This abstract of offers document summarizes bids received in response to solicitation number W9124M20B0016 to construct a canopy at an ammunition supply point for the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Stewart, Georgia. Fourteen contractors submitted bids by the September 15, 2020 deadline, with bid amounts ranging from $648,330 to $962,585.97. The independent government estimate for the project was $542,000. Scope of work includes design, fabrication and installation of a pre-engineered metal building system and foundation, demolition of an existing concrete slab, site work including fencing and drainage, and electrical work for power, lighting and lightning protection.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMENDMENT 04- Conform copy.pdf | ||
| AMENDMENT 04.pdf | ||
| AMENDMENT 04.pdf | ||
| AMENDEMTENT 03.pdf | ||
| AMENDMENT 02.pdf | ||
| AMENDMENT 01 - Construct Canopy at ASP.pdf | ||
| Drawings-4071 Combined 6-8-2020.pdf | ||
| Solicitation- 20-B-0016- Construct Canopy ASP.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation Number: | Bidder/Offeror #1: | Bidder/Offeror #2: | Bidder/Offeror #3: | Bidder/Offeror #4: | BIDDER/OFFEROR #5 | Bidder/Offeror #6 | Bidder/Offeror | Bidder/Offeror #8 | Bidder/Offeror #9 | Bidder/Offeror #7 | Bidder/Offeror #8 | Bidder/Offeror #9 | Bidder/Offeror #10 | Bidder/Offeror #11 | Bidder/Offeror #13 | ||||||||||||||||||||||||||||||||||
| W9124M-20-B-0016 | |||||||||||||||||||||||||||||||||||||||||||||||||
| Central Minority Maintenance, LLC | Veterans South Builders | BOYER COMMERICAL CONSTRUCTION | SDAC | New Dominion Construction , LLC | FEDERAL CONSTRUCTORS ,INC | OUTSIDE THE BOX, LLC | Constructive Ingenuity | Harbor Enterprises, LLC | Lynn Construction Contracting, INC. | Reams Enterprises,INC | GEC Trucking INC. | ||||||||||||||||||||||||||||||||||||||
| 8730 North Park Blvd, Suite 4A, North Charleston, SC 29406 | 106 Torrence Road,Tuskegee, AL 36083 | 2122 S. Beltine Blvd., Columbia, SC 29201 | 910 Landline Rd Selma, AL 36701 | 17959 Dumfries Shopping Plaza ,Ste B3, Dumfries,VA 22026 | 1900 NE 36th Street, Suite 102, Oklahoma City, OK 73111 | 1428 Floyd Ave, Richmond, VA 23220 | 1990 Lakeside Parkway,Suite 200, Tucker, GA 30084 | 1207 Sunset Drive, Thomasville, GA 31792 | P.O.Box 564,10789 US HWY.280, CLAXTON,GA 304170564 | 1473 Central Ave., East Point, GA 30344 | 2950 Melson Ave, Jacksonville,FL 32254 | ||||||||||||||||||||||||||||||||||||||
| Project Description: | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | Yes/No/NA | ||||||||||||||||||||||||||||||||||
| Construct Canopy at ASP , FS Bid Date: 15 Sept 2020 Bid Time: 3:00 p.m. | Bid Signed? | Yes | Bid Signed? | Yes | Bid Signed? | Yes | Bid Signed? | Yes | Bid Signed? | yes | Bid Signed? | yes | Bid Signed? | Bid Signed? | Bid Signed? | Bid Signed? | yes | Bid Signed? | Yes | Bid Signed? | yes | Bid Signed? | YES | Bid Signed? | Yes | Bid Signed? | Yes | ||||||||||||||||||||||
