Q&A__2_-_Connector_Road_answered.pdf
PDF 60 KB Posted
- Attached to
- Construct Connector Road Federal contract opportunity
- Solicitation number
- W91242-18-B-0995
About this file
Q&A #2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_opening_abstract.pdf | ||
| Bid_opening_sign_in.pdf | ||
| W91242-18-B-0995-0003.pdf | ||
| Q&A__1_-_Connector_Road_answered.pdf | ||
| Combined_Drawings_R1.pdf | ||
| W91242-18-B-0995-0002.pdf | ||
| W91242-18-B-0995-0001.pdf | ||
| W91242-18-B-0995.pdf | ||
| Combined_Drawings.pdf | ||
| Visitor_Request_Worksheet1.pdf | ||
| SOW.pdf | ||
| Pre-Bid_Conference,_Site_Visit,_Bid_Opening_Map.pdf | ||
| Combined_Specs.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91242-18-B-0995 Questions & Answers #2
12. The chain link fence detail shows a bottom rail and bottom tension wire. My fence contractors have told me this is redundant and that tension wire is preferable. What does the Government want?
Response: Top tension wire, and bottom rail. Install per UFC 4-022-03 Chapter 2 and drawings UFC-700 and UFC-701
13. On the chain link fence detail a middle rail is only shown on the gate. I am aware that there is no gate on this project. Is there supposed to be a middle rail used as a brace rail?
Response: Per the drawings, there’s no middle rail. Install per UFC 4-022-03 Chapter 2 and drawings UFC-700 and UFC-701
14. What is the depth of the existing asphalt and base course that must be removed for this project?
Response: Existing is unknown. Assume 4” asphalt and 8” base.