W9124A18R0009.pdf

PDF 1005 KB Posted

Attached to
Air to Ground Radio
Solicitation number
W9124A18R0009
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEE ADDENDUM

(No Collect Calls)

W9124A18R0009 15-Mar-2018

b. TELEPHONE NUMBER

520-538-0395

8. OFFER DUE DATE/LOCAL TIME

04:00 PM 13 Apr 2018

5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 2/2012)

Prescribed by GSA – FAR (48 CFR) 53.212

(TYPE OR PRINT)

(SIGNATURE OF CONTRACTING OFFICER)

ADDENDA ARE

26. TOTAL AWARD AMOUNT (For Gov t. Use Only )

23.

CODE 10. THIS ACQUISITION IS

SUCH ADDRESS IN OFFER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT

BELOW IS CHECKED

TELEPHONE NO.

W9124A9. ISSUED BY

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME

LISA PADILLA

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER

(TYPE OR PRINT)

30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA

0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.

25. ACCOUNTING AND APPROPRIATION DATA

1. REQUISITION NUMBER

20.

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

0011147173

ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

. YOUR OFFER ON SOLICITATION

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

% FOR:SET ASIDE:UNRESTRICTED OR X

SMALL BUSINESSX

17a.CONTRACTOR/ CODE FACILITY

OFFEROR CODE

ACC-APG

GARRISON COMMERCIAL ACQUISITION

BUILDING 22208

FT HUACHUCA AZ 85613

18a. PAYMENT WILL BE MADE BY CODE

RATED ORDER UNDER

DPAS (15 CFR 700)

13a. THIS CONTRACT IS A

13b. RATING

CODE15. DELIVER TO CODE W61DEX 16. ADMINISTERED BY

12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

14. METHOD OF SOLICITATION

RFQ IFB RFPX

CENTRAL RECEIVING WAREHOUSE

LISA AT 538-7450

BLDG 90312 MACHOL AVE

FT HUACHUCA AZ 85613

TEL: 520-538-7450 FAX:

(520) 538-6503FAX:

TEL: SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

8(A)

HUBZONE SMALL

BUSINESS

SIZE STANDARD:

1,250

NAICS:

334220

X

OFFER DATED

29. AWARD OF CONTRACT: REF.

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

EMAIL:

TEL:

31c. DATE SIGNED

SEE SCHEDULE

SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT

24.22.21.19.

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

(CONTINUED)

PAGE 2 OF46

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

37. CHECK NUMBER

FINALPARTIALCOMPLETE

36. PAYMENT35. AMOUNT VERIFIED

CORRECT FOR

34. VOUCHER NUMBER

FINAL

33. SHIP NUMBER

PARTIAL

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

STANDARD FORM 1449 (REV. 2/2012) BACK

Prescribed by GSA – FAR (48 CFR) 53.212

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

20.

SCHEDULE OF SUPPLIES/ SERVICES

21.

QUANTITY UNIT

22. 23.

UNIT PRICE

24.

AMOUNT

19.

ITEM NO.

W9124A18R0009

Section SF 1449 - CONTINUATION SHEET

SPECIAL INSTRUCTIONS

Award of this contract will be done using FAR Part 13 – Simplified Acquisition Procedures

Any contract with the government requires registration in the System for Award Management (SAM) and must be register in ORCA at website https://www.sam.gov.

Please provide you’re DUNs, Cage Code and Tax ID number as part of your proposal.

Please total all CLIN’s on your quote/proposal to show total overall price and include the FOB lead time as well as any reinstatement charges that may apply.

Please provide detailed drawings or specification sheets with your proposal if appropriate.

Please provide any reinstatement charges that may apply if necessary.

This requirement will be awarded as a Lowest Price Technically Acceptable (LPTA) contact.

Brand Name or Equal:

If an item in this solicitation is identified as “brand name or equal,” the purchase description reflects the characteristics and level of quality that will satisfy the Government’s need. The salient physical, functional, or performance characteristics that “equal” products and must meet are specified in the solicitation. (See FAR Clasue 52.211-6 for details on proposing offers which are “or equal”).

Evaluation Factors:

The Government will award a Firm Fixed-Price Contract on an all or none basis, to the lowest priced offer that meets all the terms and conditions of the solicitation. (See FAR Clause 52.212-1 Instructions to Offerors – Commercial Items and FAR Clause 52.212-2 Evaluation – Commercial Items) for details on the Government’s instructions and evaluation procedures.

Delivery Schedule:

The vendor selected must be able to deliver to Ft. Huachuca by delivery date specified after contract award. Request that address labels contain the contract number on all shipping documents.

All offeror’s who need access to the military installation must come through the Main Gate (Van Demon) of Fort Huachuca, located at the corner of State Highway 90 Bypass and State Highway 90.

