W91236-19-B-0005-0001.pdf
PDF 388 KB Posted
- Attached to
- Thimble Shoal Channel Maintenance Dredging
- Solicitation number
- W91236-19-B-0005
About this file
Amendment W91236-19-B-0005-0001
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W91236-19-B-0005 Thimble Shoal Maintenance Dredging Project, located in Hampton Roads, Virginia is hereby Amended as follow s:
Please see continuation page for full Amendment breakout
Contracting POC: Stormie Wicks (757) 201.7215 Stormie.B.Wicks@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 07-Jan-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123619B0005
X 9B. DATED (SEE ITEM 11)
18-Dec-2018
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
07-Jan-2019
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123619B0005
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE (SF 30)
The following have been added by full text:
AMENDMENT 0001
W91236-19-B-0005-0001
Please note that the Bid Opening date has not been extended as a result of Amendment 0001, and remains 1:00 PM EST, 18 January 2019. Please acknowledge all Amendments.
As a result of Amendment 0001, the following is hereby applicable:
1. Section 01 57 40, Paragraph 3.1 Subparagraph 2, add the following sentence to the end of the subparagraph:
“The contractor shall comply with all hardware, submittal, and training requirements specified in the document following this section, titled “Operations and Dredging Endangered Species System (ODESS) Guidance”.”
2. Section 01 57 40, Paragraph 3.1.8, delete the first sentence and replace with the following:
“Sea turtle trawling and relocation procedures and equipment shall comply and be conducted in accordance with the Construction and Maintenance of Chesapeake Bay Entrance Channels and use of sand borrow areas for beach nourishment (F/NER/2018/14816) Biological Opinion “Sea Turtle Trawling and Relocation Guidelines”.”
3. Section 35 20 23, Paragraph 1.21.1, add the following:
“d. Hopper dredges shall be provided with a fixed vertical ship ladder system (in compliance with the requirements of ASTM F1166-95a) as the primary means of safe access/egress for workers and visitors embarking/disembarking the vessel. A double rung or flat tread Jacob's ladders shall not be used as the vessels primary means of safe access.”
4. The following Bidder Inquiries submitted via ProjNet and corresponding answers are hereby incorporated:
Bidder Inquiry:
Drawing Sheet/Detail: Page 17 Contract Specifications 3.1.5 Placement Area Requirements Inquiry Text: The Contract Plans show Cell 5 being open for use with this Contract, but the Specifications indicate Cells 2 & 5 will be available for use. Can the Client clarify which area
W9123619B0005 will be available?
Government Response:
SECTION 35 20 23, page 17 of the specifications, paragraph 3.1.5 Placement Area Requirements, first sentence states "Place all dredged material in the Government furnished Dam Neck Ocean Disposal Site (Cells 2 & 5) for Thimble Shoal Dredged Material as shown in the contract drawings." Sheet 1 of the plan drawings, under LEGEND, the hatching defines the "Limits of Dredged Material Placement Area". Sheet 16 of the plan drawings indicates the hatched portions of Cells 2 and 5 available for placement of dredged material.
(End of Summary of Changes)
File details come from the government source that posted it.