| Bid Bond Furnished? | NO | Bid Bond Furnished? | Yes | Bid Bond Furnished? | Yes | Bid Bond Furnished? | Yes | Bid Bond furnished? | yes | Bid Bond Furnished? | yes | Bid Bond Furnished? | Bid Bond Furnished? | Bid Bond Furnished? | Bid Bond Furnished? | yes | Bid Bond Furnished? | yes | Bid Bond Furnished? | yes | Bid Bond Furnished? | yes | Bid Bond Furnished? | yes | Bid Bond Furnished? | yes | |||||||||||||||||||||||
| Amendments Acknowledged? | Yes | Amendments Acknowledged? | Yes | Amendments Acknowledged? | Yes | Amendments Acknowledged? | Yes | Amendments Acknowledged? | yes | Amendments Acknowledged? | yes | Amendments Acknowledged? | Amendments Acknowledged? | Amendments Acknowledged? | Amendments Acknowledged? | yes | Amendments Acknowledged? | yes | Amendments Acknowledged? | yes | Amendments Acknowledged? | yes | Amendments Acknowledged? | yes | Amendments Acknowledged? | yes | |||||||||||||||||||||||
| 0001-0007 | |||||||||||||||||||||||||||||||||||||||||||||||||
| Estimated IGE: $ 542,000.00 | Remarks: | Remarks: | Remarks: | Remarks: | Remarks: | Remarks: | Remarks: | Remarks: | Remarks: | Remarks: | Remarks: | Remarks: | |||||||||||||||||||||||||||||||||||||
| CLIN | Quantity | Unit of Issue | Unit Price | Grand Total | Unit Price | Grand Totals | Unit Price | Grand Totals | Unit Price | Grand Totals | Unit Price | Grand Totals | Unit Price | Grand Total | Unit Price | Grand Total | Unit Price | Grand Total | Unit Price | Grand Total | Unit Price | Grand Total | Unit Price | Grand Total | Unit Price | Grand Total | Unit Price | Grand Total | Unit Price | Grand Total | Unit Price | Grand Total | |||||||||||||||||
| 0001 | 1 | JOB | 1 | 0.00% | $881.045.00 | 0.00% | $648,330.00 | 0.00% | $750,000.00 | $0.00 | 1 | 0.00% | $773,850.00 | $0.00 | 1 | 0.00% | $825,693.00 | $0.00 | 1 | $667,350.00 | $0.00 | 1 | $0.00 | $0.00 | 1 | $0.00 | $0.00 | 1 | $725,800.00 | $0.00 | 1 | $858,822.00 | $0.00 | 1 | $583,162.00 | $0.00 | 1 | $597,373.00 | $0.00 | 1 | $962,585.97 | $0.00 | 1 | $683,051.49 | |||||
| $0.00 | 1 | $0.00 | $0.00 | 1 | $0.00 | ||||||||||||||||||||||||||||||||||||||||||||
| TOTAL | $881,045.00 | TOTAL | $648,330.00 | TOTAL | $750,000.00 | TOTAL | $773,850.00 | $825,693.00 | TOTAL | $667,350.00 | TOTAL | $725,800.00 | TOTAL | $858,822.00 | TOTAL | $583,162.00 | TOTAL | $597,373.00 | TOTAL | $962,585.97 | TOTAL | $683,051.49 | |||||||||||||||||||||||||||
| Percent of IGE: | 1.63% | Percent of IGE: | 1.20% | Percent of IGE: | 1.40% | Percent of IGE: | 1.43% | 1.52% | Percent of IGE: | 1.23% | Percent of IGE: | 0.00% | Percent of IGE: | 0.00% | Percent of IGE: | 0.00% | Percent of IGE: | 1.34% | Percent of IGE: | 1.55% | Percent of IGE: | 1.08% | Percent of IGE: | 1.10% | Percent of IGE: | 1.78% | Percent of IGE: | 1.26% | |||||||||||||||||||||
| I CERTIFY THAT I HAVE OPENED, READ AND RECORDED ON THIS ABSTRACT (AND CONTINUATION SHEETS, IF ANY) ALL OFFERS RECEIVED IN RESPONSE TO THE SOLICITATION | TYPED NAME OF BID OPENING OFFICIAL: Tatjana Fisher | ||||||||||||||||||||||||||||||||||||||||||||||||
| WITNESSED BY:Sebrena Butler | |||||||||||||||||||||||||||||||||||||||||||||||||
| SIGNATURE: | DATE: |
Sheet2
Sheet3
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .