Answers to several questions.

View the file

Other files

File Type Posted
Vehicle exhaust system.pdf PDF
Questions 3 4.doc DOC document
Question 1 2.PDF PDF
Contruct Air Traffic Control Facility - Project Manual.pdf PDF
FP-PLUMB-MECH DWGS.pdf PDF
CIVIL DWGS 2.pdf PDF
ARCH DWGS.pdf PDF
CIVIL DWGS 1.pdf PDF
STRUCT DWGS.pdf PDF
ELECT DWGS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions Dated 1 Aug 08 Project: Construct Air Traffic Control Facility Solicitation: W91242-08-B-0001 Project # WEFM069122

Question 1: On sheet E6 it shows panel S1 in (2) locations, in the electric room and in the power production room. Which is it?

Answer 1: PANEL “S1” IS TO BE LOCATED IN ELECTRICAL ROOM 102.

Question 2: Sheet E11 One line it shows panel EA on the first and the second floor. It also shows panel L1 on the first and the second floor. These panels are shown in the second floor electric room but not in the first floor.

Answer 2: THE FLOOR PLANS ARE CORRECT. PANELS “EA”, “P2”, and “L1” ARE IN ELECTRICAL ROOM 202. PANELS “P1”, “M1”, “S1”, AND “D1” ARE IN ELECTRICAL ROOM 102.

Question 3: The driveway paving to be Alternate 1 is called out to be Type B on Sheet C7.0 which is light duty. Should the driveway be light duty instead of Heavy Duty?

Answer 3: ON SHEET C3.0, REVISE PAVEMENT NOTE FOR ADDITIVE BID ITEM NO. 1 AT NEW ENTRANCE TO READ:

“BITUMINOUS CONCRETE PAVEMENT, TYPE A. SEE DETAIL B1/C7.0.”

Question 4: On page C5.0 it has some pipe and catch basins that have a note below it additive bid item #5. There is no additive bid item #5. Is this pipe and catch basins suppose to be in the base bid or are they suppose to be in additive bid item #2. Please let me know something as soon as possible.

Answer 4: ALL REFERANCE TO ADDITIVE BID ITEM #5 ON SHEET C5.0 SHALL BE DISREGARDED AS WORK IS INCLUDED

IN THE BASE BID.

Question 5: Sheet C3.1 - Bid Item # 3 - Is the paving for the RAPCON existing road supposed to be heavy duty or light duty? The parking area shows light duty but I don't see any detail for the roadway.

Answer 5: ROADWAY IS LIGHT DUTY.

Question 6: Sheet C2.1 - Calls for synthetic liner in the temporary diversion ditch. What kind?

Answer 6: TYPICAL DITCH LINER. NO SPECIFIC MODEL LISTED.

Question 7: Can extra fill or topsoil be left on site or do we need to price it being hauled off?

Answer 8. EXTRA FILL AND TOPSOIL WILL BE DISPOSED OF ON SITE ADJACENT TO NEW WAREHOUSE

Question 9: Sheet C3.0 - How deep and what kind of stone needs to be used in the 2' gravel strip around the storage building?

Answer 9: WASHED STONE (NO. 57) 4” DEEP.

Question 10: Sheet C5.0 – Calls for the existing headwall to be extended. There are no details provided for what is existing or what they want the proposed to be.

Answer 10: REPLACE THE EXISTING WING-WALL IN ACCORDANCE WITH THE ATTACHED HEADWALL AND EXTEND AS

SHOWN ON PLANS.