”X34” LF 3 1081
EA 2 1082
181-19 REINFORCED CONCRETE ELLIPTICAL PIPE-
EA 2 1083
EA 2 1084
181-21 REINFORCED CONCRETE ELLIPTICAL PIPE-
EA 2 1085
EA 2 1086
181-23 ALUMINUM CORRUGATED PIPE, ROUND-
18” DIAMETER
LF 1 1087
181-24 ALUMINUM CORRUGATED PIPE, ROUND-
24” DIAMETER
LF 2 1088
181-25 ALUMINUM CORRUGATED PIPE, ROUND-
30” DIAMETER
LF 3 1089
181-26 ALUMINUM CORRUGATED PIPE, ROUND-
36” DIAMETER
LF 2 1090
181-27 ALUMINUM CORRUGATED PIPE, ROUND-
42” DIAMETER
LF 1 1091
181-28 ALUMINUM CORRUGATED PIPE, ARCH 21"X15" LF 3 1092
181-29 ALUMINUM CORRUGATED PIPE, ARCH 28"X20" LF 2 1093
181-30 ALUMINUM CORRUGATED PIPE, ARCH 35"X24" LF 1 1094
181-31 ALUMINUM CORRUGATED PIPE, ARCH 42"X29" LF 1 1095
181-32 ALUMINUM CORRUGATED PIPE, ARCH 49”X33” LF 2 1096
191-01 INSTALL SEIBERT STAKES EA 120 1097
192-01 NON-PREPRICED ITEMS EA 1 1098
OPTION-2
Number
Bid Item Name UM Est.
Qty.Note:
Not guarantee Min or Max Quantity
Item Number
UM
Price
Total Bid
111-01 EROSION CONTROL BLANKET SY 2 2001
112-01 GEOTEXTILE, WOVEN SY 2805 2002
112-02 GEOTEXTILE, NONWOVEN SY 2 2003
113-01 SEDIMENT LOG, 9 INCH LF 300 2004
113-02 SEDIMENT LOG, 12 INCH LF 1770 2005
113-03 SEDIMENT LOG, 20 INCH LF 270 2006
114-01 SILT FENCE, TYPE A LF 1 2007
114-02 SILT FENCE, TYPE B LF 150 2008
114-03 SILT FENCE, TYPE C LF 585 2009
6.79 2010
121-02 FINISHED SEEDING, NATIVE AC
22.8 2011
125 2012
131-01 EARTH FILL CY 314 2013
131-02 EARTH FILL WITH COMPACTION CY 2700 2014
132-01 EXCAVATION CY 365 2015
132-02 CLEAN OUT SILT AND SEDIMENT BASINS CY 75 2016
132-03 STRUCTURE REMOVAL CY 27 2017
133-01 DIVERSION & DITCH CUTOUTS LF 725 2018
134-01 SMOOTHING SY 32000 2019
134-02 SMOOTHING WITH AREA COMPACTION SY 50 2020
345 2021
2 2022
141-01 AGGREGATE COARSE, GRADED AGGREGATE BA
SE COURSE [GABC]
TN 1700 2023
141-02 AGGREGATE COARSE, #4 TN 1 2024
141-03 AGGREGATE COARSE, #4 MODIFIED TN 2 2025
141-04 AGGREGATE COARSE, #57 TN 3 2026
142-01 RIP RAP, TYPE 1 TN 2 2027
142-02 RIP RAP, TYPE 3 TN 191 2028
142-03 ROCK EMBANKMENT TN 2 2029
17 2030
152-01 TYPE II SITE PREPARATION (CLEARING) AC
35 2031
153-01 TYPE III SITE PREPARATION (MIDSTORY VEGETA
TION CONTROL <6" DBH)
AC
RE
450 2032
154-01 TYPE IV SITE PREPARATION (UNDERSTORY VEG
ETATION CONTROL)
AC
75 2033
155-01 TYPE V SITE PREPARATION (FELLING AND BUNC
HING STANDING TIMBER)
CY 20 2034
161-01 INSTALL READY MIX CONCRETE CY 2 2035
161-02 INSTALL READY MIX CONCRETE with FIBER ADD
ITIVE
CY 1 2036
161-03 INSTALL 700 FLEXURAL STRENGTH CONCRETE CY 2 2037
161-04 INSTALL 700 FLEXURAL STRENGTH CONCRETE
with FIBER ADDITIVE
CY 475 2038
161-05 INSTALL GENERAL CONCRETE CY 3 2039
161-06 INSTALL GENERAL CONCRETE with FIBER ADDIT
IVE
CY 2 2040
161-07 INSTALL EXPANSION JOINTS WITH SEALANT LF 3 2041
