Attachment 1 DRAWINGS ANC Columbarium 7 8 9 FINAL.pdf
PDF 5 MB Posted
- Attached to
- ANC Columbarium Phase III Courts 7-9 Repair
- Solicitation number
- W9123621B2004
About this file
This is a solicitation for repair and cleaning services at Arlington National Cemetery. The scope of work includes cleaning Columbarium Courts 7 and 9, conducting repointing, sealant replacement and other repairs in Courts 7, 8 and 9. It also includes replacing the roof membrane and repairing roof drains and finishes at the west committal shelter. Services will jointly address needs identified by the cemetery and contracting office. The solicitation is issued by the Department of the Army Corps of Engineers Norfolk District for a contract to provide all necessary labor, materials and equipment.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W9123620B2004 Columbarium.pdf | ||
| Attachment 2 SPECS Columbarium 7 8 and9 FINAL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
US Army Corps of Engineers ®
SOLICITATION NO.:
CONTRACT NO.:
ISSUE DATE.:
C O
N
TR
AC
T
N O
2/ 9/
0:
:0
AM
G-001
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
M .J
O H
N
SO
N
M .J
O H
N
SO
N
M cC
O Y
N O
V
R
TA
F
IN
AL
SHEET 1 OF 67
CO
VE
R
SH
EE
T
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AR
LI
N G
TO
N
, V
IR
G
IN
IA
C
O
LU
M
BA
R
IU
M R
EP
AI
R S
PH
C
O U
R
TS
, 8
AN
D W
ES
T
C O
M M
IT
TA
L
SH
EL
TE
R W
6-
-B -2
NORFOLK DISTRICT
ARLINGTON NATIONAL CEMETERY
ARLINGTON, VIRGINIA
W91236-21-B-2004
W91236-XX-X-XXXX
NOV 2020
COLUMBARIUM REPAIRS PH 3 - COURTS 7, 8, & 9,
AND WEST COMMITTAL SHELTER
W
6-
XX
-X
-X
XX
X
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
INDEX OF DRAWINGS
SHEET ID
SHEET
NUMBER SHEET TITLE
G-001 1 COVER SHEET
G-002 2 INDEX OF DRAWINGS
G-003 3 ARCHITECTURAL LEGEND, ABBREVIATIONS, & PROJECT NOTES
G-004 4 SITE MAP
WEST COMMITTAL SHELTER
SHEET ID
SHEET
NUMBER SHEET TITLE
WEST COMMITTAL SHELTER
SHEET ID
SHEET
NUMBER SHEET TITLE
AA101 5 WEST SHELTER PLAN
AA102 6 WEST SHELTER SECTIONS AND DETAILS
AA103 7 WEST SHELTER EXISTING LIGHTING
COLUMBARIUM COURT 7
SHEET ID
SHEET
NUMBER SHEET TITLE
AD101 10 OVERALL REFLECTED CEILING PLAN
AD102 11 OVERALL COPING PLAN (ROOF PLAN)
AD201 12 OVERALL ELEVATIONS
AD301 13 SECTIONS
AD302 14 SECTIONS
AD303 15 SECTIONS
AD304 16 SECTIONS
AD305 17 SECTIONS
AD306 18 SECTIONS
AD307 19 SECTIONS
COLUMBARIUM COURT 8
SHEET ID
SHEET
NUMBER SHEET TITLE
AE101 20 OVERALL REFLECTED CEILING PLAN
AE102 21 OVERALL COPING PLAN (ROOF PLAN)
AE201 22 OVERALL ELEVATIONS
AE301 23 SECTIONS
AE302 24 SECTIONS
AE303 25 SECTIONS
AE304 26 SECTIONS
AE305 27 SECTIONS
AE306 28 SECTIONS
AE307 29 SECTIONS
COLUMBARIUM COURT 9
SHEET ID
SHEET
NUMBER SHEET TITLE
COLUMBARIUM COURT 9
SHEET ID
SHEET
NUMBER SHEET TITLE
AF101 30 OVERALL REFLECTED CEILING PLAN
AF102 31 OVERALL COPING PLAN (ROOF PLAN)
AF110 32 REFLECTED CEILING PLAN - AREA A
AF111 33 REFLECTED CEILING PLAN - AREA B
AF112 34 REFLECTED CEILING PLAN - AREA C
AF131 35 COPING PLAN (ROOF PLAN)- AREA A
AF132 36 COPING PLAN (ROOF PLAN) - AREA B
AF133 37 COPING PLAN (ROOF PLAN) - AREA C
AF201 38 EXTERIOR ELEVATIONS
AF202 39 EXTERIOR ELEVATIONS
AF301 40 SECTIONS
AF302 41 SECTIONS
AF303 42 SECTIONS
AF304 43 SECTIONS
AF305 44 SECTIONS
AF306 45 SECTIONS
AF307 46 SECTIONS
AF308 47 SECTIONS
AF309 48 SECTIONS
AF310 49 SECTIONS
AF311 50 SECTIONS
AF312 51 SECTIONS
AF313 52 SECTIONS
AF314 53 SECTIONS
AF315 54 SECTIONS
AF316 55 SECTIONS
AF317 56 SECTIONS
AF318 57 SECTIONS
AF319 58 SECTIONS
COLUMBARIUM DETAILS
SHEET ID
SHEET
NUMBER SHEET TITLE
A-311 59 WALL SECTIONS
A-312 60 WALL SECTIONS
A-313 61 WALL DETAIL
A-314 62 WALL SECTIONS AND ELEVATIONS
A-315 63 WALL SECTIONS
A-316 64 WALL REPAIR DETAILS
A-317 65 WALL REPAIR DETAILS
A-318 66 TYPICAL ISOMETRIC DETAILS
A-319 67 TYPICAL CLADDING DETAILS
COLUMBARIUM COURT FOUNTAINS 1-8
SHEET ID
SHEET
NUMBER SHEET TITLE
COLUMBARIUM COURT FOUNTAINS 1-8
SHEET ID
SHEET
NUMBER SHEET TITLE
AB101 8 COURT 1 - 8 FOUNTAIN PLANS
COLUMBARIUM COURTS 1
SHEET ID
SHEET
NUMBER SHEET TITLE
COLUMBARIUM COURTS 1
SHEET ID
SHEET
NUMBER SHEET TITLE
AC100 9 OVERALL COPING PLAN (ROOF PLAN)
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:1
AM
G-002
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 2 OF 67
IN
D
EX
O
F D
R
AW
IN
G
S
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AR
LI
N G
TO
N
, V
IR
G
IN
IA
C
O
LU
M
BA
R
IU
M R
EP
AI
R S
PH
C
O U
R
TS
, 8
AN
D W
ES
T
C O
M M
IT
TA
L
SH
EL
TE
R W
6-
-B -2
W
6-
XX
-X
-X
XX
X
M
AR
K D
ES
C
R
IP
TI
O
N D
@ AT
Ø DIAMETER
# NUMBER
AB ANCHOR BOLT
AC AIR CONDITIONING
ACC ACCESSIBLE
ACFRP FIBER REINFORCED PANELS
ACP ACOUSTICAL CEILING
PANEL
ACST ACOUSTIC
ACT ACOUSTICAL CEILING TILE
ADA AMERICANS WITH
DISABILITIES ACT
ADH ADHESIVE
ADJ ADJUSTABLE
ADMIN ADMINISTRATION
AESS ARCHITECTURALLY
EXPOSED STRUCTURAL STEEL
AFC ABOVE FINISH CEILING
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AFS ABOVE FINISH SLAB
AHU AIR HANDLING UNIT
ALT ALTERNATE
ALUM ALUMINUM
ANCH ANCHOR, ANCHORAGE
APC ARCHITECTURAL PRECAST
CONC.
