W9123619B0001-0002_02132019.pdf
PDF 460 KB Posted
- Attached to
- Maintenance Dredging, Lynnhaven Inlet Federal contract opportunity
- Solicitation number
- W91236-19-B-0001
About this file
Amendment, W9123619B0001-0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID_OPENING_BID_ABSTRACT_02262019.pdf | ||
| LYN.2017-07-18.PS_AMENDMENTS__3.pdf | ||
| W9123619B0001-0003_02192019.pdf | ||
| LY_01_LYN_20170530_CS_A.xyz | XYZ file | |
| LYN.2017-07-18.PS_AMENDMENTS.pdf | ||
| LY_01_LYN_20170530_CS_A.met | — | |
| LYN.2017-07-18.PS_m.pdf | ||
| W9123619B0001-0001.pdf | ||
| H.01.01_PLANS_2017-07-18.pdf | ||
| H.01.04_Lynnhaven_Inlet_Maintenance_Dredging_Final_Specs_11-6-18.pdf | ||
| A.07.23_W91236-19-B-0001_01042019.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
W9123619B0001 Maintenance Dredging of the Lynnhaven Inlet Federal Navigation Project, including the Lynnhaven Entrance Channel, Turning Basin, Side Channel to Broad Bay, and Narrow s Channel located in Virginia Beach, Virginia is hereby Amended as follow s:
Please see continuation page for full Amendment breakout.
Please acknow ledge ALL amendments.
Contracting POC: Stormie Wicks (757) 201.7215 Stormie.B.Wicks@usace.army.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 11
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 13-Feb-2019
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W9123619B0001
X 9B. DATED (SEE ITEM 11)
04-Jan-2019
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
13-Feb-2019
CODE
USA ENGINEER DISTRICT, NORFOLK
803 FRONT STREET
NORFOLK VA 23510-1096
W91236 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W9123619B0001
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
SUMMARY OF CHANGES
SECTION 00 11 00 - SF 1442 AND CLIN SCHEDULE
The required response date/time has changed from 19-Feb-2019 02:00 PM to 26-Feb-2019 02:00 PM.
SECTION 00 21 00 - INSTRUCTIONS, CONDITIONS & NOTICES TO OFFERORS
The following have been added by full text:
AMENDMENT 0002
W91236-19-B-0001 Maintenance Dredging of the Lynnhaven Inlet Federal Navigation Project, including the Lynnhaven Entrance Channel, Turning Basin, Side Channel to Broad Bay, and Narrows Channel located in Virginia Beach, Virginia is hereby Amended as follows:
A. ProjNet Bidder Inquiry submission period is hereby extended to 2:00 PM EST 15 February 2019.
B. Bid Opening Date is hereby extended from 2:00 PM EST 19 February 2019 to 2:00 PM EST 26 February 2019.
C. In Specification Section 35 20 23, Paragraph 3.1.6 Special Beach Placement Area Safety
Requirements:
Delete the following language:
During night time operations, the dredge discharge pipeline and point of discharge, as well as all ramp areas provided as access across the discharge pipeline, shall be clearly marked and well lighted in a manner as approved by the Contracting Officer.
Replace with the following language:
During night time operations, the point of dredge material discharge and fenced work area shall be clearly marked and well lighted in a manner as approved by the Contracting Officer.
D. In Specification Section 35 20 23, Paragraph 3.1.9 Upland Placement Area Use and Maintenance During Placement Operations
Delete the following language:
The Contractor shall employ proper dredging and placement methods to ensure that adequate ponding depth is maintained and that a minimum of four feet of freeboard, measured at the minimum containment dike elevation, is maintained at all times.
The contractor shall immediately notify the COR if the freeboard drops below four-feet.
Replace with the following:
The Contractor shall employ proper dredging and placement methods, advancing discharge pipe and mound material to ensure that adequate ponding depth is maintained and that a minimum of two feet of freeboard, measured at the minimum containment dike elevation, is maintained at all times.
The contractor shall immediately notify the COR if the freeboard drops below two feet.