161-08 INSTALL SAWED JOINTS WITH SEALANT LF 1 2042
161-09 INSTALL CONTRACTION JOINTS WITH SEALANT LF 225 2043
161-10 INSTALL LONGITUDINAL CONSTRUCTION JOINT
S WITH SEALANT
LF 2 2044
161-11 INSTALL TRANSVERSE CONSTRUCTION JOINTS
WITH SEALANT
LF 1 2045
161-12 INSTALL REINFORCING STEEL LF 200 2046
161-13 INSTALL WELDED WIRE FABRIC SF 2 2047
161-14 INSTALL 1” DIAMETER DOWEL X 16” LONG EA 50 2048
162-01 INSTALL ARTICULATED CONCRETE BLOCK SYST
EM-CC35
SF 2 2049
162-02 INSTALL ARTICULATED CONCRETE BLOCK SYST
EM-
CC35 WITH AGGREGATE COURSE UNDERLAYME
NT
SF 3 2050
162-03 INSTALL ARTICULATED CONCRETE BLOCK SYST
EM-CC70
SF 2 2051
162-04 INSTALL ARTICULATED CONCRETE BLOCK SYST
CC70 WITH AGGREGATE COURSE UNDERLAYME
NT
SF 3 2052
162-05 INSTALL ARTICULATED CONCRETE BLOCK SYST
EM-CC90
SF 1 2053
162-06 INSTALL ARTICULATED CONCRETE BLOCK SYST
CC90 WITH AGGREGATE COURSE UNDERLAYME
NT
SF 1 2054
162-07 REPLACE/INSTALL ARTICULATED CONCRETE BL
OCK SYSTEM-CC35
SF 3 2055
162-08 REPLACE/INSTALL ARTICULATED CONCRETE BL
OCK SYSTEM-
CC35 WITH AGGREGATE COURSE UNDERLAYME
NT
SF 2 2056
162-09 REPLACE/INSTALL ARTICULATED CONCRETE BL
OCK SYSTEM –CC70
SF 2 2057
162-10 REPLACE/INSTALL ARTICULATED CONCRETE BL
CC70 WITH AGGREGATE COURSE UNDERLAYME
NT
SF 1 2058
162-11 REPLACE/INSTALL ARTICULATED CONCRETE BL
OCK SYSTEM –CC90
SF 2 2059
162-12 REPLACE/INSTALL ARTICULATED CONCRETE BL
CC90 WITH AGGREGATE COURSE UNDERLAYME
NT
SF 2 2060
171-01 INSTALL GEOCELL SYSTEM SF 200 2061
171-02 INSTALL GEOCELL SYSTEM WITH AGGREGATE C
OURSE UNDERLAYMENT
SF 800 2062
171-03 REPLACE/INSTALL GEOCELL SYSTEM SF 400 2063
171-04 REPLACE/INSTALL GEOCELL SYSTEM WITH AGG
REGATE COURSE UNDERLAYMENT
SF 3 2064
181-01 REINFORCED ROUND CONCRETE PIPE-
15" DIAMETER
LF 1 2065
181-02 REINFORCED ROUND CONCRETE PIPE-
18" DIAMETER
LF 2 2066
181-03 REINFORCED ROUND CONCRETE PIPE-
24" DIAMETER
LF 2 2067
181-04 REINFORCED ROUND CONCRETE PIPE-
30" DIAMETER
LF 3 2068
181-05 REINFORCED ROUND CONCRETE PIPE-
36" DIAMETER
LF 40 2069
181-06 REINFORCED ROUND CONCRETE PIPE-
42" DIAMETER
LF 2 2070
181-07 REINFORCED ROUND CONCRETE FLARED END S
ECTION-15"
EA 2 2071
181-08 REINFORCED ROUND CONCRETE FLARED END S
ECTION-18"
EA 2 2072
181-09 REINFORCED ROUND CONCRETE FLARED END S
ECTION-24"
EA 2 2073
181-10 REINFORCED ROUND CONCRETE FLARED END S
ECTION-30"
EA 2 2074
181-11 REINFORCED ROUND CONCRETE FLARED END S
ECTION-36"
EA 2 2075
181-12 REINFORCED ROUND CONCRETE FLARED END S
ECTION-42"
EA 2 2076
181-13 REINFORCED CONCRETE ELLIPTICAL PIPE 23”X1
4”
LF 2 2077
181-14 REINFORCED CONCRETE ELLIPTICAL PIPE 30”X1
9”
LF 1 2078
181-15 REINFORCED CONCRETE ELLIPTICAL PIPE 38”X2
LF 2 2079
OPTION-3
Number
Bid Item Name UM Est.
