Questions 1: can contractor have bulk fuel storage at crushing site?

ANSWER 1: Contractor may have a portable tank that complies with Fort Campbell Environmental requirements.

Question 2: Can we look at proposed crushing site and material to be crushed?

Answer 2: DPW Landfill is the location. Coordinate can be made to visit.

Question 3: Explain what you want on pages 18 & 19 of solicitation?

ANSWER 3: Please provide specific paragraph s to address

Question 4: 3 1.6.3 how far and how often do you anticipate requiring contractor to move crushing plant?

ANSWER 4: This paragraph discusses possible different sites for operations but it will be at the landfill most of the time

Question 5: 1.56.20.3 what permits will be needed?

ANSWER 5: As listed

Question 6: 1.6.20.5 contractor is not allowed a storage trailer on site of plant setup, is this correct?

ANSWER 6: Correct

Question 7: 6.1.7.7 OZONE is any year model diesel engine acceptable or is there a tier restriction on engines?

ANSWER 7: This paragraph is no longer required

Question 8: 7.1.7.11.3 who receives value of recyclables?

ANSWER 8: Deliveries to DRMO go to MWR, contractor is required to dispose of all steel and may keep the value

Question 9: 8.1.7.11.4 who receives value?

ANSWER 9: There is no value

Question 10: 9.1.7.11.7 is there any cost to contractor?

ANSWER 10: No cost to contractor

Question 11: 10. 3.3 is water available at crushing site or does it need to be transported by truck from offsite source?

ANSWER 11: Contract shall coordinate with CH2MHill for use of a fire hydrant (contractor shall provide backflow device) or they can use a fill point on Screaming Eagle Road.

Question 12: 11.4.4.1 does delivery trucks need to be 4 wheel or all‐wheel drive or are you referring to just pickup trucks?

ANSWER 12: This is referencing dump trucks to transport processed materials

Question 13: 12. 5.1 do you have a specific list of products you need (2, 5, 57, 8, DGA, channel lining)?

How many products need to be produced at once?

ANSWER 13: Typically we want DG+A, and size 3 minus

Question 14: 135.1.6.1 will crushing equipment need a Tn. air quality permit? If so, then will contractor have time to acquire permit after award before you want to start crushing?

ANSWER 14: No State permit is required

Question 15: wage determination for this project.

Answer 15: KY170145 08/11/2017 KY145

TN170133 08/11/2017 TN133