W9124M19R0004 1/75 PLT LFX LIFE SUPPORT
Questions from interested parties:
1. Is dropping the four-inch raised flooring requirement, in favor of, a rigid plastic floor that sits directly on the ground and can hold more weight, an option?
-If the contractor can get the floor level using the rigid plastic this would be acceptable.
2. Are different tent sizes with the same SF an option, or is the specific sizes needed in order to fit in the area?
-Changes in tent sizes would need to be approved. After the proposed changes they could be deemed acceptable.
3. Are you taking the 50 sq ft OSHA minimum into account when calculating how many square feet of tent is required?
-Please advise on this more.
4. Are cots required?
-No
5. Can we get a picture of the proposed layout?
Tentative Places are attached. We will recommend designated areas and will work with the contractor on exact placement pending the contractors professional recommendation.
6. Are dumpsters needed for the DFAC?
-Dumpsters will be coordinated through the Department of Public Works.
7. Is there a requirement for bottled water or ice?
-No