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED
CEILING
AVG AVERAGE
BCJ BRICK CONTROL JOINT
BD BOARD
BDRY BOUNDARY
BHMA BUILDER'S HARDWARE
MANUFACTURER'S
ASSOCIATION
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BO BOTTOM OF
BOS BOTTOM OF STEEL
BOT BOTTOM
BRCG BRACING
BRG BEARING
BRS BACKER ROD & SEALANT
BSMT BASEMENT
BUR BUILT-UP ROOFING
CAB CABINET
CB CORNER BEAD
CEM CEMENT
CER CERAMIC
CF CEMENT FLOOR
CFLG COUNTERFLASHING
CFMF COLD-FORMED METAL
FRAMING
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLD CLOTHES DRYER
CLG CEILING
CLO CLOSET
CLR CLEAR
CMPST COMPOSITE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONF CONFERENCE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS
CONTR CONTRACTOR
COORD COORDINATE
CORR CORRIDOR
CP CONCRETE PIPE
CPT CARPET
CSK COUNTERSUNK
CSWK CASEWORK
CT CERAMIC TILE
CTR CENTER
CU COPPER
D DEEP / DEPTH
D-B DESIGN-BUILD
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
ARCHITECTURAL ABBREVIATIONS
DEPT DEPARTMENT
DETL DETAIL
DGTL DIGITAL
DIA DIAMETER
DIAG DIAGONAL
DIAP DISPENSER
DIM DIMENSION
DIR DIRECTION
DIST DISTANCE
DIV DIVISION
DK DECK
DL DEAD LOAD
DN DOWN
DOC DOCUMENT
DWP DEPT. OF PUBLC WORKS
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DF DRINKING FOUNTAIN
E EAST
EA EACH
EIFS EXTERIOR INSULATION
FINISHING SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENGR ENGINEER
ENTR ENTRANCE
EOS EDGE OF SLAB
EPS EXPANDED POLYSYRENE
EPDM ETHYLENE PROPYLENE
DIENE MONOMER
EQ EQUAL
EQUIP EQUIPMENT
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED
EXT EXTERIOR
EXTRU EXTRUSION
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR
PANEL
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER
CABINET
FF FINISH FLOOR
FGL FIBER GLASS
FIN FINISH / FINISHED
FLASH FLASHING
FLR FLOOR
FLUOR FLUORESCENT
FM FACTORY MUTUAL
FND FEMININE NAPKIN
DISPENSER
FNR FEMININE NAPKIN
RECEPTACLE
FO FINISHED OPENING /
FACE OF
FOB FACE OF BRICK
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FOW FACE OF WALL
FRG FIBER REINFORCED
GYPSUM
FRP FIBERGLASS REINFORCED
PLASTIC
FRT FIRE RETARDANT
FRTW FIRE RETARDANT TREATED
WOOD
FRMG FRAMING
FT FOOT / FEET
FTG FOOTING
FURG FURRING
FWC FABRIC WALL COVERING
GA GAGE
GALV GALVANIZED
GB GRAB BAR
GD GUARD
GFCI GOVERNMENT FURNISHED
CONTRACTOR INSTALED /
GROUND FAULT CIRCUIT
INTERRUPTER
GFGI GOVERNMENT FURNISHED
GOVERNMENT INSTALED
GFRC GLASS FIBER REINFORCED
CONCRETE
GFRG GLASS FIBER REINFORCED
GYPSUM
GL GLASS
GR GRADE
GT GROUT
GYP GYPSUM
GWB GYPSUM WALL BOARD
HB HOSE BIB
HC HANDICAPPED
HCWD HOLLOW CORE WOOD
DOOR
HD HAND
HDPE HIGH DENSITY
POLYETHYLENE
HDW HARDWARE
HDWD HARDWOOD
HEPA HIGH EFFICIENCY
PARTICULATE AIR FILTER
HK HOOK
HM HOLLOW METAL
HMD HOLLOW METAL DOOR
HNG HUNG
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HVAC HEATING VENTILATION &
AIR CONDITIONING
IBC INTERNATIONAL BUILDING
CODE
ID INSIDE DIMENSION
ILO IN LIEU OF
IN INCH
INCAND INCANDESCENT
INFO INFORMATION
INSUL INSULATE
INT INTERIOR
IRREG IRREGULAR
JAN JANITOR
JS JANITOR'S SINK
JT JOINT
KO KNOCK OUT
KPL KICK PLATE
L ANGLE/LENGTH/LONG
LA LANDSCAPE ARCHITECT
LAM LAMINATE
LAV LAVATORY
LB POUND
LD LOAD
LDG LANDING
LF LINEAR FOOT (FEET)
LIB LIBRARY
LKR LOCKER
LL LIVE LOAD
LOC LOCATION
LMST LIMESTONE
LT LIGHT
LVR LOUVER MACH MACHINE
MANUF MANUFACTURER
MATL MATERIAL
MAX MAXIMUM
MB MOISTURE BARRIER
MC MEDICINE CABINET
MDF MEDIUM DENSITY FIBER
BOARD
MECH MECHANICAL
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURER
MGT MANAGEMENT
MH MANHOLE
MID MIDDLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY (MODIFIED)
MTD MOUNTED
MTG MOUNTING
MTL METAL
MULL MULLION
MWP MEMBRANE
WATERPROOFING
N NORTH
NA NOT APPLICABLE
NAT NATURAL
NE NORTHEAST
NFPA NATIONAL FIRE
PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRC NOISE REDUCTION
COEFFICIENT
NTS NOT TO SCALE
NW NORTHWEST
OA OVERALL
OC ON CENTER
OD OUTSIDE DIMENSION
OH OPPOSITE HAND
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
OPNG OPENING
OPP OPPOSITE
OPH OPPOSITE HAND
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
OWSJ OPEN WEB STEEL JOIST
PA PUBLIC ADDRESS
PAT PATTERN
PB PULL BOX
PERF PERFORATED
PH PHASE
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNL PANEL
PNT PAINT (PAINTED)
POL POLISHED
PR PAIR
PRCST PRECAST
PREFIN PREFINISHED
PSF POUND PER SQUARE FOOT
PSI POUND PER SQUARE INCH
PT PRESSURE TREATED
PTD PAPER TOWEL DISPENSER
PTN PARTITION
PVC POLYVINYL CHLORIDE
PWD PLYWOOD
QUAL QUALITY
QTY QUANITY
QT QUARRY TILE
R RADIUS
RB RESILIENT BASE
RBR RUBBER
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE REFERENCE
REC RECESSED
REF REFRIGERATOR
REINF REINFORCE / REINFORCING
REQ REQUIRE (REQUIRED)
REV REVISION
RF ROOF
RFR REFRIGERATOR
RFG ROOFING
RFI REQUEST FOR
INFORMATION
RFP REQUEST FOR PROPOSAL
RHR RIGHT HAND REVERSE
RL RAIN LEADER
RLG RAILING
RM ROOM
RO ROUGH OPENING
RTF RUBBER TILE FLOOR
RTU ROOF TOP UNIT
RWL RAIN WATER LEADER
S SOUTH
SATC SUSPENDED ACOUSTICAL
TILE CEILING
SAFB SOUND ATTENUATION FIRE
BLANKETS
SB SPLASH BLOCK
SC SOLID CORE
SCD SEAT COVER DISPENSER
SCP SCUPPERED SOAP
DISPENSER
SD SMOKE DETECTOR
SE SOUTHEAST
SECT SECTION
SED SEE ELECT DRAWINGS
SF SQUARE FOOT
SGL SINGLE
SHT SHEET
SHTHG SHEATHING
SHWR SHOWER
SIM SIMILAR
SM SHEET METAL
SMD SEE MECH DRAWINGS
SKLT SKYLIGHT
SLNT SEALANT
SPECS SPECIFICATIONS
SPD SEE PLUMBING DRAWINGS
SQ SQUARE
SS SERVICE SINK / STAINLESS
STEEL
SSM STANDING SEAM METAL
SSMR STANDING SEAM METAL
ROOF
SST STAINLESS STEEL
ST STREET
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPEND
SYS SYSTEM
SW SOUTHWEST
T TREAD
T&G TONGUE AND GROOVE
T&B TOP & BOTTOM
TC TERRA COTTA
TCA TILE COUNCIL OF AMERICA
TD TRENCH DRAIN
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
THK THICKNESS
THR THRESHOLD
TKBD TACKBOARD
TMPD TEMPERED
TOC TOP OF CURB
TOF TOP OF FOOTING
TOPA TOP OF PARAPET
TOPO TOPOGRAPHY
TOS TOP OF STEEL
TOW TOP OF WALL
TP TOILET PARTITION
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TPO THERMOPLASTIC
POLYOLEFIN
TRANS TRANSOM
TRTD TREATED
TS TUBE STEEL
TV TELEVISION
TYP TYPICAL
UC UNDERCUT
UL UNDERWRITER'S
LABORATORY
UNFIN UNFINISHED
UON UNLESS OTHERWISE
NOTED
UR URINAL
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VENT VENTILATOR
VERT VERTICAL
VEST VESTIBULE
VIF VERIFY IN THE FIELD
VR VAPOR RETARDER
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WIDTH / WEST
W/ WITH
W/O WITHOUT
W/W WALL TO WALL
WBL WOOD BLOCKING
WC WATER CLOSET /
WALLCOVERING
WCHR WATER CHILLER
WCL WATER COOLER
WD WOOD
WDW WINDOW
WH WATER HEATER
WL WALL
WO WINDOW OPENING
WP WEATHERPROOF /
WORK POINT
WR WATER RESISTANT
WS WEATHERSTRIP
WSCT WAINSCOT
WT WEIGHT
x BY
XPS EXTRUDED POLYSTYRENE
LEGEND
NAME
CEILING FINISH
ACT-1
WINDOW TYPE
COLUMN LINE
DESIGNATOR
DOOR NUMBER
REVISION TAG
KEYNOTE
CENTER LINE
#' - #" SPOT
ELEVATIONN
PROJECT NOTES
1. REPETITIVE FEATURES NOTED TYPICAL ON
THE DRAWINGS SHALL BE COMPLETELY
PROVIDED AS IF DRAWN IN FULL.
REPETITIVE FEATURES NOT NOTED ON THE
DRAWINGS SHALL BE COMPLETELY
PROVIDED AS IF NOTED IN FULL.
2. DIMENSIONS ARE DRAWN TO THE FACE OF
CONCRETE UNLESS NOTED OTHERWISE,
EXCEPT WHERE WALLS ALIGN WITH GRID
LINES. DIMENSIONS ARE DRAWN TO THE
CENTERLINE OF STRUCTURAL STEEL,
UNLESS NOTED OTHERWISE. GRID LINES
INDICATE THE CENTERLINE OF COLUMNS &
CONCRETE WALLS, UNLESS NOTED
OTHERWISE.
3. WOOD IN CONTACT WITH CONCRETE OR
MASONRY SHALL BE PRESERVATIVE
TREATED WOOD. ISOLATE P.T. WOOD FROM
METALS.
4. PRECAST CONCRETE WORK SHALL HAVE
EASED EDGES, EITHER PROVIDED IN THE
CAST FORMWORK, OR TOOLED DURING THE
CURING PROCESS. EDGES SHALL BE EVEN
AND OF A DURABLE THICKNESS.
5. REFER TO THE SPECIFICATIONS FOR
INFORMATION THAT SUPPLEMENTS THESE
NOTES AND OTHER DRAWING
INFORMATION.
6. ARCHITECTURAL DETAILS ARE INTENDED
TO SHOW THE GENERAL CHARACTER &
EXTENT OF THE PROJECT. THEY ARE NOT
INTENDED TO SHOW ALL DETAILS OF THE
WORK. DETAILS NOTED "TYPICAL" APPLY
TO SIMILAR WORK THROUGHOUT THIS
BUILDING UNLESS NOTED OTHERWISE.
7. THE CONTRACTOR IS RESPONSIBLE FOR
THE MEANS AND METHODS OF
CONSTRUCTION & ALL JOB RELATED
SAFETY STANDARDS.
