2._CONTRACT_DATA_REQUIREMENTS_LIST.DOCX
DOCX document 31 KB Posted
- Attached to
- Signal Captain Carriier Course(SCCC)
- Solicitation number
- W91249-19-R-0003
About this file
Contract Data Requirement Lists (CDRL)
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 11-09-2018_Amendment_0001.pdf | ||
| 3._Wage_Determination.docx | DOCX document | |
| 4._DD_254_.pdf | ||
| 1._MASTER_TRAINING_SCHEDULE_(MTS).pdf | ||
| 10-29-2018__Final_Solicitation_Released_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 2
CONTRACT DATA REQUIREMENTS LIST
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP TM OTHER MISC
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A001 |
| Monthly Progress Report (MSR) |
| Performance and Cost Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| PWS Para. 5.4 |
| INTERNATIONAL MILITARY STUDENT OFFICE (IMSO) |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
DD
| MTHLY |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
A
| N/A |
| SEE BLK 16 |
16. REMARKS:
Contractor’s format is acceptable.
MSR submission is due no later than (NLT) 10 working days after the end of the month. MSRs must also be submitted electronically with the invoice via WAWF.
MSRs shall be divided into two sections:
1: Instructor/training developer personnel
2. Education and training specialist personnel BLOCK 9: Distribution Statement D - Distribution authorized to the Department of Defense and DoD contractors only. Reason: To protect technical/operational data or information. All other requests shall be referred to the undersigned.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
NATHANIEL BROWN
10/29/2018
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP TM OTHER MISC
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A002 |
| In Progress Review (IPR) Report |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| PWS Para. 5.3 |
| IMSO |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
DD
| AS REQUIRED BY THE GOV |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
A
| N/A |
| SEE BLK 16 |
16. REMARKS:
Contractor’s format is acceptable for IPR reports.
The contractor shall prepare an IPR Report monthly to be delivered NLT ten (10) working days after end of each month. Results of IPR meetings will be captured by the contractor in the form of meeting minutes and will be used to generate the IPR Report. The report will provide a synopsis of decisions made and may correlate with activity identified in reports produced under other CDRLs. IPRs must also be submitted electronically with the invoice via WAWF. This IPR report is NOT the same as the MSR.
IPRs shall be divided into two sections:
1: Instructor/training developer personnel
2. Education and training specialist personnel BLOCK 9: Distribution Statement D - Distribution authorized to the Department of Defense and DoD contractors only. Reason: To protect technical/operational data or information. All other requests shall be referred to the undersigned.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| NATHANIEL BROWN |
| 10/29/2018 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP TM OTHER MISC
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A003 |
| Training Schedule/SCCC-PREP Curriculum Updates |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| PWS Para. 5.3 |
| IMSO |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
DD
| AS REQUIRED BY THE GOV |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
A
| N/A |
| SEE BLK 16 |
16. REMARKS:
Curriculum updates shall be completed in an electronic TRADOC Regulation 350-70 and 350-70-3 format.
Due to COR ten (10) working days prior to the beginning of training and when the course curriculum requires adjustment as determined necessary by the government.
BLOCK 9: Distribution Statement D - Distribution authorized to the Department of Defense and DoD contractors only. Reason: To protect technical/operational data or information. All other requests shall be referred to the undersigned.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| NATHANIEL BROWN |
| 10/27/2018 |
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
| A. CONTRACT LINE ITEM NO. |
| B. EXHIBIT |
| C. CATEGORY: |
TDP TM OTHER MISC
| D. SYSTEM/ITEM |
| E. CONTRACT/PR NO. |
| F. CONTRACTOR |
| 1. DATA ITEM NO. |
| 2. TITLE OF DATA ITEM |
| 3. SUBTITLE |
| A004 |
| Conduct Classroom Training and Academic Evaluations |
| 4. AUTHORITY (Data Acquisition Document No.) |
| 5. CONTRACT REFERENCE |
| 6. REQUIRING OFFICE |
| PWS Para. 5.3 |
| IMSO |
| 7. DD 250 REQ | |
| 9.DIST STATEMENT REQUIRED | |
| 10. FREQUENCY | |
| 12. DATE OF FIRST SUBMISSION | |
| 14. | DISTRIBUTION |
DD
| 5 WORKING DAYS AFTER THE COMPLETION OF EACH COURSE |
| SEE BLK 16 |
| 8. APP CODE |
| D |
| 11. AS OF DATE |
| 13. DATE OF SUBSEQUENT |
SUBMISSION
a. ADDRESSEE
A
| N/A |
| SEE BLK 16 |
16. REMARKS:
Instruct/Facilitate classes and evaluate student performance. The instructors/facilitators shall also collaborate with government personnel to establish a productive student centric learning environment for all courses taught within the staff and faculty development section.
Conduct peer to peer evaluations as assigned.
BLOCK 9: Distribution Statement D - Distribution authorized to the Department of Defense and DoD contractors only. Reason: To protect technical/operational data or information. All other requests shall be referred to the undersigned.
15. TOTAL
| G. PREPARED BY |
| H. DATE |
| I. APPROVED BY |
| NATHANIEL BROWN |
| 10/29/2018 |
image1.wmf
File details come from the government source that posted it.