E. In Specifications Section 35 20 23, Paragraph 3.1.8 Maple Street Upland Placement Area Maintenance and Rehabilitation Construction Prior to Dredging
Delete the following:
Where dike maintenance and or construction is required, excavate materials from inside the placement area to use for dike maintenance and construction to the maximum extent practical.
Dike construction will be required to repair or rehabilitate any portion of the dike that is below the minimum height elevation of +14.0' MLLW. Dike elevations above +14.0' MLLW are acceptable. Remove trash, brush and trees (if any) from dikes and inside the placement area and dispose of in approved landfill. The entire placement area shall be blade-graded smooth to allow positive drainage to the spill box.
Replace with the following:
Where dike maintenance and or construction is required, excavate materials from inside the placement area to use for dike maintenance and construction to the maximum extent practical.
Dike construction will be required to repair or rehabilitate any portion of the dike that is below the minimum height elevation of +14.0' MLLW. Dike elevations above +14.0' MLLW are acceptable. Remove trash, brush and trees (if any) from dikes and inside the placement area and dispose of in approved landfill. In-situ material above the proposed surface, as detailed in the drawings, shall be excavated in a manner that promotes positive drainage to the spillbox.
Delete the following:
If the walkway requires replacement, the walkway shall be constructed from the +14.0' elevation on the finished dike to the spill box.
Replace with the following:
A walkway will need to be constructed with the rehabilitation of the upland placement site. The walkway shall be constructed from the +14.0' elevation on the finished dike to the spill box.
Add the following:
3.1.8.1 Diversion (Spur) Dike Construction
Construction of a diversion (spur) dike is required with the rehabilitation of the upland placement site. The dike will be constructed to a height of +14.0’ with a 2 on 1 side slope as indicated in the drawings. Satisfactory excavated soil material within the Maple Street placement site shall be used for construction of the dike as indicated and specified. Fill material for dike construction shall be placed in lifts not to exceed 12 inches. The alignment of the dike, along with typical section views showing horizontal details of required excavation and dike construction, shall be as indicated. The required spur dike shall be constructed to a minimum height elevation, top berm width, and side slopes as indicated in the drawings. The 12 inch lifts shall be compacted by using a minimum of one pass with a roller, sheeps-foot compactor, or other standard equipment. No compaction tests will be required.
F. In Specification Section 01 57 20, Paragraph 3.12 Post Construction Cleanup
The Contractor will clean up all areas used for construction in accordance with Contract Clause:
"Cleaning Up". Unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work. The disturbed area must be graded, filled and the entire area seeded unless otherwise indicated.
Replace with the following:
The Contractor will clean up all areas used for construction in accordance with Contract Clause:
"Cleaning Up". Unless otherwise instructed in writing by the Contracting Officer, obliterate all signs of temporary construction facilities such as haul roads, work area, structures, foundations of temporary structures, stockpiles of excess or waste materials, and other vestiges of construction prior to final acceptance of the work. The disturbed area must be graded and filled.
G. In Specification Section 01 57 20, Paragraph 3.3.5.1 Protection
Add the following:
The Contractor shall conduct placement operations at the Narrows Beach Placement Area in a manner to prevent or best minimize impact to the adjacent shellfish ground detailed on the drawings. The Contractor shall not float pipe over the shellfish ground that lies adjacent the Narrows Beach Placement Area except as approved by the Contracting Officer.
H. In Specification Section 01 22 00, Paragraph 1.3.2 Payment Item No. 0002 Maple St.
Upland Placement Area Maintenance and Rehabilitation Construction
The finished product shall conform to what is outlined in Section 35 20 23 Subpart 3.1.8 "Maple St. Upland Placement Area maintenance and Rehabilitation Construction Prior to Dredging" including, but not limited to:.
-Dike / Berm Repair -Grading -Spillbox Repair -Debris Removal
Replace with the following:
The finished product shall conform to what is outlined in Section 35 20 23 Subpart 3.1.8 "Maple St. Upland Placement Area maintenance and Rehabilitation Construction Prior to Dredging" including, but not limited to:.
