32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
SEE SCHEDULE
19. ITEM NO. 20. SCHEDULE OF SUPPLIES/ SERVICES 21. QUANTITY 22. UNIT 24. AMOUNT
PAGE 2 OF
23. UNIT PRICE
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV 3/2005) BACK
Prescribed by GSA
FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
W9124A-13-P-0055
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Each $16,329.00 $16,329.00 Runway Lighting Support Program
FFP
For a Performance Support Program that will improve maintenance staff productivity, increase efficiency of the Runway Lighting Control System and protect our investment through training, troubleshooting and preventive maintenance. PREVENTATIVE MAINTENANCE: visits will be performed once
(1) per quarter at Ft Huachuca, AZ. Up to 8 hours of service will be scheduled and performed each quarter. OPERATOR SUPPORT: Provide consultation to assist the operator(s) in identifying, verifying and resolving problems using the Runway Lighting System. This support is for operators that have received training.
Operator consultation is provided via telephone during normal working hours only.
DOCUMENTATION AND QUALITY ASSURANCE: document each on-line and on-site service call and furnish us with a copy showing time, date and a brief description of activity. Work orders for on-site system preventive maintenance will list the inspection date, individual to report to, equipment identification, equipment location, work to be performed and any special instructions. The contractor will meet with us one time per year to evaluate system performance and our satisfaction with the quality of service that is being provided under this Performance Support Program. ON-SITE SERVICES: Provide software documentation updates as they become available. Create or modify graphics in order to ensure that the software interface continues to meet our needs. Will regularly backup the graphics database. In the event of hardware failure, reload the graphics database and system file from current site backup copy. Regularly backup each field panel database and system file. In the event of memory loss, reload the database from current site backup copy. Perform field panel diagnostics, analyze the results and make recommendations to optimize lighting control performance within the functional limits of our system. Provide evaluation and tuning of the critical control loops to maintain system control to peak efficiency as building and mechanical system characteristics change. Critical control loops will be identified by the client and the vendor. Provide software consultation to assist the operator(s) in identifying, verifying and resolving software problems found in executing the tasks, for which they have received training. HARDWARE AND LABOR: Replace the network manager battery annually. Inspect all relays, all DDC controllers and all transformers for wear or malfunction. Includes all parts and all labor for the replacement of any parts to minimize obsolescence and maintain the system in peak operating condition at no extra charge. EMERGENCY SERVICES: Will respond to telephone requests for corrective maintenance within 1 hour. If it is determined that a site visit is required to complete troubleshooting, the vendor will be on-site within 6 hours of the request. Non-emergency calls as determined by Ft Huachuca and the vendor will be incorporated into the on-site preventative maintenance schedule. There is no travel charge or mileage charge for work covered under this agreement. LIST OF MAINTAINED AND COVERED EQUIPMENT: 1 each tower workstation computer and UPS (CPU, UPS, monitor, keyboard and mouse). 1 each Ops building workstation computer and UPS (CPU, UPS, monitor, keyboard and mouse). 1 each network manager in electrical building (network manager, transformer, power supply and enclosure). 3 each freely programmable controllers in electrical building (DDC controllers, transformer and enclosure). 35 each relays with HOA switches located in the electrical building (relays and enclosure). 1 each graphics pages (programming and function).
REPORTING OF CONTRACTOR MANPOWER MUST BE REPORTED by 31 October 2013. See Clause ACC-APG 5152.237-4900.
FOB: Destination
PURCHASE REQUEST NUMBER: 0010360560
NET AMT $16,329.00
ACRN AA
CIN: GFEBS001036056000001
$16,329.00
1000 1 Each $16,830.00 $16,830.00 OPTION Runway Lighting Support Program OPT YR 1
FFP
For a Performance Support Program that will improve maintenance staff productivity, increase efficiency of the Runway Lighting Control System and protect our investment through training, troubleshooting and preventive maintenance. PREVENTATIVE MAINTENANCE: visits will be performed once
(1) per quarter at Ft Huachuca, AZ. Up to 8 hours of service will be scheduled and performed each quarter. OPERATOR SUPPORT: Provide consultation to assist the operator(s) in identifying, verifying and resolving problems using the Runway Lighting System. This support is for operators that have received training.
Operator consultation is provided via telephone during normal working hours only.
