19B0010_Am_2_Official.docx

DOCX document 29 KB Posted

Attached to
Replace Perimeter Fencing at DDJC Tracy Federal contract opportunity
Solicitation number
W91238-19-B-0010
Issued by
Department of the Army Corps of Engineers Engineering District Sacramento

About this file

19B0010 Amendment 2

View the file

Other files for this federal contract opportunity

Other files attached to Replace Perimeter Fencing at DDJC Tracy, newest first.
File Type Posted
Abstract.xlsx XLSX spreadsheet
Sign_In_Sheet.pdf PDF
Appendix_03_Specification_28Mar19.pdf PDF
19B0010_Am_2_Conformed_Copy.docx DOCX document
19B0010_Am_1_Conformed_Copy.docx DOCX document
19B0010_Amendment_1_Official.docx DOCX document
Appendix_03_Specifcations.pdf PDF
W9123819B0010_Official_Solicitation.docx DOCX document
Atch_2_Wage_Determination_22Feb19.docx DOCX document
Atch_1_Perimeter_Fencing_SOW_26Jul18.pdf.docx DOCX document
Appendix_01__Replace_Perimeter_Fence_Drawings..pdf PDF
Appendix_02_Sign_Spec.pdf PDF
Badge_Request.xlsx XLSX spreadsheet
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W9123819B0010

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 1
Atch 1 Perimeter Fencing SOW 26Jul18
8
26-JUL-2018
Attachment 2
Atch 2 Wage Determination 22Feb19
100
22-FEB-2019
Attachment 3
Appendix 01 Replace Perimeter Fence Drawings
1
18-DEC-2019
Attachment 4
Appendix 02 Sign Spec
4
18-DEC-2018
Attachment 5
Appendix 03 Specifications
212
18-DEC-2018

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE
DESCRIPTION
PAGES
DATE
Attachment 1
Atch 1 Perimeter Fencing SOW 26Jul18
8
26-JUL-2018
Attachment 2
Atch 2 Wage Determination 22Feb19
100
22-FEB-2019
Attachment 3
Appendix 01 Replace Perimeter Fence Drawings
1
18-DEC-2019
Attachment 4
Appendix 02 Sign Spec
4
18-DEC-2018
Attachment 5
Appendix 03-Specifications 28March19
299
28-MAR-2019

(End of Summary of Changes) image1.wmf

File details come from the government source that posted it.