W91249-16-R-0006-0002.pdf
PDF 176 KB Posted
- Attached to
- MCASP Federal contract opportunity
- Solicitation number
- W91249-16-R-0006
About this file
Amendment 0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Q A_part_2.docx | DOCX document | |
| Q_and_A_W91249-16-R-0006.docx | DOCX document | |
| W91249-16-R-0006-0001.pdf | ||
| TECHNICAL_EXHIBIT_2_Historical_Staffing_Matrix.docx | DOCX document | |
| TECHNICAL_EXHIBIT_3-CDRL.docx | DOCX document | |
| Solicitation_W91249-16-R-0006.pdf | ||
| ATTACHMENT_2_PPQ.docx | DOCX document | |
| ATTACHMENT_3-Specific_Relevant_Contracts_Sheet.docx | DOCX document | |
| TECHNICAL_EXHIBIT_2_Est_Workload_Data.docx | DOCX document | |
| TECHNICAL_EXHIBIT_4_Est_Class_Load.docx | DOCX document | |
| ATTACHMENT_4-SUBCONTRACTOR_FORM.docx | DOCX document | |
| ATTACHMENT_5-Wage_Determination_2005-2135_Rev_18.pdf | ||
| ATTACHMENT_1-DD254.pdf | ||
| TECHNICAL_EXHIBIT_1_PRS.docx | DOCX document |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
0010806029-0002
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
The purpose of this amendments is to:
1. Post second Q&A document for remainder of questions received.
2. Please make note of changes on PM requirements w ithin the PWS.
3. Resume and Letter of Intent are required for Key Personnel only by close of solicitation. Resume and Letter of intent for all other personnel is required no later than 10 days after contract aw ard.
4. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 29
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Apr-2016
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W91249-16-R-0006
X 9B. DATED (SEE ITEM 11)
06-Apr-2016
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Apr-2016
CODE
MISSION AND INSTALLATION CONTRACTING CMD
MICC - FORT GORDON
WINSHIP HALL 419 B STREET
BLDG 29718 3RD FL
FORT GORDON GA 30905-5719
W91249 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W91249-16-R-0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been modified:
52.212-1 ADDENDUM
ADDENDUM 52.212-1
A. Proposal Submittal and Inquiries.
1. Proposals shall be submitted prior to the closing date and time identified on SF 1449, to the following address:
Mission and Installation Contracting Command – Fort Gordon Attn: Shannon L. Mccauley 419th B Street, Bldg. 29718
Fort Gordon, GA 30905 shannon.l.mccauley3.civ@mail.mil
2. Electronic submission via facsimile will not be accepted. Offers shall be submitted via electronic email and shall be hand carried or mailed through a commercial/Government carrier.
3. The point of contact responsible for supplying additional information and answering all inquiries is the Contracting Officer via the Contract Specialist. Address all questions or concerns the offeror may have to the Contract Specialist and Contracting Officer, Shannon L. Mccauley shannon.l.mccauley.civ@mail.mil and Suzanne Mattingly at Suzanne.e.mattingly.civ@mail.mil. All questions regarding this solicitation shall be submitted in writing via email:
Shannon McCauley at shannon.l.mccauley3.civ@mail.mil
All questions regarding this solicitation shall be submitted in writing via email by 15 April 2016, 11:00 a.m.
4. Site Visit. N/A
B. GENERAL INSTRUCTIONS.
1. The selection of a source for award purposes will be conducted utilizing source selection (negotiated) procedures as delineated in FAR Part 15.3. Offers will be evaluated using the criteria under Section M, “Evaluation Factors for Award.” Noncompliance with the Request for Proposal (RFP) requirements may hamper the Government's ability to properly evaluate the proposal and may result in elimination of the proposal from further consideration for contract award.
2. The Offer. The submission of the documentation specified below will constitute the offeror's acceptance of the terms and conditions of the RFP, concurrence with the Performance Work Statement, and contract type.
3. It is the Government’s intention to award without discussions. Offerors are encouraged to present their best technical proposal and prices in their initial proposal submission. However, in accordance with (IAW) FAR Part 15.306, should discussions become necessary, the Government reserves the right to hold them. If this occurs, a competitive range will be determined and offerors notified. The competitive range may be limited for purposes of efficiency IAW FAR Part 15.306 (c)(2).
4. Instructions outlined in paragraph C below, prescribe the format for the proposal and describe the approach for the development and presentation of proposal data. These instructions are designed to ensure the submission of necessary information to provide for the understanding and comprehensive evaluation of proposals.
5. If an offeror believes that the requirements in these instructions contain an error, an ambiguity, omission, or are otherwise deemed unsound, the offeror shall immediately notify the KO in writing with supporting rationale.
The offeror is reminded that the Government reserves the right to award this effort based on the initial proposal, as received, without discussion.
6. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain one copy of all unsuccessful proposals. Unless the offeror requests otherwise, the Government will destroy extra copies of such unsuccessful proposals.
7. All referenced documents for this solicitation are available on the Federal Business Opportunities (FedBizOpps) website at http://www.fedbizzopps.gov. Potential offerors are encouraged to subscribe for real-time e-mail notifications when information has been posted to the website for this solicitation.
8. Debriefings. The KO will promptly notify offerors of any decision to exclude them from the competitive range, whereupon they may request and receive a debriefing in accordance with FAR 15.505. The KO will notify offerors who were in the competitive range but were not selected for award in accordance with FAR 15.503(b).
Upon such notification, unsuccessful offerors may request and receive a debriefing in accordance with the requirements of FAR 15.506.
C. Proposal Preparation Instructions
1. Offerer’s proposal shall consist of 4 volumes: (1) General, (2) Technical, (3) Past Performance, and (4) Price.
2. Proposal Format
(a) Offerors shall submit an one (1) original and the four (4) copies, in paragraph (c) below of their proposal.
(b) Exceptions. Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as evaluation factors and subfactors. Failure to meet a requirement may result in an offer being ineligible for award. If the offeror finds it necessary to take exception to any of the requirements specified in this solicitation, the offeror shall clearly identify the applicable Volume and exceptions with a complete explanation of why the exception was taken, what benefit accrues to the Government (if any), and its impact, if any, on the performance, schedule, cost, and specific requirements of the solicitation. Each exception shall be specifically related to each paragraph and/or specific part of the solicitation to which the exception is taken. Offerors are cautioned that taking an exception may render the offer ineligible for award. This information shall be provided in the format below.
Table 1 - Solicitation Exceptions
Solicitation Document
Page/ Paragraph
Requirement/ Portion
Rationale & Impact
Section B, PWS/SOO/ SOW, Section L&M, etc.
Applicable Page and Paragraph Numbers
Identify the requirement or portion to which exception is taken
Describe The rationale and impact of the exception
(c) The proposals shall be organized into 4 volumes. Each volume of the proposal should be separately bound in a coil-bound spiral-bound, or comb-binding. A cover sheet should be bound in each book, clearly marked as to volume number, title, copy number, solicitation identification and the offeror's name. All text shall be single spaced and printed black on white paper (Black and white requirement does not apply to graphics, photos, etc., Company stationary and logos are acceptable). Printing shall be easily readable (12-pitch type or 10 point proportional spacing.) Cross-references should be utilized to preclude unnecessary duplication of data between sections. In addition to submitting hard copies of the proposals, electronic copies shall be provided via email. The file name shall be “Company Name – Initial” for the first submission. The file name of later submissions (if necessary), shall be “Company Name – Revision X’ with X indicating the number of the revision. Page limitations are as follows:
Table 2
VOLUME TITLE NO. HARD
COPIES (Applies to Hand Carry and
Mail Offer)
NO. OF Email Copies
PAGE LIMITS
I General
1 Original and 4 Copies
1 No Limitations
II Technical 1 Original and 4 Copies
1 (20)
III Past Performance 1 Original and 4 Copies
1 3 pages per reference
IV Price 1 Original and 4 Copies
1 N/A
(d) Proposal Limitation. The proposal shall not exceed the limits stated above. If the page limits are exceeded, the pages in excess of the limit shall be removed and returned, unread, to the offeror. The Government will not accept any changes to the contractor’s proposal after the closing date of the solicitation (See FAR 15.208 for further information regarding late proposals). If discussions become necessary, page limitations may be placed on responses to Evaluation Notices (ENs). The specified page limits for EN responses will be identified in the letters forwarding the ENs to the offerors.
(e) Page Limit Includes: All appendices, charts, graphs, diagrams, tables, photographs, drawings, etc.
(f) Page Limit does not include covers for volumes, tables of contents, glossary of abbreviations and acronyms, indices, title pages, cross reference indices, and section dividers/tables if they are inserted solely to provide ease to the reader in locating parts/sections of the proposal. Pages will be counted if they contain any other information, i.e., diagrams, extraneous data, etc. Pages marked “This page intentionally left blank” will not be counted.
(g) What Counts As A Page? A page shall be an 8 ½ X 11” sheet of paper. When both sides of a sheet display printed material, it shall be counted as two pages. Letter size and spacing requirements for illustrations and tables can be at the discretion of the offeror but must be easily readable. Fold-outs will be counted as the appropriate number of pages based on an 8 ½” X 11” sheet of paper. Margins shall be at least 1 inch on the top and bottom and 3/4 inch on the side. The Contractor shall number each page in order to eliminate any confusion. In the event contractor creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages. In the event contractor creates an ambiguity in their numbering of pages, the Government may exercise its own discretion in counting pages.
(h) Indexing. Each volume shall contain a more detailed table of contents to delineate the subparagraphs within that volume. Tab indexing shall be used to identify sections.
(i) Glossary of Abbreviations and Acronyms. Each volume shall contain a glossary of all abbreviations and acronyms used, with a definition for each.
3. Proposal Content
(a) Volume I – General. Offerors are required to submit a completed SF 1449 (including acknowledgment of Amendments), SF 1449 – Continuation Sheets (Supplies or Services and Prices/Costs, and 52.213-3 Alt I, Offeror Representations and Certifications. All final monetary extensions shall be in whole dollars only. Failure to follow the below Contract Proposal preparation instructions may cause your proposal to be deemed unacceptable by the Government. The General Volume shall be organized as follows and contain the identified information.
TAB A, Exceptions/Assumptions (if required) - Identification and explanation of any exceptions or deviations. Additionally, any assumptions used in the proposal preparation must be identified.
TAB B, Solicitation, Offer and Award – The SF 1449 shall be submitted fully completed. The offeror is cautioned that the SF 1449 must contain an original signature in block 30A of the form. The contractor shall acknowledge any amendments to the RFP in accordance with the instructions on the SF 1449 and with Addendum 52.212-1, Instruction to Offerors—Competitive Acquisition. The offeror shall provide the name, title and telephone number of the company/division point of contact regarding decisions made with respect to your proposal and who can obligate your company contractually. Also, identify those individuals authorized to negotiate with the Government.
TAB C, SF1449 – Continuation Sheets -- Supplies or Services and Prices/Costs – This section shall be submitted fully completed and error free. It shall contain the offeror’s prices for the established Contract Line Items Numbers (CLINS).
TAB D, 52.213-3, Offeror Representations and Certifications – The offeror shall ensure this section is submitted thoroughly completed with all blocks in each certification/representation completed truthfully and completely.
(b) Volume II – Technical Volume
(1) The Technical Volume shall be clear, concise, and include sufficient detail for effective evaluation and for substantiating the validity of stated claims in the Offeror’s proposal. Legibility, clarity and coherence are very important. Your responses will be evaluated against the Technical factors defined in Addendum 52.212-2, Evaluation Factors for Award. The proposal should not simply rephrase or restate the Government's requirements, but rather shall provide convincing rationale to address how the offeror intends to meet these requirements. Statements that the offeror understands, can, or will comply with the PWS (including referenced publications, technical data, etc.); statements paraphrasing the PWS or parts thereof (including applicable publications, technical data, etc.); and phrases such as “standard procedures will be employed” or “well known techniques will be used,” etc., will be considered unacceptable. Offerors shall assume that the Government has no prior knowledge of their facilities and experience, and will base its evaluation on the information presented in the offeror's proposal. Elaborate brochures or documentation, binding, detailed art work, or other embellishments are unnecessary and are not desired.
(2) The Technical Volume shall, at a minimum, be prepared in a form consistent with the Performance Work Statement (PWS) and the evaluation criteria for award set forth in Addendum 52.212-2 of this solicitation. The section shall be prepared in an orderly format and in sufficient detail to enable the Government to make a thorough evaluation of the contractor’s technical competence and ability to comply with the contract task requirements specified in the PWS. The offeror shall address as specifically as possible the actual methodology you would use for accomplishing the PWS tasks. The volume shall be organized according to the following general outline:
-Table of Contents -List of Table and Drawings
-Cross Reference Matrix -Exceptions/Assumptions (Identification and explanation of any exceptions or deviations). Additionally, identify any assumptions used in preparing the proposal.
Factor 1: Technical Capability consists of two Subfactors:
Subfactor 1A : Technical Ability Subfactor 1B: Management Approach & Staffing Approach
SUBFACTOR 1A: Technical Ability The Offeror’s overall technical approach shall demonstrate its knowledge and understanding of the magnitude and complexity of this requirement and its capability to perform all tasks in the Performance Work Statement. The Offeror’s technical approach shall also concisely and clearly address the Offeror’s approach to plan, organize, control and perform the major performance objectives below:
• Conduct all required Mission Command Arts and Sciences Instruction.
• Conduct all required Mission Command Arts and Sciences Virtual Instruction.
• Develop and update Training Curriculum and Program Documentation.
• Maintain and Manage the Virtual Local Area Network (VLAN).
• Manage and coordinate scheduling for all Mission Command instruction.
SUBFACTOR 1B: Management Approach & Staffing Approach.
The Offeror’s management approach shall describe the extent to which subcontractors and/or teaming partners (hereafter referred to as “personnel”) shall be used to perform this requirement by task and by percentage of the costs of service performed. The Offeror’s management approach shall address its procedures to monitor and manage performance by all personnel, across numerous geographic locations, to ensure timely quality work and to control costs. The Offeror’s staffing approach shall identify its proposed staffing (by number of personnel, by labor categories and by location) and any plans to cross-utilize or rely on reach-back, part-time or temporary personnel to perform this requirement. The Offeror’s staffing plan shall describe its plans for recruiting and retaining personnel with all of the qualifications necessary to perform this requirement. The Offeror shall provide the names of all proposed key personnel performing under this contract and proof of their certifications, security clearances and other qualifications required for their designated positions by close of solicitation. The Offeror shall provide letters of intent (signed within 60 days of proposal submission) and resumes for all key personnel performing under this contract. Resumes and Letters of Intent are not included in the page count. Resume and Letter of Intent for other than key personnel are required no later than 10 days after award. Résumés must conform to the following format:
(1) Name
(2) Education (Degree/discipline/year attained, educational institution)
(3) Certifications (certification member ID; expiration date)
(4) Security Clearance (List clearance(s) currently held)
(5) Proposed Labor Category
(6) Experience as related to this requirement.
(7) Present Position
a. Company and title of position
b. Dates of employment (month/year to month/year or to “present”)
c. Brief description of duties and responsibilities, including supervisory experience
d. Number and type of personnel supervised
(c) Volume III - Past Performance. Offeror shall identify and submit recent and relevant performance/experience information from at least three (3) but no more than five (5) Federal, State, or Local Government task orders or contracts that the Offeror has performed. Recent is defined as within the past three (3) calendar years from the closing date of this RFP. Relevant is defined as work performed that is similar to that anticipated by the PWS. Each narrative shall also include contract number and amount: the name, telephone number, and email address of the Government representative who can verify past performance. The Past
Performance evaluation will be accomplished by reviewing aspects of an Offeror's recent and relevant Past Performance, focusing on and targeting performance which is relevant to the effort as it directly relates to the work being procured under this solicitation and as defined in Addendum 52.212-2
Past Performance information described herein is required on the offeror and all subcontractors, teaming partners, and/or joint venture partners proposed to perform 50% of the proposed effort based on the total proposed price. The offeror shall submit, along with the information required in this paragraph, a consent letter, executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing release of adverse past performance information to the offeror so the offeror can respond to such information. For each identified effort for a commercial customer, the offeror shall also submit a client authorization letter, authorizing release to the Government of requested information on the offeror's performance.
1. The offeror is requested to submit the Past Performance by the scheduled due date, to the Contracting Officer at the address specified in Addendum 52.212-1.
2. The offeror shall include documentation regarding their relevant past performance as it directly relates to the work being procured under this solicitation. The offeror SHALL NOT go back any farther than 3 years for services for the submitted data. The past performance data shall document a successful history of past contract performance.
3. In conducting the Past Performance evaluation, the Government reserves the right to use both the information provided in the offeror’s Past Performance Volume and information obtained from other sources, such as the Past Performance Information Retrieval System (PPIRS) or similar systems, Defense Contract Management Agency (DCMA) and commercial sources. Offerors are reminded that both independent data and data provided by offerors in their proposals may be used by the Government to evaluate offeror past performance. However, the burden of providing thorough, complete, and current past performance information as requested in this paragraph remains with the offerors. Proposals that do not contain the information requested by this paragraph risk rejection or a less than acceptable performance rating by the Government. All past performance comments received will be taken into account and could affect the overall rating. The overall past performance evaluation is a subjective decision based on the whole of all data received. In the case of an offeror without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the offeror may not be evaluated favorably or unfavorably on past performance (see FAR 15.305 (a)(2)(iv)). Therefore, the offeror shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”
4. Submission Requirements. The offeror shall submit a Past Performance Volume containing the following:
• Table of Contents
• Summary Page describing the role of the offeror and each subcontractor, teaming partner, and /or joint venture partner that the offeror is required to provide Past Performance Specific Relevant Contract Reference Sheets for the past performance experience in accordance with Attachment 3.
• Consent Letters executed by each subcontractor, teaming partner, and/or joint venture partner, authorizing the release of past performance information so the offeror can respond to such information.
• Client Authorization Letters for each identified effort for a commercial customer authorizing release to the Government of requested information on the offeror’s performance.
• Organization Structure Change History— Organizational Structure Change History. Many companies have acquired, been acquired by, or otherwise merged with other companies, and/or reorganized their divisions, business groups, subsidiary companies, etc. In many cases, these changes have taken place during the time of performance of relevant present or past efforts or between conclusion of recent past efforts and this source selection. As a result, it is sometimes difficult to determine what past performance is relevant to this acquisition. To facilitate this relevancy determination, include in this proposal volume a "roadmap" describing all such changes in the organization of your company. As part of this explanation, show how these changes impact the relevance of any efforts you identify for past performance evaluation/performance confidence assessment. Since the Government intends to consider present and past performance information provided by other sources as well as that provided by the offeror(s), your "roadmap" should be both specifically applicable to the efforts you identify and general enough to apply to efforts on which the Government receives information from other sources.
• Specific Relevant Contracts Format - Sheets in accordance with Attachment 3 and are limited to 3 pages per reference. The offeror shall provide documentation outlining the offeror’s past performance with contracts, as a prime or major subcontractor, which is the same or similar in nature, size, and complexity to the services being procured under this Solicitation. The submittal shall include rationale supporting your assertion of relevance and how it was determined that the work performed previously was the same or similar in nature, size, and complexity to the work specified by this solicitation. Offerors are required to explain what aspects of the contracts are deemed relevant to the proposed effort, and to what aspects of the proposed effort they relate.
Past Performance Questionnaire - See Attachment 2, Past Performance Questionnaire. For the contracts identified on each Specific Relevant Contract Reference, the offeror shall forward a copy of the Past Performance Questionnaire to the points of contact responsible for monitoring performance under such contracts. The points of contact shall return the questionnaires directly to Ms. Shannon L. Mccauley shannon.l.mccauley3.civ@mail.mil prior to the closing of the RFP. Any questionnaires not returned directly to the Contract Specialist will not be reviewed and evaluated. The information contained in the questionnaires will be used to evaluate the offeror’s past performance. New entities that have no past customers shall annotate on the Summary Page that they have had no previous clients and that the minimum number of questionnaires cannot be provided.
(d) Volume IV- Price – All information relating to the proposed price must be included in both hard copy and electronic format. Electronic versions of the cost/price proposal shall be submitted in a format compatible with Microsoft Office (2007 or earlier) as further delineated below, and files should not be read only or password protected. All Excel formulas, lookup tables, and links should be intact, and no links should exist to files not included with the submission. Excel workbooks should not contain hidden spreadsheets. PDF or flat files will not be considered adequate. The electronic version will take precedence for any differences noted between the hard and electronic versions of an offeror’s proposal. Failure to comply with these formatting requirements may result in rejection of your proposal. Offerors’ submittals shall be free of viruses, Trojans, spyware, and other malicious code for which appropriate detection and removal/quarantine software exists.
(1) Volume Organization. The Price Volume shall be comprised of two parts:
(a) Price:
(i) The offeror’s response shall consist of a price proposal corresponding to the CLINs 0001- 2003. The Price proposal for all the CLINs contained in Schedule B, Pricing Schedule shall contain two Sections: the Price Narrative Section and the Price Proposal Section.
(ii) Price Narrative portion in MS Word or compatible format, with a Table of Contents. The price narrative shall provide the basis of estimate for all major elements of the price proposed. These narratives shall clearly explain the methodologies, calculations, exceptions and assumptions used in developing each cost element.
(b) A seperate labor breakdown shall be submitted for the base year and each option year. Pricing shall be traceable to the amounts inserted in Schedule B.
(c) Regarding labor costs, the Price Proposal Section shall be submitted using the Direct Labor Table format below, or other similar comprehensive formats which include the similar information as referenced below. The references in parentheses refer to the subparagraphs below.
DIRECT LABOR TABLE
PWS
Para (f.i)
Labor Category
(f.ii)
AWD
Code (f.iii)
Exempt Non-
Exempt (f.iv)
FTE
(f.v)
Labor Hrs
(Reg) (f.ii)
Wage Rate (f.vi)
Total
Respecting labor, the following information shall be included in the Cost Narrative Section.
(i) PWS Para. If multiple PWS paragraphs are being performed by cross-utilized employees, identify such approach by cross-referencing the cost of such PWS paragraphs.
(ii) Labor Category/Hours. The Offeror shall identify the estimated hours for the proposed prime and each subcontractor for each labor category. The proposed hours should reflect a realistic assessment of each Team Member’s expected participation/contribution to this effort.
(iii) Area Wage Determination (AWD) Code. If the position is Non-exempt then the offeror shall provide the five digit AWD code for the corresponding position title.
(iv) Exempt/Non-Exempt. The offeror shall identify whether the proposed position is classified as Exempt or Non-exempt. The terms “Exempt” and “Non-exempt” refer to applicability of the Fair Labor Standards Act (FLSA) and the Service Contract Act (SCA) requirements as reflected in the applicable AWD’s. Further instructions are indicated below.
(v) Full Time Equivalent (FTE). The offeror shall provide hours utilized for a productive work year and describe the methodology used to derive the number of productive hours from available hours. “Available hours” refers to the standard number of annual work hours in accordance with the provisions of the FLSA (normally 52 weeks of 40 hours; 2,080 total).
(vi) Wage Rate. The offeror shall identify the applicable wage rate for each labor category. If the position is Exempt, the offeror shall clearly explain the basis for the proposed wage rate. Additionally, the Offeror shall ensure that the non-exempt rates are compliant with the applicable AWD.
PWS
1.PERFORMANCE WORK STATEMENT (PWS)
Mission Command Arts and Sciences (MCASP)
U.S. Army Cyber Center of Excellence, Fort Gordon, Georgia
Part 1
General Information
1. GENERAL: This is a non-personnel services contract to provide Mission Command Arts and Sciences Program (MCASP) initiative. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
1.1 Description of Services/Introduction: The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform Mission Command Arts and Sciences Program (MCASP) as defined in this Performance Work Statement except for those items specified as Government furnished property and services. The contractor shall perform to the standards in this contract.
1.2 Background: For over five years Mission Command Arts and Sciences Program (MCASP) initiative has been supporting the Army’s Battle Command Training Strategy (BCTS) and Mission Command Training Strategy Implementation Plan (MCTSIP) on Fort Gordon, GA.
1.3 Objectives: MCASP is TRADOC’s implementation plan to support the Army’s Battle Command Training Strategy (BCTS) and Mission Command Training Strategy Implementation Plan (MCTSIP). This program supports
Mission Command training to Professional Military Education (PME) and Initial Military Training (IMT) classes in various Officers, Warrant Officers, and Noncommissioned officer Courses, in the United States Army Cyber Center of Excellence for 442d Signal Battalion, and 15th SIG BDE, Fort Gordon, GA.
1.4 Scope: The contractor shall provide instruction, cirriculum developemernt and classroom management services to support Mission Command training requirements in a virtual, classroom or lab environment to students in the Command & General Staff College P943 Course, BDE/BCT/BN S6 Course, 25G Network Integration Officer, Signal Captains’ Career Course, Basic Officer Leader Course, 255A Basic and Advanced Courses, FA53A Course, FA24 Course, 255N Basic Course, various NCOES Senior Leader Courses, Advanced Leader Courses, and upon request by Forces Command (FORSCOM) units. Minimum qualifications for these instructors are specified in paragraph 1.6.8. Instructors shall rotate between teams performing instruction, classroom preparation, and curriculum development and updates to teach critical tasks identified by the Critical Task and Site Selection Board (CT/SSB). Instructors shall be required to follow the lesson plans developed IAW the current Program of Instruction (POI). The contractor shall also provide network administration services to maintain the MCASP network infrastructure and its’ server stacks. The Government will own all developed products.
1.5 Period of Performance: The period of performance shall be for one (1) Base Year of 8 months and two (2) 12-month option years. The Period of Performance reads as follows:
Base Year: 2 July 2016 to 1 March 2017 Option Year I: 2 March 2017 to 1 March 2018 Option Year II: 2 March 2018 to 1 March 2019
1.6 General Information
1.6.1 Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor’s quality control program is the means by which he assures himself that his work complies with the requirement of the contract.
1.6.2 Quality Assurance: The Government shall evaluate the contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan. This plan is primarily focused on what the Government must do to ensure that the contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance, and the minimum acceptable defect rate(s).
1.6.3 Recognized Holidays: The contractor is not required to perform services on the following holidays.
New Year’s Day 1st day of January Martin Luther King Jr.’s Birthday 3rd Monday of January President’s Day 3rd Monday of February Memorial Day Last Monday in May Independence Day 4 July Labor Day 1st Monday of September Columbus Day 2nd Monday of October Veteran’s Day 11th day of November Thanksgiving Day 4th Thursday of November Christmas Day 25th day of December
1.6.4 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0800-1700 Monday thru Friday except Federal holidays or when the Government facility is closed due to local or national emergencies, administrative closings, or similar Government directed facility closings. Advanced notification will be provided in cases where shift-work and weekends businesses will be required. For other than firm fixed price contracts, the contractor will not be reimbursed when the Government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.5 Place of Performance: The work to be performed under this contract will be performed at all Mission Command training sites within the Cyber Schools located on Fort Gordon, GA. to include but not limited to Greely Hall, Cobb Hall, Burkhart Hall, Dixson Hall, SOS building, S6 building, 442d SIG BN Motor pool, FOB Ready and Fort Leavenworth in support of P943 Elective.
1.6.6 Type of Contract: The Government will award a Firm Fixed Price (FFP) contract.
1.6.7 Security Requirements: Contractor employees performing on this contract must be a U.S. citizen. At work performance start date, contractor employees to include subcontractors, performing on this contract shall have a SECRET security clearance and shall maintain the required security clearance throughout the life of the contract.
The contractor is responsible for acquiring the clearances. The contractor shall ensure that all assigned personnel understand applicable security policies and directives found in DOD 5220.22-M, National Industry Security Program Operating Manual (NISPOM); AR 380-5, Information Security Program; and all other applicable policies and regulations.
The contractor shall ensure that classified data is controlled, protected, and safeguarded in accordance with AR 380- 5 and current Army and DOD policy. Information classified up to SECRET shall be accessed and stored in Government spaces only. The contractor shall agree that any data furnished by the Government to the contractor shall be used only for performance under this PWS, and all copies of such data shall be returned to the Government upon completion of this effort.
The contractor Facility Security Officer (FSO) will ensure there is a procedure for all terminated employees to out process the installation. Compliance with DD Form 254, Department of Defense Contract Security Classification Specification, is required.
1.6.7.1 Handling/Access to Classified Information: The contractor shall comply with FAR 52.204-2, Security Requirements. This clause involves access to information classified "Confidential," "Secret," or "Top Secret" and requires contractors to comply with (1) the Security Agreement (DD Form 441), including the National Industrial Security Program Operating Manual (DoD 5220.22-M), and (2) any revisions to DoD 5220.22-M. Any adverse action preventing a contractor from retaining access to classified material must be brought to the attention of the COR and contractor Facility Security Officer (FSO) immediately.
1.6.7.2 SIPRNET Access: Not required or applicable to this contract.
1.6.7.3 COMSEC: Classified COMSEC material is not releasable to contractor employees who have not received a final clearance at the appropriate security level. COMSEC access shall be IAW DOD 5220.22-M and AR 380-40.
When access is required at Government facilities, contractor employees will adhere to COMSEC rules and regulations as mandated by Command policy and procedures.
1.6.7.4 Cyber Security (formerly Information Assurance (IA)/Information Technology (IT)) Training: All contractor employees and associated subcontractors must complete the DoD Cyber Awareness Challenge Training (https://ia.signal.army.mil/DoDIAA) before issuance of network access and annually thereafter. Certificates of successful completion, for both initial awareness training and annual refresher training shall be provided to the COR via the Army Training and Certification Tracking System (ATCTS). All contractor employees will successfully complete all required IA training as specified in AR 25-2 and as directed by the Government. All contractor employees working IA/IT functions must comply with DoD and Army training requirements in DoDD 8570.01, DoD 8570.01-M, DFARS 252.239.7001, DoDD 8140.01, and AR 25-2.
Contractor employees, to include subcontractors, requiring access to information systems to fulfill their duties must possess the required favorable security investigation. Contractor employees that require access to the Fort Gordon network shall have a minimum of a National Agency Check with Inquiries (NACI) investigation initiated and favorable review before issuance of network access. The IASO/IANO from the activity that the contractor employee is assigned to, will submit an electronic DD 2875, System Authorization Access Request (SAAR) to Security & Intelligence Division for verification that the contractor employee meets the requirements of AR 25-2 for accessing the Fort Gordon network. (Ref AR 25-2)
1.6.7.5 Anti-Terrorism (AT) Awareness Training: All contractor employees, including subcontractors, assigned to this contract shall receive an initial Antiterrorism Level I Brief by a certified ATO Level II Officer within 30 days of reporting for duty. (Monthly briefings will be offered by the Garrison Antiterrorism Officer.) Annual refresher
Antiterrorism Level I Training shall be completed on-line at https://atlevel1.dtic.mil/at/ or they may attend the monthly training offered by the Garrison ATO. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR and unit/activity security manager. (Ref Department of the Army, US Army Contracting Agency, SFCA-CO, 5 Sep 07, subject: Incorporation of Measures into the Contracting Process and AR 525-13, Antiterrorism).
1.6.7.6 iWATCH: All contractor employees, including subcontractors, assigned to this contract shall receive a brief on the local iWATCH program (provided in conjunction with the AT Level I Training). This training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the COR. This training shall be completed within 30 days of reporting to duty and annual refresher training with the results reported to the COR.
1.6.7.7 Operation Security (OPSEC) Training: All contractor employees, including subcontractors, assigned to this contract shall complete Level I OPSEC training within 30 days of reporting for duty and then annually thereafter. Initial Level 1 OPSEC training will be conducted monthly by the Garrison OPSEC Officer or a Level II certified OPSEC Officer. Annual refresher training shall be completed on-line at http://cdsetrain.dtic.mil/opsec/index/htm. The contractor shall submit certificates of completion for each affected contractor employee and subcontractor employee to the COR and unit/activity security manager. OPSEC training guidelines are contained in AR 530-1, Operations Security. The contractor shall adhere to local OPSEC policies and procedures of the Government requiring activity. When in a TDY status in support of this work effort, the contractor shall also adhere to any OPSEC policies and procedures in effect at TDY locations.