Qty.Note:
Not guarantee Min or Max Quantity
Item Num ber
UM
Price
Total Bid Item Price
111-01 EROSION CONTROL BLANKET SY 2 3001
181-16 REINFORCED CONCRETE ELLIPTICAL PIPE 45”X2
9”
LF 3 2080
181-17 REINFORCED CONCRETE ELLIPTICAL PIPE 53”X3
LF 3 2081
EA 2 2082
181-19 REINFORCED CONCRETE ELLIPTICAL PIPE-
EA 2 2083
EA 2 2084
181-21 REINFORCED CONCRETE ELLIPTICAL PIPE-
EA 2 2085
EA 2 2086
181-23 ALUMINUM CORRUGATED PIPE, ROUND-
18” DIAMETER
LF 1 2087
181-24 ALUMINUM CORRUGATED PIPE, ROUND-
24” DIAMETER
LF 2 2088
181-25 ALUMINUM CORRUGATED PIPE, ROUND-
30” DIAMETER
LF 3 2089
181-26 ALUMINUM CORRUGATED PIPE, ROUND-
36” DIAMETER
LF 2 2090
181-27 ALUMINUM CORRUGATED PIPE, ROUND-
42” DIAMETER
LF 1 2091
181-28 ALUMINUM CORRUGATED PIPE, ARCH 21"X15" LF 3 2092
181-29 ALUMINUM CORRUGATED PIPE, ARCH 28"X20" LF 2 2093
181-30 ALUMINUM CORRUGATED PIPE, ARCH 35"X24" LF 1 2094
181-31 ALUMINUM CORRUGATED PIPE, ARCH 42"X29" LF 1 2095
181-32 ALUMINUM CORRUGATED PIPE, ARCH 49”X33” LF 2 2096
191-01 INSTALL SEIBERT STAKES EA 120 2097
192-01 NON-PREPRICED ITEMS EA 1 2098
112-01 GEOTEXTILE, WOVEN SY 2805 3002
112-02 GEOTEXTILE, NONWOVEN SY 2 3003
113-01 SEDIMENT LOG, 9 INCH LF 300 3004
113-02 SEDIMENT LOG, 12 INCH LF 1770 3005
113-03 SEDIMENT LOG, 20 INCH LF 270 3006
114-01 SILT FENCE, TYPE A LF 1 3007
114-02 SILT FENCE, TYPE B LF 150 3008
114-03 SILT FENCE, TYPE C LF 585 3009
6.79 3010
121-02 FINISHED SEEDING, NATIVE AC
22.8 3011
125 3012
131-01 EARTH FILL CY 314 3013
131-02 EARTH FILL WITH COMPACTION CY 2700 3014
132-01 EXCAVATION CY 365 3015
132-02 CLEAN OUT SILT AND SEDIMENT BASINS CY 75 3016
132-03 STRUCTURE REMOVAL CY 27 3017
133-01 DIVERSION & DITCH CUTOUTS LF 725 3018
134-01 SMOOTHING SY 32000 3019
134-02 SMOOTHING WITH AREA COMPACTION SY 50 3020
345 3021
2 3022
141-01 AGGREGATE COARSE, GRADED AGGREGATE BASE CO
TN 1700 3023
141-02 AGGREGATE COARSE, #4 TN 1 3024
141-03 AGGREGATE COARSE, #4 MODIFIED TN 2 3025
141-04 AGGREGATE COARSE, #57 TN 3 3026
142-01 RIP RAP, TYPE 1 TN 2 3027
142-02 RIP RAP, TYPE 3 TN 191 3028
142-03 ROCK EMBANKMENT TN 2 3029
17 3030
152-01 TYPE II SITE PREPARATION (CLEARING) AC
35 3031
AC
RE
450 3032
154-01 TYPE IV SITE PREPARATION (UNDERSTORY VEGETATI
ON CONTROL)
AC
75 3033
CY 20 3034
161-01 INSTALL READY MIX CONCRETE CY 2 3035
161-02 INSTALL READY MIX CONCRETE with FIBER ADDITIVE CY 1 3036
161-03 INSTALL 700 FLEXURAL STRENGTH CONCRETE CY 2 3037
CY 475 3038
161-05 INSTALL GENERAL CONCRETE CY 3 3039
161-06 INSTALL GENERAL CONCRETE with FIBER ADDITIVE CY 2 3040
161-07 INSTALL EXPANSION JOINTS WITH SEALANT LF 3 3041
161-08 INSTALL SAWED JOINTS WITH SEALANT LF 1 3042