Point of Contract for this action is:

Lisa Padilla Phone: 520-538-0395 Fax: 520-533-5157 E-Mail:lisa.a.padilla.civ@mail.mil

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

0001 1 Each

AIR TO GROUND RADIO

FFP

ICOM Model IC-A220 vhf air transceiver 13.8 VDC power supply. Brand Name or Equal.

FOB: Destination

PURCHASE REQUEST NUMBER: 0011147173

PSC CD: 5895

NET AMT

0002 1 Each

RFS - 120-132 MHZ

FFP

UNITY GAIN FIBERGLASS OMNI ANTENNA.

FOB: Destination

0003 120 Each

LMR-400

FFP

FOB: Destination

0004 2 Each

BNC MALE (PLUG)

FFP

CRIMP CONNECTOR.

FOB: Destination

0005 2 Each

NXU2A REMOTE PANEL

FFP

FOB: Destination

0006 2 Each

COMPACT MEDIA CONVERTER

FFP

FOB: Destination

0007 1 Each

POLYPHASER N/F - N/F

FFP

FOB: Destination

0008 4 Each

NM CRIMP CONNECTOR

FFP

FOB: Destination

0009 1 Each Installation, Testing, and Optimization

FFP

Must be a Motorola or a Motorola Premier Service Partner NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

FOB: Destination

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government 0003 Destination Government Destination Government 0004 Destination Government Destination Government 0005 Destination Government Destination Government 0006 Destination Government Destination Government 0007 Destination Government Destination Government 0008 Destination Government Destination Government 0009 Destination Government Destination Government

STATEMENT OF WORK

Land Mobile Radio (LMR) Airfield Consolette Initial Preparation date: 1/10/2018

Revision Number: 1 Current Date: 3/15/2018

Preparing Organization: NEC, Fort Huachuca, Arizona

TABLE OF CONTENTS

1. Introduction and Background

2.0 Scope

3.0 Technical Requirements

3.1 Design and Engineering

3.2 Installation

3.3 Networking

3.4 Brand Name

4.0 Administrative Requirements

4.1 Place of Work and Work Hours

4.2 Training

4.3 Travel

4.4 Security

4.4.1 Physical Security

4.4.2 Key Control

4.4.3 Lock Combinations

4.5 Protection

4.5.1 Information Assurance

4.5.2 Information Assurance Workforce Certification

4.5.3 Non-Government-owned computing systems or devices

4.5.4 Protection of Sensitive Unclassified Data

4.5.5 Anti-terrorism

4.5.6 Operations Security (OPSEC)

4.6 Safety

4.7 Contractor Indentification Requirements

4.8 Government Provided Resources

4.8.1 Government Furnished Property (GFP)

4.8.2 Contractor Provided Equipment and Material

4.9 Common Access Card (CAC)

4.10 Access to Protected Information

4.11 Accounting for Contractor Support

5.0 Quality Control and Quality Assurance

5.1 Quality Control

5.2 Quality Assurance

6.0 References

6.1 Publications and Forms

6.2 Definitions

7.0 Applicable Documents

8. NEC POC

1. Introduction and Background. Enhancements to the Fort Huachuca LMR are needed to enable the Post Dispatch Center Operators to engage in radio voice traffic with aircraft located in and around the Libby Army Airfield (LAAF) on the emergency air traffic control frequency of 121.5mHz during weekends when the airfield tower is unmanned.

At end state, dispatch operators at Site 6, building 31044, using headsets connected to the MCC7500 Elite Dispatch Application will remotely transmit and receive from a radio consolette physically located at LAAF. The radio consolette needs to be physically located at LAAF to ensure the best radio reception and transmission to aircraft under emergency conditions.

2. Scope.

The specific support to be addressed during the performance of this order is described in Section 3.0. The Contractor shall support the NEC in improving the functionality of the Land Mobile Radio (LMR) services on Fort Huachuca with the design, engineering development, purchase, installation, networking and testing of the Airfield Consolette to the Fort Huachuca Land Mobile Radio (LMR) System.

3. Technical Requirements.

3.1. Design and Engineering. The contractor shall design and develop a radio path using a consolette capable of transmitting and receiving on 121.5mHz and interoperate with the dispatch console at building 31044 using the Elite Dispatch Application resources icons through as existing LMR Conventional Channel Gateway (CCGW) and site router and switch located at the Mutual Aid CCGW stack at building 51420 (Site8). Fiber connectivity from LAAF to Site8 will be provided by the NEC.

Equipment needed.

One radio consolette, antenna and 100ft antenna cable. Any lightning protection, grounding and connectors required.

Two fiber media converters.

One UPS to provide battery hold time for the consolette and media converter at LAAF.

3.2 Installation. The contractor shall install the radio consolette, antenna and antenna cable. Plus any lightning protection, grounding, connectors or brackets needed to complete the installation. Install the two media converters.

Install the UPS. Connect all CAT-V and fiber connections. Configure port 4 at the CCGW router 10.1.8.87.

Configure the CCGW resource in Zone Configuration Manager (ZCM). Add the resource to Elite Dispatch config.