1.6.7.8 Threat Awareness and Reporting Program (TARP) Training: All contractor employees, including subcontractors, assigned to this contract shall complete TARP training within 30 days of reporting for duty and then annually thereafter. TARP training will be conducted monthly by the 902nd MI Group. The COR will ensure contractors are notified of available training. Completion of training shall be reported to the COR and the unit/activity security manager (Ref AR 381-12).
1.6.7.9. Installation Access: All contractor employees, including subcontractors, shall comply with applicable installation and facility access security policies and procedures at all work and TDY locations. All contractors and subcontractors will be issued a Common Access Card (CAC) or an Installation Pass issued through the Automated Installation entry (AIE) Security System to access the installation. The Fort Gordon military installation is a limited access post. Unscheduled gate closures by the military police may occur at any time. In accordance with Army Regulation 525-13, paragraph 5-19, all prospective contractors will undergo a verification process by the installation Provost Marshal Office, Director of Emergency Services to determine the trustworthiness and suitability prior to being granted access to federal property. This will be accomplished using the National Crime Information Center (NCIC) Interstate Identification Index (III). This is the minimum baseline background check for entrance onto Army Installations for non-CAC holders to include entrance of visitors (Ref AR 190-13, paragraph 8-2). All personnel entering or exiting the installation may experience a delay due to vehicle inspections, registration checks, verification of seat belt use, etc. All vehicles and personnel are subject to search and seizure. The search and seizure provisions shall apply to contractor personnel while within Fort Gordon's area of jurisdiction. Contractor personnel shall comply with all entry control requirements and security policies/procedures in effect. Security procedures may change without notice.
1.6.7.10. Identification of Contractor Employees: In accordance with FAR 37.114 contractor employees shall identify themselves as a contractor at all times while on the job, e.g., in the workplace, when attending meetings, in email, when answering Government telephones, or when making phone calls.
1.6.7.11. ID Badges: The contractor shall provide each contractor employee an identification (ID) badge on contract start date or on employment start date. The ID badge shall be made of nonmetallic material, be easily readable, and shall contain the following minimum information: Employee's Name, Contract Company Name and Employee's Photograph. Contract employees shall wear proper identification at Government workplaces at all times.
1.6.7.12. Display of ID Badges: Contractor employees shall wear the ID badge at all times when performing work under this contract to include attending Government meetings and conferences. Unless otherwise specified in the contract, each contract employee shall wear the ID badge in a conspicuous place on the front of exterior clothing and above the waist except when safety or health reasons prohibit such placement.
1.6.7.13. Answering Telephones: Contractor employees shall identify themselves as a contract employee when answering and making calls on Government telephones.
1.6.7.14. Utilizing Electronic Mail: When contractor employees send e-mail messages to Government personnel while performing on this contract, the contractor employee's e-mail address shall include the company name together with the person's name (ex: John Smith, Contractor, ABC Company). When contractor employees require access to a Government computer, the contractor employee shall be required to obtain a Common Access Card. To do so, the contractor employee shall request a CAC Card through the COR. NOTE: The Government issued CAC is the property of the U.S. Government and shall be returned to the COR upon expiration of the contract, replacement or termination of the contract employee (CAC card must be turned in to the COR on contractor employee's last day of employment). Unauthorized possession of the CAC can be prosecuted criminally under section 701, title 18, United States Code. All contractor employees shall conduct official communication using Government-owned or provided e-mail, networks, websites, systems, and devices. The use of commercial ISP e-mail accounts or personal e-mail accounts to conduct official communication is prohibited. Remote access / telework technology may be leveraged to ensure compliance with these requirements. Contractor employees are prohibited from using Army-assigned, AKO, and other official e-mail addresses for unofficial business affiliations. Personnel shall not provide official e-mail addresses to businesses, affiliated organizations, or online retailers; unless those entities are known by personnel to be legitimately engaging in official business.
1.6.7.15. Eligibility Verification for Employment: E-Verify is an Internet-based system that compares information from an employee's Form I-9, Employment Eligibility Verification, to data from U.S. Department of Homeland Security and Social Security Administration records to confirm employment eligibility. The U.S.
Department of Homeland Security is working to stop unauthorized employment. By using E-Verify to determine the employment eligibility of their employees, companies become part of the solution in addressing this problem. All U.S. employers must complete and retain a Form I-9 for each individual they hire for employment in the United States. This includes citizens and noncitizens. On the form, the employer must examine the employment eligibility and identity document(s) an employee presents to determine whether the document(s) reasonably appear to be genuine and relate to the individual and record the document information on the Form I-9. The list of acceptable documents can be found on the last page of the form. E-Verify is mandatory for employers with federal contracts or subcontracts that contain the Federal Acquisition Regulation E-Verify clause.
16.7.16 Physical Security: The contractor shall be responsible for safeguarding all Government equipment, information and property provided for contractor use. At the close of each work period, Government facilities, equipment, and materials shall be secured.
1.6.7.17 Key Control: The…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .