Attachment (G8) - Schedule I and II.pdf
PDF 239 KB Posted
- Attached to
- Local Moves Fort Campbell
- Solicitation number
- W91248-20-R-0006
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IV‐G3‐1
Offeror Name:____________________ W91248-20-R-0006
SUMMARY SHEET
Base Period
Ordering Period 1
SCHEDULE I:
Ordering Period 2
Ordering Period 3
Ordering Period 4
Base Period
Ordering Period 1
SCHEDULE II:
Ordering Period 2
Ordering Period 3
Ordering Period 4
TOTAL PRICE
Business Name:
Business Address:
Business Phone:
Business Email:
Business POC:
ESTIMATED QUANTITIES
The quantities shown by area of performance for each item in this Solicitation are the Government’s estimate of requirements, which may be ordered during the period of the contract.
The Government’s estimated maximum daily requirements, excluding Saturday, Sunday; National, State, and local holidays are listed below by area of performance within each schedule. Offerors must complete the “Guaranteed Daily Capability”, which must equal or exceed the Government’s minimum acceptable daily capability, for all items within an area of performance for which they submit a proposal. Failure to do so will render the proposal non-responsive.
Government’s
Government’s
Estimated
Maximum Daily
Requirement
Minimum
Acceptable
Daily
Capability
Guaranteed
Daily
Capability
OUTBOUND NCWT NCWT NCWT
(Schedule I)
Area 1 18,000
INBOUND NCWT NCWT NCWT
(Schedule II)
Area 1 18,000
SCHEDULE I
OUTBOUND SERVICES
Item 0001. Complete Service – Outbound (HHG). Services must include premove survey, servicing of appliances , disassembly of furniture, packaging, inventorying, tagging, wrapping, padding, packing, and bracing of HHG in Government-owned and furnished shipping containers (Shipping Container Commercial Spec ASTM- D4169-01, MTMC Pamphlet 55-12) at member’s /employee’s residence, or at contractor’s facility when ordered by the contracting officer, property securing and sealing for shipment, weighing, obliterating old markings, marking, strapping, and drayage of the container within an area of performance. Service must also include loading of shipments on linehaul carrier’s equipment at the contractor’s facility. When containers will not accommodate all articles of any one lot, loose articles must be packed in the said containers before any over-packed articles are placed therein. Overflow, oversize, and other shipments must be paid for under Item 0003.
Annual Unit
Area 1 Quantity Unit Price Total
AA. At member/employee residence:
Container, Commercial Spec ASTM-D4169-01, or MTMC Pamphlet 55-12
AB. At contractor’s facility:
Container, Commercial Spec ASTM-D4169-01, or MTMC Pamphlet 55-12
NCWT
Item 002. Outbound (HHG from Nontemporary Storage). Service must be the same as Item 0001 above except that: (a) HHG must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) HHG must be delivered to contractor’s facility: and (c) premove survey, servicing of appliances, preliminary packing and assessorial services must not be provided. Overflow articles requiring containerization will be paid for under Item 003.
Area 1 Quantity Unit Price Total AA. Pickup by contractor:
Container, Commercial Spec ASTM-D4169-01, or MTMC Pamphlet 55-12
AB. Delivered to contractor:
Container, Commercial Spec ASTM-D4169-01, or MTMC Pamphlet 55-12
Item 0003. Complete Service-Outbound (HHG-Overflow Articles and HHG Shipments requiring other than ASTM-D4169-01 or MTMC Pamphlet 55-12). Service must be the same as Item 0001 and Item 0002 except those that loose articles are drayed to contractor’s facility when ordered by the contracting officer for containerization in Government-furnished or contractor-furnished containers. Overflow, other shipments, and oversize containers must be constructed IAW ASTM-D6251. Each container must be caulked during assembly.
Overflow boxes and other shipments must be limited to one per shipment. Other shipments are small HHG shipments that normally require a lesser size box than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12. Overflow containers are of a lesser size than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12 and oversized containers are always of a greater size than specified in Commercial Spec ASTM-D4169-01 or MTMC Pamphlet 55-12. One or more of these containers may be required per shipment.
Price for Item 0003 includes container plus weight of its contents.
Area 1 Quantity Unit Price Total AA. Government-Furnished Containers:
Overseas Pack Overflow Articles AB. Government-Furnished Containers:
Overseas Pack Oversize Articles AC. Government-Furnished Containers:
Overseas Pack Other Shipments AD. Government-Furnished Containers:
Domestic Pack: Overflow Articles AE. Government-Furnished Containers:
Domestic Pack: Oversize Articles AF. Government-Furnished Containers:
NCWT
NCWT
NCWT
NCWT
Domestic Pack: Other Shipments 50 NCWT AG. Contractor-Furnished Containers:
Overseas Pack: Overflow Articles 50 NCWT AH. Contractor-Furnished Containers:
Overseas Pack: Oversize Articles AI. Contractor-Furnished Containers:
50 NCWT
Overseas pack: Other Shipments 50 NCWT AK. Domestic Pack: Overflow Articles: 50 NCWT
AL: Domestic Pack: Oversize Articles: 50 NCWT
AM: Domestic Pack: Other Shipments 50 NCWT
Item 0004. Complete Service-Outbound (Unaccompanied Baggage). Service includes packaging, inventorying, packing in Government approved containers, weighing, strapping, obliteration of old markings, marking, and loading shipments on the linehaul carrier’s equipment. Service must be performed at member’s/employee’s residence. (Service may be performed at contractor’s facility when ordered by the Ordering Officer.)
Area 1 Quantity Unit Price Total AA. Government-Furnished Containers:
Drayage Included AB. Government-Furnished Containers:
Drayage Not Included AC. Contractor-Furnished Containers:
Drayage Included AD. Contractor-Furnished Containers:
Drayage Not Included
0 NCWT 0 0
0 NCWT 0 0
Item 0005. Complete Service-Outbound (Unaccompanied Baggage from Nontemporary Storage). Service must be the same as Item 0004 except that (a) unaccompanied baggage must be picked up at a nontemporary storage facility and transported to contractor’s facility; or (b) unaccompanied baggage must be delivered to contractor’s facility; and (c) servicing of appliances, preliminary packing and accessorial services must not be provided.
Area 1 Quantity Unit Price Total AA. Government-Furnished Containers:
Drayage Included AB. Government-Furnished Containers:
Drayage Not Included AC. Contractor-Furnished Containers:
AD. Contractor-Furnished Containers:
0 NCWT 0 0_
Drayage not Included 0 NCWT _0 0
Item 0006. Outbound Service-Unaccompanied Baggage Packed by Member/Employee. Service must include weighing, strapping, banding, obliterating old markings, and marking. Service may include containerization in outer shipping containers as ordered by the contracting officer.
Area 1 Quantity Unit Price Total AA. Containerization Not Required:
Drayage Included AB. Containerization Not Required:
25 NCWT
Drayage Not Included AC. Containerization Required:
25 NCWT
Drayage Included 25 NCWT AD. Containerization Required:
Drayage Not Included 25 NCWT
Item 0007. Outbound Service-Unaccompanied Baggage Packed By Member/Employee-Consolidated Shipments/Government Facility. Service must be the same as Item 0006 above except that service must include two or more shipments picked up from a Government office, warehouse, or facility.
Area 1 Quantity Unit Price Total AA. Containerization Not Required:
Drayage Included AB. Containerization Required:
Item 0008. Expensive and Valuable Items. Service must include inventorying each item, packing in Government-approved, contractor-furnished container(s), marking, banding, and cubing at member’s/employee’s residence.
Drayage will be ordered by the contracting officer. If drayage is required, weighing must be done on properly certified scales and a certified weight ticket must be furnished. If drayage is not required, weighing must be done at member’s/employee’s residence on portable or bathroom scales. In jurisdictions where local law prohibits the certification of portable scales, a weight certificate will not be required. However, upon the written authority of the contracting officer, the contractor may apply a constructive weight of 11 pounds per gross cubic foot of the container.
Estimated
Area 1
Annual Quantity
Unit
Price
Total
AA. Drayage Included 10 NCWT
AB. Drayage Not Included 10 NCWT
Item 0009. Storage. Storage of containerized articles must be furnished when ordered by the contracting officer.
Charges must not commence earlier than the sixth workday following date of transportation officer’s receipt of notification of completion of containerization service. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
50 NCWT
Item 0010. Containers. Service must consist of the furnishing of the following types of new containers or specially constructed wooden crates. Containers furnished or specially constructed are to be assembled and ready for loading. When a specific container from the MTMC Pamphlet 55-12 is ordered, the order will indicate the MTMC approval number.
AA. Container (ASTM-D4169-01) 2 ea
AB. Container (MTMC Pamphlet 55-12) 2 ea
AC. Crate (ASTM-D6039/D6039M-02) 2 cu ft or fraction thereof
Item 0011. Remarking, Coopering and Assembly/Disassembly Service.
AA. Remarking of Shipments for Reconsignment. Service must consist of obliteration of all old markings, stenciling of necessary information on loaded shipping containers scheduled for reconsignment, and loading on the hauling carrier’s vehicle.
10 ea
AB. Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or cost of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, nails and bands must be accomplished at no expense to the Government.
10 ea
AC. Assembly/Disassembly of Government-Owned Containers. Contractor will assemble Government owned containers. Component parts will be furnished by the Government. Contractor will disassemble Government-owned containers. Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
AD. Assembly 0 each
AE. Disassembly 15 each
Item 0012. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance.
Annual
AA. Household goods 50 per loaded mile
AB. Unaccompanied baggage 50 per
Item 0013. Attempted Pickup. When the initial attempt to pickup a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the Contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted pickup at the residence.
Area Quantity Unit Price Total
AA. Household goods 75 ea shpmt
AB Unaccompanied baggage 75 ea shpmt
NOTE: All above Items are included in the evaluation of proposals
Item 0014. Additional Services. The contractor must provide additional services not included in the schedule, but required for satisfactory completion of the services ordered under this contract, at a rate comparable to the rate for like services as contained in tenders on file with the state regulatory bodies or MTMC, in effect at the time of the order.
RECAPITULATION SCHEDULE I
Schedule Total - Area .....1. .............. $ .
SCHEDULE II
INBOUND SERVICES
Item 0015. Complete Service-Inbound (HHG). Service must include drayage from contractor's facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle , handling into contractor’s facility, drayage to member’s/employee’s residence, decontainerization and unpacking of loaded containers of HHG and placing goods in rooms as directed by member/employee, unservicing appliances, assembly of any disassembled articles and removing shipping containers, barrels, boxes/crates, and debris from member’s/employee’s residence and drayage of empty containers to contractor’s or Government facility.
_2835_ NCWT
Item 0016. Complete Service - Inbound (HHG). Service must be same as Item 0015 above except that drayage of shipment to residence is not required.
_50 NCWT
Item 0017. Complete Service Inbound (HHG). Service must be the same as Item 0015 above except removal of items from outer container will be at the contractor’s facility and articles will be drayed to member’s/employee’s residence.
100 NCWT
Item 0018. Inbound Service-Contractor Facility (HHG). Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle into the contractor’s facility and delivery of articles to property member/employee, motor van carrier, or NTS contractor at the contractor’s facility.
10_ NCWT
Item 0019. Complete Service-Expensive and Valuable Items. Services must include drayage from the storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, decontainerization and unpacking of containers at member’s/employee’s residence, and removal of shipping containers and debris from the residence.
AA. Drayage Included
AB. Drayage Not Included
Item 0020. Complete Service-Inbound (Unaccompanied Baggage). Service must include drayage from contractor’s facility to storage warehouses, air and surface transportation terminals, military installation shipping offices and ocean or river terminals/piers and return, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, drayage of unaccompanied baggage containers to member’s/employee’s residence, unpacking of containers, reassembly of articles and removal of all shipping containers and debris from the residence.
150 NCWT
Item 0021. Complete Service-Inbound (Unaccompanied Baggage). Service must be same as Item 0020 except that drayage to residence is not required.
125 NCWT
Item 0022. Inbound Service - Contractor Facility (Unaccompanied Baggage). Service must be the same as Item 0020 except service must also include removal of unaccompanied baggage from outer shipping containers for pickup by the member/employee or release to a motor carrier or other contractor at the contractor’s facility.
50 NCWT
Item 0023. Storage. Storage of containerized articles must be furnished when ordered. Charges under this item must not commence earlier than the sixth workday following date of contractor’s notification to the transportation officer of arrival of shipment. Storage charges apply for each 30-day period or fraction thereof. Date of release from storage must not be considered in computation of storage charges.
300 NCWT
Item 0024. Remarking, Coopering, and Assembly/Disassembly Service.
AA. Remarking of Shipments for Reconsignment. Services must include drayage from storage warehouses, air and surface transportation terminals, military installation shipping offices, and ocean or river terminals/piers to contractor’s facility, unloading from the delivering carrier’s vehicle, handling into contractor’s facility, obliteration of all old markings, stenciling of necessary information on loaded shipping containers schedule for reconsignment loading on the hauling carrier’s vehicle.
25 ea piece
AB. Coopering. Service must consist of repair of containers not to exceed 30 percent of total area of shipping container or costs of repairs will not exceed 50 percent of the container replacement cost. Minor repair, such as replacement of bolts, renailing and rebanding must be accomplished at no expense to the Government.
25 ea piece
AC. Assembly/Disassembly of Government-Owned Containers. Contractor will assemble Government owned containers. The Government will furnish component parts. Contractor will disassemble Government-owned containers.
Component parts will be put into a cloth bag and attached to the container. Knocked down container sections will be banded.
Estimated
AD. Assembly 25 each
AE. Disassembly 0 each
Item 0025. Attempted Delivery. When the initial attempt to deliver a shipment at the member’s/employee’s residence is unsuccessful, charges apply provided the contractor notified the contracting officer via telephone and provided that after contractor’s notification, the contracting officer (a) cannot locate the member/employee within 30 minutes, (b) cannot have the member/employee at the residence within one hour after notification, and (c) the contractor left a notice of attempted delivery at the residence.
AA. Household Goods
AB. Unaccompanied Baggage ea shpmt
Item 0026. Reweighing. Service must consist of weighing the loaded containers prior to delivery and weighing the empty containers after delivery.
AB. Unaccompanied Baggage
Item 0027. Drayage Beyond the Contract Area of Performance. Service must consist of drayage of packed shipments beyond the contract area of performance, not to exceed _50_ miles. Mileage must be computed on the shortest highway distance commencing with the point of pickup to the outer boundary of the contract area of performance
AB. Unaccompanied baggage per per
Item 0028. Partial Withdrawal. Service must be the same as Items 0015, 0016, 0020, or 0021, except a partial removal of the items from the outer container will be performed at the contractor’s facility. Articles not removed from the shipment will remain at the contractor’s facility.
Drayage included
AB. Household Goods
Drayage not included
AC. Unaccompanied Baggage Drayage included
AD. Unaccompanied Baggage
Drayage not included
Item 0029-0030. Reserved (See additional services).
Note: All above Items are included in the evaluation of proposals
RECAPITULATION SCHEDULE II
Schedule Total - Area ....1… .......... $ .
| ESTIMATED QUANTITIES |
| Government’s |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
| Estimated |
File details come from the government source that posted it. Updated .