161-09 INSTALL CONTRACTION JOINTS WITH SEALANT LF 225 3043
161-10 INSTALL LONGITUDINAL CONSTRUCTION JOINTS WITH
SEALANT
LF 2 3044
161-11 INSTALL TRANSVERSE CONSTRUCTION JOINTS WITH S
LF 1 3045
161-12 INSTALL REINFORCING STEEL LF 200 3046
161-13 INSTALL WELDED WIRE FABRIC SF 2 3047
161-14 INSTALL 1” DIAMETER DOWEL X 16” LONG EA 50 3048
SF 2 3049
SF 3 3050
162-03 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
SF 2 3051
SF 3 3052
162-05 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
SF 1 3053
SF 1 3054
162-07 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 3 3055
CC35 WITH AGGREGATE COURSE UNDERLAYMENT
SF 2 3056
162-09 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 2 3057
CC70 WITH AGGREGATE COURSE UNDERLAYMENT
SF 1 3058
162-11 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 2 3059
CC90 WITH AGGREGATE COURSE UNDERLAYMENT
SF 2 3060
171-01 INSTALL GEOCELL SYSTEM SF 200 3061
SF 800 3062
171-03 REPLACE/INSTALL GEOCELL SYSTEM SF 400 3063
SF 3 3064
181-01 REINFORCED ROUND CONCRETE PIPE-15" DIAMETER LF 1 3065
181-02 REINFORCED ROUND CONCRETE PIPE-18" DIAMETER LF 2 3066
181-03 REINFORCED ROUND CONCRETE PIPE-24" DIAMETER LF 2 3067
181-04 REINFORCED ROUND CONCRETE PIPE-30" DIAMETER LF 3 3068
181-05 REINFORCED ROUND CONCRETE PIPE-36" DIAMETER LF 40 3069
181-06 REINFORCED ROUND CONCRETE PIPE-42" DIAMETER LF 2 3070
EA 2 3071
EA 2 3072
181-09 REINFORCED ROUND CONCRETE FLARED END SECTIO
EA 2 3073
EA 2 3074
181-11 REINFORCED ROUND CONCRETE FLARED END SECTIO
EA 2 3075
EA 2 3076
181-13 REINFORCED CONCRETE ELLIPTICAL PIPE 23”X14” LF 2 3077
181-14 REINFORCED CONCRETE ELLIPTICAL PIPE 30”X19” LF 1 3078
181-15 REINFORCED CONCRETE ELLIPTICAL PIPE 38”X24” LF 2 3079
181-16 REINFORCED CONCRETE ELLIPTICAL PIPE 45”X29” LF 3 3080
181-17 REINFORCED CONCRETE ELLIPTICAL PIPE 53”X34” LF 3 3081
EA 2 3082
181-19 REINFORCED CONCRETE ELLIPTICAL PIPE-
EA 2 3083
EA 2 3084
181-21 REINFORCED CONCRETE ELLIPTICAL PIPE-
EA 2 3085
EA 2 3086
181-23 ALUMINUM CORRUGATED PIPE, ROUND-18” DIAMETER LF 1 3087
181-24 ALUMINUM CORRUGATED PIPE, ROUND-24” DIAMETER LF 2 3088
181-25 ALUMINUM CORRUGATED PIPE, ROUND-30” DIAMETER LF 3 3089
181-26 ALUMINUM CORRUGATED PIPE, ROUND-36” DIAMETER LF 2 3090
181-27 ALUMINUM CORRUGATED PIPE, ROUND-42” DIAMETER LF 1 3091
181-28 ALUMINUM CORRUGATED PIPE, ARCH 21"X15" LF 3 3092
181-29 ALUMINUM CORRUGATED PIPE, ARCH 28"X20" LF 2 3093
181-30 ALUMINUM CORRUGATED PIPE, ARCH 35"X24" LF 1 3094
181-31 ALUMINUM CORRUGATED PIPE, ARCH 42"X29" LF 1 3095
181-32 ALUMINUM CORRUGATED PIPE, ARCH 49”X33” LF 2 3096
191-01 INSTALL SEIBERT STAKES EA 120 3097
192-01 NON-PREPRICED ITEMS EA 1 3098
OPTION-4
Number
Bid Item Name UM Est.
Qty.Note:
Not guarantee Min or Max Quantity
Item Num ber
UM
Price
Total Bid Item Price
111-01 EROSION CONTROL BLANKET SY 2 4001
112-01 GEOTEXTILE, WOVEN SY 2805 4002
112-02 GEOTEXTILE, NONWOVEN SY 2 4003
113-01 SEDIMENT LOG, 9 INCH LF 300 4004
113-02 SEDIMENT LOG, 12 INCH LF 1770 4005
113-03 SEDIMENT LOG, 20 INCH LF 270 4006
114-01 SILT FENCE, TYPE A LF 1 4007
114-02 SILT FENCE, TYPE B LF 150 4008
114-03 SILT FENCE, TYPE C LF 585 4009
6.79 4010
121-02 FINISHED SEEDING, NATIVE AC
22.8 4011
125 4012
131-01 EARTH FILL CY 314 4013
131-02 EARTH FILL WITH COMPACTION CY 2700 4014
132-01 EXCAVATION CY 365 4015
132-02 CLEAN OUT SILT AND SEDIMENT BASINS CY 75 4016
132-03 STRUCTURE REMOVAL CY 27 4017
133-01 DIVERSION & DITCH CUTOUTS LF 725 4018
134-01 SMOOTHING SY 32000 4019
134-02 SMOOTHING WITH AREA COMPACTION SY 50 4020
345 4021
2 4022
141-01 AGGREGATE COARSE, GRADED AGGREGATE BASE CO
TN 1700 4023
141-02 AGGREGATE COARSE, #4 TN 1 4024
141-03 AGGREGATE COARSE, #4 MODIFIED TN 2 4025
141-04 AGGREGATE COARSE, #57 TN 3 4026
142-01 RIP RAP, TYPE 1 TN 2 4027
142-02 RIP RAP, TYPE 3 TN 191 4028
142-03 ROCK EMBANKMENT TN 2 4029
17 4030
152-01 TYPE II SITE PREPARATION (CLEARING) AC
35 4031
AC
RE
450 4032
154-01 TYPE IV SITE PREPARATION (UNDERSTORY VEGETATI
ON CONTROL)
AC
75 4033
CY 20 4034
161-01 INSTALL READY MIX CONCRETE CY 2 4035
161-02 INSTALL READY MIX CONCRETE with FIBER ADDITIVE CY 1 4036
161-03 INSTALL 700 FLEXURAL STRENGTH CONCRETE CY 2 4037
CY 475 4038
161-05 INSTALL GENERAL CONCRETE CY 3 4039
161-06 INSTALL GENERAL CONCRETE with FIBER ADDITIVE CY 2 4040
161-07 INSTALL EXPANSION JOINTS WITH SEALANT LF 3 4041
161-08 INSTALL SAWED JOINTS WITH SEALANT LF 1 4042
161-09 INSTALL CONTRACTION JOINTS WITH SEALANT LF 225 4043
161-10 INSTALL LONGITUDINAL CONSTRUCTION JOINTS WITH
SEALANT
LF 2 4044
161-11 INSTALL TRANSVERSE CONSTRUCTION JOINTS WITH S
LF 1 4045
161-12 INSTALL REINFORCING STEEL LF 200 4046
161-13 INSTALL WELDED WIRE FABRIC SF 2 4047
161-14 INSTALL 1” DIAMETER DOWEL X 16” LONG EA 50 4048
SF 2 4049
SF 3 4050
162-03 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
SF 2 4051
SF 3 4052
162-05 INSTALL ARTICULATED CONCRETE BLOCK SYSTEM-
SF 1 4053
SF 1 4054
162-07 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 3 4055
CC35 WITH AGGREGATE COURSE UNDERLAYMENT
SF 2 4056
162-09 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 2 4057
SF 1 4058
162-11 REPLACE/INSTALL ARTICULATED CONCRETE BLOCK S
SF 2 4059
CC90 WITH AGGREGATE COURSE UNDERLAYMENT
SF 2 4060
171-01 INSTALL GEOCELL SYSTEM SF 200 4061
SF 800 4062
171-03 REPLACE/INSTALL GEOCELL SYSTEM SF 400 4063
SF 3 4064
181-01 REINFORCED ROUND CONCRETE PIPE-15" DIAMETER LF 1 4065
