This document contains responses to requests for information (RFIs) related to a solicitation to install a metal roof at Building 3 at Fort Stewart, Georgia. The RFI responses provide details such as confirmation that an asbestos report will be provided, clarification that a temporary lightning protection system is not required, information on coordinating construction access and schedules with building occupants, and specifications of the existing roof and structure. Structural drawings of the existing building are available from the Contracting Officer. The new roof system will be uninsulated and the existing roof membrane and insulation will remain in place below the new metal roof.

The related federal contract opportunity is solicitation number W9124M-20-B-0014 for the installation of a metal roof at the specified building, issued by the Department of the Army Materiel Command Mission and Installation Contracting Command.

View the file

Other files

File Type Posted
QUESTIONS AND ANSWERS -20-B-0014.docx DOCX document
Drawings-26_S-6.pdf PDF
Drawings-22_S-2.pdf PDF
Drawings-24_S-4.pdf PDF
Drawings-21_S-1.pdf PDF
Drawings-25_S-5.pdf PDF
Drawings-10_A-3.pdf PDF
SOLICITATION - METAL ROOF.pdf PDF
Drawings-4097_Combined FINAL.pdf PDF
Webex Instructions.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Install Metal Roof Bldg. 3 – RFIs

1- Will a building asbestos report be provided prior to the bid submission deadline?

**I will send a copy of the report to MICC.

2- Will there be a requirement to install a temporary lightning protection system during construction?

**No.

3- If the answer to question 2 is yes, what are the requirements for the temporary lightning protection system?

**N/A

4- How much notice will need to be given to the user before start of construction?

** Upon award of the contract, the User will be contacted by a representative of DPW’s

Contract Management Branch to arrange access and specific schedule of construction.

5- Will the existing condensing units need to be relocated to curbs on the new roof or will they remain in their current location?

**They will remain on the existing roof.

6- How thick (inches) is the existing roof?

**You can arrange to take core samples with the Contracting Officer.

7- How tall is the parapet wall measured from the surface of the existing roof to the highest point on the parapet wall?

**You can arrange to take measurements with the Contracting Officer.

8- What is the spacing (inches) of the existing roof joists?

**A full set of the existing structural drawings for the building are with the Contracting

Officer.

9- Is the existing roof membrane and insulation to be demolished or left in place?

**The existing roofing system is to remain in place.

10- Will the contractor be required to install a new roof hatch ladder?

**No.

11- If the answer to question 10 is yes, please provide the specifications for the new roof hatch ladder.

**N/A

12- Please provide the specifications for the insulation to be installed on the new roof system.

**The new roof system will be uninsulated. The attic space will be fully ventilated by the louvers. The existing roof will remain in place and serve as insulation for the occupied space below.

13. No information is provided which shows the existing building supports.

Without this, I cannot price the retrofit because I do not know what my grid system will have to be."

** A full set of structural drawings for the building has been provided to the Contracting Officer.