Questions_and_Answers.docx
DOCX document 49 KB Posted
- Attached to
- Additional Information
- Solicitation number
- W91237-19-Q-0005
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A.03.09_gatehouse_elevations_(002).pdf | ||
| W9123719Q00050001.pdf | ||
| A.03.09_Roof_Plan_(002).pdf | ||
| W9123719Q0005.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1) Performance and Payment Bonds required for actions over $150k. Payment bonds over $35k.
2) The quote only needs to include the first four pages.
3) I’ve attached some photos of drawings for review.
4) Photos of drawing attached
5) Roof was replaced in 2006 Type Rubber build up with granular blanket, There is no brick exposed between the stone coping and copper reglate. (photo attached)
6) Concrete to stone coping are the limits for the project. (photo attached)
7) There is no access to fresh water.
8) We do have electric hook up contractor would need to specify the type of plug that would be required and a certified electrician would need to change if needed
9) No work is to be performed on the service bridge
10) The 2016 bridge report has rating of 43.33 tons
11) There is no estimated structural crack repair.