181-02 REINFORCED ROUND CONCRETE PIPE-18" DIAMETER LF 2 4066
181-03 REINFORCED ROUND CONCRETE PIPE-24" DIAMETER LF 2 4067
181-04 REINFORCED ROUND CONCRETE PIPE-30" DIAMETER LF 3 4068
181-05 REINFORCED ROUND CONCRETE PIPE-36" DIAMETER LF 40 4069
181-06 REINFORCED ROUND CONCRETE PIPE-42" DIAMETER LF 2 4070
EA 2 4071
EA 2 4072
181-09 REINFORCED ROUND CONCRETE FLARED END SECTIO
EA 2 4073
EA 2 4074
181-11 REINFORCED ROUND CONCRETE FLARED END SECTIO
EA 2 4075
EA 2 4076
181-13 REINFORCED CONCRETE ELLIPTICAL PIPE 23”X14” LF 2 4077
181-14 REINFORCED CONCRETE ELLIPTICAL PIPE 30”X19” LF 1 4078
181-15 REINFORCED CONCRETE ELLIPTICAL PIPE 38”X24” LF 2 4079
181-16 REINFORCED CONCRETE ELLIPTICAL PIPE 45”X29” LF 3 4080
181-17 REINFORCED CONCRETE ELLIPTICAL PIPE 53”X34” LF 3 4081
EA 2 4082
181-19 REINFORCED CONCRETE ELLIPTICAL PIPE-
EA 2 4083
EA 2 4084
181-21 REINFORCED CONCRETE ELLIPTICAL PIPE-
EA 2 4085
EA 2 4086
181-23 ALUMINUM CORRUGATED PIPE, ROUND-18” DIAMETER LF 1 4087
181-24 ALUMINUM CORRUGATED PIPE, ROUND-24” DIAMETER LF 2 4088
181-25 ALUMINUM CORRUGATED PIPE, ROUND-30” DIAMETER LF 3 4089
181-26 ALUMINUM CORRUGATED PIPE, ROUND-36” DIAMETER LF 2 4090
181-27 ALUMINUM CORRUGATED PIPE, ROUND-42” DIAMETER LF 1 4091
181-28 ALUMINUM CORRUGATED PIPE, ARCH 21"X15" LF 3 4092
181-29 ALUMINUM CORRUGATED PIPE, ARCH 28"X20" LF 2 4093
181-30 ALUMINUM CORRUGATED PIPE, ARCH 35"X24" LF 1 4094
181-31 ALUMINUM CORRUGATED PIPE, ARCH 42"X29" LF 1 4095
181-32 ALUMINUM CORRUGATED PIPE, ARCH 49”X33” LF 2 4096
191-01 INSTALL SEIBERT STAKES EA 120 4097
192-01 NON-PREPRICED ITEMS EA 1 4098
BID PRICE SCHEDULE TOTAL
BID AMOUNT
0001 – BASE $
1001 – 1st Option Year $
2001 - 2nd Option Year $
3001 – 3rdnd Option Year$
4001 – 4th Option Year $
TOTAL
Section E - Inspection and Acceptance
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1001 Destination Government Destination Government 2001 Destination Government Destination Government 3001 Destination Government Destination Government 4001 Destination Government Destination Government
CLAUSES INCORPORATED BY FULL TEXT
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(a) Definition. "Work" includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not--
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) of this section.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer's written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes reinspection or retest necessary. The Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor's right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or nonconforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government's rights under any warranty or guarantee.
