AMENDMENT.pdf
PDF 781 KB Posted
- Attached to
- Grease Traps Cleaning Services Federal contract opportunity
- Solicitation number
- W9124A-18-R-0004
About this file
Solicitation Amendment - Sign and Return
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| QUESTIONS_AND_RESPONSES.pdf | ||
| AMENDMENT_-_Conformed_Copy.pdf | ||
| ATTACHMENT__1_-_Quality_Assurance_Surveillance_Plan_(QASP).pdf | ||
| SOLICITATION_-_W9124A-18-R-0004.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ACC-APG
KRISTIE JANSEN
BUILDING 22208
FT HUACHUCA AZ 85613
0011141722
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this Amendment is to:
14.1. Update Technical Exhibit; update highlighted in yellow .
14.2. Update CLIN quantities to match Technical Exhibit.
14.3. Conformed copy of Solicitation is attached w ith all updates.
14.4. Post Questions and Responses.
14.5. Vendor must submit proposal pricing on attached Conformed Copy.
14.6. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 49
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 21-Feb-2018
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9124A-18-R-0004
X 9B. DATED (SEE ITEM 11)
02-Feb-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
21-Feb-2018
CODE
ACC-APG
GARRISON COMMERCIAL ACQUISITION
BUILDING 22208
FT HUACHUCA AZ 85613
W9124A 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE W9124A
FACILITY CODECODE
EMAIL:TEL:
W9124A-18-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The FOB Destination has been deleted.
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
The NAICS code 562998 has been deleted.
The MDAP/MAIS Code 000 has been deleted.
SUBCLIN 0001AC
The pricing detail quantity has increased by 7,200.00 from 7,200.00 to 14,400.00.
CLIN 0002
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 0002AA
The pricing detail quantity has increased by 6,000.00 from 6,000.00 to 12,000.00.
SUBCLIN 0002AE
The pricing detail quantity has decreased by 2,000.00 from 6,000.00 to 4,000.00.
SUBCLIN 0002AF
The pricing detail quantity has increased by 3,760.00 from 240.00 to 4,000.00.
CLIN 0003
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 0003AA
The pricing detail quantity has decreased by 4,000.00 from 12,000.00 to 8,000.00.
SUBCLIN 0003AC
The pricing detail quantity has increased by 19,200.00 from 96,000.00 to 115,200.00.
CLIN 0004
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 0005
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 0006
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 0006AB
The CLIN extended description has changed from:
To:
Price per hour for grease traps emergency repairs in accordance with PWS Section H. Contractor will invoice for actual Emergency Repairs upon approval of the COR or Contracting Officer.Daytime: $OT: $Sun/Holiday: $ The pricing detail quantity has decreased by 39.00 from 40.00 to 1.00.
The unit of issue has changed from Hours to Job.
CLIN 1000
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 1000AC
CLIN 1001
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 1001AA
SUBCLIN 1001AE
SUBCLIN 1001AF
CLIN 1002
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 1002AA
SUBCLIN 1002AC
CLIN 1003
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
CLIN 1004
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 1005
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 1005AB
will invoice for actual Emergency Repairs upon approval of the COR or Contracting Officer.Daytime: $OT: $Sun/Holiday: $
CLIN 2000
The PSC code S202 has been deleted.
SUBCLIN 2000AC
CLIN 2001
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 2001AA
SUBCLIN 2001AE
SUBCLIN 2001AF
CLIN 2002
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 2002AA
SUBCLIN 2002AC
CLIN 2003
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 2004
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 2005
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 2005AB
will invoice for actual Emergency Repairs upon approval of the COR or Contracting Officer.Daytime: $OT: $Sun/Holiday: $
CLIN 3000
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 3000AC
CLIN 3001
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 3001AA
SUBCLIN 3001AE
SUBCLIN 3001AF
CLIN 3002
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 3002AA
SUBCLIN 3002AC
CLIN 3003
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 3004
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 3005
The PSC code S202 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 3005AB
will invoice for actual Emergency Repairs upon approval of the COR or Contracting Officer.Daytime: $OT: $Sun/Holiday: $
CLIN 4000
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 4000AC
CLIN 4001
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
SUBCLIN 4001AA
SUBCLIN 4001AE
SUBCLIN 4001AF
CLIN 4002
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 4002AA
SUBCLIN 4002AC
CLIN 4003
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 4004
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
CLIN 4005
The PSC code S202 has been deleted.
The PROG code S10 has been deleted.
The WSC Equipment code 000 has been deleted.
SUBCLIN 4005AB
will invoice for actual Emergency Repairs upon approval of the COR or Contracting Officer.Daytime: $OT: $Sun/Holiday: $
DELIVERIES AND PERFORMANCE
The following Delivery Schedule for CLIN 0001 has been deleted:
DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201 FOB: Destination
W61RSF
The following Delivery Schedule item for SUBCLIN 0001AC has been changed from:
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 0002 has been deleted:
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 0002AA has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 0002AE has been changed from:
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 0002AF has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 0003 has been deleted:
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 0003AA has been changed from:
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 0003AC has been changed from:
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 0004 has been deleted:
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 0005 has been deleted:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 0006 has been deleted:
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 0006AB has been changed from:
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2018 TO
02-APR-2019
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 1000 has been deleted:
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 1000AC has been changed from:
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 1001 has been deleted:
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 1001AA has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 1001AE has been changed from:
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 1001AF has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 1002 has been deleted:
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 1002AA has been changed from:
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 1002AC has been changed from:
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 1003 has been deleted:
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 1004 has been deleted:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 1005 has been deleted:
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 1005AB has been changed from:
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2019 TO
02-APR-2020
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 2000 has been deleted:
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 2000AC has been changed from:
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 2001 has been deleted:
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 2001AA has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 2001AE has been changed from:
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 2001AF has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 2002 has been deleted:
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 2002AA has been changed from:
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 2002AC has been changed from:
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 2003 has been deleted:
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 2004 has been deleted:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 2005 has been deleted:
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 2005AB has been changed from:
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2020 TO
02-APR-2021
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 3000 has been deleted:
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 3000AC has been changed from:
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 3001 has been deleted:
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 3001AA has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 3001AE has been changed from:
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 3001AF has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 3002 has been deleted:
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 3002AA has been changed from:
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 3002AC has been changed from:
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 3003 has been deleted:
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 3004 has been deleted:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 3005 has been deleted:
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 3005AB has been changed from:
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2021 TO
02-APR-2022
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 4000 has been deleted:
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 4000AC has been changed from:
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 4001 has been deleted:
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 4001AA has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 4001AE has been changed from:
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 4001AF has been changed from:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 4002 has been deleted:
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 4002AA has been changed from:
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 4002AC has been changed from:
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 4003 has been deleted:
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 4004 has been deleted:
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule for CLIN 4005 has been deleted:
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
The following Delivery Schedule item for SUBCLIN 4005AB has been changed from:
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
CAGE
POP 03-APR-2022 TO
02-APR-2023
N/A W6CF INSTALLATION SUPPORT
W6CF DIR DPW
BLDG 90312 MACHOL ST
FT HUACHUCA AZ 85613-6000
520-533-1201
INSPECTION AND ACCEPTANCE
The Acceptance/Inspection Schedule for CLIN 0001 has been changed from:
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
Destination Government Destination Government
INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
N/A N/A N/A N/A
The Acceptance/Inspection Schedule for CLIN 0002 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 0003 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 0004 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 0005 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 0006 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 1000 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 1001 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 1002 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 1003 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 1004 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 1005 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 2000 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 2001 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 2002 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 2003 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 2004 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 2005 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 3000 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 3001 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 3002 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 3003 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 3004 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 3005 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 4000 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 4001 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 4002 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 4003 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 4004 has been changed from:
Destination Government Destination Government
To:
The Acceptance/Inspection Schedule for CLIN 4005 has been changed from:
Destination Government Destination Government
To:
The following have been modified:
PERFORMANCE WORK STATEMENT
GREASE TRAPS CLEANING SERVICES
Fort Huachuca, Arizona
As of 30 January 2018
A. PURPOSE
A.1. The purpose of this contract is to remove all grease, dirt, or any other foreign material from Grease Traps. The term of the contract is for one year, with the option for renewal for each of the following four years.
B. THE CONTRACTOR SHALL PROVIDE TRAINED EMPLOYEE(S) TO:
B.1. Provide a competent person to oversee all aspects of the work being preformed, safety, quality control, disposal of waste materials, and clean-up.
B.1.1. The manager, competent person and alternate must be able to read, write, speak, and understand the English language.
B.2. Operations Security (OPSEC). The Contractor shall comply with DoD Directive 5205.02, Army Regulation 530-1, and the requiring activity OPSEC program. The Contractor shall ensure all contractor employees and subcontractors performing work under this contract complete Level I OPSEC training within 30 calendar days of start of employee performance on this contract and annually thereafter. The Contractor shall maintain all OPSEC training records and shall provide copies to the COR upon request.
B.2.1. AT Level I Training. AT Level I Training. All contractor employees, to include subcontractor employees, requiring access to Army installations, facilities, and controlled access areas shall complete AT Level I awareness training within 60 calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR or to the KO, if a COR is not assigned within 30 calendar days after completion of training by all employees and subcontractor personnel. The contractor is provided the following information: CAC HOLDERS: Level I Antiterrorism Awareness Training course (JS-US007-14) is now hosted on https://Jkodirect.jten.mil. Login and Search for the course on the Course Catalog tab via the number or key word, enroll, and Launch. FOR NON-CAC HOLDERS: A standalone version of the course for Non-CAC holders is also available at this link http://jko.jten.mil/courses/atl1/launch.html.
B.2.2. iWATCH Training. This standard language is for contractor employees with an area of performance within an Army controlled installation, facility or area. The contractor and all associated sub-contractors shall brief all employees on the local iWATCH program (training standards provided by the requiring activity Anti-Terrorism Officer). This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 45 calendar days of contract award and within 10 calendar days of new employees commencing performance with the results reported to the COR NLT 10 calendar days after contract award.
B.2.3. Contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). Contractor and all associated sub-contractors employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9 or NAF Clause BI.142, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
B.2.4. Contractor and all associated sub-contractors employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative).
C. GENERAL
C.1. Scope of Work. The contractor shall furnish all labor, materials, equipment, personnel, supervision and transportation necessary to provide cleaning service in accordance with paragraph G during normal work hours for all grease traps listed at Section G.1. All work areas shall be left clean and all debris shall be removed after completion of work. Performance shall be in accordance with the terms and conditions of this contract and with the current local, state, and federal regulations.
C.2. Damaged Items. All defective components, parts, and materials shall be reported in writing to the Contracting Officer’s Representative (COR). Any items damaged by the Contractor shall be replaced by the Contractor at no cost to the Government.
C.3. Location of work is at Fort Huachuca, Arizona.
C.4. Occupational Safety and Health. The Contractor shall comply with the provisions in Occupation Safety and Health Program, as well as the Occupational Safety and Health Administration (OSHA) Act, Part 1960.
C.5. The Contractor shall contain, clean up, decontaminate and dispose of hazardous/toxic spill(s) waste occurring on the site. The Contractor shall be required to divert his work force as necessary to support spill cleanup operations in the event of a large spill (over 5 gallons or in excess of 100 square feet of surface coverage). The Contractor shall report to the Contracting Officer and Fort Huachuca Environmental Compliance Management Branch by telephone immediately after notification or discovery of a large spill and within 30 minutes after notification or discovery of small spills (less than 5 gallons or less than 100 square feet of surface coverage) that contain hazardous or toxic substances.
D. DEFINITIONS
D.1. Normal Work Hours. All work shall be conducted during the hours of 7:00 a.m. to 3:30 p.m., Monday through Friday, excluding federal holidays, as set forth in Title 5, United States Code (USC) 6103 (a). Work accomplished outside this time frame shall require prior approval of the Contracting Officer.
D.1.1. Federal Holidays.
New Year's Day, 1 January Martin Luther King Jr.'s Birthday, third Monday in January President’s Day, third Monday in February Memorial Day, last Monday in May Independence Day, 4 July Labor Day, first Monday in September Columbus Day, second Monday in October Veterans Day, 11 November Thanksgiving Day, fourth Thursday in November Christmas Day, 25 December
D.2. Quality Assurance. These actions taken by the Government to assure it is receiving the services for which it has contracted. The Contracting Officer’s Representative (COR) or designated representative shall evaluate these services acting as Quality Assurance Evaluator (QAE).
D.3. Quality Control. Those actions taken by the contractor to assure the Government receives the services for which it contracts and those services meet the requirements of the contract.
E. GOVERNMENT-FURNISHED ITEMS
E.1. The Government will furnish water and electricity as required for the work to be performed.
F. CONTRACTOR-FURNISHED ITEMS
F.1. Contractor shall provide all equipment or material required to complete job as stated in paragraph G.
F.2. Certification. Contractor must provide proof that the firm has been engaged in inspection and maintenance services for the aforementioned items and has the qualifications both in terms of expertise and having proper and adequate equipment to accomplish the work as required.
F.3. Personnel. The Contractor shall provide the name and phone number of the Project Manager to the Contracting Officer within ten (10) calendar days after award of the contract, and no later than five (5) calendar days prior to effective date of change. The Project Manager shall be responsible for the supervision, overall administration, and coordination of the required services and be available during normal hours of operation. The Project Manager shall be empowered to act with full authority to enable him to make decisions to resolve the issues that arise in the day-to-day operations without undue delay.
F.4. Quality Control Plan (QCP). Quality Control is the responsibility of the contractor. The contractor is responsible for the delivery of quality services/supplies to the Government (see FAR 52.246-1 Contractor Inspection Requirements). The Contractor shall develop, implement and maintain an effective Quality Control System which includes a written QCP. The QCP shall implement standardized procedure/methodology for monitoring and documenting contract performance to ensure all contract requirements are met. The Contractors’ QCP must contain a systematic approach to monitor operations to ensure acceptable services/products are provided to the Government.
The QCP as a minimum shall address continuous process improvement; procedures for scheduling, conducting and documentation of inspection; discrepancy identification and correction; corrective action procedures to include procedures for addressing Government discovered non-conformance; procedures for root cause analysis to identify the root cause and root cause corrective action to prevent re-occurrence of discrepancies; procedures for trend analysis; procedures for collecting and addressing customer feedback/complaints. The contractor shall upon request provide to the Government their quality control documentation. QCP is to be delivered electronically within 10 days after contract award. Electronic copies of a comprehensive written QCP shall be submitted to the KO and COR within 5 working days when changes are made thereafter. After acceptance of the quality control plan the contractor shall receive the Contracting Officer’s acceptance in writing of any proposed change to their QC system.
F.5. Environmental Protection Plan (EPP). The Contractor shall establish and maintain an EPP that is in compliance with local, state, and federal environmental protection laws, regulations and standards. The EPP shall be submitted to the Contracting Officer for review and acceptance ten (10) calendar days prior to contract start date. Any changes to the EPP shall be submitted to the Contracting Officer for review and acceptance five (5) calendar days prior to any changes.
F.6. Material Safety Data Sheets (MSDS). Contractor shall provide MSDS to the COR or designated representative 10 days prior to start of work. MSDS are required for all hazardous material. Contractor is responsible for complying with all federal and state environmental and safety requirements. A specific requirement is hazardous communication and MSDS in accordance with 20 Code of Federal Regulations Part 1910. Contractor is also responsible for proper management of hazardous materials and petroleum products under Arizona Revised Statutes, Title 49, and the Resource Conversation and Recovery Act, 49 Code of Federal Regulations Parts 260 through 279.
F.7. Disposal Receipts. Contractor shall provide copy of all disposal receipts to the Government with monthly invoice.
G. SPECIFIC TASKS
G.1. The contractor shall pump and clean on all grease traps located at buildings listed below and at the frequency indicated. All grease traps shall be cleaned by the third Friday of the month due. Contractor shall contact the QAE two (2) days prior to service being performed and, in addition, will contact the QAE when contractor physically arrives on Fort Huachuca to pump grease traps. The contractor will also be required to provide emergency on call services for all facilities listed.
TECHNICAL EXHIBIT
Grease Traps Cleaning Service Locations
G.1.2. The contractor shall pump out all liquid and solid waste contents of the grease traps and inspection chambers until empty.
G.1.3. The contractor shall (where possible) scrape the walls of the tank to remove building-up of solids.
G.1.4. The contractor shall secure all lids to the tank and make sure that they are fitted property before departing from the area.
G.2. The contractor when finished shall clean the area of all trash and grease spills before departing from the work area.
G.3. The contractor shall properly dispose of all grease laden water in a site permitted and approved by the Arizona Department of Environmental Quality for the disposal or transfer of solid waste or a site that meets the criteria for an “agricultural landfill” under A.R.S. § 49-766 and provide copy of disposal receipts as required in paragraph F.7.
H. EMERGENCY SERVICE
H.1. When it is determined by the COR there is a valid need for emergency cleaning of grease traps, the contractor shall respond within (two) 2 hours of callout.
I. SAFETY
I.1. Procedures. The work performance shall be in accordance with the following current publications: “Corps of Engineers Manual, General Safety Requirements, EM 385-1-1; Occupational Safety and Health Act (OSHA) Public Law 91-596 and the standards as set by the National Board of Fire Underwriters (National Fire Codes) and NFPA National Fire Code, No. 91. Flammable solvents or other flammable cleaning aids shall not be used. During cleaning, proper ventilation shall be provided and safety precautions taken when cleaning is done inside Grease Trap tanks.