Test functionality from the dispatch console to the radio consolette at LAAF. All equipment will be grounded in accordance with R56 grounding standards.

3.3 Networking. The contractor shall make any network configuration changes to complete the radio path. This shall include using the software application User Configuration Manager (UCM) and Zone Configuration Manager (ZCM) to add the CCGW port required for this path. The contractor shall have the ability to work with the Motorola System Support Center for any networking and troubleshooting requirements.

3.4 Brand Name. In order to provide a seamless movement, installation and integration of equipment into the Fort Huachuca LMR System, the contractor will be a Motorola Premier Service Partner and will have an expert level knowledge on the following systems and applications; Motorola Astro25 v7.7 LMR Systems, Motorola switching and router configuration methods and practices, Motorola v7.7 Unified Event Manager (UEM), Motorola v7.7 User Configuration Manager (UCM), Motorola v7.7 Zone Configuration Manager (ZCM), Motorola MCC 7500 Elite Admin and Elite Dispatch functionality.

4. Administrative Requirements

4.1 Place of Work and work Hours. The Contractor's place of duty shall be in a Government provided office environment located at various sites on Fort Huachuca Arizona, unless in a TDY status. ACCESS TO

CLASSIFIED INFORMATION IS LIMITED TO GOVERNMENT WORK LOCATIONS. NO CLASSIFIED

INFORMATION SHALL BE DISCUSSED, PROCESSED, OR STORED IN THE CONTRACTOR’S FACILITY.

Each employee shall work a 40-hour work week consisting of 8-hour days. The workday shall start between 0600 and 0800, and end between 1500 and 1700 depending on company policy for lunch periods. A regularly scheduled lunch break must be taken. The COR must approve, in advance, any deviation from the standard schedule, including any additional duty hours and all overtime supporting this requirement. The Contractor shall coordinate employees’ proposed normal workday schedules with the COR to ensure they will meet mission requirements before the employees’ start date.

4.2. Training. All Contractor personnel shall be trained and have the required certification to provide the support as defined in this PWS. The Government will only provide one-time training to the existing contractor personnel for new technology not previously identified that can be directly correlated to the tasks within the PWS. If trained Contractor personnel are replaced, the Contractor shall be responsible for training the replacement employees at the Contractor’s expense before they begin work on this contract/task order.

4.3. Travel. The Contractor shall provide support at CONUS. The support outside Fort Huachuca, AZ, area will be designated as TDY. The Contractor shall obtain all necessary travel documents to execute travel as required, including but not limited to U.S. Government-issued passports to support OCONUS travel requirements. The Contractor shall ensure all Contractor employees comply with all guidance, instructions, and general orders applicable to U.S. Armed Forces and DoD civilians and issued by the Theater Commander or his/her representative.

This shall include any and all guidance and instructions issued based on the need to ensure mission accomplishment, force protection, and safety. The Government will reimburse the Contractor, in accordance with the Joint Travel Regulation (JTR) and FAR part 31.205-46, for all approved travel incurred during the performance of this task order. The COR will approve all travel requirements before travel begins.

4.3.1. The COR will issue travel subtasks via email to the Contractor that include destination, dates, duration of stay, purpose, and estimated cost. Travel requests for deployment will specify additional travel conditions. The Contractor shall not proceed without this notification and adequate contract/task order funding.

4.3.1.1. Travel to other OCONUS Locations. The Contractor may be required to travel to various remote OCONUS locations, such as Southwest Asia, and may be required to perform under extreme conditions. The Government will provide the Contractor a Letter of Authorization (LOA) for billeting, meals, and other amenities as required. The Government and the Contractor will fulfill all current regulatory and policy requirements before travel.

4.3.1.2. The Contractor shall coordinate all contractor travel requirements with appropriate Government personnel within NETCOM at each location in advance of the actual travel to minimize the impact on Government travel requirements.

4.3.1.3. Synchronized Predeployment Operational Tracker (SPOT): The prime Contractor shall enter before deployment and maintain data for all Contractor personnel to include sub-contractors that are authorized to accompany U.S. Armed Forces deployed outside the United States as specified in paragraph (b)(1) of this clause.

The Contractor shall use the Synchronized Predeployment and Operational Tracker (SPOT) web-based system, at https://spot.dmdc.mil/privacy.aspx, to enter and maintain the data.

4.3.1.4. The prime contractor is responsible to close out the deployment of personnel, including subcontractor employees at all tiers, at the end of the contract completion period and to release the personnel from the prime contractor’s company in the SPOT database IAW DFARS 252.225-7040 or DFARS DOD class deviation 2011- O0004. The release of employee information must be accomplished no more than 30 calendar days after the end of the contract/task order completion date.