(End of clause)
52.246-13 INSPECTION--DISMANTLING, DEMOLITION, OR REMOVAL OF IMPROVEMENTS (AUG
1996)
(a) Unless otherwise designated by the specifications, all workmanship performed under the contract is subject to Government inspection at all times and places where dismantling or demolition work is being performed. The Contractor shall furnish promptly, and at no increase in contract price all reasonable facilities, labor, and materials necessary for safe and convenient inspection by the Government. The Government shall perform inspections in a manner that will not unduly delay the work.
(b) The Contractor is responsible for damage to property caused by defective workmanship. The Contractor shall promptly segregate and remove from the premises any unsatisfactory facilities, materials, and equipment used in contract performance, and promptly replace them with satisfactory items. If the Contractor fails to proceed at once in a workmanlike manner with performance of the work or with the correction of defective workmanship, the Government may (1) by contract or otherwise, replace the facilities, materials, and equipment or correct the workmanship and charge the cost to the Contractor and (2) terminate for default the Contractor's right to proceed.
The Contractor and any surety shall be liable, to the extent specified in the contract for any damage or cost of repair or replacement.
Section F - Deliveries or Performance
DELIVERIES OF PERFORMANCE
F. 1 Deliverables
F.1.1. Except as specified or directed otherwise, the Contractor shall provide all deliverables, reports, plans, schedules, etc. to the Contracting Officer. All plans, schedules, etc., must be reviewed and approved in writing by the Contracting Officer except as specified otherwise herein or as otherwise delegated by the Contracting Officer.
Deliverables will be specified in each individual Job order.
F.2. Basic Ordering Period:
F.2.1 This Requirements contract shall commence on the date of award and shall continue for 12 months thereafter.
F.3. Option Ordering Periods:
F.3.1. This Requirements contract provides for four (4), 12-month option ordering periods to be exercised at the discretion of the Government.
(END DELIVERIES OR PERFORMANCE)
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 31-MAR-2022 TO
30-MAR-2023
N/A N/A
FOB: Destination
1001 POP 31-MAR-2023 TO
30-MAR-2024
2001 POP 31-MAR-2024 TO
30-MAR-2025
3001 POP 31-MAR-2025 TO
30-MAR-2026
4001 POP 31-MAR-2026 TO
30-MAR-2027
CLAUSES INCORPORATED BY REFERENCE
52.242-14 Suspension of Work APR 1984 52.242-17 Government Delay Of Work APR 1984
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than the completion date on the Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
52.211-12 LIQUIDATED DAMAGES--CONSTRUCTION (SEP 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of damages to the Government based on the Task Order amount for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
52.211-13 TIME EXTENSIONS (SEP 2000)
Time extensions for contract changes will depend upon the extent, if any, by which the changes cause delay in the completion of the various elements of construction. The change order granting the time extension may provide that the contract completion date will be extended only for those specific elements related to the changed work and that the remaining contract completion dates for all other portions of the work will not be altered. The change order also may provide an equitable readjustment of liquidated damages under the new completion schedule.
Section G - Contract Administration Data
SUBMIT INVOICE ELECTRONICALLY
(a) To expedite payment, reduce lost documents, and increase visibility into the status of payments, the Department of Defense (DOD) has implemented electronic invoicing. In conformance with Defense Federal Acquisition Regulation supplement (DFARS) Clause 252.232-7003, Electronic submission of payment Request, which is incorporated herein by reference, contractors shall submit invoices ELECTRONICALLY through the Defense Finance and Accounting System (DFAS) Web Invoicing System (Wide Area Workflow – Receipt and Acceptance).
(WAWF-RA)) at https://wawf.eb.mil/. Select Construction Invoice.
(b) Applicable codes necessary for submission of invoices against this contract are as shown below:
1. ADMINISTERED BY: W9124M
2. ISSUED BY: W9124M
3. CONTRACTING OFFICE: W9124M
4. PAYMENT: HQ0490 DFAS-Indianapolis
5. DODAAC/INSPECT BY: W33DL4
6. LPO: n/a
7. DESCRIPTION: Uplands Requirement Contract.
8. CONTRACTOR’S CAGE CODE:
(c) Paper invoices will be rejected and returned and the contractor advised to invoice electronically.