8. THE CONTRACTOR IS RESPONSIBLE FOR
ADVANCED REVIEW OF THE WORK
REQUIRED IN THE CONSTRUCTION
DOCUMENTS AND THE REQUIREMENTS FOR
EXECUTING IT PROPERLY. IF THE
CONTRACTOR FINDS DISCREPANCIES IN
THE CONSTRUCTION DOCUMENTS OR
SPECIFICATION, THEN THE CONTRACTOR
SHALL NOTIFY THE CONTRACTING OFFICER
IMMEDIATELY. THE CONTRACTOR SHALL
WORK TO HAVE ALL DISCREPANCIES
RESOLVED WELL IN ADVANCE OF ACTUAL
CONSTRUCTION OCCURRING.
9. IN CASE OF DISCREPANCIES BETWEEN THE
CONSTRUCTION DOCUMENTS,
REFERENCED STANDARDS AND THE
GOVERNING CODES, THE CONTRACTING
OFFICER WILL DETERMINE WHICH SHALL
GOVERN. DISCREPANCIES SHALL BE
BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER BEFORE
PROCEEDING WITH THE WORK.
10. THE CONTRACTOR SHALL VERIFY ALL
DIMENSIONS, EXISTING UTILITIES, FIXTURES
AND CONDITIONS AT THE SITE. CONFLICTS
BETWEEN THE DRAWINGS AND ACTUAL
SITE CONDITIONS SHALL BE BROUGHT TO
THE ATTENTION OF THE CONTRACTING
OFFICER BEFORE PROCEEDING WITH THE
WORK.
11. PLUMBING AND ELECTRICAL FEATURES OR
INFORMATION SHOWN ON ARCHITECTURAL
DRAWINGS IS FOR COORDINATION AND
LOCATION PURPOSES ONLY. REFER TO
DRAWINGS OF OTHER DISCIPLINES FOR
SPECIFIC DESIGN INFORMATION ON
COMPONENTS & SYSTEMS.
12. FLASHING COLOR SHALL MATCH EAST
SHELTER WALL OR ROOF COLOR, UNLESS
OTHERWISE NOTED.
INTERIOR ELEVATION
EXTERIOR ELEVATION
SECTION
ENLARGEMENT DETAIL
X-###
X-###
LEVEL
LEVEL NAME
LEVEL ELEVATION
ROOM NAME / NUMBER
VIEW TITLE
X-###
1 View Name
SCALE: 1/8" = 1'-0"
R-###, R-###
X-###
SHEET NUMBER OF
VIEW
VIEW NUMBER
SHEET NUMBER OF
VIEW
VIEW NUMBER
SHEET NUMBER OF
VIEW
VIEW NUMBER
VIEW NUMBER
SHEET NUMBER OF
VIEW
ELEV.
NAME
ROOM NAME
ROOM NUMBER
CEILING FLOOR/
FINISH FLOOR/ AREA
WALL TAGX#X
NORTH ARROW
PROJECT NORTH
TRUE NORTH
SHEET NUMBER OF
REFERENCED VIEW(S)
SCALE OF VIEW
VIEW NUMBER
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:1
AM
G-003
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M . J
O H
N
SO
N
B.
H
AK
EY
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 3 OF 67
AR
C
H
IT
EC
TU
R
AL
L
EG
EN
D
, A B
B R
EV
IA
TI
O
N S, PR
O
JE
C T
N O
TE
S
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AR
LI
N G
TO
N
, V
IR
G
IN
IA
C
O
LU
M
BA
R
IU
M R
EP
AI
R S
PH
C
O U
R
TS
, 8
AN
D W
ES
T
C O
M M
IT
TA
L
SH
EL
TE
R W
6-
-B -2
M
AR
K D
ES
C
R
IP
TI
O
N D
SLATE WALK
WALKSLATE
E1
T
COLUMBARIUM #8 COLUMBARIUM #7
COLUMBARIUM #9
COLUMBARIUM #6 COLUMBARIUM #5
COLUMBARIUM #4 COLUMBARIUM #3
COLUMBARIUM #2 COLUMBARIUM #1
WEST
COMMITTAL
SHELTER
EAST
COMMITTAL
SHELTER
CEREMONIAL
PLAZA
PATTON
DRIVE
NIMITZ DRIVE
MARSHALL DRIVE
YO
R
K D
R
IV
E
BR
AD
LE
Y
D R
IV
E
COLUMBARIUM REPAIR KEY NOTES
1 REPLACE EXPANSION JOINT SEALANT ON UNDERSIDE OF
LINTEL (TYP.) SEE DETAIL 2/A313
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AB-101, FOR REPAIR JOINT LOCATIONS.
STONE EXPANSION JOINT, REPLACE SEALANT & BACKER
ROD
ZINC STRIP DRIP EDGE. SEE DETAIL 1/A-313.
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
DUTCHMAN. SEE DETAILS ON A-316.
REPLACE SEALANT & BACKER ROD, TYP.
SEE DETAILS 5/A-317
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPOINT JOINT (TYPICAL). SEE DETAIL 8/A-317.
INJECT GROUT IN CRACK (TYPICAL). SEE DETAIL 1/A-317.
SAND DOWN, PREP, AND REPAINT ELECTRICAL PANEL
(INSIDE & OUTSIDE). REPLACE SEALANT & BACKER ROD
AROUND ELECTRICAL PANEL.
CRACK , INJECT EPOXY THEN GROUT AT CORNICE. SEE
DETAIL 2/A-317.
REATTACH EPOXY THEN GROUT INCIPIENT SPALL. SEE
DETAIL 2/A-316.
(NOT USED)
DUTCHMAN, ADJACENT REPOINTING, AND PROVIDE NEW
OUTLET COVER, MATCH EXISTING, TYP..
INJECT GROUT (CRACK IN GRANITE BASE). SEE 1/A-317
REPOINT JOINT UNDER SOFFIT. SEE DETAIL 8/A-317
INSTALL SEALANT AROUND OUTLET
TIE HOLES PATCH (TYPICAL). SEE DETAIL 3/A-316.
REPLACE ARCHITECTURAL COATING
REMOVE EXISTING ARCHITECTURAL COATING AT
BOTTOM OF LINTEL AND SKIM COAT DOWN TO
EXISTING CONCRETE. APPLY RUST INHIBITOR TO
ANY EXPOSED SITE. PREP, PRIME AND PAINT 2
NEW COATS OF MOISTURE RESISTANT
ARCHITECTURAL COATING.
CUT JOINTS TO MAKE 1/4" WIDE AND 3/4" DEEP MIN. AND
FILL WITH GROUT
ADD GROUT TO PATCH
NEW OUTLET COVER, MATCH EXISTING, TYP.
LIFT POINT, SEE DETAIL 10/A-317.
REPLACE WEEPHOLES IN KIND
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
SAW CUT (RECTANGULAR SHAPE) AND REMOVE
EXISTING CONCRETE. REMOVE ANY RUST FROM
REBAR AND APPLY RUST INHIBITOR. CAST-IN-
PLACE NEW CONCRETE. MATCH EXISTING
THICKNESS, SHAPE, AND APPEARANCE. REPLACE
ADJACENT SEALANT.
REMOVE AND REPLACE LIMESTONE PANEL
NOTIFY ALRINGTON NATIONAL CEMETERY AND
CONSTRUCTION FIELD OFFICE WHEN THIS PANEL
IS REMOVED. AN INSPECTION MUST OCCUR
BEHIND THE REMOVED PANEL TO INVESTIGATE
THE REASONING OF THE EXISTING DAMAGES. THIS
PROCESS WILL BE CONDUCTED BY ANC
ENGINEERING TEAM BEFORE THE NEW PANEL IS
INSTALLED.
REPLACE MORTAR WITH SEALANT & BACKER
A 2 INCH VERTICAL JOINT THAT IS LOCATED AT THE
TOP OF THE NICHE COVERS AND IS SPACED OUT
EVERY 3RD NICHE COVER.
(ONLY ON COURTS 7 & 8 FOUNTAIN NICHE WALLS)
REPOINT JOINT
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
INJECT GROUT IN CRACK (TYP.)
ZINC STRIP DRIP EDGE (ONLY AT COURT 8).
REPOINT JOINT BETWEEN SOFFIT AND WALL
CLADDING
REPLACE ARCHITECTURAL COATING
CUT JOINT TO MAKE 1/4" WIDE AND 3/4" DEEP MIN.
AND FILL WITH GROUT
LIFT POINT (@ COURT 7 & 9)
TIE HOLES (@ COURT 8)
REPAIR LINE LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:1
AM
G-004
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M . J
O H
N
SO
N
B.
H
AK
EY
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 4 OF 67
SI
TE
M
AP
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AR
LI
N G
TO
N
, V
IR
G
IN
IA
C
O
LU
M
BA
R
IU
M R
EP
AI
R S
PH
C
O U
R
TS
, 8
AN
D W
ES
T
C O
M M
IT
TA
L
SH
EL
TE
R W
6-
-B -2
SCALE: NTS1 SITE MAP
N
M
AR
K D
ES
C
R
IP
TI
O
N D
BEAM ABOVE
LIMESTONE
CLADDING
SEE DETAIL 6/AA102
IN 1"
REVEAL
CONC. COL. WITH
LIMESTONE
CLADDING,
SEE DETAIL 8/AA102
NOTE:
PROVIDE SAME ARCHITECTURAL
MATERIAL AND FINISH THAT
MATCHES EAST SHELTER TO THE
UNDERSIDE OF THE ROOF.
5"5"
5' - 2"5' - 2"5' - 2"5' - 2"5' - 2"5' - 2"5' - 2"5' - 2"
5"5"
5" 5"
5'
2" 5'
2"
5'
2" 5'
2"
5'
2" 5'
2"
5'
2" 5'
2"
5" 5"
C
64 TYPE A LIGHT
FIXTURES AND
CKT #
E
L
F TYP.
43' - 0"
R.D.
SL
O
PE
R.D.R.D.
R.D.
1/ 4"
:1 '-0
M
IN
SL
O
PE
1/
4" :1
'-0
M
IN
B
A
SL
O
PE
1/
4" :1
'-0
M
IN
SL
O
PE
1/
4" :1
'-0
M
IN
SLOPE
1/4":1'-0"
MIN.
SLOPE
1/4":1'-0"
MIN.
SLOPE
1/4":1'-0"
MIN.
SLOPE
1/4":1'-0"
MIN.
K
REPOINT JOINT
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
REPAIR LINE LEGEND
COMMITTAL SHELTER REPAIR KEY NOTES
REPLACE GRAVEL STOP FLASHING WITH MATCHING
PROFILE AND COLOR OF SAME FLASHING AND TREATED
WOOD NAILER ON EAST COMMITTAL SHELTER. RETROFIT
AS NEEDED TO ACCOMMODATE EXISTING CONDITIONS
WHICH MAY DIFFER FROM EAST SHELTER.
REMOVE EXISTING SINGLE PLY EPDM ROOFING,
ASPHALT, AND TAR. ALLOW EXISTING LIGHT WEIGHT
CONCRETE TO DRY BEFORE APPLYING NEW SINGLE PLY
EPDM ROOFING SYSTEM.
REMOVE THE ENTIRE CEILING FINISH COATING. REPAIR
CRACKS ON CEILING AND REFINISH. MATCH FINISH TYPE
SIMILAR TO EAST COMMITTAL SHELTER.
REMOVE AND REPLACE 2 SINGLE POLE 20 AMP LIGHT
SWITCHES, DUPLEX RECEPTACLE, AND WATERPROOF
RECESSED BOX WITH WATER TIGHT HINGE COVER THAT
CAN RECEIVE A PAD-LOCK.
REPLACE BACKER ROD AND SEALANT.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPOINT ALL JOINTS ON ALL COLUMNS,TYP
REMOVE STAINS ON STRUCTURE WITH APPROVED
CLEANER, TYP.
NOT USED.
NOT USED.
PROVIDE (5) ONE PIECE SEAMLESS OPAL ACYLIC
SPHERICAL GLOBE ENCLOSURE. (3) TO BE INSTALLED
AND (2) TO GIVEN TO DEPARTMENT OF PUBLIC WORKS
(DPW) AS SPARES.
PROVIDE CIPP LINER INTO ALL (3) 3" DRAIN PIPES ONLY.
REPLACE ALL 4 ROOF DRAIN STRAINER, BOWL FLANGE,
AND COMPONENTS.
A
B
F
G
H
J
KC
D
L
E
M
N
GENERAL NOTES
1. NOT ALL JOINTS SHOWN ON PLANS OR ELEVATIONS.
2. TREAT AND CLEAN ALL LIMESTONE CLADDING.
PROVIDE SEALANT IN BETWEEN ALL LIMESTONE
CLADDING JOINT.
3. PROVIDE NEW WORK MATERIALS THAT MATCHES
EAST CEREMONIAL SHELTER.
4. REMOVE ALL FOREIGN DEBRIS AND CALCIUM
DEPOSITS FROM LIMESTONE LIGHTING FIXTURES.
CLEAN ALL LIMESTONE SURFACES WITH DETERGENT
PER APPROVED MOCKUP. SEE SPECIFICATION FOR
THE LIST OF DETERGENTS TO BE USED FOR THE
MOCKUP(S).
S.D.
S.D. S.D.
S.D.
6'-10" 6'-10"
6'-8"
SHELTER ROOF
LINE ABOVE
PLANTER
LOW HEIGHT
STONE WALL
CONC COL WITH
LIMESTONE
CLADDING,
SEE DETAIL 8/AA102
LOW HEIGHT
STONE WALL
GRANITE
PAVING
GRANITE
PAVING
GRANITE
PAVING
PAVING, SLATE WALK
51' - 8"
6'
2"
GFI, WP
S
NOTE:
RECEPTACLES ARE TO BE
WEATHERPROOF, GFCI, AND
RECESSED. THEY SHALL BE
SIMILAR TO THE EXISTING
RECESSED RECEPTACLES IN THE
EXISTING COLUMBARIUMS
D AT THIS
LOCATION
ONLY32
AA102
AA102
1AA102 2 AA102
AA102
AA102
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:4
AM
AA101
WEST COM
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
M .J
O H
N
SO
N
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 5 OF 67
W
ES
T
SH
EL
TE
R
PL
AN
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AR
LI
N G
TO
N
, V
IR
G
IN
IA
C
O
LU
M
BA
R
IU
M R
EP
AI
R S
PH
C
O U
R
TS
, 8
AN
D W
ES
T
C O
M M
IT
TA
L
SH
EL
TE
R W
6-
-B -2
SCALE: 1/8" = 1'-0"2 WEST SHELTER - REFLECTED CEILING PLAN
SCALE: 1/8" = 1'-0"3 WEST SHELTER - ROOF PLAN N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
SCALE: 1/8" = 1'-0"1 WEST SHELTER - FLOOR PLAN
M
AR
K D
ES
C
R
IP
TI
O
N D
ADHERED FLASHING
MEMBRANE
EXISTING
LIMESTONE
CLADDING
EXISTING
STRUCT CONC.
TREATED
BLOCKING, TYP.
B
A
EXISTING LIGHT WEIGHT
CONCRETE
IN 1" REVEALE
C
L
DRAIN STRAINER
CLAMPING RING
EXISTING STRUCTURAL
CONC.
SINGLE PLY, EPDM ROOFING
MEMBRANE, TYP
INSTALL SEALANT
BETWEEN DRAIN
BOWL FLANGE AND
ROOF MEMBRANE
EXISTING LIGHT WEIGHT CONC.
C
B
M
EXISTING ROOF DRAIN
N
@ 3" O.D. DRAIN ONLY
N
1/2" EXP JT
LIMESTONE COLUMN CAP
LIMESTONE CLADDING,
TYPE 2
3" O.D. DRAIN
STRAP ANCHOR, TYP
GROUT
@ 3" O.D. DRAIN ONLY
15 1/2" DIA. CONC
COL, SEE STRUCT
CRAMP ANCHOR
LIMESTONE CLADDING,
TYPE 2
GROUT
ONLY AT
NORTHWEST COL,
2" O.D. DRAIN &
1 1/2" O.D.
ELECTRIC CONDUIT
SEALANT, TYP
COL SECTION
PLAN
2'-0"
8' -8
3"
2" 2"
1" 2" 1" G
M
COMMITTAL SHELTER REPAIR KEY NOTES
REPLACE GRAVEL STOP FLASHING WITH MATCHING
PROFILE AND COLOR OF SAME FLASHING AND TREATED
WOOD NAILER ON EAST COMMITTAL SHELTER. RETROFIT
AS NEEDED TO ACCOMMODATE EXISTING CONDITIONS
WHICH MAY DIFFER FROM EAST SHELTER.
REMOVE EXISTING SINGLE PLY EPDM ROOFING,
ASPHALT, AND TAR. ALLOW EXISTING LIGHT WEIGHT
CONCRETE TO DRY BEFORE APPLYING NEW SINGLE PLY
EPDM ROOFING SYSTEM.
REMOVE THE ENTIRE CEILING FINISH COATING. REPAIR
CRACKS ON CEILING AND REFINISH. MATCH FINISH TYPE
SIMILAR TO EAST COMMITTAL SHELTER.
REMOVE AND REPLACE 2 SINGLE POLE 20 AMP LIGHT
SWITCHES, DUPLEX RECEPTACLE, AND WATERPROOF
RECESSED BOX WITH WATER TIGHT HINGE COVER THAT
CAN RECEIVE A PAD-LOCK.
REPLACE BACKER ROD AND SEALANT.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPOINT ALL JOINTS ON ALL COLUMNS,TYP
REMOVE STAINS ON STRUCTURE WITH APPROVED
CLEANER, TYP.
NOT USED.
NOT USED.
PROVIDE (5) ONE PIECE SEAMLESS OPAL ACYLIC
SPHERICAL GLOBE ENCLOSURE. (3) TO BE INSTALLED
AND (2) TO GIVEN TO DEPARTMENT OF PUBLIC WORKS
(DPW) AS SPARES.
PROVIDE CIPP LINER INTO ALL (3) 3" DRAIN PIPES ONLY.
REPLACE ALL 4 ROOF DRAIN STRAINER, BOWL FLANGE,
AND COMPONENTS.
A
B
F
G
H
J
KC
D
L
E
M
N
EQ
S
PA
C
ESLIMESTONE CLADDING
ON CONC. COL, TYP.
LOW HEIGHT,
STONE WALL
LIMESTONE CLADDING
ON CON. FASCIA
STRUCT CONC.-
WAFFLE FLAT PLATE
CONSTRUCTION
EPDM ROOF
MEMBRANE,TYP
RDRD
FLOOR
LEVEL
ROOF
DRAIN
9' -3
3'
-6
AA102
AA102
AA102
A
43' - 0"
F F TYP.
G TYP.
H TYP.
AF TYP.
G TYP.
H TYP.
AF TYP.
G TYP.
H TYP.
LIMESTONE CLADDING
ON CON. FASCIA
LOW HEIGHT,
STONE WALL
LIMESTONE CLADDING
ON CONC. COL
A
FF TYP.
G TYP.
H TYP.
REPOINT JOINT
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
REPAIR LINE LEGENDGENERAL NOTES
1. NOT ALL JOINTS SHOWN ON PLANS OR ELEVATIONS.
2. TREAT AND CLEAN ALL LIMESTONE CLADDING.
PROVIDE SEALANT IN BETWEEN ALL LIMESTONE
CLADDING JOINT.
3. PROVIDE NEW WORK MATERIALS THAT MATCHES
EAST CEREMONIAL SHELTER.
4. REMOVE ALL FOREIGN DEBRIS AND CALCIUM
DEPOSITS FROM LIMESTONE LIGHTING FIXTURES.