DOCUMENTATION AND QUALITY ASSURANCE: document each on-line and on-site service call and furnish us with a copy showing time, date and a brief description of activity. Work orders for on-site system preventive maintenance will list the inspection date, individual to report to, equipment identification, equipment location, work to be performed and any special instructions. The contractor will meet with us one time per year to evaluate system performance and our satisfaction with the quality of service that is being provided under this Performance Support Program. ON-SITE SERVICES: Provide software documentation updates as they become available. Create or modify graphics in order to ensure that the software interface continues to meet our needs. Will regularly backup the graphics database. In the event of hardware failure, reload the graphics database and system file from current site backup copy. Regularly backup each field panel database and system file. In the event of memory loss, reload the database from current site backup copy. Perform field panel diagnostics, analyze the results and make recommendations to optimize lighting control performance within the functional limits of our system. Provide evaluation and tuning of the critical control loops to maintain system control to peak efficiency as building and mechanical system characteristics change. Critical control loops will be identified by the client and the vendor. Provide software consultation to assist the operator(s) in identifying, verifying and resolving software problems found in executing the tasks, for which they have received training. HARDWARE AND LABOR: Replace the network manager battery annually. Inspect all relays, all DDC controllers and all transformers for wear or malfunction. Includes all parts and all labor for the replacement of any parts to minimize obsolescence and maintain the system in peak operating condition at no extra charge. EMERGENCY SERVICES: Will respond to telephone requests for corrective maintenance within 1 hour. If it is determined that a site visit is required to complete troubleshooting, the vendor will be on-site within 6 hours of the request. Non-emergency calls as determined by Ft Huachuca and the vendor will be incorporated into the on-site preventative maintenance schedule. There is no travel charge or mileage charge for work covered under this agreement. LIST OF MAINTAINED AND COVERED EQUIPMENT: 1 each tower workstation computer and UPS (CPU, UPS, monitor, keyboard and mouse). 1 each Ops building workstation computer and UPS (CPU, UPS, monitor, keyboard and mouse). 1 each network manager in electrical building (network manager, transformer, power supply and enclosure). 3 each freely programmable controllers in electrical building (DDC controllers, transformer and enclosure). 35 each relays with HOA switches located in the electrical building (relays and enclosure). 1 each graphics pages (programming and function).
October 2014. See Clause ACC-APG 5152.237-4900.
NET AMT $16,830.00
2000 1 Each $17,330.00 $17,330.00 OPTION Runway Lighting Support Program OPT YR 2
FFP
For a Performance Support Program that will improve maintenance staff productivity, increase efficiency of the Runway Lighting Control System and protect our investment through training, troubleshooting and preventive maintenance. PREVENTATIVE MAINTENANCE: visits will be performed once
(1) per quarter at Ft Huachuca, AZ. Up to 8 hours of service will be scheduled and performed each quarter. OPERATOR SUPPORT: Provide consultation to assist the operator(s) in identifying, verifying and resolving problems using the Runway Lighting System. This support is for operators that have received training.
Operator consultation is provided via telephone during normal working hours only.
DOCUMENTATION AND QUALITY ASSURANCE: document each on-line and on-site service call and furnish us with a copy showing time, date and a brief description of activity. Work orders for on-site system preventive maintenance will list the inspection date, individual to report to, equipment identification, equipment location, work to be performed and any special instructions. The contractor will meet with us one time per year to evaluate system performance and our satisfaction with the quality of service that is being provided under this Performance Support Program. ON-SITE SERVICES: Provide software documentation updates as they become available. Create or modify graphics in order to ensure that the software interface continues to meet our needs. Will regularly backup the graphics database. In the event of hardware failure, reload the graphics database and system file from current site backup copy. Regularly backup each field panel database and system file. In the event of memory loss, reload the database from current site backup copy. Perform field panel diagnostics, analyze the results and make recommendations to optimize lighting control performance within the functional limits of our system. Provide evaluation and tuning of the critical control loops to maintain system control to peak efficiency as building and mechanical system characteristics change. Critical control loops will be identified by the client and the vendor. Provide software consultation to assist the operator(s) in identifying, verifying and resolving software problems found in executing the tasks, for which they have received training. HARDWARE AND LABOR: Replace the network manager battery annually. Inspect all relays, all DDC controllers and all transformers for wear or malfunction. Includes all parts and all labor for the replacement of any parts to minimize obsolescence and maintain the system in peak operating condition at no extra charge. EMERGENCY SERVICES: Will respond to telephone requests for corrective maintenance within 1 hour. If it is determined that a site visit is required to complete troubleshooting, the vendor will be on-site within 6 hours of the request. Non-emergency calls as determined by Ft Huachuca and the vendor will be incorporated into the on-site preventative maintenance schedule. There is no travel charge or mileage charge for work covered under this agreement. LIST OF MAINTAINED AND COVERED EQUIPMENT: 1 each tower workstation computer and UPS (CPU, UPS, monitor, keyboard and mouse). 1 each Ops building workstation computer and UPS (CPU, UPS, monitor, keyboard and mouse). 1 each network manager in electrical building (network manager, transformer, power supply and enclosure). 3 each freely programmable controllers in electrical building (DDC controllers, transformer and enclosure). 35 each relays with HOA switches located in the electrical building (relays and enclosure). 1 each graphics pages (programming and function).
October 2015. See Clause ACC-APG 5152.237-4900.
NET AMT $17,330.00
SPECIAL INSTRUCTIONS
SECTION 1 : POINTS OF CONTACT INFORMATION
Receiver/Acceptor:
Name:Edward Perrone Phone:520 538 2874 Email: edward.b.perrone2.civ@mail.mil
WAWF POC:
Name: Greg Klotz Phone: 520 538 7137 Email: gregory.l.klotz.civ@mail.mil
Contract Administration:
See Block 16 on SF1449
Contracting Officer:
See Block 31a on SF1449
SECTION 2: DELIVERY AND SHIPPING
Purchase/Delivery Order Number must appear on the outside of shipping containers for identification purposes, supplies will be returned on the supplier at their expense, if not marked as requested. Enclose a copy of the packing list with shipment. Delivery/Shipment shall be made by the date specified in the Schedule to the address shown in Block 15.
SECTION 3: PAYMENT INFORMATION
WAWF
If Block 18a provides payment by DFAS, reference FAR Clause 252.232-7003, Electronic Submission of Payment Requests and Army Electronic Invoicing Instructions included in the purchase order to assist in all matters relating to payment, to include invoice and receiving reports.
NOTICE TO CONTRACTOR: WAWF will issue a prompt requesting “additional e-mail submissions” after clicking “SIGNATURE”. Please obtain the email addresses for your input from “POINTS OF CONTACT INFORMATION” described above, in order to prevent delays in processing of payment.
NOTICE TO GOVERNMENT PERSONNEL: Upon receipt of email notification that the invoice has been submitted to WAWF, you must promptly log on to WAWF and process the receiving report.
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government 1000 Destination Government Destination Government 2000 Destination Government Destination Government
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS UIC
0001 POP 15-JUL-2013 TO
14-JUL-2014
N/A AIR TRAFFIC CONTROL
ATC MAINTENANCE
LAAF
FORT HUACHUCA, AZ AZ 85613
W91QUS
1000 POP 15-JUL-2014 TO
14-JUL-2015
N/A (SAME AS PREVIOUS LOCATION)
2000 POP 15-JUL-2015 TO
14-JUL-2016
N/A (SAME AS PREVIOUS LOCATION)
ACCOUNTING AND APPROPRIATION DATA
AA: 02120132013202000001131312532AEO0039 S.0010757.22 6100.9000021001
COST CODE: A2AEO
AMOUNT: $16,329.00
CIN GFEBS001036056000001: $16,329.00
CLAUSES INCORPORATED BY REFERENCE
52.204-7 Central Contractor Registration DEC 2012 52.212-4 Contract Terms and Conditions--Commercial Items FEB 2012 52.229-3 Federal, State And Local Taxes FEB 2013 52.247-34 F.O.B. Destination NOV 1991 252.203-7002 Requirement to Inform Employees of Whistleblower Rights JAN 2009
252.204-7004 Alt A Central Contractor Registration Alternate A MAY 2013 252.232-7010 Levies on Contract Payments DEC 2006 252.243-7001 Pricing Of Contract Modifications DEC 1991
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL ITEMS (JAN 2013)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial items:
(1) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
___ Alternate I (Aug 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(2) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(3) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Pub. L. 108-77, 108-78).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (Sept 2006), with Alternate I (Oct 1995) (41 U.S.C. 253g and 10 U.S.C. 2402).
____ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (Apr 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note)).
____ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (June 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
x (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Aug 2012) (Pub. L. 109-
282) (31 U.S.C. 6101 note).
___ (5) 52.204-11, American Recovery and Reinvestment Act—Reporting Requirements (Jul 2010) (Pub. L. 111- 5).
___ (6) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (Dec 2010) (31 U.S.C. 6101 note).
____ (7) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (Feb 2012) (41 U.S.C. 2313).
____ (8) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (MAY 2012) (section 738 of Division C of Pub. L. 112-74, section 740 of Division C of Pub. L. 111-117, section 743 of Division D of Pub. L.
111-8, and section 745 of Division D of Pub. L. 110-161).
____ (9) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (NOV 2011) (15 U.S.C. 657a).
____ (10) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (Jan 2011) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (11) [Reserved]
____ (12)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2011) (15 U.S.C. 644).
____ (ii) Alternate I (NOV 2011).
____ (iii) Alternate II (NOV 2011).
____ (13)(i) 52.219-7, Notice of Partial Small Business Set-Aside (June 2003) (15 U.S.C. 644).
____ (ii) Alternate I (Oct 1995) of 52.219-7.
____ (iii) Alternate II (Mar 2004) of 52.219-7.
____ (14) 52.219-8, Utilization of Small Business Concerns (Jan 2011) (15 U.S.C. 637(d)(2) and (3)).
____ (15)(i) 52.219-9, Small Business Subcontracting Plan (Jan 2011) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (Oct 2001) of 52.219-9.
____ (iii) Alternate II (Oct 2001) of 52.219-9.
____ (iv) Alternate III (Jul 2010) of 52.219-9.
____ (16) 52.219-13, Notice of Set-Aside of Orders (NOV 2011) (15 U.S.C. 644(r)).
____ (17) 52.219-14, Limitations on Subcontracting (NOV 2011) (15 U.S.C. 637(a)(14)).
____ (18) 52.219-16, Liquidated Damages—Subcon-tracting Plan (Jan 1999) (15 U.S.C. 637(d)(4)(F)(i)).
____ (19)(i) 52.219-23, Notice of Price Evaluation Adjustment for Small Disadvantaged Business Concerns (Oct 2008) (10 U.S.C. 2323) (if the offeror elects to waive the adjustment, it shall so indicate in its offer).
____ (ii) Alternate I (June 2003) of 52.219-23.
____ (20) 52.219-25, Small Disadvantaged Business Participation Program—Disadvantaged Status and Reporting (Dec 2010) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
____ (21) 52.219-26, Small Disadvantaged Business Participation Program— Incentive Subcontracting (Oct 2000) (Pub. L. 103-355, section 7102, and 10 U.S.C. 2323).
____ (22) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (NOV 2011) (15 U.S.C. 657f).
____ (23) 52.219-28, Post Award Small Business Program Rerepresentation (Apr 2012) (15 U.S.C. 632(a)(2)).
____ (24) 52.219-29, Notice of Set-Aside for Economically Disadvantaged Women-Owned Small Business (EDWOSB) Concerns (APR 2012) (15 U.S.C. 637(m)).
____ (25) 52.219-30, Notice of Set-Aside for Women-Owned Small Business (WOSB) Concerns Eligible Under the WOSB Program (APR 2012) (15 U.S.C. 637(m)).
x (26) 52.222-3, Convict Labor (June 2003) (E.O. 11755).
x (27) 52.222-19, Child Labor—Cooperation with Authorities and Remedies (MAR 2012) (E.O. 3126).
x (28) 52.222-21, Prohibition of Segregated Facilities (Feb 1999).
x (29) 52.222-26, Equal Opportunity (Mar 2007) (E.O. 11246).
____ (30) 52.222-35, Equal Opportunity for Veterans (Sep 2010)(38 U.S.C. 4212).
x (31) 52.222-36, Affirmative Action for Workers with Disabilities (Oct 2010) (29 U.S.C. 793).
x (32) 52.222-37, Employment Reports on Veterans (Sep 2010) (38 U.S.C. 4212).
____ (33) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) (E.O.
13496).
____ (34) 52.222-54, Employment Eligibility Verification (Jul 2012). (Executive Order 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial items as prescribed in 22.1803.)
____ (35)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (May 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (May 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (36) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C. 8259b).
____ (37)(i) 52.223-16, IEEE 1680 Standard for the Environmental Assessment of Personal Computer Products (Dec 2007) (E.O. 13423).
____ (ii) Alternate I (Dec 2007) of 52.223-16.
x (38) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (Aug 2011) (E.O. 13513).
x (39) 52.225-1, Buy American Act—Supplies (Feb 2009) (41 U.S.C. 10a-10d).
____(40)(i) 52.225-3, Buy American Act--Free Trade Agreements--Israeli Trade Act (NOV 2012) (41 U.S.C.
chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43).
(ii) Alternate I (MAR 2012) of 52.225-3.
(iii) Alternate II (MAR 2012) of 52.225-3.
(iv) Alternate III (NOV 2012) of 52.225-3.
(41) 52.225-5, Trade Agreements (NOV 2012) (19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
x (42) 52.225-13, Restrictions on Certain Foreign Purchases (June 2008) (E.O.’s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (43) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (Nov 2007) (42 U.S.C. 5150
____ (44) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (Nov 2007) (42 U.S.C.
5150).
____ (45) 52.232-29, Terms for Financing of Purchases of Commercial Items (Feb 2002) (41 U.S.C. 255(f), 10 U.S.C. 2307(f)).
____ (46) 52.232-30, Installment Payments for Commercial Items (Oct 1995) (41 U.S.C. 255(f), 10 U.S.C.
2307(f)).
x (47) 52.232-33, Payment by Electronic Funds Transfer—Central Contractor Registration (Oct 2003) (31 U.S.C.
3332).
____ (48) 52.232-34, Payment by Electronic Funds Transfer—Other than Central Contractor Registration (May 1999) (31 U.S.C. 3332).
____ (49) 52.232-36, Payment by Third Party (Feb 2010) (31 U.S.C. 3332).
____ (50) 52.239-1, Privacy or Security Safeguards (Aug 1996) (5 U.S.C. 552a).
____ (51)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.
Appx. 1241(b) and 10 U.S.C. 2631).
____ (ii) Alternate I (Apr 2003) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items: (Contracting Officer check as appropriate.)
_____ (1) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).
_____ (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (May 1989) (29 U.S.C. 206 and 41 U.S.C.
351, et seq.).
_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Multiple Year and Option Contracts) (Sep 2009) (29 U.S.C. 206 and 41 U.S.C. 351, et seq.).
_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Act—Price Adjustment (Sep 2009) (29 U.S.C.
206 and 41 U.S.C. 351, et seq.).
_____ (5) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment—Requirements (Nov 2007) (41 351, et seq.).
_____ (6) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services— Requirements (Feb 2009) (41 U.S.C. 351, et seq.).
_____ (7) 52.222-17, Nondisplacement of Qualified Workers (JAN 2013) (E.O.13495).
_____ (8) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (Mar 2009) (Pub. L. 110-247).
_____ (9) 52.237-11, Accepting and Dispensing of $1 Coin (Sept 2008) (31 U.S.C. 5112(p)(1)).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other clauses of this contract. If this contract is completely or partially terminated, the records relating to the work terminated shall be made available for 3 years after any resulting final termination settlement. Records relating to appeals under the disputes clause or to litigation or the settlement of claims arising under or relating to this contract shall be made available until such appeals, litigation, or claims are finally resolved.
(3) As used in this clause, records include books, documents, accounting procedures and practices, and other data, regardless of type and regardless of form. This does not require the Contractor to create or maintain any record that the Contractor does not maintain in the ordinary course of business or pursuant to a provision of law.
(e) (1) Notwithstanding the requirements of the clauses in paragraphs (a), (b), (c), and (d) of this clause, the Contractor is not required to flow down any FAR clause, other than those in this paragraph (e)(1)in a subcontract for commercial items. Unless otherwise indicated below, the extent of the flow down shall be as required by the clause—
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (APR 2010) (Pub. L. 110-252, Title VI, Chapter 1 (41 U.S.C. 251 note).
(ii) 52.219-8, Utilization of Small Business Concerns (DEC 2010) (15 U.S.C. 637(d)(2) and (3)), in all subcontracts that offer further subcontracting opportunities. If the subcontract (except subcontracts to small business concerns) exceeds $650,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(iii) 52.222-17, Nondisplacement of Qualified Workers (JAN 2013) (E.O. 13495). Flow down required in accordance with paragraph (l) of FAR clause 52.222-17.
(iv) 52.222-26, Equal Opportunity (MAR 2007) (E.O. 11246).
(v) 52.222-35, Equal Opportunity for Veterans (SEP 2010) (38 U.S.C. 4212).
(vi) 52.222-36, Affirmative Action for Workers with Disabilities (OCT 1998) (29 U.S.C. 793).
(vii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496). Flow down required in accordance with paragraph (f) of FAR clause 52.222-40.
(viii) 52.222-41, Service Contract Act of 1965 (Nov 2007) (41 U.S.C. 351, et seq.).
(ix) 52.222-50, Combating Trafficking in Persons (FEB 2009) (22 U.S.C. 7104(g)).
Alternate I (AUG 2007) of 52.222-50 (22 U.S.C. 7104(g)).
(x) 52.222-51, Exemption from Application of the Service Contract Act to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (Nov 2007) (41 U.S.C. 351, et seq.).
(xi) 52.222-53, Exemption from Application of the Service Contract Act to Contracts for Certain Services-- Requirements (FEB 2009) (41 U.S.C. 351, et seq.).
(xii) 52.222-54, Employment Eligibility Verification (JUL 2012).
(xiii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations. (MAR 2009) (Pub. L. 110-247).
Flow down required in accordance with paragraph (e) of FAR clause 52.226-6.
(xiv) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. Appx 1241(b) and 10 U.S.C. 2631). Flow down required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the contractor May include in its subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(End of clause)
52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within 60 days.
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.
52.232-19 AVAILABILITY OF FUNDS FOR THE NEXT FISCAL YEAR (APR 1984)
Funds are not presently available for performance under this contract beyond 7/14/14 . The Government's obligation for performance of this contract beyond that date is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise for performance under this contract beyond 7/14/14, until funds are made available to the Contracting Officer for performance and until the Contractor receives notice of availability, to be confirmed in writing by the Contracting Officer.
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
http://farsite.hill.af.mil
252.204-0001 LINE ITEM SPECIFIC: SINGLE FUNDING. (SEP 2009)
The payment office shall make payment using the ACRN funding of the line item being billed.
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
The Contractor's procedures for protecting against unauthorized disclosure of information shall not require Department of Defense employees or members of the Armed Forces to relinquish control of their work products, whether classified or not, to the contractor.
252.212-7001 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS APPLICABLE TO DEFENSE ACQUISITIONS OF COMMERCIAL ITEMS (MAY
2013)
(a) The Contractor agrees to comply with the following Federal Acquisition Regulation (FAR) clause which, if checked, is included in this contract by reference to implement a provision of law applicable to acquisitions of commercial items or components.
____ 52.203-3, Gratuities (APR 1984) (10 U.S.C. 2207).
(b) The Contractor agrees to comply with any clause that is checked on the following list of Defense FAR Supplement clauses which, if checked, is included in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial items or components.
(1) x 252.203-7000, Requirements Relating to Compensation of Former DoD Officials (SEP 2011) (Section 847 of Pub. L. 110-181).
(2) ____ 252.203-7003, Agency Office of the Inspector General (DEC 2012)(section 6101 of Pub. L. 110-252, 41 U.S.C. 3509).
(3) ____ 252.205-7000, Provision of Information to Cooperative Agreement Holders (DEC 1991) (10 U.S.C.
2416).
(4) ____ 252.219-7003, Small Business Subcontracting Plan (DoD Contracts) (AUG 2012) (15 U.S.C. 637).
(5) ____ 252.219-7004, Small Business Subcontracting Plan (Test Program) (JAN 2011) (15 U.S.C. 637 note).
(6)(i) ____ 252.225-7001, Buy American and Balance of Payments Program (DEC 2012) (41 U.S.C. chapter 83, E.O. 10582).
(ii) ____ Alternate I (OCT 2011) of 252.225-7001.
(7) ____ 252.225-7008, Restriction on Acquisition of Specialty Metals (MAR 2013) (10 U.S.C. 2533b).
(8) ____ 252.225-7009, Restriction on Acquisition of Certain Articles Containing Specialty Metals (MAR 2013) (10 U.S.C. 2533b).
(9) ____ 252.225-7012, Preference for Certain Domestic Commodities (FEB 2013) (10 U.S.C. 2533a).
(10) ____ 252.225-7015, Restriction on Acquisition of Hand or Measuring Tools (JUN 2005) (10 U.S.C. 2533a).
(11) ____ 252.225-7016, Restriction on Acquisition of Ball and Roller Bearings (JUN 2011) (Section 8065 of Pub.
L. 107-117 and the same restriction in subsequent DoD appropriations acts).
12) ____ 252.225-7017, Photovoltaic Devices (DEC 2012) (Section 846 of Pub. L. 111-383).
13)(i) ____ 252.225-7021, Trade Agreements (DEC 2012) (19 U.S.C. 2501-2518 and 19 U.S.C. 3301 note).
(ii) ____ Alternate I (OCT 2011) of 252.225-7021.
(iii) ____ Alternate II (OCT 2011) of 252.225-7021.
(14) ____ 252.225-7027, Restriction on Contingent Fees for Foreign Military Sales (APR 2003) (22 U.S.C. 2779).
(15) ____ 252.225-7028, Exclusionary Policies and Practices of Foreign Governments (APR 2003) (22 U.S.C.
2755).
(16)(i) ____ 252.225-7036, Buy American Act—Free Trade Agreements—Balance of Payments Program (DEC 2012) (41 U.S.C. chapter 83 and 19 U.S.C. 3301 note).
(ii) ____ Alternate I (JUN 2012) of 252.225-7036.
(iii) ____ Alternate II (NOV 2012) of 252.225-7036.
(iv) ____ Alternate III (JUN 2012) of 252.225-7036.
(v) ____ Alternate IV (NOV 2012) of 252.225-7036.
(vi) ____Alternate V (NOV 2012) of 252.225-7036.
(17) ____ 252.225-7038, Restriction on Acquisition of Air Circuit Breakers (JUN 2005) (10 U.S.C. 2534(a)(3)).
(18) ____ 252.225-7039, Contractors Performing Private Security Functions (JUN 2012) (Section 862 of Pub. L.
110-181, as amended by section 853 of Pub. L. 110-417 and sections 831 and 832 of Pub. L. 111-383).
(19) ____ 252.226-7001, Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small Business Concerns (SEP 2004) (Section 8021 of Pub. L. 107-248 and similar sections in subsequent DoD appropriations acts).
(20) ____ 252.227-7013, Rights in Technical Data--Noncommercial Items (MAY 2013), if applicable (see 227.7103-6(a)).
(21) ____ 252.227-7015, Technical Data—Commercial Items (MAY 2013) (10 U.S.C. 2320).
(22) ____ 252.227-7037, Validation of Restrictive Markings on Technical Data (JUN 2012), if applicable (see 227.7102-4(c)))(10 U.S.C. 2321).
(23) x 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports (MAR 2008) (10 U.S.C.
2227).
(24) ____ 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84)
(25) ____ 252.237-7019, Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Pub. L. 108-375).
(26) ____ 252.243-7002, Requests for Equitable Adjustment (DEC 2012) (10 U.S.C. 2410).
(27) ____ 252.246-7004, Safety of Facilities, Infrastructure, and Equipment For Military Operations (OCT 2010) (Section 807 of Pub. L. 111-84).
(28) ____ 252.247-7003, Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (SEP 2010) (Section 884 of Pub. L. 110-417).
(29)(i) x 252.247-7023, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631).
(ii) ____ Alternate I (MAR 2000) of 252.247-7023.
(iii) ____ Alternate II (MAR 2000) of 252.247-7023.
(iv) x Alternate III (MAY 2002) of 252.247-7023.
(30) ____ 252.247-7024, Notification of Transportation of Supplies by Sea (MAR (2000) (10 U.S.C. 2631).
(31) ____ 252.247-7027, Riding Gang Member Requirements (OCT 2011) (Section 3504 of Pub. L. 110-417).
c) In addition to the clauses listed in paragraph (e) of the Contract Terms and Conditions Required to Implement Statutes or Executive Orders--Commercial Items clause of this contract (FAR 52.212-5), the Contractor shall include the terms of the following clauses, if applicable, in subcontracts for commercial items or commercial components, awarded at any tier under this contract:
(1) 252.225-7039, Contractors Performing Private Security Functions (JUN 2012) (Section 862 of Pub. L. 110-181, as amended by section 853 of Pub. L. 110-417 and sections 831 and 832 of Pub. L. 111-383).
(2) 252.227-7013, Rights in Technical Data--Noncommercial Items (MAY 2013), if applicable (see 227.7103-6(a)).
(3) 252.227-7015, Technical Data--Commercial Items (MAY 2013), if applicable (see 227.7102-4(a)).
(4) 252.227-7037, Validation of Restrictive Markings on Technical Data (JUN 2012), if applicable (see 227.7102- 4(c)).
(5) 252.237-7010, Prohibition on Interrogation of Detainees by Contractor Personnel (NOV 2010) (Section 1038 of Pub. L. 111-84).
(6) 252.237-7019, Training for Contractor Personnel Interacting with Detainees (SEP 2006) (Section 1092 of Pub.
L. 108-375).
(7) 252.247-7003, Pass-Through of Motor Carrier Fuel Surcharge Adjustment to the Cost Bearer (SEP 2010) (Section 884 of Pub. L. 110-417).
(8) 252.247-7023, Transportation of Supplies by Sea (MAY 2002) (10 U.S.C. 2631).
(9) 252.247-7024, Notification of Transportation of Supplies by Sea (MAR 2000) (10 U.S.C. 2631).
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (MAY 2013)
(a) Definitions. As used in this clause--
Department of Defense Activity Address Code (DoDAAC) is a six position code that uniquely identifies a unit, activity, or organization.
Document type means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
Local processing office (LPO) is the office responsible for payment certification when payment certification is done external to the entitlement system.
(b) Electronic invoicing. The WAWF system is the method to electronically process vendor payment requests and receiving reports, as authorized by DFARS 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall--
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.acquisition.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this Web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.
(e) WAWF methods of document submission. Document submissions may be via Web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
Combo (Invoice/Receiving Report)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
W91QUS
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC HQ0490 Issue By DoDAAC W9124A Admin DoDAAC W9124A Inspect By DoDAAC W91QUS Ship To Code N/A Ship From Code N/A Mark For Code N/A Service Approver (DoDAAC) W91QUS Service Acceptor (DoDAAC) W91QUS Accept at Other DoDAAC N/A
LPO DoDAAC N/A DCAA Auditor DoDAAC N/A Other DoDAAC(s) N/A
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g. timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the email address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
Gregory.l.klotz.civ@mail.mil; james.t.anderson124.civ@mail.mil
(g) WAWF point of contact. (1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Gregory.l.klotz.civ@mail.mil
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
AMC‐LEVEL PROTEST PROGRAM (Aug 2012)
ACC‐APG 5152.233‐4900
If you have complaints about this procurement, it is preferable that you first attempt to resolve those concerns with the responsible Contracting Officer.
However, you can also protest to Headquarters, AMC. The HQ, AMC‐Level Protest Program is intended to encourage interested parties to seek resolution of their concerns within AMC as an Alternative Dispute Resolution forum, rather than filing a protest with the General Accounting Office (GAO) or other external forum. Contract award or performance is suspended during the protest to the same extent, and within the same time periods, as if filed at the GAO. The AMC protest decision goal is to resolve protests within 20 working days from filing. To be timely, protests must be filed within the periods specified in FAR 33.103. Send protests (other than protests to the Contracting Officer) to:
Headquarters U.S. Army Materiel Command Office of Command Counsel‐Deputy Command Counsel 4400 Martin Road Rm: A6SE040.001 Redstone Arsenal, AL 35898‐5000 Phone: (256) 450‐8165 Fax: (256) 450‐8840 E‐mail: amcprotests@conus.army.mil
The AMC‐Level Protest Procedures are accessible via the Internet at:
www.amc.army.mil/amc/commandcounsel.html. If Internet access is not available, contact the Contracting Officer or HQ, AMC, to obtain the AMC‐Level Protest Procedures.
ACC-APG 5152.237-4900
REPORTING OF CONTRACTOR MANPOWER DATA ELEMENTS
The Office of the Assistant Secretary of the Army (Manpower & Reserve Affairs) operates and maintains a secure Army data collection site where the contractor will report ALL contractor manpower (including subcontractor manpower) required for performance of this contract. The contractor is required to completely fill in all the information in the format using the following web address:
https://cmra.army.mil The required information includes: (1) Contracting Office, Contracting Officer, Contracting Officer’s Technical Representative; (2) Contract number, including task and delivery order number; (3) Beginning and ending dates covered by reporting period; (4) Contractor name, address, phone number, e-mail address, identity of contractor employee entering data; (5) Estimated direct labor hours (including subcontractors); (6) Estimated direct labor dollars paid this reporting period (including subcontractors); (7) Total payments (including subcontractors); (8) Predominant Federal Service Code (FSC) reflecting services provided by contractor (and separate predominant FSC for each subcontractor if different); (9) Estimated data collection cost; (10) Organizational title associated with the Unit Identification Code (UIC) for the Army Requiring Activity (the Army Requiring Activity is responsible for providing the contractor with its UIC for the purposes of reporting this information; (11) Locations where contractor and subcontractors perform the work (specified by zip code in the United States and nearest city, country, when in an overseas location, using standardized nomenclature provided on website); (12) Presence of deployment or contingency contract language; and (13) Number of contractor and subcontractor employees deployed in theater this reporting period (by country). As part of its submission, the contractor will also provide the estimated total cost (if any) incurred to comply with this reporting requirement.
Reporting period will be the period of performance not to exceed 12 months ending September 30 of each government fiscal year and must be reported by 31 October of each calendar year. Contractors may use a direct XML data transfer to the database server or fill in the fields on the website. The XML direct transfer is a format for transferring files from a contractor’s systems to the secure website without the need for separate data entries for each required data element at the website. The specific formats for the XML direct transfer may be downloaded from the website.
ACC-APG HUA 5152.204-0005 CONTRACTOR ACCESS TO GOVERNMENT INSTALLATIONS
The Contractor shall submit, to the Contracting Officer, the names and social security numbers of all employees and/or prospective employees who will require access to a Government installation and/or facility for purposes of this contract. This requirement also applies to the Contractor's subcontractors and suppliers. The Contracting Officer will submit the names and social security numbers to the corresponding installation's Provost Marshal, and the Contractor will be advised if any of the individuals have been barred from the Government installation pursuant to Title 18 U.S.C. Section 1382. Those individuals currently or previously barred from the Government installation will not be allowed to enter or work on the installation. Procedures or policies regarding Contractor access to Government installations and/or facilities may vary somewhat at different installations. If procedures vary, the appropriate procedures will be provided by the Contracting Officer.
ACC-APG HUA 5152.204-0010 DENIAL OF ENTRY
The Government reserves the right to terminate the entry of any Contractor employee upon disclosure of information which indicates the individual’s continued entry to the installation is not in the best interest of national security. Additionally, the violation of or deviation from the established security procedures by contractor employees may result in the confiscation of identification media and the denial of future entry to the installation.
ACC-APG HUA 5152.209-0007 KEY PERSONNEL
Key Personnel relative to this solicitation and resultant contract must have demonstrated ability, background, and qualifications to lead and manage TO BE COMPLETED BY THE CONTRACTING OFFICE WITH THE ASSISTANCE OF THE REQUIRING ACTIVITY and the contract administration/management skills to perform the contract requirements. These key personnel must have an in-depth understanding of the requirements and their responsibilities through education, knowledge and experience and must be fully committed to the success of the project. The following positions are designated as Key Personnel:
TO BE COMPLETED BY THE CONTRACTING OFFICE WITH THE ASSISTANCE OF THE REQUIRING
ACTIVITY
Within ten days of notification of contract award, the contractor shall provide the names, and resumes of all designated Key Personnel, and also provide certifications for inside plant personnel to the COR. Key Personnel identified at the beginning of phase-in must have the same or greater experience and qualifications as those presented in the contractor's proposal. During contract performance, the contractor shall provide written notification to the contracting officer at least 30 days prior to making any changes to Key Personnel. The written notification shall include copies of the resumes and Certifications of any individuals proposed as replacements to Key Personnel. Individuals with equal or higher qualifications and experience must be provided.
ACC-APG HUA 5152.211-0001 PERIOD OF PERFORMANCE
a. The period of performance for this contract is:
START END
Basic Performance Period: 7/15/13 7/14/14
Performance Period I (Option I): 7/15/14 7/14/15
Performance Period II (Option II): 7/15/15 7/14/16
b. Any extension to performance periods will be made by the contracting officer, in writing in accordance with appropriate authority such as the options clause, or extension of services clause. Contractor shall not perform beyond the current period of performance for which he has authority nor will the government be liable for costs incurred by the contractor for performing in a period without authorization.
ACC-APG HUA 5152.222-0009 LEGAL FEDERAL HOLIDAYS
a. Government Federal holidays are as follows:
New Year’s Day Martin Luther King Jr.’s Birthday Presidents Day Memorial Day Independence Day Labor Day Columbus Day Veteran’s Day Thanksgiving Day Christmas Day
NOTE: Check the SCA Wage Determination for the…