4.3.1.5. Accountability of Prime and Subcontractor Personnel: Whether specifically written into the contract/task order or not, it is the expectation of the Government that for any persons brought into the theater of operation for the sole purposes of performing work on Government contracts, contract employers will return employees to their point of origin/home country once the contract is completed or their employment is terminated for any reason. If the prime contractor fails to re-deploy an employee, or subcontractor employee at any tier, the Government shall notify the applicable U.S. Embassy to take appropriate action. Failure by the prime contractor to re-deploy its personnel, including subcontractor personnel at any tier, at the end of the contract completion date, could result in the contractor being placed on the Excluded Parties List System (EPLS) and not be allowed to propose on future U.S.

contracts anywhere in the world.

4.3.2. Travel to Germany. Contractors traveling to Germany for TDY shall use the Technical Expert Status Accreditation/Analytical Support Accreditation (TESA/ASSA) TDY procedures. The complete instructions are available at the DOD Contractor Personnel Office (DOCPER) website at http://www.eur.army.mil/g1/content/CPD/docper/docper_germanyLinks.html?tab=5&framepage=tesa.html.

Under the Technical TESA/ASSA TDY procedure, contractors would be entitled to logistical support and applicable tax exemptions.

4.3.2.1. Before the Contractor begins work in Germany, the COR for the Contractor seeking TE accreditation under this procedure will complete the TESA/ASSA TDY Application online through the DOCPER Contractor Online Processing System (DCOPS) and submit it, along with required uploaded documents, to DOCPER. The application form (AE 715-9D) must be printed from DCOPS, signed by the COR and the applicant, and then be scanned and uploaded into DCOPS.

4.3.2.2. Applications submitted to DOCPER more than 90 days in advance of the arrival date will be returned without action. [Note: The time between approval of the DD 1172-2 by DOCPER and the issuance by the ID card facility must be less than 90 days.] If the individual is determined to be qualified and is performing work in an approved position on an approved contract, DOCPER will approve technical expert status (and an ID card) for a limited period of time (not to exceed 90 days). [Note: Because ID card facilities will not issue ID cards for periods less than 30 days, 1172-2s issued by DOCPER will reflect a minimum of 30 days.]

4.3.2.3. Each period of TESA/ASSA TDY requires a separate TESA/ASSA TDY application. TESA/ASSA TDY is limited to a cumulative total of 90 days or three approved requests, whichever occurs first, within a 12-month period. The latter restriction concerning the number of approved requests is a function of the 30-day minimum approval period as three requests for short periods of TESA/ASSA TDY over a period of time still equate to the maximum of 90 days.

4.3.3. Travel to Republic of Korea (ROK).

4.3.3.1. U.S. Government contractors who travel to ROK must be identified as Invited Contractors/Technical Representatives (IC/TR). Reference is United States Forces Korea (USFK) Regulation 700-19 (The Invited Contractors and Technical Representatives Program).

4.3.3.2. The COR will inform the KO of any anticipated contractor travel to Korea as soon as the requirement is known. The COR will ensure that the Sponsoring Agency (SA) has been identified, and that the SA has appointed a Responsible Officer (RO). The RO shall ensure the completed USFK Form 700-19A-R-E and Letter of Accreditation (LOA) are submitted USFK/FKAQ no later than 30 calendar days prior to travel. USFK/FAQ will review, process, stamp, and complete Part III of the USFK Form 700-19A-R-E.

4.3.3.3. Status of Forces Agreement (SOFA) ensures that SOFA provisions on legal and jurisdictional issues and official support mechanisms are applied to the Contractor while on official business. In order to obtain SOFA status in Korea, the Contractor employees shall present a DOD identification card obtained stateside prior to travel, passport with A-3 Visa, LOA, red-stamped USFK Form 700-19A-R-E, and copies of each document to Korean immigration authorities.

4.3.3.4. Training Requirements for IC/TR personnel shall be conducted in accordance with USFK Reg 350-2 Theater Specific Required Training for all Arriving Personnel and Units Assigned to, Rotating to, or in Temporary Duty Status to USFK. IC/TR personnel shall comply with requirements of USFK Reg 350-2. The COR will provide necessary instructions for accessing and completing this training.

4.3.4. Travel to Japan.

4.3.4.1. Contractors traveling to Japan for TDY shall refer to the Electronic Foreign Clearance Guide for Japan at https://www.fcg.pentagon.mil/fcg.cfm for information on entry requirements. The Status of Forces Agreement (SOFA) with Japan covers contractor personnel who travel to Japan solely to execute contracts for the benefit of the United States armed forces. Under the SOFA, theater clearance is required. The Contractor shall submit clearance requests via the Automated Personnel and Aircraft Clearance System (APACS). The Contractor shall log onto the website at https://apacs.dtic.mil to create an account, and then create and submit a clearance request. Training, materials, documentation, and contact information are available on the website.

4.3.5. Travel to Southwest Asia.

4.3.5.1 Contractors traveling to SWA for TDY shall refer to the Electronic Foreign Clearance Guide for SWA countries at https://www.fcg.pentagon.mil/fcg.cfm for information on entry requirements. The Status of Forces Agreement (SOFA) with SWA covers contractor personnel who travel to SWA solely to execute contracts for the benefit of the United States armed forces. Under the SOFA, theater clearance is required. The Contractor shall submit clearance requests via the Automated Personnel and Aircraft Clearance System (APACS). The Contractor shall log onto the website at https://apacs.dtic.mil to create an account, and then create and submit a clearance request. Training, materials, documentation, and contact information is available on the website.

4.4. Security. This requirement will not require access to classified and controlled or sensitive information and facilities. Contractor personnel shall comply with all applicable security and safety regulations, guidance, and procedures, including local, referenced in this PWS and in effect at the work sites. Contractor personnel will not require access to SIPRNET in support of this work effort.

4.4.1 Physical Security: The Contractor shall safeguard all Government equipment, information and property provided for Contractor use.

4.4.2 Key Control: All references to keys include key cards. The Contractor shall ensure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. The Contractor shall not duplicate Government-issued keys. The Contractor shall include procedures covering key control in the QCP. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The Contractor shall immediately report any occurrence of lost or duplicate keys to the COR.

4.4.3. Lock Combinations: The Contractor shall ensure all lock combinations are not revealed to unauthorized persons. The Contractor shall ensure lock combinations are changed when personnel having access to the combinations no longer have a need to know such combinations. The Contractor shall include these procedures in the Contractor’s QCP.

4.5. Protection

4.5.1 Information Assurance

4.5.1.1 Information Assurance (IA) Training. All Contractor personnel with access to Government information systems and networks shall successfully complete all required initial and annual IA awareness training as specified in AR 25-2 and as specified by the Government requiring activity. Training is available at https://ia.signal.army.mil

4.5.1.2 Contractor employees and subcontractor employees performing work under this contract/task order who have access to Government information systems and networks shall create a user account and profile in the Army Training and Certification Tracking System website (ATCTS) at https://atc.us.army.mil, in the unit container managed by the COR. Certificates of successful completion of IA training, Acceptable Use Policies (AUP), applicable baseline and computing environment certifications, and continuing professional education credits, as required by DoD 8570.01-M, shall be uploaded to the ATCTS and provided to the COR for continuous compliance monitoring and reporting.

4.5.1.3 The Contractor shall ensure that all contractor employees and subcontractor employees requiring IA awareness training complete the training at the start of work performance on this contract/task order and annually thereafter for the duration of this contract/task order.

4.5.2 Information Assurance Workforce Certification. DFARS clause 252.239-7001 (Information Assurance Contractor Training and Certification) applies to this contract/task order. This contract/task order is subject to the mandates of DoD 8570.01-M, which establishes baseline technical and management IA skills for personnel performing IA functions within DoD. Functions spanning multiple levels require certification of the highest level functions. Contractor personnel performing functions in multiple categories or specialties shall hold certifications appropriate to the functions performed in each category or specialty.

4.5.2.1 The Contractor shall ensure its IA workforce members have the baseline certifications corresponding to their IA functions, as defined in Chapters 3, 4, 5, 10, and 11, and Appendix 3 of DoD 8570.01-M at work performance start date. Contractors will obtain all required Computing Environment (CE) certificates within 6 months of being engaged. The IAT Level I baseline certification is the minimum requirement for unsupervised privileged access.

The Contractor shall ensure that all employee certifications remain active and are renewed prior to expiration.

4.5.2.2 The Contractor shall ensure that all employees IA certifications are released to the Department of Defense through the Defense Workforce Certification Application at https://www.dmdc.osd.mil/appj/dwc/index.jsp.

4.5.2.3 Table 1 reflects the Personnel Security (IT Level) and IA Workforce Specialty requirements, aligning the IA functional responsibilities and access levels to the task order tasks, in accordance with DoD 8570.01-M.

Table 1. Information Technology Access and IA Certification Requirements.

Functional Category

IT Level

(IAW AR

25-2)

Security Clearance

Investigation Required

IA Certification Category and Level (IAW DoD 8570.01- M and BBP 05-PR- M-0002)

Computing Environment Certifications

Site Management II SECRET

NACLC IAM II

Yes

Technical Support Level I II SECRET NACLC IAT II

Level II II SECRET

NACLC IAT II

Level III I SECRET

SSBI IAT III

Supply Technical Support III SECRET

NACLC NA

No

4.5.3. Non-Government-owned computing systems or devices. The Contractor shall comply with AR 25-1 and AR 25-2. The Contractor shall not install or connect non-Government-owned computing systems or devices to Government networks without the COR’s coordinating and obtaining proper authorization from the appropriate Information Assurance Program Manager (IAPM), ensuring that all software has a Government Certificate of Networthiness. The non-Government-owned computing systems or devices include, but are not limited to, personal or Contractor-owned thumb drives (e.g., memory sticks, flash drives, Universal Serial Bus (USB) drives, jump drives, pen drives), removable or external hard drives, Personal Digital Assistants (PDA), PC Cards/Express Cards, MP3 players, cell phones, digital media, floppy disks, compact disc (CD)/digital video disk (DVD) burners, optical recordings, photo flash cards, laptops, or any devices that can store data.

4.5.4. Protection of Sensitive Unclassified Data. The Contractor shall ensure any sensitive information, including, but not limited to, Personally Identifiable Information (PII) and For Official Use Only (FOUO), proprietary, and Law Enforcement Sensitive information residing on Mobile Computing Devices (MCD) or other external media, is protected in accordance with current Data at Rest (DAR) guidelines and requirements. The Contractor shall use an authorized, approved, and prescribed DAR solution. The MCDs include, but are not limited to, laptop, netbook, notebook, or tablet computers, and Blackberry or equivalent devices. External media include optical disk media such as CDs, DVDs, USB drives (also referred to as flash or thumb drives) (when authorization to use them is restored), floppy disks, and other portable digital storage devices. Guidance for protecting DAR information appears in DoD Policy Memorandum, 3 Jul 07, subject: Encryption of Sensitive Unclassified Data at Rest on Mobile Computing Devices and Removable Media and in DoD Component implementing instructions.

4.5.5 Antiterrorism

4.5.5.1 Antiterrorism Level I Training. The Contractor shall ensure that all contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas complete Antiterrorism (AT) Level I awareness training within 30 calendar days after start of employee performance on this contract/task order. Within 5 calendar days after completion of training, the contractor shall certify to the COR or KO that all employees performing work under this contract/task order have completed the AT Level I awareness training. AT Level I awareness training is available at https://jkodirect.jten.mil, course #JS-US007-14.

4.5.5.2 Outside Continental United States (OCONUS) Travel. If this contract/task order requires OCONUS travel, contractor employees shall obtain KO or COR approval prior to such travel. The contractor employees shall contact the Government requiring activity Antiterrorism Office (ATO) to receive a specific theater AT/threat briefing prior to departing on OCONUS temporary duty travel.

4.5.5.3 iWATCH. The Contractor shall ensure that all employees and subcontractor employees performing work under this contract/task order are trained on the local iWATCH program within 30 calendar days of start of employee performance on this contract/task order. The requiring activity ATO will provide the locally developed iWATCH training. The Contractor shall maintain all iWATCH training records and shall provide copies to the COR upon request.

4.5.5.4 Emergencies and Force Protection Conditions. During declare emergencies and/or elevated Force Protection Conditions (FPCONs) Charlie or Delta, contractor performance under this contract/task order shall be determined by the COR or KO. All Contractor employees providing services under this contract/task order are required to report for duty as scheduled and remain on duty during declared emergencies and/or elevated FPCON levels unless otherwise directed by the KO or COR. The Contractor Project Manager shall keep the COR apprised of all personnel whereabouts when in a temporary duty (TDY) location.

4.5.6 Operations Security (OPSEC). The Contractor shall comply with DoD Directive 5205.02E, Army Regulation 530-1, and the requiring activity OPSEC program. Failure to comply with the OPSEC directives shall be deemed adequate cause for the removal of a Contractor employee from performance on this contract/task order and could be considered for appropriate legal action. The Contractor shall ensure all contractor employees and subcontractors performing work under this contract/task order complete Level I OPSEC training within 30 calendar days of start of employee performance on this contract/task order and annually thereafter. The Contractor shall maintain all OPSEC training records and shall provide copies to the COR upon request.

4.6. Safety. The Contractor shall perform in a manner that assures maximum safety and protection for their employees and all personnel while performing work for this contract/task order. The Contractor shall exercise surveillance on a continuing basis and shall eliminate or otherwise control existing or potential safety hazards.

4.6.1 The Contractor shall participate in the Government’s safety program. Compliance with provisions pertaining to safety of site facilities and equipment is mandatory. The Contractor shall establish and implement a comprehensive Safety Program Plan for use by contractor and sub-contractor employees. This Plan shall incorporate appropriate elements of 29 CFR 1910 and 1926, AR 385-10, NETCOM Reg 385-1 and applicable OSHA regulatory guidance. The Contractor shall provide the COR and KO with its Safety Program Plan within 30 calendar days of contract/task order award for acceptance. The COR and KO will approve all updates to the Safety Program Plan before implementation.

4.6..2 The Contractor shall comply with all federal, state and local policies, directives, laws and regulations. During the performance of tasks requiring protective equipment and clothing, contractor employees shall wear safety items required by OSHA and as specified in the applicable regulations. The Contractor shall be responsible for providing personal protective equipment, clothing and training.

4.6.3 The COR may require the Contractor to cease operations associated with the performance of this contract/task order for safety violation reasons. The Contractor shall correct any safety violations, caused by a contractor employee, during non-duty hours at no additional cost to the Government.

4.6.4 The Contractor shall ensure all employees receive the safety training required by all federal, state and local laws and policies. The Contractor shall maintain the safety training records and make them available to the COR and KO upon request.

4.7. Contractor Identification Requirements. In accordance with FAR 37.114(c), all contractor personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious are required to identify themselves as such to avoid being mistaken for Government officials.

Contractors performing work at Government workplaces shall provide their employees with an easily readable identification (ID) badge indicating the employee’s name, the contractor’s name, the functional area of assignment, and a recent color photograph of the employee. Contractors shall require their employees to wear the ID badges visibly when performing work at Government workplaces. Contractor personnel shall also ensure that all e-mails, documents, or reports they produce are suitably marked as Contractor products and/or that Contractor participation is appropriately disclosed. All signature blocks on e-mails shall indicate that the sender is a Contractor employee and include the Contractor's company name.

4.8 Government Provided Resources

4.8.1 Government Furnished Property (GFP).

4.8.1.1 Safeguarding Government Property. The Contractor shall safeguard all Government property as defined in the DFARS, FAR and applicable regulations. The Government retains title to all Government-furnished property until properly disposed of, as authorized by law or regulation. The Contractor shall not use GFP or any Government property for any purpose other than in the performance of this contract/task order.

4.8.1.2. Written notifications required in FAR 52.245-1 for loss, damage, destruction, or theft of Government Property shall be provided to the Government PA, COR and KO within 24 hours of the discovery.

4.8.1.3. Government Property that is provided to the contractor for use not via the contract/task order will not be considered GFP. This includes fixed equipment that the Contractor is operating and maintaining, does not have full control of, or Government Property that is being made available for the Contractor’s use on a temporary basis or on an as needed basis. The contractor shall protect all Government property from damage, theft and negligence IAW with FAR 52.245-1.The Government may use DA Form 3161, Hand Receipt DA Form 2062, or a locally produced form to provide the property to the Contractor as an audit trail. However, the accountability will remain with the Government.

4.8.2. Contractor Provided Equipment and Material

4.8.2.1. Contractor Property. The Contractor shall provide all equipment, parts, safety equipment and clothing, vehicles, tools, materials and items required to perform the requirements of this contract/task order unless provided as GFP. All Contractor provided equipment shall be clearly marked and stored separately from Government property. Upon completion or termination of this contract/task order, the Contractor shall remove all Contractor-owned equipment/property. If the Contractor does not remove Contractor-owned items NLT thirty (30) calendar days after the conclusion of the contract/task order, the Government will properly dispose of the items. The Contractor shall furnish safety protective equipment and clothing required for compliance with NETCOM Regulation 385-1 and other applicable regulations prior to performance start.

4.9. Common Access Card (CAC). The Government will provide special access badges as necessary. The Prime Contractor Facility Security Officer (FSO) shall ensure that all Contractor personnel acquire and maintain CACs.

The approving Government Trusted Agent (TA) may give access to the FSO using the online Trusted Associate Sponsorship System (TASS), https://www.dmdc.osd.mil/tass. Contractor eligibility remains in force during employment under the contract/task order for those employees who have a valid and recurring requirement for access to Government facilities or automation systems (reference DD254 for systems access) to perform those duties stipulated in the contract. The Contractor shall use a valid CAC to access the Government domain. The Contractor shall immediately return the CACs to the COR when the Contractor employee’s employment is terminated or upon expiration of the contract/task order. The CACs expire when Contractor employee’s eligibility terminates or three years from the issuance date, whichever occurs first. The Contractor is responsible for all CACs and shall report all lost or stolen CACs to the COR immediately.

4.10. Access to Protected Information. Protected information means all non-public information, including, but not limited to, trade secrets or proprietary information of other Contractors, Government source selection information, Privacy Act or personally identifiable information (PII), or any other information with distribution limited by the Government. If, during the performance of this requirement, Contractor personnel obtain access by any means to protected information, they shall not disclose, publish, divulge, release, or make known, in any manner or to any extent, the information except as necessary to carry out duties under this contract. Protected information shall be given only to persons specifically granted access to this sensitive information and may not be further divulged without specific prior written approval from an authorized U.S. Government individual. Further, contractor employees may use any non-public information for official/authorized Government purposes, and they shall not use the information for their personal gain, the gain of their employer, or the gain of anyone else. The Contractor shall notify the Contracting Officer of any potential organizational conflicts of interest created by any such access;

however, a nondisclosure agreement will not overcome an Organizational Conflict of Interest (OCI) as defined in FAR Subpart 9.5. Moreover, the Trade Secrets Act prohibits releasing proprietary information without the owner’s consent. Accordingly, all Government Contractors are required to mark their proprietary information, and any time the Contractor is given inadvertent access to such marked information, the Contractor shall inform the Contracting Officer of the access.

4.11. Accounting for Contractor Support. The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the Contractor shall report ALL Contractor manpower (including subcontractor manpower) required for performance of this contract/task order. The Contractor is required to completely fill in all the information in the format using the following Web address:

https://cmra.army.mil. The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer's Representative; (2) Contract number, including task or delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of Contractor employee entering data; (5) Estimated direct labor hours (including sub-Contractors); (6) Estimated direct labor dollars paid this reporting period (including sub-Contractors); (7) Total payments (including sub- Contractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by Contractor (and separate predominant FSC for each sub-Contractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the Contractor with its UIC for the purposes of reporting this information); (11) Locations where the Contractor and sub-Contractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of Contractor and sub-Contractor employees deployed in theater this reporting period (by country). As part of its submission, the Contractor shall also provide the estimated total cost (if any) incurred to comply with this reporting requirement. Reporting period will be the period of performance not to exceed 12 months ending September 30 of each Government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a Contractor's systems to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Army via the eCMRA secure data collection site. The contractor is required to completely fill-in all required data fields within the eCMRA.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year, beginning with 2013. Contractors may direct questions to the help desk at: http://www.ecmra.mil/.

5.0. Quality Control/Quality Assurance

5.1. Quality Control (QC). The Contractor shall develop a quality control plan (QCP) and implement a quality control program to satisfy the specific requirements of this contract/task order. Specific performance metrics appear in Attachment A, Performance Metrics/Surveillance Activity Checklist. An optimal QCP shall identify potential problem areas and evolve over the life of the contract/task order. The Contractor shall provide the QCP to the KO and COR for approval no later than 30 days after contract/task order award. The Contractor shall update the QCP as required and provide copies to the KO and COR for approval.

5.2. Quality Assurance (QA). The Government will monitor the Contractor's performance under this contract/task order. The Government has the right to conduct inspections and performance evaluation at any time. If any aspect of the performance is not in conformance with the requirements of this contract/task order, the Government has the right to issue to the Contractor a Contract Discrepancy Report (CDR). The Contractor shall explain in writing why performance was not in conformance with the requirements of the contract/task order, how performance will be returned to conformance, and how recurrence of the problem will be prevented in the future. The Contractor shall complete and return the CDR to the Contracting Officer and COR within five workdays after receipt of the CDR.

The Contractor shall maintain copies of all inspection and evaluation reports.

6.0 References

6.1 Publications and Forms

6.1.1. Forms. The Contractor shall use forms in an electronic format to the maximum extent possible. Forms shall be transmitted by e-mail unless regulations prescribe other procedures. The Contractor shall request printed Government forms from the COR when not available in electronic format.

The following forms are available from http://www.dtic.mil/whs/directives/infomgt/forms/ddforms0001-0499.htm.

DD Form 250, Material Inspection and Receiving Report DD Form 254, Department of Defense Contract Security Classification Specification

The following form is available from http://www.dtic.mil/whs/directives/infomgt/forms/dd/ddforms2500-2999.htm.

DD Form 2772 Contract Discrepancy Report

The following form is available from http://www.gsa.gov/portal/forms/type/SF.

SF85P Questionnaire for Public Trust Positions

6.1.2 LandWarNet Services Catalog is available from https://www.itmetrics.hua.army.mil/.

Army Command, Control, Communication, Computers and Information Management (C4IM) Services List Version 3.0

6.2 Definitions.

CONTRACTOR: A supplier or vendor having a contract to provide specific supplies or service to the government.

The term used in this contract refers to the prime.

CONTRACTING OFFICER: A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.

CONTRACTING OFFICER'S REPRESENTATIVE (COR): An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.

DEFECTIVE SERVICE: A service output that does not meet the standard of performance associated with the Performance Work Statement.

DELIVERABLE: is a term used in project management to describe a tangible or intangible object produced as a result of the project that is intended to be delivered to a customer (either internal or external). A deliverable could be a report, a document, a server upgrade, or any other building block of an overall project

KEY PERSONNEL: Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.

PHYSICAL SECURITY: Actions that prevent the loss or damage of Government property.

QUALITY ASSURANCE: The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.

QUALITY ASSURANCE SURVEILLANCE PLAN (QASP): An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.

QUALITY CONTROL: All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.

SUBCONTRACTOR: One that enters into a contract with a prime contractor. The Government does not have privities of contract with the subcontractor.

WORK DAY: The number of hours per day the Contractor provides services in accordance with the contract.

WORK WEEK: Is defined as Monday through Friday, unless specified otherwise.

7. Applicable Documents. The following publications form a part of this contract/task order. The publications below with which the Contractor shall comply are “Mandatory.” The Contractor shall use current commercial practices and publications whenever possible. A significant number of Army regulations that govern the conduct of the required work are listed below. The PWS may set a higher standard of performance than an applicable Army regulation. The PWS will have precedence over the regulations unless a particular PWS provision is in direct conflict with the applicable provision of the Army regulation. Unless otherwise noted, the publications can be accessed at www.apd.army.mil. Upon request, the Government will provide those publications not available on a web site. The Contractor shall comply with changes to publications.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.