CLEAN ALL LIMESTONE SURFACES WITH DETERGENT
PER APPROVED MOCKUP. SEE SPECIFICATION FOR
THE LIST OF DETERGENTS TO BE USED FOR THE
MOCKUP(S).
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:4
AM
AA102
WEST COM
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
M .J
O H
N
SO
N
M .J
O H
N
SO
N
W .M
C C
O Y
N O
V
R
TA
F
IN
AL
SHEET 6 OF 67
W
ES
T
SH
EL
TE
R
SE
CT
IO
NS
A
ND
D
ET
AI
LS
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AR
LI
N G
TO
N
, V
IR
G
IN
IA
C
O
LU
M
BA
R
IU
M R
EP
AI
R S
PH
C
O U
R
TS
, 8
AN
D W
ES
T
C O
M M
IT
TA
L
SH
EL
TE
R W
6-
-B -2
SCALE: 3/4" = 1'-0"6 WEST SHELTER - WALL SECTION ROOF
AA102
SCALE: 3/4" = 1'-0"7 WEST SHELTER - SECTION AT ROOF DRAIN
AA102
SCALE: 3/4" = 1'-0"8 WEST SHELTER - COLUMN DETAIL
AA102
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
SCALE: 1/8" = 1'-0"5 CANOPY SECTION
AA101
SCALE: 1/8" = 1'-0"1 NORTH ELEVATION
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATION
SCALE: 1/8" = 1'-0"3 WEST ELEVATION
SCALE: 1/8" = 1'-0"4 EAST ELEVATION
M
AR
K D
ES
C
R
IP
TI
O
N D
MINIMUM REINFORCING
SUMP WALLS AND
MINIMUM CONCRETE THICKNESS
6 INCHES
HANDHOLE WALLS, TOP AND
FLOOR
4 FEET
HEIGHT
4 FEET
LENGTH
4 INCHES
a
FLOOR
4 FEET
WIDTH SUMP
1 FEET
DEPTH
CONSTRUCTION REQUIREMENTS
PULLING IRONS,
PROVIDE ONE
OPPOSITE EACH DUCT ENTRANCE HANDHOLE DETAIL
CABLE RACKS
4 MINIMUM
SLOPE TO DRAIN
3'-5"D
SUMP
NOT TO SCALE
MIN 36" OPENING
SUMP COVER
AND FRAME
3"
CLEAR MINIMUM INSIDE REQUIREMENTS FOR INSTALLATION
AND MAINTENANCE PURPOSES
4" PVC CONDUIT WITH
PULL WIRES, 4 TYP
4#1/0 & 1#2 EG
4" PVC CONDUIT WITH
YELLOW WARNING TAPE
FINISH GRADE
100 WATT LAMP LONG LIFE 130
VOLT LAMP INCANDESCENT
ONE PIECE SEAMLESS OPAL ACYLIC
SPHERICAL GLOBE ENCLOSURE
LIGHT
FIXTURE
LIGHT
FIXTURE
2" DRAIN
STONE COL.
10 #8 & 1 #10GR
IN 1 11/4 PVC CONDUIT
3/4"
SLEEVE
4"x 4" x 1
1/2"JUNCTION
BOX
6" x 6" x 4"
JUNCTION BOX
2" X 8" x 3/4"C
4"x 4" x 1 1/2"
JUNCTION BOX
WEATHERPROOF
CEILING
FITTING
FINISHED ROOF
MEDIUM BASE GLAZED
PORCELAIN LAMP HOLDER
14" DIA.
FINISHED
CEILING
CAST ALUMINUM FITTER
WITH WATERPROOF
GASKET BRONZE BAKED
ACRYLIC FINISH
FIXTURE SHALL COMPLY WITH U.L. 57
FOR NEW ELECTRICAL WORK SHOWN ON THE SITE DRAWING
W
AR
W
AR
3" TYP
30"
1. BARS WILL BE A MINIMUM OF NO. 4 ROUND DEFORMED.
2. WALLS AND FLOOR WILL HAVE BARS AT 8 INCHES
MAXIMUM ON CENTERS WITH A MINIMUM 12 INCH HOOK
AT CORNERS AND INTERSECTIONS.
3. THE TOP WILL HAVE BARS INSTALLED AT A MINIMUM
OF 2 INCHES FROM THE OPENING AND WITH A MINIMUM
4 INCHES SPACING BETWEEN BARS.
a. REINFORCING WILL BE INCREASED WHERE REQUIRED
TO SUIT ACTUAL INSTALLATION. MINIMUM REQUIREMENTS
ARE FOR A H20 WHEEL LOADING (AASHTO).
H TYPA
C
F TYP
L
C
D
N
B
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:4
AM
AA103
WEST COM
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
M .J
O H
N
SO
N
M .J
O H
N
SO
N
W .M
C C
O Y
N O
V
R
TA
F
IN
AL
SHEET 7 OF 67
W
ES
T
SH
EL
TE
R
EX
IS
TI
NG
L
IG
HT
IN
G
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AR
LI
N G
TO
N
, V
IR
G
IN
IA
C
O
LU
M
BA
R
IU
M R
EP
AI
R S
PH
C
O U
R
TS
, 8
AN
D W
ES
T
C O
M M
IT
TA
L
SH
EL
TE
R W
6-
-B -2
SCALE: 6" = 1'-0"1 WEST SHELTER - EXISTING LIGHTING (FOR REFERENCE ONLY)
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SCALE: 12" = 1'-0"2 PHOTO - NORTH ELEV.
SCALE: 12" = 1'-0"3 PHOTO - CEILING
SCALE: 12" = 1'-0"4 PHOTO - ELECTRICAL BOX
SCALE: 12" = 1'-0"5 PHOTO - ROOF
2 2
2 2
NORTH SECTION
NORTH ELEVATION
SOUTH SECTION
SOUTH ELEVATION
PLAN LAYOUT
2 2 2
NORTH SECTION
NORTH ELEVATION
SOUTH SECTION
SOUTH ELEVATION
PLAN LAYOUT
REPLACE SEALANT & BACKER ROD (TYP.)
REPAIR LINE LEGEND
COLUMBARIUM REPAIR KEY NOTES
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AB-101, FOR REPAIR JOINT LOCATIONS.
GENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES.
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND.
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
2 2
2 2
NORTH SECTION
NORTH ELEVATION
SOUTH SECTION
SOUTH ELEVATION
PLAN LAYOUT
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:5
AM
AB101
COURT 1-8
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M . J
O H
N
SO
N
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 8 OF 67
CO
UR
T
-8 F
O
UN
TA
IN
P
LA
NS
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AR
LI
N G
TO
N
, V
IR
G
IN
IA
C
O
LU
M
BA
R
IU
M R
EP
AI
R S
PH
C
O U
R
TS
, 8
AN
D W
ES
T
C O
M M
IT
TA
L
SH
EL
TE
R W
6-
-B -2
SCALE: 1/4" = 1'-0"
COURTS 2 & 6 FOUNTAIN PLAN
SCALE: 1/4" = 1'-0"
COURT 5 FOUNTAIN PLAN
N
4' 8' 12'
SCALE: 1/4" = 1' - 0"
0'
SCALE: 1/4" = 1'-0"
COURTS 1, 3, 4, 7, & 8 FOUNTAIN PLAN
NOTE: ALL JOINTS TO BE REPOINTED.
NOTE: ONLY INSIDE JOINTS TO BE REPOINTED.
NOTE: COPING AND INSIDE JOINTS TO BE REPOINTED.
M
AR
K D
ES
C
R
IP
TI
O
N D
2'
6"
1 2 3 4 5 6 7 8
REPLACE SEALANT & BACKER ROD (TYP.)
REPAIR LINE LEGEND COLUMBARIUM REPAIR KEY NOTES
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AB-101, FOR REPAIR JOINT LOCATIONS.
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
SAW CUT (RECTANGULAR SHAPE) AND REMOVE
EXISTING CONCRETE. REMOVE ANY RUST FROM
REBAR AND APPLY RUST INHIBITOR. CAST-IN-
PLACE NEW CONCRETE. MATCH EXISTING
THICKNESS, SHAPE, AND APPEARANCE. REPLACE
ADJACENT SEALANT.
GENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES.
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND.
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
NORTH SECTION
SOUTH SECTION
NORTH ELEVATION
SOUTH ELEVATION
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:5
AM
AC100
COURT 1
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M . J
O H
N
SO
N
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 9 OF 67
O
VE
RA
LL
C O
PI
NG
P
LA
N (R
O O
F
PL
AN
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AR
LI
N G
TO
N
, V
IR
G
IN
IA
C
O
LU
M
BA
R
IU
M R
EP
AI
R S
PH
C
O U
R
TS
, 8
AN
D W
ES
T
C O
M M
IT
TA
L
SH
EL
TE
R W
6-
-B -2
SCALE: 1/8" = 1'-0"
OVERALL COPING PLAN (ROOF PLAN) - COURT 1
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SCALE: 1/4" = 1'-0"
COURT 1 FOUNATION
1110987654321
F
E
D
C
B
A
DD
CC
1'
0"
1'
0"
224' - 4"
4'
2"
6'
8"
4'
7'
0" 7'
0"
5'
0"
6'
8"
4'
3'
1/
2"
/2
3' - 4 1/2"52' - 3"3' - 4 1/2"
3'
1/
2"
3'
1/ 2"
4'
2"
6'
8"
4'
4'
6'
8"
4'
2"
2' - 2" 23' - 0" 30' - 0" 30' - 0" 30' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 0" 16' - 0" 23' - 0" 2' - 2"
TYP1
COLUMBARIUM REPAIR KEY NOTES
1 REPLACE EXPANSION JOINT SEALANT ON UNDERSIDE OF
LINTEL (TYP.) SEE DETAIL 2/A-313
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AB-101, FOR REPAIR JOINT LOCATIONS.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPLACE ARCHITECTURAL COATING
REMOVE EXISTING ARCHITECTURAL COATING AT
BOTTOM OF LINTEL AND SKIM COAT DOWN TO
EXISTING CONCRETE. APPLY RUST INHIBITOR TO
ANY EXPOSED SITE. PREP, PRIME AND PAINT 2
NEW COATS OF MOISTURE RESISTANT
ARCHITECTURAL COATING.