-Diversion (Spur)Dike Construction -Dike / Berm Repair -Excavation and Grading
-Walkway Construction -Spillbox Repair -Debris Removal
I. Delete Plan Sheet 4 and replace with the attached Plan Sheet 4.
- Labels an area adjacent (west) the Turning Basin that may be used as a staging area and material storage location by the contractor.
J. Delete Plan Sheet 13 and replace with the attached Plan Sheet 13.
- Modified the Beach placement design for Narrows Beach.
K. Delete Plan Sheet 22 and replace with the attached Plan Sheet 22.
- Modified the Maple Street Placement Area Notes
- Labeled the proposed surface on sections C – C’ and D – D’
L. Original plan sheets including the revised drawings associated with this amendment are attached.
M. Bidder Inquiries and corresponding Government Responses from ProjNet are hereby incorporated:
Inquiry ID: 7802734 Question - Can the Owner please send out a set of large set scaled drawings? Currently the plan drawings provided for this project is scanned in on an 8 ½ x 11 sheet, which when you blow these plans up to a larger scale they become distorted and you cannot read them.
Government response to Inquiry ID: 7802734 Noted. Rescaled plan drawings will be provided by amendment.
Inquiry ID: 7804808 Question - Please delete plan drawing sheets 16 & 17 and replace with cross sections that represent the actual conditions of the surveys provided in the other drawings.
You are currently showing approximately 9’ of bank on all of your cross sections which is not even close to what is actually existing in the cuts. This is very misleading.
Government response to Inquiry ID: 7804808 Referenced drawings illustrate the required, allowable, and permitted depths with regard to the contract pay prism volume. Cross sections are not intended to represent the existing volume in the cuts. An XYZ file of the hydrographic survey will be provided by amendment.
Inquiry ID: 7804872 Sec 35 20 23 Pg. 19. Reference - "During night time operations, the dredge discharge pipeline and point of discharge, as well as all ramp areas provided as access across the discharge pipeline, shall be clearly marked and well lighted in a manner as approved by the contracting officer".
Evaluation - Since the maximum distance between sand ramps is 500' and the Virginia Beach placement site is approximately 10,000' long, this means that the contractor would have to have around 19-20 LIGHTED ramps during nighttime operations.
Question - Is the Owner wanting the Contractor to light each ramp that goes over the discharge pipe during night operations? This would require several generators running through the night to power the lights. I'm assuming that the property owners will not be receptive of this.
Government response to Inquiry ID: 7804872 Contractor will not be responsible for lighting all sand ramps. Specifications Sec 35 20 23 paragraph 3.1.6, Special Beach Placement Area Safety Requirements, have been amended to reflect this.
Inquiry ID: 7804880 Question - Please confirm there are no "Time of Year" restrictions for this project.
Government response to Inquiry ID: 7804880 There are no time of year restrictions for this project.
Inquiry ID: 7804881 Question - Please confirm there is no "new work dredging" to be performed on this project and that the entire project is considered to be maintenance work.
Government response to Inquiry ID: 7804881 There is no new work dredging to be performed on this project and the entire project is considered maintenance work.
Inquiry ID: 7804906 Sec. 35 20 23 Pg. 20. Reference - "....ponding depth is maintained and that a minimum of four feet of freeboard, measured at the minimum containment dike elevation, is maintained at all times.
Question - What is the total capacity in cubic yards of the upland placement site when figuring in an elevation of 14' for the dikes and a 4' freeboard requirement?
Government response to Inquiry ID: 7804906 There is a nominal 40,000 cubic yards of capacity in the Maple St. Upland Site based on ponding and freeboard requirements once the placement area is rehabilitated to the design provided in the plans and specifications.
Inquiry ID: 7804936 Sec. 35 20 23 Pg. 20. Reference - "Per direction of the Contracting Officer, the spillbox and/or walkway may be required to be either repaired or replaced".
Question - Since it is ultimately up to the Contracting Officer whether or not the spillbox and/or walkway will be required to be either repaired or replaced, then would this item of work be considered a change order to the Contract price?
A Contractor cannot be held liable to replaced something at their cost when we do not know if the work is going to be required or not. It would be fair for everyone involved if this item of work was determined upon the inspection of the Contracting Officer.
Government response to Inquiry ID: 7804936 The Contractor will need to replace the walkway during rehabilitation of the upland site.
Specifications will be amended to include the required walkway replacement. The current spillbox structure will not need to be replaced or repaired.
Inquiry ID: 7806911 Question - Please send out a Coordinate table for the PI's on the upland placement site for the center lines.
Government response to Inquiry ID: 7806911 Requested Information is not available at this time.
Inquiry ID: 7806914 Reference - You currently do not have any detailed drawings or cross sections of the proposed levee work. The Contractor needs to have drawings showing the proposed work to be performed at the upland placement site.
Question - Please send out plan drawings showing existing conditions along with proposed work to be performed at the upland placement site.
Government response to Inquiry ID: 7806914 Plan drawing sheets 19 – 22 show detailed drawings of the upland placement site existing conditions and proposed levee work. Cross sections (A-D) that display existing and proposed surface are on plan drawing sheets 21 & 22. Cross sections to scale show elevations of proposed rehabilitated elevations and side slopes.
Inquiry ID: 7806919 Reference - Surveys of the upland placement site.
Question - Will any surveys be required of the upland placement site? If so, who will be responsible for performing these surveys? If it is the Contractors responsibility, please send out a specification detailing the requirements of the survey.
Government response to Inquiry ID: 7806919 No contractor submitted surveys of the Maple Street Upland Placement Site will be required after rehabilitation or after placement of dredged material.
Inquiry ID: 7806922 Reference - You are showing a cross dike on plan drawing 20.
Question - Is building a new cross dike required for the upland placement area? If so, please give some detailed information regarding this.
Government response to Inquiry ID: 7806922 Yes, in addition to Specifications section 3.1.8, Maple Street Upland Placement Area Maintenance and Rehabilitation Construction Prior to Dredging, please refer to detailed drawings on sheet 20 cross sections A – D and those associated profiles on sheet 21 & 22.
A diversion (spur) dike will be required to be constructed as indicated on sheets 20 and 22, profile C, to ensure adequate settlement time to meet state effluent water quality standards.
Inquiry ID: 7809966 Question - Please include the wage scale for the upland placement site work.
Government response to Inquiry ID: 7809966 Please refer to the Heavy construction wage determination scale that has been provided with the solicitation for the upland placement site work.
Inquiry ID: 7814931 Sec 01 57 20 pg. 12 Reference - "The disturbed area must be graded, filled and the entire area seeded unless otherwise indicated".
Question - To what degree will seeding be required for this project? Does the top of the levees and inside slopes need to be seeded?
Government response to Inquiry ID: 7814931 Seeding will not be required. Specifications Sec 01 57 20 paragraph 3.12 will be revised by amendment.
Inquiry ID: 7815013 Reference - www.fbo.gov "Maple St. Upland Placement Area will require site maintenance and rehabilitation before dredging operations to include, construction of a spur dike, site grading, and spillbox repair".
Evaluation - The only place that talks about constructing a spur dike is in the advertisement found on the FBO website. There is nothing in the specs which mention the construction of a spur dike, nor does it give any detail on if any compaction requirements are required.
The plan drawings sheet 20 of 22 show a spur dike, and plan drawing 22 of 22 shows a cross section but no other information is given.
Question - Please include language in the specifications regarding building a spur dike if in fact it is required for this project.
Government response to Inquiry ID: 7815013
A spur dike is required as indicated in the solicitation and seen on plan drawing sheets 20 and 22.
Specification section 35 20 23 paragraph 3.1.8 will be amended to include language regarding construction of the spur dike.
Inquiry ID: 7833030 Reference - "Contractor designated acceptance sections shall be for contiguous areas, the full width of the channel, identified by station numbers, and shall not exceed three acceptance sections for the entire dredging area".
Evaluation - It seems by the wording of this spec, that only 3 acceptance sections will be allowed for the entire dredging project as a whole.
Question - If only three acceptance sections are in fact allowed on this project, then we would like to request that 5 acceptance sections be allowed on this project for the following areas:
* Entrance Channel
* Turning Basin, Long Creek Side Channel, & Channel to Broad Bay 95+00 to + 106+19.
* Channel to Broad Bay 0+00 to 19+00
* Channel to Broad Bay 65+00 to 68+00 / 72+00 to 74+00 / 84+00 to 90+00
* Narrows Channel
Notes: The entrance channel needs to have its own acceptance sections due to the volatile nature of this work. This will also save cost on the overall project due to the Contractor not needing to figure in as much sweeping due to the area shoaling in.
The Broad Bay sections also needs their own acceptance sections on each side of the bridge due to the contractor having to tear down their equipment before going to the next area.
Government response to Inquiry ID: 7833030 Five acceptance sections will not be allowed for this project. Due to the slow shoaling rate in the inner portions of the project, the contract will allow three acceptance sections.
Inquiry ID: 7833042 Question - Please confirm that all Base Bid Items will be awarded prior to the award of the Option Bid Items.
Government response to Inquiry ID: 7833042 As indicated in the solicitation, base bid items and optional items will be awarded concurrently.
Optional Items will be awarded, if deemed feasible by the Government, at the time of base contract award.
Inquiry ID: 7833757 Do we use 'Standard Form 24 (Rev. 8-2016)' for the bid bond?
Government response to Inquiry ID: 7833757 Yes.
Inquiry ID: 7833771 Will we be permitted to work 24/7 on this project?
Government response to Inquiry ID: 7833771 Yes, the contractor will be permitted to work 24/7 on the project.
Inquiry ID: 7833780 What is the desired NTP timing?
Government response to Inquiry ID: 7833780 The intent of the Government is to issue NTP as soon as possible, in accordance with Norfolk District normal business procedures.
Inquiry ID: 7833792 Were portable dredges used on this project previously? And if so, where were they assembled?
Government response to Inquiry ID: 7833792.
Portable dredges have not been used in the last 4 iterations of the hydraulic maintenance dredging. Should a portable dredge need to be assembled, the Crab Creek Maintenance Area and bulkhead, adjacent the Turning Basin and south of the Lynnhaven Boat Ramp and Beach Facility, may be used.
Inquiry ID: 7833795 Where would be the preferred location for setting up office trailer and material storage site?
Government response to Inquiry ID: 7833795 Temporary Office trailers are not required for this project. Should the Contractor desire to set up temporary office trailers they shall be responsible for securing the necessary provisions for operation of the facilities. The preferred location for setting up office trailer and material storage site is the Crab Creek maintenance area, adjacent the Turning Basin, south of the Crab Creek Lynnhaven Boat Ramp and Beach Facility.
Inquiry ID: 7833797 What size dredge was used last to pump into the Maple St. Upland Placement Area and did the operator require any polymer to maintain the clarified water requirement at the spill box?
Government response to Inquiry ID: 7833797 An 18” hydraulic cutterhead dredge was last used to pump into Maple St. Upland Site. The operator did not require any polymer to achieve the effluent water quality standards at the spillbox. No add mixture, or other substances will be allowed to be mixed, added with the dredged material to achieve effluent water quality standards.
Inquiry ID: 7833802 Where would be the preferred location for crew changes and personnel transfer to boats?
Government response to Inquiry ID: 7833802 The preferred location for crew changes and personnel transfer to boats is the Crab Creek Lynnhaven Boat Ramp and Beach Facility and bulkhead at the Crab Creek Maintenance Area.
Inquiry ID: 7833803 Is trenching below channel grade for submerged pipelines required?
Government response to Inquiry ID: 7833803 Trenching in support of submerged pipelines is currently not anticipated to be required for this project. Should pipeline be required to be placed across the bottom of the channel to support dredging operations, it will be placed in a manner to not obstruct navigation or become a hazard to navigation. Whether trenched or weighted down, the top of pipeline shall not encroach into Federal channel prism.
Inquiry ID: 7833812 Where would be the preferred location for fuel storage and transfer?
Government response to Inquiry ID: 7833812 The preferred location for fuel storage and transfer is the Crab Creek Maintenance Area and Bulkhead adjacent the Turing Basin and South of the Lynnhaven Boat Ramp and Beach Facility.
(End of Summary of Changes)