CLIN Customer Bldg. # Location Capacity (Gallons) Cleaning Schedule
Cleanings Per Year
0001AA AAFES 82301 Mini Mall 1,000 Monthly 12 0001AB AAFES 61801 Greely Hall Café 1,000 Monthly 12 0001AC AAFES 51004 Burger King 1,200 Monthly 12 0002AA MWR 15479 19th Hole (Golf Course) 1,000 Monthly 12 0002AB MWR 52010 Bowling Alley 1,000 Monthly 12 0002AC MWR 70525 TMAC 4,000 6 x Yr (every other month) 6 0002AD MWR 48101 Child Care (New Beginnings) 40 Monthly 12 0002AE MWR 52056 School Age Center 1,000 Quarterly 4 0002AF MWR 49055 Child Care (New Horizons) 4,000 On Call TBD
*0002AG MWR 52220 *Family Fitness Center 40 On Call TBD 0003AA DFAC 80504 Yardley Hall DFAC 2,000 Quarterly 4 0003AB DFAC 52107 ThunderBird DFAC 1,000 Monthly 12 0003AC DFAC 85202 Weinstein DFAC 4,800 Every Two Weeks 24
*0003AD DFAC 11656 *Black Tower DFAC 1,000 On Call TBD *0003AE DFAC 80503 *Virginia Hall DFAC 2,000 On Call TBD 0004AA DECA 61610 Commissary 500 6 x Yr (every other month) 6
0005AA
FIRE
STATION 91253 Fire Station #3 100 6 x Yr (every other month)
0006AA TBD TBD Emergency Services Cleaning Up to 6,000 On Call On Call
0006AB TBD TBD Emergency Services Labor Up to 40
Hours On Call On Call
*Family Fitness Center, Black Tower DFAC, and Virginia Hall are not currently being used.
I.2. Contractor personnel shall use proper safety equipment at all times during the performance of this contract and shall perform all tasks in a safe manner.
I.3. Fire Protection. Contractor shall equip motor vehicles used in performance of this contract with a fire extinguisher with a minimum listed rating of 10B:C in accordance with National Fire Protection Association (NFPA) 10-1984, Paragraph 4.
I.4. Vehicle Maintenance. Contractor shall maintain the outside of pumping vehicles and keep them free of grease and oil.
I.5. The Contractor shall not drive any vehicle on the grass or sidewalks.
I.6. Pumping requirements may require the Contractor to use approximately one hundred twenty (120) feet of additional suction lines. These lines may extend from the nearest parking lot, road, or sidewalk to the grease traps.
Contractor shall ensure these lines are protected so as to not pose a tripping hazard.
I.7. The Contractor shall be required to remove manhole covers on grease traps. These covers will vary in size and shape and may weigh as much as three hundred fifty (350) pounds.
I.8. Confined Space Entry. If Contractor must enter the grease trap for any reason, the Contractor shall perform all operations IAW OSHA standard 29 CFR 1910.146 (c) (4), Confined Space Entry.
J. INSPECTION OF SERVICES
J.1. Inspection. The work shall be subject to inspection at any and all times. The presence or absence of the inspector shall not relieve the contractor from strict compliance with these specifications nor shall the presence of an inspector relieve the contractor from any deficiency that may be noted in the final inspection. Upon completion of work on each grease trap or other item required to be cleaned in each building, the contractor shall notify the COR or designated representative and a joint inspection shall be made with the contractor.
J.2. Unsatisfactory Work. The Contractor shall re-perform work that was not satisfactorily accomplished in accordance with contract requirements within four (4) working hours after notification from the Contracting Officer.
If there is a problem beyond the Contractor's control that does not permit the Contractor to accomplish the work, the Contractor shall report such instances to the Contracting Officer the same day the Contractor receives notification of the unsatisfactory work.
K. CONTRACTOR MANPOWER REPORTING REQUIREMENTS
K.1. The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Department of Public Works (DPW) for Fort Huachuca, AZ via a secure data collection site. The Contractor is required to completely fill in all required data fields using the following web address: http://www.ecmra.mil/.
K.2. Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk by clicking on "Send an email" which is located under the Help Resources ribbon on the right side of the login page of the applicable Service/Component's Contractor Manpower Reporting website.
L. CONTRACT PAYMENTS
L.1. The contractor shall submit monthly invoices. Invoices shall be entered in Wide Area Workflow (WAWF) in order for payments to be processed.
M. APPLICABLE PUBLICATIONS
1. Corps of Engineers Manual, General Safety Requirements, EM 385-1-1
2. Occupational Safety and Health Act (OSHA) Public Law 91-596
3. NFPA National Fire Code, No. 91
4. 29 Code of Federal Regulations Part 1910
5. Arizona Revised Statues, Title 49
N. ATTACHMENTS
N.1. Attachment #1 – Quality Assurance Surveillance Plan (QASP)
(End of Summary of Changes)
File details come from the government source that posted it.