(d) For assistance regarding electronic invoicing issues, please contract WAWF Customer Service at 1-866-618- 5988 or DFAS Electronic Commerce Division at 1-614-693-6868. Web-based training is available at the WAWF site https://www.wawftraining.com
(End)
CONTRACT ADMINISTRATION
G.1. CONTRACT ADMINISTRATION. The roles, duties, responsibilities and authority of each of the members are discussed below:
G.2. CONTRACTING OFFICER (KO): A person with authority to enter into, administer, and/or terminate contracts, and to make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
G.3. CONTRACTING OFFICER'S REPRESENTATIVE (COR). An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor, as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
G.4. All matters pertaining to the administration of each individual task order should be directed to the pertinent Administrative KO. Each individual task order may be signed by any of the KO within the Mission and Installation Contracting Command – Fort Stewart, and does not preclude another KO within the Mission and Installation Contracting Command- Fort Stewart from signing any documents or attending any meetings in matters pertaining to the individual task order signed by the primary KO.
G.5. The KO is the only person authorized to direct changes in any of the requirements under this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the KO.
In the event the Contractor effects any such change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk of the Contractor. The Contractor shall ensure that all Contractor personnel are knowledgeable and cognizant of this contract provision.
G.6. PRE-CONSTRUCTION CONFERENCE.
G.6.1. After ward of the master contract and prior to the Contractor starting work on Task Orders, a pre-construction conference (as described in FAR Subpart 42.5), may be convened by the KO. The PM shall meet with the KO to establish the agenda for the conference. The Contractor's PM or APM, Quality Control Manager, and Safety personnel shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor shall also attend.
G.6.2. The KO and the Contractor will agree to the date, time, and location of the conference after award of the Contract. In event of a conflict in schedules, the KO shall establish the date for the conference.
End Contact Administrative Data.
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(a) Definitions. As used in this clause—
“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.
“Document type” means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.
“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232- 7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall—
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items—
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial item financing, submit a commercial item financing request.
(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF
Pay Official DoDAAC Hq0490
Issue By DoDAAC W9124M
Admin DoDAAC** W9124M
Inspect By DoDAAC W33DL4
Ship To Code W33DL4
Service Approver (DoDAAC) W33DL4
Service Acceptor (DoDAAC) W33DL4
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
sebrena.m.butler.civ@army.mil melvin.f.reid2.civ@army.mil
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
Section H - Special Contract Requirements
SPECIAL INSTRUCTIONS
ALTERNATE DISPUTES RESOLUTION
In furtherance of Federal policy and the Administrative Dispute Resolution Act of 1990 (ADR Act), Public Law 101-552 and FAR Clause 52.233-1, the Contracting Officer will try to resolve all post award acquisition issues in controversy by mutual agreement of both parties. Interested parties are encouraged to use alternative dispute resolution procedures to the maximum extent practicable in accordance with the authority and requirements of the ADR Act.
EMERGENCY MEDICAL TREATMENT
Emergency medical treatment will be provided by the Winn Army Community Hospital in order to prevent undue suffering or loss of life. Emergencies will be treated only during the period of emergency and appropriate action will be taken to discharge or transfer such patients as soon as the emergency period ends.
Charges for medical care will be at the prevailing rate and at the Contractor's expense.
HOURS OF OPERATION
Normal working hours are 7:30 a.m. through 4:00 p.m. Monday through Friday excluding Federal Holidays.
Notwithstanding the provisions of the Contract Work Hours and Safety Standards Act – Overtime Compensation clause herein, work will not be permitted outside normal work hours, nor on Saturdays, Sundays or legal holidays unless approved by the Contracting Officer. Requests to work other than normal work hours for all work must be submitted in writing a minimum of 2 work days in advance of date on which such work is anticipated. The exclusion of work on Saturdays, Sundays, and holidays has been considered in computing the performance time of this contract. The following legal holidays are observed:
January 1st 1st Monday of September 3rd Monday of January 2nd Monday of October 3rd Monday of February November 11th Last Monday of May 4th Thursday of November Juneteenth – June 19 - New July 4th December 25th
Any other Congressional or Presidential imposed Federal Holiday.
When a holiday falls on a Sunday, the following Monday will be observed as a holiday and when a holiday falls on a Saturday, the preceding Friday is observed as a holiday by U.S. Government Agencies.
MATERIAL APPROVAL SUBMITTALS
The submittals contemplated by FAR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .