Amendment 002 Q&A, submission extenstion

View the file

Other files for this federal contract opportunity

Other files attached to Abstract of Offerors, newest first.
File Type Posted
Amendment_0003_-_Site_visit_roster.pdf PDF
DRAFT_W91247-17-B-A005-U0002.pdf PDF
Amendment_001.pdf PDF
Attachment__3(Statement_Of_Work).pdf PDF
Attachment__4(Specification).pdf PDF
W91247-17-B-A005.pdf PDF
Attachment__2(_Drawings).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

X

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

2. AMENDMENT/MODIFICATION NO.

U0002

3. EFFECTIVE DATE

20-Jun-2017

4. REQUISITION/PURCHASE REQ. NO.

0010980650

5. PROJECT NO.(Ifapplicable)

6. ISSUED BY CODE W91247 7. ADMINISTERED BY (If other than item 6) CODE

MICC CENTER - FORT BRAGG

MICC - FORT BRAGG

2175 REILLY ROAD STOP A

FORT BRAGG NC 28310-5000

See Item 6

8. NAME AND ADDRESS OF CONT RACT OR (No., Street, County, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

W91247-17-B-A005

X 9B. DATED (SEE ITEM 11)

02-Jun-2017

10A. MOD. OF CONT RACT/ORDER NO.

CODE

FACILIT Y CODE

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENT S OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt ofthis amendment prior to the hour and date specified in the solicitation or as amended by one ofthe following methods:

(a) By completing Items 8 and 15, and returning copies ofthe amendment; (b) By acknowledging receipt ofthis amendment on each copy ofthe offer submitted;

or (c) By separate letter or telegramwhich includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. Ifby virtue ofthis amendment you desire to change an offer already submitted, such change may be made by telegramor letter, provided each telegramor letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNT ING AND APPROPRIAT ION DAT A (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICAT IONS OF CONT RACTS/ORDERS.

IT MODIFIES THE CONT RACT /ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONT RACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONT RACT /ORDER IS MODIFIED TO REFLECT THE ADMINIST RAT IVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUT HORIT Y OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUT HORIT Y OF:

D. OTHER (Specify type of modification and authority)

E. IMPORT ANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPT ION OF AMENDMENT /MODIFICAT ION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

See summary of changes

Except as provided herein, all terms and conditions ofthe document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONT RACTING OFFICER (Type or print)

15B. CONT RACT OR/OFFEROR

15C. DATE SIGNED

TEL:

16B. UNIT ED ST AT ES OF AMERICA

EMAIL:

16C. DATE SIGNED

(Signature of person authorized to sign)

BY

(Signature of Contracting Officer)

EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

30-105-04 ST ANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The Issued By organization below has been deleted:

MICC CENTER - FORT BRAGG

MICC - FORT BRAGG

2175 REILLY ROAD STOP A

FORT BRAGG NC 28310-5000

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The following have been added by full text:

MODIFICATION 0002

Summary of Changes

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 23-Jun-2017 04:00 PM to 28-Jun-2017 02:00 PM

Post site visit Q&A Q1.Will Commissioning be required for this project?

A1. Yes

Q2. Will there be any requirements for LEED documentation on this project?

A2.No

Q3. Will the project signs be required?

A3.Just safety signs and normal safety info.

Q4. Will the furniture and furnishings present in the building during the site visit still be present during construction?

A4.The building will be occupied.

Q5. Is the new guard shack to be installed on a new concrete pad with anchors per manufacturer's recommendations or installed to match the existing installation?

A5.On pad according to manufacturer's instructions.

Q6. Will the Superintendent, QC Manager and SSHO need to be three separate individuals and will they be required for this project?

A6.You can have one person or two do the three jobs.

Q7. Does section 23 05 93 Testing, Adjusting and Balancing for HVAC only apply to the three exhaust fans?

A7.No all Hvac equipment

Q8.Will the full submittal requirements of the Specification Section apply?

A8. Yes

Q9. Are there any fire resistance rated assemblies which would require the fire caulking as specified in section 07 84 00?

A9. Any wall or hard ceiling penetrations.

(End of Summary of Changes)

SUMMARY OF CHANGES
Summary of Changes
Post site visit Q&A