Q and A (3).pdf
PDF 60 KB Posted
- Attached to
- 6th BN Access Control System Federal contract opportunity
- Solicitation number
- W9124721T0204
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bco 6BN ESS Upgrade SOW February 21 v2 (003).docx | DOCX document | |
| Bco 6BN ESS Upgrade SOW (2).docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. Are Scaled Drawings available? Only to site visit participants.
2. Are Ceilings Suspended? Or Hard Lid? They are suspended drop ceilings.
3. Are there existing Cable Trays for wiring above ceilings? Only in the classroom areas. J‐hooks are also ok for use indoors for cabling. Out door cabling must be in conduit (which should already exits to all the gates).
4 .Can Existing Wiring be utilized? Yes, if it works.
5. Is a “UPS” required? If so, What Time/Power Duration is required? Yes, minimum required to maintain power to the access control PC for 4‐hours.
6. Are “Or Equal” Equipment substitutions allowed? Yes, with exceptions. PACS System must be AMAG HSE, all other substitutions must be NDAA compliant.
7. Is “Plenum Wire” acceptable? Yes, cannot use red, yellow, purple, or green colors. Otherwise, ok.
8. Is “After Hours Access” for said work, available to contractor at no add’l cost to the Gov’t? Yes, with prior coordination with occupying unit’s representatives in the facility.
9. What is the height of Exterior Cameras? (If any) Two (2) outdoor cameras. Northeast corner mounted camera ‐ 18 feet. Southwest corner mounted camera – 16.5 feet.