BID_OPENING_BID_ABSTRACT_02262019.pdf
PDF 210 KB Posted
- Attached to
- Maintenance Dredging, Lynnhaven Inlet Federal contract opportunity
- Solicitation number
- W91236-19-B-0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| LYN.2017-07-18.PS_AMENDMENTS__3.pdf | ||
| W9123619B0001-0003_02192019.pdf | ||
| LY_01_LYN_20170530_CS_A.xyz | XYZ file | |
| W9123619B0001-0002_02132019.pdf | ||
| LYN.2017-07-18.PS_AMENDMENTS.pdf | ||
| LY_01_LYN_20170530_CS_A.met | — | |
| LYN.2017-07-18.PS_m.pdf | ||
| W9123619B0001-0001.pdf | ||
| H.01.01_PLANS_2017-07-18.pdf | ||
| H.01.04_Lynnhaven_Inlet_Maintenance_Dredging_Final_Specs_11-6-18.pdf | ||
| A.07.23_W91236-19-B-0001_01042019.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91236-19-B-0001 LYNNHAVEN INLET Maintenance Dredging Bid Opening: 26 Feb 2019 2:00 PM EST
GOVERNMENT ESTIMATE
BASE TITLE Est QTY UNIT UNIT PRICE Est AMOUNT CLIN 0001 Mobilization/Demobilization BASE 1.00 Job $1,155,488.42 $1,155,488.42
CLIN 0002
Rehab and Maintenance of Maple St Upland Placement Are, including all associated site work BASE 1.00 Job $141,347.85 $141,347.85
CLIN 0003
Maintenance dredging the Entrance Channel, Turning Basin, Long Creek Side Channel, and portions of the Channel to Broad Bay to specified required depths with one foot allowable overdepth BASE 128,400.00 CY $14.95 $1,919,580.00
CLIN 0004
Maintenance dredging portions of the Channel to Broad Bay to -9 feet MLLW required depth with one foot of allowable overdepth BASE 5,000.00 CY $29.18 $145,900.00
CLIN 0005
Maintenance dredging Narrowns Channel to -7 feet MLLW required depth with one foot allowable overdepth BASE 6,000.00 CY $27.23 $163,380.00
TOTAL (BASE YEAR) $3,525,696.27
OPTIONS TITLE Est QTY UNIT UNIT PRICE Est AMOUNT
CLIN 0006
Maintenance dredging the Entrance Channel, Turning Basin, Long Creek side Channel, and portions of the Channel to Broad Bay to one additional foot of required depts, with one foor of allowable overdepth OPTION 41,800.00 CY $13.45 $562,210.00
CLIN 0007
Maintenance dredging portions of the Channel to Broad Bay to one addiitonal foot of required depth, -10 MLLW, with one foot of allowable overdepth OPTION 6,100.00 CY $24.08 $146,888.00
TOTAL (OPTIONS) $709,098.00
BASE YEAR (CLINS 0001-0005)
OPTIONS (CLINS 0006-0007)
Total Evaluated Price (Base + ALL Options)
Prepared By: Stormie Wicks, Contract Specialist
Approved By: Eartha D. Garrett, Contracting Officer
$3,525,696.27 $709,098.00
$4,234,794.27
W91236-19-B-0001 LYNHAVVEN INLET Maintenance Dredging Bid Opening: 26 Feb 2019 2:00 PM EST
Cottrell Contracting Corporation BASE TITLE Est QTY UNIT UNIT PRICE Est AMOUNT CLIN 0001 Mobilization/Demobilization BASE 1.00 Job $1,260,000.00 $1,260,000.00
CLIN 0002
Rehab and Maintenance of Maple St Upland Placement Are, including all associated site work BASE 1.00 Job $25,000.00 $25,000.00
CLIN 0003
Maintenance dredging the Entrance Channel, Turning Basin, Long Creek Side Channel, and portions of the Channel to Broad Bay to specified required depths with one foot allowable overdepth BASE 128,400.00 CY $6.40 $821,760.00
CLIN 0004
Maintenance dredging portions of the Channel to Broad Bay to -9 feet MLLW required depth with one foot of allowable overdepth BASE 5,000.00 CY $25.00 $125,000.00
CLIN 0005
Maintenance dredging Narrowns Channel to -7 feet MLLW required depth with one foot allowable overdepth BASE 6,000.00 CY $30.00 $180,000.00
TOTAL (BASE YEAR) $2,411,760.00
OPTIONS TITLE Est QTY UNIT UNIT PRICE Est AMOUNT
CLIN 0006
Maintenance dredging the Entrance Channel, Turning Basin, Long Creek side Channel, and portions of the Channel to Broad Bay to one additional foot of required depts, with one foor of allowable overdepth OPTION 41,800.00 CY $6.40 $267,520.00
CLIN 0007
Maintenance dredging portions of the Channel to Broad Bay to one addiitonal foot of required depth, -10 MLLW, with one foot of allowable overdepth OPTION 6,100.00 CY $28.00 $170,800.00
TOTAL (OPTIONS) $438,320.00
BASE YEAR (CLINS 0001-0005)
OPTIONS (CLINS 0006-0007)
Total Evaluated Price (Base + ALL Options)
$2,411,760.00 $438,320.00
$2,850,080.00
W91236-19-B-0001 LYNHAVVEN INLET Maintenance Dredging Bid Opening: 26 Feb 2019 2:00 PM EST
Southwind Construction Corp.
BASE TITLE Est QTY UNIT UNIT PRICE Est AMOUNT CLIN 0001 Mobilization/Demobilization BASE 1.00 Job $1,330,233.42 $1,330,233.42
CLIN 0002
Rehab and Maintenance of Maple St Upland Placement Are, including all associated site work BASE 1.00 Job $130,308.82 $130,308.82
CLIN 0003
Maintenance dredging the Entrance Channel, Turning Basin, Long Creek Side Channel, and portions of the Channel to Broad Bay to specified required depths with one foot allowable overdepth BASE 128,400.00 CY $10.97 $1,408,548.00
CLIN 0004
Maintenance dredging portions of the Channel to Broad Bay to -9 feet MLLW required depth with one foot of allowable overdepth BASE 5,000.00 CY $28.49 $142,450.00
CLIN 0005
Maintenance dredging Narrowns Channel to -7 feet MLLW required depth with one foot allowable overdepth BASE 6,000.00 CY $25.29 $151,740.00
TOTAL (BASE YEAR) $3,163,280.24
OPTIONS TITLE Est QTY UNIT UNIT PRICE Est AMOUNT
CLIN 0006
Maintenance dredging the Entrance Channel, Turning Basin, Long Creek side Channel, and portions of the Channel to Broad Bay to one additional foot of required depts, with one foor of allowable overdepth OPTION 41,800.00 CY $9.90 $413,820.00
CLIN 0007
Maintenance dredging portions of the Channel to Broad Bay to one addiitonal foot of required depth, -10 MLLW, with one foot of allowable overdepth OPTION 6,100.00 CY $16.99 $103,639.00
TOTAL (OPTIONS) $517,459.00
BASE YEAR (CLINS 0001-0005)
OPTIONS (CLINS 0006-0007)
Total Evaluated Price (Base + ALL Options)
$3,163,280.24 $517,459.00
$3,680,739.24
W91236-19-B-0001 LYNNHAVEN INLET Maintenance Dredging Bid Opening: 26 Feb 2019 2:00 PM EST
DredgIt Environmental Corporation BASE TITLE Est QTY UNIT UNIT PRICE Est AMOUNT CLIN 0001 Mobilization/Demobilization BASE 1.00 Job $1,223,824.00 $1,223,824.00
CLIN 0002
Rehab and Maintenance of Maple St Upland Placement Are, including all associated site work BASE 1.00 Job $50,174.00 $50,174.00
CLIN 0003
Maintenance dredging the Entrance Channel, Turning Basin, Long Creek Side Channel, and portions of the Channel to Broad Bay to specified required depths with one foot allowable overdepth BASE 128,400.00 CY $21.43 $2,751,612.00
CLIN 0004
Maintenance dredging portions of the Channel to Broad Bay to -9 feet MLLW required depth with one foot of allowable overdepth BASE 5,000.00 CY $61.02 $305,100.00
CLIN 0005
Maintenance dredging Narrowns Channel to -7 feet MLLW required depth with one foot allowable overdepth BASE 6,000.00 CY $36.01 $216,060.00
TOTAL (BASE YEAR) $4,546,770.00
OPTIONS TITLE Est QTY UNIT UNIT PRICE Est AMOUNT
CLIN 0006
Maintenance dredging the Entrance Channel, Turning Basin, Long Creek side Channel, and portions of the Channel to Broad Bay to one additional foot of required depts, with one foor of allowable overdepth OPTION 41,800.00 CY $19.29 $806,322.00
CLIN 0007
Maintenance dredging portions of the Channel to Broad Bay to one addiitonal foot of required depth, -10 MLLW, with one foot of allowable overdepth OPTION 6,100.00 CY $54.92 $335,012.00
TOTAL (OPTIONS) $1,141,334.00
BASE YEAR (CLINS 0001-0005)
OPTIONS (CLINS 0006-0007)
Total Evaluated Price (Base + ALL Options)
$4,546,770.00 $1,141,334.00
$5,688,104.00
| GOV EST |
| Cottrell |
| Southwind |
| DredgeIt |
| 2019-02-27T12:18:45-0500 | |
| WICKS.STORMIE.B.1115654078 |
| 2019-02-27T12:39:47-0500 | |
| GARRETT.EARTHA.D.1045443074 |