LIFT POINT, SEE DETAIL 10/A-317.
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
INJECT GROUT IN CRACK (TYP.)
REPLACE ARCHITECTURAL COATING
LIFT POINT (@ COURTS 7 & 9)
REPAIR LINE LEGENDGENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
4. PROVIDE APPROVED BIOCIDE CLEANING AT
COURTS #7 & 9. DO NOT CLEAN MARBLE AND CONCRETE
NICHE WALLS COVERS WITH THIS SOLUTION. MARBLE
NICHE MUST BE PROTECTED (STAY DRY) DURING
CLEANING.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:1
AM
AD101
COLUMB. 7
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
B.
H
AK
EY
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 10 OF 67
O
VE
RA
LL
R
EF
LE
CT
ED
C
EI
LI
NG
P
LA
N
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AL
IN
G
TO
N , V
IR
G
IN
IA
C O
LU
M
BA
R
IU
M
R
EP
AI
R
S
PH
C O
U R
TS
, 8
AN
D
W
ES
T C
O M
M
IT
TA
L
SH
EL
TE
R
W
6-
-B
-2
SCALE: 1/8" = 1'-0"
OVERALL REFLECTED CEILING PLAN
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
GENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
4. PROVIDE APPROVED BIOCIDE CLEANING AT
COURTS #7 & 9. DO NOT CLEAN MARBLE AND CONCRETE
NICHE WALLS COVERS WITH THIS SOLUTION. MARBLE
NICHE MUST BE PROTECTED (STAY DRY) DURING
CLEANING.
1110987654321
F
E
D
C
B
A
DD
CC
24 TYP.
23' - 0" 30' - 0" 30' - 0" 30' - 0" 17' - 0" 17' - 0" 17' - 0" 17' - 0" 16' - 0" 23' - 0"
4'
1"
6'
8"
4'
4'
6'
8"
4'
1"
4'
1"
6'
8"
4'
4'
6'
8"
4'
1"
7' - 0"
59' - 0"
3'
1/
2"
22' - 2"22' - 2"
5 6
8 9
11 12
14 15
16 17
22 23
272829
343536
COLUMBARIUM REPAIR KEY NOTES
1 REPLACE EXPANSION JOINT SEALANT ON UNDERSIDE OF
LINTEL (TYP.) SEE DETAIL 2/A-313
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AB-101, FOR REPAIR JOINT LOCATIONS.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPLACE ARCHITECTURAL COATING
REMOVE EXISTING ARCHITECTURAL COATING AT
BOTTOM OF LINTEL AND SKIM COAT DOWN TO
EXISTING CONCRETE. APPLY RUST INHIBITOR TO
ANY EXPOSED SITE. PREP, PRIME AND PAINT 2
NEW COATS OF MOISTURE RESISTANT
ARCHITECTURAL COATING.
LIFT POINT, SEE DETAIL 10/A-317.
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
INJECT GROUT IN CRACK (TYP.)
REPLACE ARCHITECTURAL COATING
LIFT POINT (@ COURTS 7 & 9)
REPAIR LINE LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:1
AM
AD102
COLUMB. 7
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
B.
H
AK
EY
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 11 OF 67
O
VE
RA
LL
C O
PI
NG
P
LA
N (R
O O
F
PL
AN
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AL
IN
G
TO
N , V
IR
G
IN
IA
C O
LU
M
BA
R
IU
M
R
EP
AI
R
S
PH
C O
U R
TS
, 8
AN
D
W
ES
T C
O M
M
IT
TA
L
SH
EL
TE
R
W
6-
-B
-2
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
M
AR
K D
ES
C
R
IP
TI
O
N D
AT
E
SCALE: 1/8" = 1'-0"
OVERALL COPING PLAN (ROOF PLAN)
AD201
AD201
AD201 4 AD2012
11 10 9 8 7 6 5 4 3 2 1
29' - 6" 27' - 0" 36' - 0" 36' - 0" 36' - 0" 41' - 3" 14' - 3"
10 5
9 TYP
LENGTH: 6"
F E DD CC B A
47' - 3" 2' - 0" 14' - 0" 2' - 0" 47' - 3"
A B C D E F
48' - 3" 16' - 0" 48' - 3"
112' - 6"
1 2 3 4 5 6 7 8 9 10 11521
GENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
4. PROVIDE APPROVED BIOCIDE CLEANING AT
COURTS #7 & 9. DO NOT CLEAN MARBLE AND CONCRETE
NICHE WALLS COVERS WITH THIS SOLUTION. MARBLE
NICHE MUST BE PROTECTED (STAY DRY) DURING
CLEANING.
COLUMBARIUM REPAIR KEY NOTES
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
REPOINT JOINT (TYPICAL). SEE DETAIL 8/A-317.
INJECT GROUT IN CRACK (TYPICAL). SEE DETAIL 1/A-317.
CUT JOINTS TO MAKE 1/4" WIDE AND 3/4" DEEP MIN. AND
FILL WITH GROUT
REPOINT JOINT
CUT JOINT TO MAKE 1/4" WIDE AND FILL WITH
GROUT
REPAIR LINE LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:2
AM
AD201
COLUMB. 7
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
B.
H
AK
EY
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 12 OF 67
O
VE
RA
LL
E
LE
VA
TI
O
NS
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AL
IN
G
TO
N , V
IR
G
IN
IA
C O
LU
M
BA
R
IU
M
R
EP
AI
R
S
PH
C O
U R
TS
, 8
AN
D
W
ES
T C
O M
M
IT
TA
L
SH
EL
TE
R
W
6-
-B
-2
SCALE: 1/32" = 1'-0"
KEYPLAN N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
SCALE: 1/8" = 1'-0"1 EAST ELEVATION
AD201
SCALE: 1/8" = 1'-0"2 SOUTH ELEVATION
AD201
SCALE: 1/8" = 1'-0"4 NORTH ELEVATION
AD201
SCALE: 1/8" = 1'-0"3 WEST ELEVATION
AD201
32' 64' 96'
SCALE: 1/32" = 1' - 0"
0'
M
AR
K D
ES
C
R
IP
TI
O
N D
AD304
AD305
AD307
AD307
AD307
AD307
AD306
AD306
AD306
AD306
AD305
AD305
AD305
AD304
AD304
AD304
AD301
AD302
AD303
AD301
AD302
AD303
AD301
AD303
AD303
AD301
AD301
AD303
AD303
AD301
1234567891011
3' - 8" 18' - 4"7' - 0"7' - 0"7' - 0"7' - 0"7' - 0"18' - 4" 3' - 8"
8'
/3 2"
1 2 3 4 5 6 7 8 9 10 11
TYP.810 8 TYP.
8 TYP
28 TYP
LENGTH:
10-1/2"
SIZE:
8" X 3"
LENGTH:
4"
SIZE:
2" X 3"
10 111 2
GENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
4. PROVIDE APPROVED BIOCIDE CLEANING AT
COURTS #7 & 9. DO NOT CLEAN MARBLE AND CONCRETE
NICHE WALLS COVERS WITH THIS SOLUTION. MARBLE
NICHE MUST BE PROTECTED (STAY DRY) DURING
CLEANING.
REPOINT JOINT
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
INJECT GROUT IN CRACK (TYP.)
CUT JOINT TO MAKE 1/4" WIDE AND FILL WITH
GROUT
REPAIR LINE LEGENDCOLUMBARIUM REPAIR KEY NOTES
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AA-101, FOR REPAIR JOINT LOCATIONS.
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
DUTCHMAN. SEE DETAILS ON A-316.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPOINT JOINT (TYPICAL). SEE DETAIL 8/A-317.
INJECT GROUT IN CRACK (TYPICAL). SEE DETAIL 1/A-317.
SAND DOWN, PREP, AND REPAINT ELECTRICAL PANEL
(INSIDE & OUTSIDE). REPLACE SEALANT & BACKER ROD
AROUND ELECTRICAL PANEL.
CRACK , INJECT EPOXY THEN GROUT AT CORNICE. SEE
DETAIL 2/A-317.
REATTACH EPOXY THEN GROUT INCIPIENT SPALL. SEE
DETAIL 2/A-316.
INSTALL SEALANT AROUND OUTLET
ADD GROUT TO PATCH
NEW OUTLET COVER
REMOVE AND REPLACE LIMESTONE PANEL
NOTIFY ALRINGTON NATIONAL CEMETERY AND
CONSTRUCTION FIELD OFFICE WHEN THIS PANEL
IS REMOVED. AN INSPECTION MUST OCCUR
BEHIND THE REMOVED PANEL TO INVESTIGATE
THE REASONING OF THE EXISTING DAMAGES. THIS
PROCESS WILL BE CONDUCTED BY ANC
ENGINEERING TEAM BEFORE THE NEW PANEL IS
INSTALLED.
REPLACE MORTAR WITH SEALANT & BACKER
A 2 INCH VERTICAL JOINT THAT IS LOCATED AT THE
TOP OF THE NICHE COVERS AND IS SPACED OUT
EVERY 3RD NICHE COVER.
(ONLY ON COURTS 7 & 8)
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:2
AM
AD301
COLUMB. 7
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
B.
H
AK
EY
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 13 OF 67
SE
CT
IO
NS
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AL
IN
G
TO
N , V
IR
G
IN
IA
C O
LU
M
BA
R
IU
M
R
EP
AI
R
S
PH
C O
U R
TS
, 8
AN
D
W
ES
T C
O M
M
IT
TA
L
SH
EL
TE
R
W
6-
-B
-2
SCALE: 1/32" = 1'-0"
KEYPLAN
SCALE: 1/8" = 1'-0"1 SECTION
AD301
SCALE: 1/8" = 1'-0"2 SECTION
AD301
SCALE: 1/8" = 1'-0"4 SECTION
AD301
SCALE: 1/8" = 1'-0"5 SECTION
AD301
SCALE: 1/8" = 1'-0"6 SECTION
AD301
SCALE: 1/8" = 1'-0"3 SECTION
AD301
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'32' 64' 96'
SCALE: 1/32" = 1' - 0"
0'
M
AR
K D
ES
C
R
IP
TI
O
N D
AD305
AD307
AD307
AD307
AD307
AD306
AD306
AD306
AD306
AD305
AD305
AD305
AD304
AD304
AD304
AD301
AD302
AD303
AD301
AD302
AD303
AD301
AD303
AD303
AD301
AD301
AD303
AD303
AD301
1234567891011
9 TYP
LENGTH:
1-3/4"
LENGTH: 2"11
1 2 3 4 5 6 7 8 9 10 11
235 8
8 TYP
LENGTH: 7"
SIZE:
2" X 20"
GENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
4. PROVIDE APPROVED BIOCIDE CLEANING AT
COURTS #7 & 9. DO NOT CLEAN MARBLE AND CONCRETE
NICHE WALLS COVERS WITH THIS SOLUTION. MARBLE
NICHE MUST BE PROTECTED (STAY DRY) DURING
CLEANING.
COLUMBARIUM REPAIR KEY NOTES
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AA-101, FOR REPAIR JOINT LOCATIONS.
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
DUTCHMAN. SEE DETAILS ON A-316.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPOINT JOINT (TYPICAL). SEE DETAIL 8/A-317.
INJECT GROUT IN CRACK (TYPICAL). SEE DETAIL 1/A-317.
SAND DOWN, PREP, AND REPAINT ELECTRICAL PANEL
(INSIDE & OUTSIDE). REPLACE SEALANT & BACKER ROD
AROUND ELECTRICAL PANEL.
CRACK , INJECT EPOXY THEN GROUT AT CORNICE. SEE
DETAIL 2/A-317.
REATTACH EPOXY THEN GROUT INCIPIENT SPALL. SEE
DETAIL 2/A-316.
INSTALL SEALANT AROUND OUTLET
ADD GROUT TO PATCH
NEW OUTLET COVER
REMOVE AND REPLACE LIMESTONE PANEL
NOTIFY ALRINGTON NATIONAL CEMETERY AND
CONSTRUCTION FIELD OFFICE WHEN THIS PANEL
IS REMOVED. AN INSPECTION MUST OCCUR
BEHIND THE REMOVED PANEL TO INVESTIGATE
THE REASONING OF THE EXISTING DAMAGES. THIS
PROCESS WILL BE CONDUCTED BY ANC
ENGINEERING TEAM BEFORE THE NEW PANEL IS
INSTALLED.
REPLACE MORTAR WITH SEALANT & BACKER
A 2 INCH VERTICAL JOINT THAT IS LOCATED AT THE
TOP OF THE NICHE COVERS AND IS SPACED OUT
EVERY 3RD NICHE COVER.
(ONLY ON COURTS 7 & 8)
REPOINT JOINT
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
INJECT GROUT IN CRACK (TYP.)
CUT JOINT TO MAKE 1/4" WIDE AND FILL WITH
GROUT
REPAIR LINE LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:2
AM
AD302
COLUMB. 7
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
B.
H
AK
EY
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 14 OF 67
SE
CT
IO
NS
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AL
IN
G
TO
N , V
IR
G
IN
IA
C O
LU
M
BA
R
IU
M
R
EP
AI
R
S
PH
C O
U R
TS
, 8
AN
D
W
ES
T C
O M
M
IT
TA
L
SH
EL
TE
R
W
6-
-B
-2
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
32' 64' 96'
SCALE: 1/32" = 1' - 0"
0'
SCALE: 1/32" = 1'-0"
KEYPLAN
SCALE: 1/8" = 1'-0"8 SECTION
AD301
SCALE: 1/8" = 1'-0"7 SECTION
AD301
M
AR
K D
ES
C
R
IP
TI
O
N D
AD305
AD307
AD307
AD307
AD307
AD306
AD306
AD306
AD306
AD305
AD305
AD305
AD304
AD304
AD304
AD301
AD302
AD303
AD301
AD302
AD303
AD301
AD303
AD303
AD301
AD301
AD303
AD303
AD301
1011 12
1 2 10 11
1234567891011
8TYP.
8 TYP
28 TYP
1 2 3 4 5 6 7 8 9 10 11913
COLUMBARIUM REPAIR KEY NOTES
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AA-101, FOR REPAIR JOINT LOCATIONS.
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
DUTCHMAN. SEE DETAILS ON A-316.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPOINT JOINT (TYPICAL). SEE DETAIL 8/A-317.
INJECT GROUT IN CRACK (TYPICAL). SEE DETAIL 1/A-317.
SAND DOWN, PREP, AND REPAINT ELECTRICAL PANEL
(INSIDE & OUTSIDE). REPLACE SEALANT & BACKER ROD
AROUND ELECTRICAL PANEL.
CRACK , INJECT EPOXY THEN GROUT AT CORNICE. SEE
DETAIL 2/A-317.
REATTACH EPOXY THEN GROUT INCIPIENT SPALL. SEE
DETAIL 2/A-316.
INSTALL SEALANT AROUND OUTLET
ADD GROUT TO PATCH
NEW OUTLET COVER
REMOVE AND REPLACE LIMESTONE PANEL
NOTIFY ALRINGTON NATIONAL CEMETERY AND
CONSTRUCTION FIELD OFFICE WHEN THIS PANEL
IS REMOVED. AN INSPECTION MUST OCCUR
BEHIND THE REMOVED PANEL TO INVESTIGATE
THE REASONING OF THE EXISTING DAMAGES. THIS
PROCESS WILL BE CONDUCTED BY ANC
ENGINEERING TEAM BEFORE THE NEW PANEL IS
INSTALLED.
REPLACE MORTAR WITH SEALANT & BACKER
A 2 INCH VERTICAL JOINT THAT IS LOCATED AT THE
TOP OF THE NICHE COVERS AND IS SPACED OUT
EVERY 3RD NICHE COVER.
(ONLY ON COURTS 7 & 8)
REPOINT JOINT
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
INJECT GROUT IN CRACK (TYP.)
CUT JOINT TO MAKE 1/4" WIDE AND FILL WITH
GROUT
REPAIR LINE LEGENDGENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
4. PROVIDE APPROVED BIOCIDE CLEANING AT
COURTS #7 & 9. DO NOT CLEAN MARBLE AND CONCRETE
NICHE WALLS COVERS WITH THIS SOLUTION. MARBLE
NICHE MUST BE PROTECTED (STAY DRY) DURING
CLEANING.
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:2
AM
AD303
COLUMB. 7
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
B.
H
AK
EY
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 15 OF 67
SE
CT
IO
NS
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AL
IN
G
TO
N , V
IR
G
IN
IA
C O
LU
M
BA
R
IU
M
R
EP
AI
R
S
PH
C O
U R
TS
, 8
AN
D
W
ES
T C
O M
M
IT
TA
L
SH
EL
TE
R
W
6-
-B
-2
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
SCALE: 1/32" = 1'-0"
KEYPLAN
SCALE: 1/8" = 1'-0"10 SECTION
AD301
SCALE: 1/8" = 1'-0"9 SECTION
AD301
SCALE: 1/8" = 1'-0"12 SECTION
AD301
SCALE: 1/8" = 1'-0"11 SECTION
AD301
SCALE: 1/8" = 1'-0"13 SECTION
AD301
SCALE: 1/8" = 1'-0"14 SECTION
AD301
32' 64' 96'
SCALE: 1/32" = 1' - 0"
0'
M
AR
K D
ES
C
R
IP
TI
O
N D
AD305
AD307
AD307
AD307
AD307
AD306
AD306
AD306
AD306
AD305
AD305
AD305
AD304
AD304
AD304
AD301
AD302
AD303
AD301
AD302
AD303
AD301
AD303
AD303
AD301
AD301
AD303
AD303
AD301
A B E FDDCC
ABCCDDEF
6 6 68 TYP
SIZE: 10-1/2" X 2-1/2" SIZE: 8" X 2-1/2"
SIZE: 4-1/2" X 5-1/2"
A B E FDDCC
8 TYP
28 TYP
SIZE: 2" X 6"
LENGTH: 6"
F E D C B A 16' - 0"
SIZE: 1" X 1-1/2"
GENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
4. PROVIDE APPROVED BIOCIDE CLEANING AT
COURTS #7 & 9. DO NOT CLEAN MARBLE AND CONCRETE
NICHE WALLS COVERS WITH THIS SOLUTION. MARBLE
NICHE MUST BE PROTECTED (STAY DRY) DURING
CLEANING.
COLUMBARIUM REPAIR KEY NOTES
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AA-101, FOR REPAIR JOINT LOCATIONS.
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
DUTCHMAN. SEE DETAILS ON A-316.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPOINT JOINT (TYPICAL). SEE DETAIL 8/A-317.
INJECT GROUT IN CRACK (TYPICAL). SEE DETAIL 1/A-317.
SAND DOWN, PREP, AND REPAINT ELECTRICAL PANEL
(INSIDE & OUTSIDE). REPLACE SEALANT & BACKER ROD
AROUND ELECTRICAL PANEL.
CRACK , INJECT EPOXY THEN GROUT AT CORNICE. SEE
DETAIL 2/A-317.
REATTACH EPOXY THEN GROUT INCIPIENT SPALL. SEE
DETAIL 2/A-316.
INSTALL SEALANT AROUND OUTLET
ADD GROUT TO PATCH
NEW OUTLET COVER
REMOVE AND REPLACE LIMESTONE PANEL
NOTIFY ALRINGTON NATIONAL CEMETERY AND
CONSTRUCTION FIELD OFFICE WHEN THIS PANEL
IS REMOVED. AN INSPECTION MUST OCCUR
BEHIND THE REMOVED PANEL TO INVESTIGATE
THE REASONING OF THE EXISTING DAMAGES. THIS
PROCESS WILL BE CONDUCTED BY ANC
ENGINEERING TEAM BEFORE THE NEW PANEL IS
INSTALLED.
REPLACE MORTAR WITH SEALANT & BACKER
A 2 INCH VERTICAL JOINT THAT IS LOCATED AT THE
TOP OF THE NICHE COVERS AND IS SPACED OUT
EVERY 3RD NICHE COVER.
(ONLY ON COURTS 7 & 8)
REPOINT JOINT
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
INJECT GROUT IN CRACK (TYP.)
CUT JOINT TO MAKE 1/4" WIDE AND FILL WITH
GROUT
REPAIR LINE LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:2
AM
AD304
COLUMB. 7
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
B.
H
AK
EY
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 16 OF 67
SE
CT
IO
NS
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AL
IN
G
TO
N , V
IR
G
IN
IA
C O
LU
M
BA
R
IU
M
R
EP
AI
R
S
PH
C O
U R
TS
, 8
AN
D
W
ES
T C
O M
M
IT
TA
L
SH
EL
TE
R
W
6-
-B
-2
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
32' 64' 96'
SCALE: 1/32" = 1' - 0"
0'
SCALE: 1/32" = 1'-0"
KEYPLAN
SCALE: 1/8" = 1'-0"18 SECTION
AD301
SCALE: 1/8" = 1'-0"17 SECTION
AD301
SCALE: 1/8" = 1'-0"16 SECTION
AD301
SCALE: 1/8" = 1'-0"15 SECTION
AD301
M
AR
K D
ES
C
R
IP
TI
O
N D
AD305
AD307
AD307
AD307
AD307
AD306
AD306
AD306
AD306
AD305
AD305
AD305
AD304
AD304
AD304
AD301
AD302
AD303
AD301
AD302
AD303
AD301
AD303
AD303
AD301
AD301
AD303
AD303
AD301
A B E FDDCC
ABCCDDEF
A B E FDDCC
ABCCDDEF
8 TYP
28 TYP
GENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
4. PROVIDE APPROVED BIOCIDE CLEANING AT
COURTS #7 & 9. DO NOT CLEAN MARBLE AND CONCRETE
NICHE WALLS COVERS WITH THIS SOLUTION. MARBLE
NICHE MUST BE PROTECTED (STAY DRY) DURING
CLEANING.
COLUMBARIUM REPAIR KEY NOTES
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AA-101, FOR REPAIR JOINT LOCATIONS.
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
DUTCHMAN. SEE DETAILS ON A-316.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPOINT JOINT (TYPICAL). SEE DETAIL 8/A-317.
INJECT GROUT IN CRACK (TYPICAL). SEE DETAIL 1/A-317.
SAND DOWN, PREP, AND REPAINT ELECTRICAL PANEL
(INSIDE & OUTSIDE). REPLACE SEALANT & BACKER ROD
AROUND ELECTRICAL PANEL.
CRACK , INJECT EPOXY THEN GROUT AT CORNICE. SEE
DETAIL 2/A-317.
REATTACH EPOXY THEN GROUT INCIPIENT SPALL. SEE
DETAIL 2/A-316.
INSTALL SEALANT AROUND OUTLET
ADD GROUT TO PATCH
NEW OUTLET COVER
REMOVE AND REPLACE LIMESTONE PANEL
NOTIFY ALRINGTON NATIONAL CEMETERY AND
CONSTRUCTION FIELD OFFICE WHEN THIS PANEL
IS REMOVED. AN INSPECTION MUST OCCUR
BEHIND THE REMOVED PANEL TO INVESTIGATE
THE REASONING OF THE EXISTING DAMAGES. THIS
PROCESS WILL BE CONDUCTED BY ANC
ENGINEERING TEAM BEFORE THE NEW PANEL IS
INSTALLED.
REPLACE MORTAR WITH SEALANT & BACKER
A 2 INCH VERTICAL JOINT THAT IS LOCATED AT THE
TOP OF THE NICHE COVERS AND IS SPACED OUT
EVERY 3RD NICHE COVER.
(ONLY ON COURTS 7 & 8)
REPOINT JOINT
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
INJECT GROUT IN CRACK (TYP.)
CUT JOINT TO MAKE 1/4" WIDE AND FILL WITH
GROUT
REPAIR LINE LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:2
AM
AD305
COLUMB. 7
N O
R
FO
LK
D
IS
TR
IC
T
N O
R
FO
LK
, V
A
M .J
O H
N
SO
N
B.
H
AK
EY
M .J
O H
N
SO
N
W .M cC O
Y
N O
V
R
TA
F
IN
AL
SHEET 17 OF 67
SE
CT
IO
NS
AR
LI
N G
TO
N
N
AT
IO
N
AL
C
EM
ET
ER
Y
AL
IN
G
TO
N , V
IR
G
IN
IA
C O
LU
M
BA
R
IU
M
R
EP
AI
R
S
PH
C O
U R
TS
, 8
AN
D
W
ES
T C
O M
M
IT
TA
L
SH
EL
TE
R
W
6-
-B
-2
N
8' 16' 24'
SCALE: 1/8" = 1' - 0"
0'
32' 64' 96'
SCALE: 1/32" = 1' - 0"
0'
SCALE: 1/32" = 1'-0"
KEYPLAN
SCALE: 1/8" = 1'-0"22 SECTION
AD301
SCALE: 1/8" = 1'-0"21 SECTION
AD301
SCALE: 1/8" = 1'-0"20 SECTION
AD301
SCALE: 1/8" = 1'-0"19 SECTION
AD301
M
AR
K D
ES
C
R
IP
TI
O
N D
AD305
AD307
AD307
AD307
AD307
AD306
AD306
AD306
AD306
AD305
AD305
AD305
AD304
AD304
AD304
AD301
AD302
AD303
AD301
AD302
AD303
AD301
AD303
AD303
AD301
AD301
AD303
AD303
AD301
A B E FDDCC
ABCCDDEF
A B CC DD E FABCCDDEF 10 5
LENGTH: 3"
A B E FDDCC
GENERAL NOTES
1. SEE SHEET G-004 FOR ALL KEYNOTES
2. SEE SHEET G-004 FOR ALL REPAIR LINE LEGEND
3. NOT ALL JOINTS ARE SHOWN ON PLANS.
4. PROVIDE APPROVED BIOCIDE CLEANING AT
COURTS #7 & 9. DO NOT CLEAN MARBLE AND CONCRETE
NICHE WALLS COVERS WITH THIS SOLUTION. MARBLE
NICHE MUST BE PROTECTED (STAY DRY) DURING
CLEANING.
COLUMBARIUM REPAIR KEY NOTES
REPLACE SEALANT JOINTS & BACKER ROD/BOND
BREAKER TAPE ON AND INSIDE FOUNTAIN. USE
SUBMERSIBLE SEALANT INSIDE FOUNTAIN. SEE
RESPECTIVE ENLARGED FOUNTAIN PLAN ON SHEET
AA-101, FOR REPAIR JOINT LOCATIONS.
CEMENTITIOUS PATCH. SEE DETAIL 6/A-316.
DUTCHMAN. SEE DETAILS ON A-316.
REPLACE MORTAR WITH SEALANT & BACKER ROD
REPOINT JOINT (TYPICAL). SEE DETAIL 8/A-317.
INJECT GROUT IN CRACK (TYPICAL). SEE DETAIL 1/A-317.
SAND DOWN, PREP, AND REPAINT ELECTRICAL PANEL
(INSIDE & OUTSIDE). REPLACE SEALANT & BACKER ROD
AROUND ELECTRICAL PANEL.
CRACK , INJECT EPOXY THEN GROUT AT CORNICE. SEE
DETAIL 2/A-317.
REATTACH EPOXY THEN GROUT INCIPIENT SPALL. SEE
DETAIL 2/A-316.
INSTALL SEALANT AROUND OUTLET
ADD GROUT TO PATCH
NEW OUTLET COVER
REMOVE AND REPLACE LIMESTONE PANEL
NOTIFY ALRINGTON NATIONAL CEMETERY AND
CONSTRUCTION FIELD OFFICE WHEN THIS PANEL
IS REMOVED. AN INSPECTION MUST OCCUR
BEHIND THE REMOVED PANEL TO INVESTIGATE
THE REASONING OF THE EXISTING DAMAGES. THIS
PROCESS WILL BE CONDUCTED BY ANC
ENGINEERING TEAM BEFORE THE NEW PANEL IS
INSTALLED.
REPLACE MORTAR WITH SEALANT & BACKER
A 2 INCH VERTICAL JOINT THAT IS LOCATED AT THE
TOP OF THE NICHE COVERS AND IS SPACED OUT
EVERY 3RD NICHE COVER.
(ONLY ON COURTS 7 & 8)
REPOINT JOINT
REPLACE SEALANT & BACKER ROD (TYP.)
REPLACE MORTAR WITH SEALANT & BACKER ROD
(TYP.)
INJECT GROUT IN CRACK (TYP.)
CUT JOINT TO MAKE 1/4" WIDE AND FILL WITH
GROUT
REPAIR LINE LEGEND
US Army Corps of Engineers ®
SHEET ID
U S
AR
M
Y C
O R
PS
O
F
EN
G
IN
EE
R
S D
R
AW
N B
Y:
D
ES
IG
N
ED
B
Y:
SU
BM
IT
TE
D B
Y:
SI
ZE
C H
EC
KE
D B
Y:
AN
SI
'D
D
AT
E
TI
M
E
ST
AM
P:
IS
SU
E D
AT
E:
N
AO
F
IL
E N
O
G
2 3 4 5 6 7 8 9 10
F
E
D
C
B
A
SO
LI
C
IT
AT
IO
N N
O
C O
N
TR
AC
T
N O
2/ 9/
0:
:2
AM
AD306
COLUMB. 7
N O
R
F…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .