NORTH BRANCH KOKOSING RIVER LAKE DAM
FACILITY MANAGER
18350 WATERFORD ROAD
FREDERICKTOWN OH 43019
TEL: (740)824-4343 FAX:
W81F8E72134230
REQUEST FOR QUOTATIONS
(THIS IS NOT AN ORDER) 1
PAGE OF PAGES
1. REQUEST NO. 2. DATE ISSUED RATING
W9123717Q0013 31-Aug-2017 5a. ISSUED BY
8. TO: NAME AND ADDRESS, INCLUDING ZIP CODE
IMPO RTANT: This is a request for information, and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or services. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotations must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State, and local taxes)
ITEM NO.
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e) (f)
SEE SCHEDULE
AMOUNT
% No. % NO TE: Additional provisions and representations [ ] are [ ] are not attached.
13. NAME AND ADDRESS OF QUOTER (Street, City, County, State, and
ZIP Code)
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
15. DATE OF
QUOTATION
16. NAME AND TITLE OF SIGNER (Type or print) ( Include area code)
TELEPHONE NO.
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 18 (REV. 6-95)
PREVIOUS EDITION NOT USABLE Prescribed by GSA
FAR (48 CFR) 53.215-1(a)
THIS RFQ X[ ] IS [ ] IS NOT A SMALL BUSINESS SET-ASIDE
6. DELIVER BY (Date)
SEE SCHEDULE
AND/OR DMS REG. 1
UNDER BDSA REG. 2
4. CERT. FOR NAT. DEF.3. REQUISITION/PURCHASE
REQUEST NO.
USACE, CONTRACTING BRANCH
ALLISON PACK, 502 8TH STREET
HUNTINGTON WV 25701
9. DESTINATION (Consignee and address, including ZIP Code)
7. DELIVERY
[ ]X FOB
DESTINATION
[ ] OTHER
(See Schedule)
14-Sep-2017(Date) PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS:10.
304-399-5046ALLISON PACK
(Name and Telephone no.) (No collect calls)5b. FOR INFORMATION CALL:
d. CALENDAR DAYSc. 30 CALENDAR DAYSb. 20 CALENDAR DAYS12. DISCOUNT FOR PROMPT PAYMENT a. 10 CALENDAR DAYS
W9123717Q0013
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 1 Job Paving
FFP
Contractor to furnish the necessary labor, materials and supervision required to complete paving in accordance with the attached Scope of Work. Work is to be performed at North Branch of Kokosing Dam, Fredericktown, OH. This CLIN is for funding purposes only; the Price Breakout Schedule shall be filled in below.
FOB: Destination
MILSTRIP: W81F8E72134230
PURCHASE REQUEST NUMBER: W81F8E72134230
NET AMT
PRICE BREAKOUT SCHEDULE
Item Description Qty Unit Total 0001 Reimbursement of actual 1 Job $ ____________ cost of payment bonds for quote in excess of
$35,000.00 (see FAR 52.228-13)
0002 Mobilization & 1 Job $ ____________ de-mobilization of equipment required in accordance with the attached Scope of Work.
0003 Labor for paving of 1 Job $ ____________ Roadway with Parking Area in accordance with Images A&B and the attached Scope of Work at North Branch of Kokosing Dam, Fredericktown, OH.
0004 Materials and supplies for 1 Job $ ____________ Paving of Roadway with Parking Area in accordance With Images A&B and the Attached Scope of Work at North Branch of Kokosing Dam, Fredericktown, OH.
Total $ ____________
ADDITIONAL INFORMATION
*SITE VISITS ARE HIGHLY RECOMMENDED PRIOR TO PROVIDING A QUOTE.
SEE CLAUSE 52.236-27 FOR ADDITIONAL INFORMATION.
*PLEASE DIRECT ALL QUESTIONS TO ALLISON PACK AT (304) 399-5046 or Allison.Pack@usace.army.mil . ANY INFORMATION RECEIVED AT THE SITE VISIT
WHICH CONFLICTS WITH THIS SOLICITATION SHOULD BE BROUGHT TO THE
ATTENTION OF MRS. PACK. THE SOLICITATION AND RESULTING CONTRACT
SHALL BE THE GOVERNING DOCUMENT IN ALL CASES.
**QUOTES CAN BE E-MAILED TO ALLISON PACK AT Allison.Pack@usace.army.mil Per FAR 36.204 the estimated price range for this project is between $25,000.00 and $100,000.00.
NOTE: Award will be made to the lowest price offeror who meets the technical requirements of the solicitation and is deemed responsible by the contracting officer.
QUOTATION INSTRUCTIONS (Provide the following with your quote):
Company Name and Address: _________________________________
Phone Number: ______________________________ Fax Number: ____________________________
Email Address: ______________________________________________
Business Size (select all that apply):
Large Business _____ Small Business_____ HUBZone Business_____ 8A _____
Woman-Owned ____ Service-Disabled Veteran-Owned ____
If subcontractor will be used for this work, please provide company name and credentials/qualifications: ___________________________________.
Contractors must be registered in the System for Awards Management (SAM) database (www.sam.gov ) to receive an award (See FAR 52.204-7). (Formerly the Central Contractor Registration (CCR) database and the On-Line Representations and Certifications (ORCA).) Any reference to CCR or ORCA in any clause or provision is referring to the www.sam.gov website.
Contractor is registered with SAM: _____ YES _____ NO (See FAR 52.204-7) mailto:Allison.Pack@usace.army.mil http://www.sam.gov/ http://www.sam.gov/
Provide business Unique Entity Identifier number: ___________________________(phone 800-333-0505 for Unique Entity Identifier number).
Provide business CAGE code: _______________________________
Provide Tax Identification Number: _________________________________
Contractors are not required to submit an Accident Prevention Plan (APP) with their quote.
The successful offeror will be required to submit this document upon award. The APP must be accepted by the Government Designated Authority prior to the preconstruction conference.
The contractor that receives this award will have 10 calendar days to provide an Accident Prevention Plan (APP). If this deadline is not met, the contractor will be given a cure notice stating that they will have 10 calendar days to submit an APP, otherwise the contract may be terminated for default.
Section C - Descriptions and Specifications
SOW
Statement of Work Road Network and Parking Area Paving at
North Branch of Kokosing Dam Fredericktown, Ohio
DESCRIPTION OF SERVICES: Provide all necessary labor, equipment and materials to construct and pave a 715’ length of roadway with parking area (approximately 16,000 sq. feet), across the service bridge (approximately 600 sq. feet) with one service parking area (approximately 1600 sq. feet) located at U.S. Army Corps of Engineers (USACE), North Branch of Kokosing Ohio facilities 18350 Waterford road, Fredericktown, Ohio 43019. (See Image “A” for a map of the project roadway). The roadway will be a width of 20 feet wide, and constructed using an asphalt surface. The road will have 2 un-separated lanes of traffic.
Place of Performance: U.S. Army Corps of Engineers, North Branch of Kokosing Dam, 18350 Waterford Rd.
Fredericktown, Ohio 43019.
Specific Requirements: The contractor shall perform the following tasks:
Remove Existing pavement, grade and widen existing surface down to acceptable soils for sub-grade to a depth acceptable for emplaced sub-grade. Any areas that require widening to a width of 20 feet will be widened on the upstream side of road.
Ensure sub-grade is acceptable; soil that is unacceptable must be removed and replaced with select fill, to a depth of at least 1 foot.
Emplace and compact sub-base course at a depth of 2 inches.
Install 4 inches of new 304 aggregate to entire roadway
Install prime coat applied at a rate of 0.45 – 1.25 liters per square meter.
Install tack coat applied with SS-1H Tack material or equivalent at a rate of .075G per square yard.
Apply and compact 2.5 inches of base course asphalt, then install 1.5 inches of surface course asphalt.
Existing pavement that is milled will be transported to downstream access area determined by on site government representative. Area is approx. ¼ mile away. (See Image “B”.)
Any quantities provided are for quoting purposes only. Contractors are responsible for verifying quantities and locations of work prior as part of their quote.
Engineer Materials Technical Specifications: All materials used in this project shall meet the requirements of the USACE, the EM 385-1-1, and shall not be recycled, previously used, nor repaired.
General Design Requirements:
Road alignment and profile shall be determined by Contractor. The Contractor shall design the roadway with good drainage and erosion protection. Contractor shall straighten road alignment as much as possible.
Drainage is required on both sides of the road. All intersecting roads, paths, driveways and culvert crossings are required to have a smooth transition to the new road alignment.
The road shall be built up above existing grade for storm water protection. Poor sub-grade material shall be removed and replaced with clean, compactable, gravel. Portions of the road shall be realigned and constructed at an elevation greater than the anticipated water level.
Sub-base Preparation: The sub-base should be well-graded, shaped to the desired cross-section (as specified by the typical cross-section plans), compacted to the specified density, well-drained, free from excessive moisture but not completely dry, and swept clean. Apply the prime coat when the base is almost dry so that it will absorb the prime material.
Prime Coat: The prime coat should penetrate the base about ½ inch of the sub-base, filling the voids. Plan priming operations so that there will always be an adequate amount of cured, primed base ahead of the surfacing operations; but not so far ahead that the base will become dirty or completely cured (dead). If prime coat is applied in late spring or during the summer the following bituminous materials are acceptable for prime coat: RT-2, RT-3, RT-4, MC-30, MC-70, SS-1, SS-1h, cationic slow-setting emulsified asphalt (CSS)-1, and CSS-1h. During the cold months of the winter, use rapid-setting asphalt cutbacks such as RC-70 and RC-250.
Treatment should be applied at a rate of 0.45 – 1.25 liters per square meter.
Aggregate Base Course: Shall consist of crushed stone containing angular shapes and surfaces with no rounded surfaces. The following types of rocks are acceptable crushed stone: granite and similar phanerocrystalline igneous rocks, limestone, dolomite (>11% magnesium oxide (MgO), sandstone, or metamorphic quartzite, or similar rocks. Limestone shall be a carbonate rock containing less than 11% magnesium oxide (MgO). All aggregates shall contain less than 5% of shale, clay lumps, coal, lignite, soft or unfragmented stone, or other deleterious materials.
Acceptable gradations are as indicated in the table below.
References United Facilities Criteria (UFC) 3-250-03 “Standard Practice Manual for Flexible
Pavements” and UFGS 02704, “Aggregate and/or graded-crushed aggregate base course” (Supersedes UFGS-02722A)
Source Acceptance Tests
Sieve Analysis (including 0.02 mm No. 635 size material).
Liquid limit and plasticity index.
Moisture-density relationship.
Wear.
Soundness.
Weight per cubic meter foot of Slag.
In-Place Tests Density tests shall be performed on every lift of material placed and at a frequency of one set of tests for every 250 square meters, or portion thereof, of completed area.
Sieve Analysis (including 0.02 mm No. 635 size material) shall be performed for every 50 metric tons of material placed.
Liquid limit and plasticity index tests shall be performed at the same frequency as the sieve analysis.
Weather No construction when near or below freezing.
Coarse Aggregate
Aggregate Base Course (ABC) coarse aggregate shall not show more than 50 percent loss when subjected to the Los Angeles abrasion test in accordance with ASTM C131.
The amount of flat and elongated particles shall not exceed 30 percent. A flat particle is one having a ratio of width to thickness greater than 3; an elongated particle is one having a ratio of length to width greater than 3. In the portion retained on each sieve specified, the crushed aggregates shall contain at least 50 percent by weight of crushed pieces having two or more freshly fractured faces with the area of each face being at least equal to 75 percent of the smallest mid-sectional area of the piece.
When two fractures are contiguous, the angle between planes of the fractures must be at least 30 degrees in order to count as two fractured faces. Crushed gravel shall be manufactured from gravel particles 50 percent of which, by weight, are retained on the maximum size sieve listed in this table.
Fine Aggregate The portion of any component or of the completed course passing the 0.425 mm No.
40 sieve shall be either non-plastic or have a liquid limit not greater than 25 and a plasticity index not greater than 5.
Blending The coarse and fine aggregates shall be mixed in a stationary plant, or in a traveling plant or bucket loader on an approved paved working area. Maximum lift is 150 mm.
Compaction Compaction shall continue until each layer has a degree of compaction that is at least 100 percent of laboratory maximum density through the full depth of the layer.
Thickness Requirements
The total compacted thickness of the base course shall be within 13 mm (1/2 inch) of the thickness indicated. Average job thickness shall be the average of all thickness measurements taken for the job, but shall be within 6 mm 1/4 inch of the thickness indicated. The total thickness of the base course shall be measured at intervals in such a manner as to ensure one measurement for each 500 square meters yards of base course. Measurements shall be made in 75 mm 3 inch diameter test holes penetrating the base course.
Finishing Grade and smoothness requirements. Maintain – limited traffic – no surface rutting.
Accepted Gradations for Aggregate Base Course:
Aggregate Base Preparation: The base should be well-graded, shaped to the desired cross-section (as specified by the typical cross-section plans), compacted to the specified density, well-drained, free from excessive moisture but not completely dry, and swept clean. Apply the tack coat when the base is almost dry so that it will absorb the prime material.
Tack Coat: Shall be a cutback asphalt, grades RC-70 or RC-250; an emulsified asphalt, grades MS-1, SS-1, SS-1h, CSS-1, CSS-1h; or an asphalt cement, grades AC-2.5, 5, 10, AR-1000, 2000, or 4000 applied at a rate of 0.15 to 0.75 liters per square meter. The maximum application rate of .75 liters per square meter should not be exceeded as it may result in a bleeding and flushing action and loss of stability. The tack coat should become tacky within a few hours. A tack coat is not required on the primed base unless the prime coat has completely cured and become coated with dust.
Application Notes for Road-Mix Pavement:
Bitumen for Road-Mix: Ensure the base and sub-grade is well prepared and properly drained. The road mix will be laid in two lifts, each ranging from 2 inches in compacted depth. The total thickness of the finished compacted road surface will be 3 ½ to 4 inches. Refer to the Mixed-in-place road mix row below in Table 2-2 for acceptable grades of asphalt cutbacks. Medium curing (MC) cutback is the most preferable. The mix gradation should be an open-graded mix. It shall contain coarse and fine particles in a continuous gradation. However, it will not contain enough fine articles to fill the voids between large particles so it will be less dense.
Aggregate for Road-Mix: Aggregate should be hauled in from a nearby source. Do not scarify the aggregate from the existing sub-grade or base. Table 2-3 below shows the recommended gradation limits and Table 4-3 shows the suggested bituminous material content for each gradation. After blending the aggregate in windrows, take samples for sieve analysis. The gradation of the aggregate might have to be changed to meet specific field conditions.
Acceptable deviations are-
Aggregate passing the # 4 sieve: +/- 7% Aggregate passing the # 30 sieve: +/- 5% Aggregate passing the #200 sieve: +/- 2%
The ideal aggregate will be well-graded, sandy gravel or clean sand. The maximum size of the aggregate is approximately 1 ¼ inch. Test for moisture content before mixing the aggregate with asphalt cutbacks. If the aggregate is too wet, use a mechanical mixer, a grader, or an improvised plow to allow the excess moisture to evaporate. The moisture content of CA should not exceed 3%.
Mix Proportions: The percentage of bituminous material shown in Table 4-3 below will vary in relation to the absorptive quality of the aggregate, the rate of evaporation of volatile substances, and other factors. With dense graded aggregates, do not use too much bituminous material. Ensure that all particles of the mix are coated and uniform in color. If the mix is too lean, it will stand almost vertical in the windrow; if it is too rich, it readily flows back to its previous shape. If the mix is correctly proportioned, a handful squeezed into a ball retains its shape.
Construction: Construct the road-mix pavement on a dry base when it is not raining and the atmospheric temperature is above 10 degrees Celsius or 50 degrees F. Sequences of operations are as follows:
• Inspect and recondition the base.
• Prime the base and allow the prime to cure.
• Place and windrow the aggregate at the side of the primed base and allow the aggregate to dry.
• Spread the aggregate on the cured, primed base.
• Spread the bituminous material on the aggregate in one-third increments.
• Mix the bituminous material with the aggregate.
• Blade and aerate the mix.
• Spread the mix to the specified un-compacted thickness.
• Compact the surface.
• Apply Tack coat.
• Repeat aggregate and bituminous mix process for second lift.
• Apply seal coat if necessary.
This figure shows the typical sequence of operations:
If using cutback asphalt for spraying or mixing, heat it to a temperature of 80-200 degrees F (27-93 degrees C).
Apply asphalt emulsions at 50 - 120 degrees F (10-50 degrees C) and tar at 80-225 degrees F (27-107 degrees C).
GENERAL INFORMATION:
Standards:
Construction shall adhere to the approved design and this Scope of Work unless modified in writing by the Contracting Officer.
The Contractor's design and construction must comply with technical requirements contained herein. The Contractor shall provide design and construction using the best blend of cost, construction efficiency, system durability, ease of maintenance and environmental compatibility.
The design and product requirements are minimum requirements. The Contractor may propose alternate design or products (equipment and material) that are more commonly used in the region that will be equally or more cost effective or allow for more timely completion, but furnish the same system durability, ease of maintenance and environmental compatibility. The Contractor will be required to submit information as requested by the Contracting Officer to make a comparison of the proposed alternate. All variations must be approved by the Contracting Officer.
The project includes furnishing all supervision, management, labor, materials, and equipment. Construction equipment shall be in good working order and shall be operated safely at all times.
Contractor's design and construction must comply with technical requirements contained herein and any other specifications or drawings provided. In the event of conflicting requirements, the most stringent requirement will apply, and the Contractor shall notify the Contracting Officer of the issue.
Site Clean-Up and Restoration: The contractor shall ensure the work site and areas around the work site are free of any debris and materials upon completion of work each day, as well as at the completion of the job. Contractor shall remove and properly dispose of all materials and equipment at the completion of the job. Unused materials or equipment owned by the USACE shall be returned to a location designated by the PPO. Upon completion of work, the work site shall be restored, insofar as is reasonably possible, to its condition prior to work, including replacement of vegetation, sidewalks, grading, drainage, and similar conditions affected by work during the performance of this Contract.
Warranty: The Contractor warrants that the work performed under this Agreement conforms to the contract requirements and is free from any defect in equipment, material, design, finish or workmanship performed by or the responsibility of the Contractor. This warranty shall continue for a period of 3 years from the date of final acceptance. The Contractor shall remedy at the Contractor’s expense any loss of or damage to USACE owned or controlled real or personal property when such loss or damage is incurred as the result of Contractor’s failure to conform to contract requirements, any defect in materials, design or workmanship, or the result of Contractor’s negligence. The Contractor’s warranty with respect to a work product being replaced or repaired shall run for a period of one year the date that such replacement or repair is accepted. Drawings and Exhibits: (attached).
Contractor and Government Equipment and Supplies: The contractor shall furnish all personnel, equipment, transportation, disposal, supplies and materials to perform the work. No government equipment or supplies shall be used for this project. The Contractor shall Provide Personal Protection Equipment (PPE) to include steel-toed safety boots, hard hat, safety glasses or goggles, hearing protection, sleeved shirts, long pants, gloves, sunscreen and other applicable PPE specified in EM 385-1-1 and Appendix A).
Equipment, Material, and Supply Inspections: All materials shall be inspected upon delivery and or prior to use by government personnel. Materials shall be of high quality, commercial grade and meet or exceed industry standards or otherwise specified.
Contractor Safety Requirements General. Contractor shall comply with all Federal, State and Local safety requirements including those specified by the Occupational Safety and Health Act (OSHA) in 29 CRF 1910 General Industry Standard, 1926 Construction Standard and the U.S. Army Corps of Engineers Safety & Health Requirements Manual EM 385-1-1 as currently revised at date of solicitation. Where a conflict exists between safety standards/requirements the contractor shall comply with the more stringent requirement. If the Contractor fails or refuses to promptly comply with safety requirements as specified herein, any project employee may stop all or part of the work until satisfactory corrective action has been taken. No part of the time lost due to any such work stoppage shall be made subject to any claims for extension of time or for excess costs or damages sustained by the Contractor. Also, the Contractor will not be paid for work not performed as a result of the stop order.
Contractor Accident Prevention Plan (APP). The Contractor shall prepare a site-specific Accident Prevention Plan following the outline provided in EM 385-1-1, Appendix A as a minimum. The contractor shall address each element and sub-element in the outline in the order they appear in Appendix A. Any item from the outline that does not apply must be listed, in its assigned place and a brief explanation of the reason it is not required provided. The APP shall address any unusual or unique aspects of the project or activity. This plan must be accepted by the Contracting Officer prior to commencement of any work. Contractors are encouraged to contact the USACE Safety & Occupational Health Office for questions or information regarding the development of contract Accident Prevention Plans. Office hours are Monday-Friday 8:30 a.m. - 4 p.m. at (304)399-5039/5032/5326. The web address for EM 385-1-1 is:
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
(1) The contractor shall have on site an employee designated as a Site Safety and Health Officer (SSHO) who has completed the OSHA 30-hour Construction Safety training or its equivalent as specified in EM 385-1-1, 01.A.17 and has at least five years safety management experience relative to the work to be performed. No work will be permitted unless the SSHO is present at the work site. Work crews of two or more must have two people holding current certification in First Aid and CPR from the American Red Cross, American Heart Association or a licensed physician. Training must include a hands-on component that cannot be taken online and the contractor must maintain appropriate First Aid kit on site. Single individuals working alone must have current certification in First Aid as a minimum.
(2) All work that potentially exposes the worker to falls of six feet or more will require the contractor to submit a Site Specific Fall Protection & Prevention Plan in accordance with EM 385-1-1, Section 21.D.
(3) Cranes and hoisting equipment shall be operated only by qualified personnel (operators licensing, physical and drug testing in accordance with EM 385-1-1 Section 16.B). Note: CDL Medical Clearance is not acceptable. Please see attached medical clearance requirements.
http://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf
(4) Effective November 8, 2010 all “Signalpersons” and “Riggers” shall be qualified. This is a mandatory requirement in accordance with 29 CFR 1926.1400 Regulations. Riggers must be a qualified person for the performance of specified hoisting activities such as during assembly/disassembly, in accordance with OSHA 1926.1404(r)(1) and 1926.1425(c)(3).
(5) Work orders involving potential exposure to Hazardous, Toxic or Radiological Waste shall require development of Site Specific Safety and Health Plan (SSHP) by qualified personnel as specified in EM 385-1-1 Sections 6 and 33.
Risk Management Process. The Contractor shall utilize risk management tools such as Activity Hazard Analysis (AHA), Job Hazard Analyses (JSAs) or similar tools to identify, assess, prioritize risks and develop controls to minimize, monitor and control the probability and/or impact of unfortunate events to an acceptable level. Within each major phase, all activities, tasks or Definable Features of Work (DFOWs) shall be identified that will require an AHA/JSA. For each work activity, task or DFOW contractor shall prepare the initial AHA/JSA. A Risk Assessment Code (RAC) is assigned to each step, to the risk that remains after controls have been applied (residual risk) a final RAC (cannot be lower than the highest step RAC) shall be assigned. See EM 385-1-1 Section 01.A.14.b. for further guidance or contact the SOHO for assistance. The AHA/JSA shall be reviewed and accepted by the proper authority in order to proceed with the activity. All on-site employees shall review the accepted AHA/JSA prior to performing work and during weekly and “Tool Box” safety meetings as appropriate.
1. AHA/JSA shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk. AHA/JSA should indicate compliance with EM 385-1-1 personal protective equipment requirements (safety-toed work boots, safety glasses, gloves, hard hats, etc.), work crews of two or more must have two people currently qualified in first aid and CPR and the appropriate first aid kit on site. Single individuals working alone must have current certification in First Aid only.
2. The names of the Competent Person(s) and Qualified Person(s) required for a particular activity (e.g., excavation, scaffolding, fall protection, or other activities as specified by OSHA and this manual) shall be identified and included in the AHA, as well as proof of their competency/qualification.
Accident/Mishap Reporting: The Contractor shall report all recordable mishaps to the GDA within 24-hours in accordance with EM 385-1-1 Section 01.D. Accidents shall be investigated to determine causal factors and corrective actions shall be implemented. Accidents resulting in: days away injuries, days away illnesses, restricted/transfer injuries, property damage of $5,000.00 or more shall be investigated and reported to the GDA using the USACE Accident Investigation Report Form ENG 3394 within 24 hours of the occurrence.
(1) Immediate notification to the GDA is required for all serious accidents:
a. Fatal Injury/illness;
b. Permanent totally disabling injury/illness;
c. Permanent partial disabling injury/illness;
d. One (1) or more persons hospitalized as inpatients as a result of a single occurrence;
e. $500,000 or greater accidental property damage;
f. Three (3) or more individuals become ill or have a medical condition suspected to be related to a site condition, or a hazardous or toxic agent on the site;
g. USACE aircraft destroyed or missing;
The Contractor shall maintain an OSHA Log of Work Related Injuries and Illnesses, OSHA Form 300 and comply with all accident reporting and recordkeeping requirements specified in 29 CFR 1904.39.
(2) In addition to the above, any mishap occurring in any of the following high hazard areas shall be reported immediately to the GDA, investigated and corrective actions implemented.
a. Electrical (includes Arc Flash, electrical shock, etc.);
b. Uncontrolled Release of Hazardous Energy (includes electrical and non-electrical);
c. Load Handling Equipment (LHE) or Rigging;
d. Fall-from-Height (any level or other than same surface);
e. Underwater Diving
Site Visit
Offerors are encouraged to make a site visit by contacting:
Frank Shannon, Project Supervisor
U.S. Army Corps of Engineers Pleasant Hill Dam 18350 Waterford Rd
Fredericktown, Ohio 43019 419-938-5785
Wage Rates. In accordance with contract clause FAR 52.222-6 Davis-Bacon wage rates are applicable to this procurement and can be located at http://www.dol.gov . Applicable wage rates for this procurement are: General Decision Number: OH170002 08/11/2017 OH2
Contractor Submittals The successful offeror shall provide as a minimum the following documentation. All contractor submittals must be reviewed and accepted by the contracting officer or government designated authority prior to commencement of any work.
A. Accident Prevention Plan
B. Activity Hazard Analysis
C. Invoice as stated on the contract award.
D. Manhour report to project office at completion of work.
E. Insurance Verification – Contractor shall provide the Contracting Officer with written proof that all insurance required by State and Local Governments have been acquired for the time period covered under this contract. No further insurance requirements will be imposed by the US Army Corps of Engineers for this contract.
DAMAGE REPORTS. All instances where Government materials, supplies, property, And/or equipment are damaged shall be reported immediately to the Project Supervisor at Piedmont Dam. When the damage is caused by contract employees, a written report of the incident and extent of such damage shall be submitted to the Project Supervisor, Within 2 work days (less weekends and holidays) of occurrence. For property damage Accidents of $2,000 or more, the Contractor will complete and submit to the Resource Manager a copy of ENG 3394.
http://www.dol.gov/
CONTRACTOR CONDUCT AND COMPETENCY. Employees shall conduct themselves in a proper manner at all times. Since the majority of work shall be performed in the presence of the general public, the conduct of all Employees are critical and will be closely monitored. Use of controlled substances or consumption of beer or alcoholic beverages by contract employees is strictly prohibited. The contractor may be required to immediately remove from the work site any employee of the Contractor who is incompetent or who endangers persons or property or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform the work.
CONTRACTOR INVOICE: Contractor shall submit their invoice to:
Opal Brown Walhonding Lake Project Assistant Warsaw, Ohio 43844 740-824-4343
WORKING HOURS. Normal working hours are Monday through Friday, 7:30 a.m. to 4:00 p.m. Eastern Standard Time (EST). Work inside Government buildings or other secured areas shall be performed during the above referenced work hours.
Ten Federal holidays observed are as follows:
New Year's Day (January 1st) Martin Luther King Day (3rd Monday in January) President's Day (3rd Monday in February) Memorial Day (Last Monday in May) Independence Day (July 4th) Labor Day (1st Monday in September) Columbus Day (2nd Monday in October) Veteran's Day (November 11th) Thanksgiving Day (4th Thursday in November) Christmas Day (December 25th)
When one of the above designated holidays falls on a Sunday, the following Monday is Observed as a legal holiday.
When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday.
Work that interferes with other ongoing functions at the project shall be scheduled around Normal working hours.
Work shall be scheduled around the above listed Federal holidays unless approved in advance.
Work shall be performed during daylight hours and days to be worked will be at the discretion of the Project Supervisor.
DEFICIENCIES. The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises. If the Contractor does not promptly replace or correct rejected work, the Government may –
(1) By contract or otherwise, replace or correct the work and charge the cost to the Contractor, or;
(2) Terminate for default the Contractor’s right to proceed
PRE-CONSTRUCTION CONFERENCE. The Contractor shall attend a pre-construction conference.
Prior to the initiation of work under this contract. The Contractor's Accident Prevention Plan and all contractor submittals must be accepted prior to this meeting.
PERIOD OF PERFORMANCE. Work must begin within seven (7) calendar days after contractor receives Notice to Proceed and be completed within thirty calendar days after contractor receives Notice to Proceed. Should weather conditions and/or closing of the batch plant delay the contractor’s performance, the contractor will be given additional non-compensable days extending the period of performance/completion date. The contractor will be required to perform the work at the awarded price once the batch plant is re-opened and/or weather conditions allow continued performance of the work.
SECURITY REQUIREMENTS
All Contractors and subcontractor employee(s) working on this contract who require access in and/or around any Huntington District facilities shall receive authorization to be on site at these facilities based upon a favorable background investigation in accordance with “Homeland Security Presidential Directive 12: Policy for a Common Identification Standard for Federal Employees and Contractors” (HSPD 12). The Huntington District Security Management Office shall submit contractor(s) personal information in order to complete the basic background investigation in order to make a recommendation to the Contracting Office of an employee’s suitability for work on Government property. The Procuring Contracting Officer (PCO) has the right to deny any contractor or subcontractor employee from working on the contract based upon the results provided by the Huntington District Security Management Office of the background investigation. The Government, Contractor, and subcontractors shall not permit any employee(s) access to drawings, blueprints, records, photos, sites, or projects until the Huntington District Security Management Office has completed an Operations Security (OPSEC) review of such items and determined they can be released.
Contractors shall submit a complete investigation packet for each contractor and subcontractor employee to the Huntington District Security Management office within 10 working days after award of any contract, or prior to the individual being permitted unescorted access in or on District facilities. The Contractor must also provide the following: (1) Name of the Contract Specialist with whom he/she is working, (2) Project Name, (3) Contract Number and (4) Task Order Number when applicable.
The documents listed below are required:
SF 85, Questionnaire for Non-Sensitive Positions (see http://www.opm.gov/forms/ to print form). FD 258, Contractor Fingerprint Card (one card for digital prints, two for ink prints) (NOTE: a trained/qualified individual must take prints, ORI block on the FD 258 must be USOPM000Z) (Contractor Fingerprint Cards (FD-258) may be obtained by Contracting Division by contacting the Huntington District Security Management office).
Contractor shall report any changes in personnel or at anytime conditions change at least 5 working days prior to individual(s) need to have access to the site. The Contractor shall provide the same information as listed above for all new employees.
Following submission of paperwork, the Security Management Office will conduct an initial criminal check based upon the information provided. If there are no issues, Security Management Office will make recommendations to the PCO or their Designated Representative. The Security Management Office cannot give approval due to unfavorable report(s). The Security Management Office shall coordinate with Office of Counsel and will jointly make recommendations to the PCO and/or the Designated Representative should a background investigation come back with derrogatory information. The PCO will make the determination whether to allow the Contractor http://www.opm.gov/forms/ personnel to work on the site based on Security and Office of Counsel recommendations, and the PCO will advise Contractor of the decision.
FOREIGN NATIONALS
The Contractor shall provide the package listed above, as well as additional materials noted below for all Foreign Nationals. The Contractor is to expect additional time in the approval process for all Foreign Nationals due to the level of review and elevation of the review to Headquarters Staff to accomplish. All Foreign Nationals must comply with the following paragraph:
In accordance with Engineering Regulation 380-1-18, “Technology Transfer, Disclosure of Information and Contacts with Foreign Representatives” dated 1 August 1996, Section 4, all foreign nationals who work on Corps of Engineers’ contracts shall be approved by the Headquarters US Army Corps of Engineers (HQ USACE) Foreign Disclosure Officer before beginning work on this contract; this regulation includes subcontractor employees. The Contractor shall submit to the Security Management Office, the names of all foreign nationals proposed for performance under this contract, along with documentation to verify legal admittance into the United States. Such documentation shall include at least one of the following a U.S. passport, Certificate of U.S. Citizenship (INS Form N-560 or N-561), Certificate of Naturalization (INS Form N-550 or N-570), Alien Registration Card with photograph (INS Form I-151 or I-551), Employment Authorization Card (INS Form I-688A), etc.
In order to assure forms are properly completed, and to minimize time delays, Contractor is encouraged to work closely with the Security Management Office. The Government will return for correction incomplete forms, illegible forms, etc. which will delay the contractor / subcontractor from beginning work.
Security requirements are subject to change in accordance with HSPD-12, Office of Personnel Management, regulation or policy changes, etc. The Government shall add any changes to security requirements by modification to the contract.
The Contractor shall contact the Security Management Office by phone, letter, or email at the following numbers/addresses:
CELRH-SM
502 Eighth Street Huntington, WV 25701
Stephen R. Curry, phone (304) 399-5695; email stephen.r.curry@usace.army.mil Matthew D. Green, phone (304) 399-5294; email matthew.d.green@usace.army.mil Sandra L. Hardwick, phone (304) 399-5612; email sandra.l.hardwick@usace.army.mil
AT/OPSEC Requirements. The following shall be accomplished by the contractor within the timeframes specified below:
Access and General Protection/Security Policy and Procedures. All contractor and all associated sub-contractors employees shall comply with applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative). The contractor shall also provide all information required for background checks to meet installation/facility access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any installation or facility change, the Government may require changes in contractor security matters or processes.
mailto:stephen.r.curry@usace.army.mil mailto:matthew.d.green@usace.army.mil mailto:Sandra.L.Hardwick@usace.army.mil
Suspicious Activity Reporting Training (e.g. iWATCH, CorpsWatch, or See Something, Say Something). The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training will be used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to the project manager, security representative or law enforcement entity. This training shall be completed within 30 calendar days of contract award and within 30 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the COR no later than 3 business days after the initial contract award." *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, with the designated Government representative. This Form will be provided to the Contracting Officer and shall become part of the official contract file.
ATTACHMENT 1
APPENDIX A
Minimum Basic Outline for Accident Prevention Plans
1. Accident Prevention Plan (APP) -General. An APP is a safety and health policy and program document that is contract-or job-specific. It is an integral part of the planning process. > See Section 01 and 01.A.12.
a. The APP shall interface with the employer’s overall safety and health program. Any portions of the overall safety and health program that are referenced in the APP shall be included as appropriate.
b. The APP shall be submitted to the GDA for acceptance prior to work starting.
(1) Understanding that the APP is submitted prior to work starting and that some project-specific information is not yet known (e.g., subcontractors to be used, type of fall protection to be used at a certain point in time, specific cranes or other load handling equipment (LHE) to be brought on site, etc.), the known information shall be provided and additional information added at each preparatory phase/meeting along with the appropriate Activity Hazard Analyses (AHAs).
(2) A copy of the contractor’s project-specific, accepted APP shall be available on the work site. > See ANSI/ASSE A10.38 for programmatic issues.
3. APP Format. The following areas are typically addressed in an APP, but besides being job-specific, the APP shall also address any unusual or unique aspects of the contract or job for which it is written. The non-mandatory Accident Prevention Plan (APP) Checklist, Form A-2 (or similar), may be used to insure each area of required information has been provided. > See ANSI A10.33 for multi-employer projects.
a. Signature Sheet: Include title, signature, and phone number of the following:
(1) Plan preparer (Qualified Person (QP), Competent Person (CP), Corporate safety staff person, QC) and their qualifications;
(2) Plan must be approved by company/corporate officers authorized to obligate the company;
(3) Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate Industrial Hygienist, project manager or superintendent, project safety professional, project QC). Contractors shall provide concurrence of other applicable corporate and project personnel.
b. Background Information. List the following:
(1) Contractor;
(2) Contract number;
(3) Project name;
(4) Brief project description, description of work to be performed, location (map), equipment to be used, anticipated high risk activities, and
(5) Major phases of work anticipated.
(6) Within these major phases of work identified, activities [includes Definable features of Work (DFOWs) and tasks] to be performed that will require an AHA shall be specifically highlighted. This information can then be used by QC, QA and Safety personnel to track AHA submittals. The AHAs for these activities, tasks of DFOWs are NOT submitted at this time (AHAs created/submitted at this time would not be activity-specific as they are intended to be). > See Sections 01.A.14 and 01.A.15.
c. Statement of Safety and Health Policy. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. The Contractor’s written safety program goals, objectives, and accident experience goals for this contract shall also be provided.
d. Responsibilities and Lines of Authority. Provide the following:
(1) A statement of the employer’s ultimate responsibility for the implementation of his SOH program for his own employees, all sub-contractors and all others on the worksite (includes the strict enforcement of the program).
(2) Identification and accountability of personnel responsible for safety at both corporate and project level. Contracts specifically requiring safety or industrial hygiene personnel shall include a copy of their resumes. Qualifications shall be in accordance with Section 01.A.17.
Note: Only official OSHA 30-Hour cards will be accepted or, if equivalent training is provided, appropriate instructor qualifications. > See also Section 01.A.17.i, Exception 2.
(3) If equivalent training to the OSHA 30-hour classes is being presented as qualification, the training shall have covered the following areas:
(a) OSH Act/General Duty Clause;
(b) 29 CFR 1904, Recordkeeping;
(c) Subparts C, CC, D, E, F, K and M of OSHA;
(d) Rigging, load handling equipment (LHE), welding and cutting, scaffolding, excavations, concrete and masonry, demolition, health hazards in construction, materials handling, storage and disposal, hand and power tools, motor vehicles, mechanized equipment, marine operations, steel erection, stairways and ladders, confined spaces or any others that are applicable to the work being performed;
(4) The names of CP(s) and/or QP(s) and proof of competency/qualification to meet specific OSHA CP/QP requirements must be attached. The local SOHO will review the qualifications for acceptance;
(5) Requirements and details of the employer’s Risk Management Process;
Note: USACE uses the Activity Hazard Analysis (AHA) as part of a total risk management process.
Contractors and other individual employer’s may use the AHAs or their own version [Job Safety Analyses (JSAs), Job Hazard Analyses (JHAs), or similar Risk Management assessment tools]. These documents are considered equivalent to, and acceptable substitutes for, the USACE’s AHA provided the data collected is the same as that required by the AHA.
(6) Requirements for initial activity-specific AHAs to be submitted and accepted at preparatory meetings, prior to work being performed;
(7) Requirements that no work by the Contractor shall be performed unless a designated CP/SSHO is present on the job site;
(8) Policies and procedures regarding non-compliance with safety requirements (to include disciplinary actions for violation of safety requirements) should be identified;
(9) Lines of authority;
(10) Provide written company procedures for holding managers and supervisors accountable for safety.
e. Subcontractors and Suppliers. If applicable, provide procedures for coordinating SOH activities with other employers on the job site:
(1) Identification of subcontractors and suppliers. If not known at the time of initial APP submittal, the contractor shall include the following statement in their initial APP: “The subcontractors for the following DFOWs/activities are not known at this time, but additional information will be submitted to the APP for acceptance prior to the start of any activities listed”;
(2) Safety responsibilities of subcontractors and suppliers.
f. Training.
(1) Requirements for new hire SOH orientation training at the time of initial hire of each new employee.
(2) Requirements for mandatory training and certifications that are applicable to this project (e.g. explosive actuated tools, confined space entry, crane operator, underwater diver, vehicle operator, HAZWOPER training and certification, PPE, etc.) and any requirements for periodic retraining/recertification.
(3) Procedures for periodic safety and health training for…