Amendment_0002.pdf

PDF 7 MB Posted

Attached to
Lighting Upgrade (ECIP) Federal contract opportunity
Solicitation number
W9123618B0004
Issued by
Department of the Army Corps of Engineers Engineering District Norfolk

About this file

Amendment 0002

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

Solicitation W9123618B0004, Lighting Upgrade (ECIP)

The purpose of this amendment is to add Ft. Lee Veh Maint Bldgs photometric draw ings sheets FC101-102, FC109-112 and FC114.

Update draw ings EL110-113 and EL501.

Update Bid Schedule for Option CLINs 0002 - 0006.

Contracting POC: Temekka Ellis, temekka.s.ellis@usace.army.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 05-Jun-2018

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123618B0004

X 9B. DATED (SEE ITEM 11)

14-May-2018

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

05-Jun-2018

CODE

USA ENGINEER DISTRICT, NORFOLK

803 FRONT STREET

NORFOLK VA 23510-1096

W91236 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123618B0004

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 11 00 - SOLICITATION, OFFER & AWARD

CLIN 0002

The CLIN extended description has changed from:

All work related to the replacement of existing metal halide high-bay lighting fixtures with LED fixtures, re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18029 (Sheets ELD101 & EL101), exclusive of CLINs 0001 and 0003 thru 0007.

To:

All work related to re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18029 (Sheets ELD101 & EL101), exclusive of CLINs 0001 and 0003 thru 0007.

CLIN 0003

The CLIN extended description has changed from:

All work related to the replacement of existing metal halide high-bay lighting fixtures with LED fixtures, re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18030 (Sheets ELD102 & EL102), exclusive of CLINs 0001 thru 0002 and and 0004 thru 0007.

All work related to re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18030 (Sheets ELD102 & EL102), exclusive of CLINs 0001 thru 0002 and and 0004 thru 0007.

CLIN 0004

The CLIN extended description has changed from:

All work related to the replacement of existing metal halide high-bay lighting fixtures with LED fixtures, re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18038 (Sheets ELD107 & EL107), exclusive of CLINs 0001 thru 0003 and 0005 thru 0007.

All work related to re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18038 (Sheets ELD107 &

W9123618B0004

EL107), exclusive of CLINs 0001 thru 0003 and 0005 thru 0007.

CLIN 0005

The CLIN extended description has changed from:

All work related to the replacement of existing metal halide high-bay lighting fixtures with LED fixtures, re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18039 (Sheets ELD108 & EL108), exclusive of CLINs 0001 thru 0004 and 0006 thru 0007.

To:

All work related to re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18039 (Sheets ELD108 & EL108), exclusive of CLINs 0001 thru 0004 and 0006 thru 0007.

CLIN 0006

The CLIN extended description has changed from:

All work related to the replacement of existing metal halide high-bay lighting fixtures with LED fixtures, re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18040 (Sheets ELD109 & EL109), exclusive of CLINs 0001 thru 0005 and 0007.

To:

All work related to re-circuiting existing fluorescent emergency fixtures to be on separate circuits from other lighting, associated light controls, switching, and other incidental work - in BUILDING B18040 (Sheets ELD109 & EL109), exclusive of CLINs 0001 thru 0005 and 0007.

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 3 FT LEE VEHICLE

MAINT BLDGS Lighting Upgrade Photometrics

7 05-JUN-2018

Attachment 4 Amended Drawings 5 05-JUN-2018

(End of Summary of Changes)

US Army Corps of Engineers ®

SHEET 29OF

SHEET ID

M O

D

ER

N

IZ

E H

IG

H

-B A

Y

LI

G H

TI

N

G

VE

H

IC

LE

M

A

IN

TE

N

A N

C E

B U

IL

D

IN

G

S D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

x3

KJ

N

ER

T

KJ

N

KJ

N

N O

VE

M

BE

R

5, FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1 2 3 4 5

D

C

B

A

FO

R

T

LE

E, V

IR

G

IN

IA

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N O

R

FO

LK

D

IS

TR

IC

T

N O

R

FO

LK

, V

A W

7B

EL110

N

EW

W O

R K

PL

AN

AR

EA

'A

BU

IL

D

IN

G

SHEET 29OF

SHEET ID

M O

D

ER

N

IZ

E H

IG

H

-B A

Y

LI

G H

TI

N

G

VE

H

IC

LE

M

A

IN

TE

N

A N

C E

B U

IL

D

IN

G

S D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

x3

KJ

N

ER

T

KJ

N

KJ

N

N O

VE

M

BE

R

5, FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1 2 3 4 5

D

C

B

A

FO

R

T

LE

E, V

IR

G

IN

IA

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N O

R

FO

LK

D

IS

TR

IC

T

N O

R

FO

LK

, V

A W

7B

EL111

N

EW

W O

R K

PL

AN

AR

EA

'B

BU

IL

D

IN

G

SHEET 29OF

SHEET ID

M O

D

ER

N

IZ

E H

IG

H

-B A

Y

LI

G H

TI

N

G

VE

H

IC

LE

M

A

IN

TE

N

A N

C E

B U

IL

D

IN

G

S D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

x3

KJ

N

ER

T

KJ

N

KJ

N

N O

VE

M

BE

R

5, FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1 2 3 4 5

D

C

B

A

FO

R

T

LE

E, V

IR

G

IN

IA

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N O

R

FO

LK

D

IS

TR

IC

T

N O

R

FO

LK

, V

A W

7B

EL112

N

EW

W O

R K

PL

AN

AR

EA

'C

BU

IL

D

IN

G

SHEET 29OF

SHEET ID

M O

D

ER

N

IZ

E H

IG

H

-B A

Y

LI

G H

TI

N

G

VE

H

IC

LE

M

A

IN

TE

N

A N

C E

B U

IL

D

IN

G

S D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

x3

KJ

N

ER

T

KJ

N

KJ

N

N O

VE

M

BE

R

5, FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1 2 3 4 5

D

C

B

A

FO

R

T

LE

E, V

IR

G

IN

IA

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N O

R

FO

LK

D

IS

TR

IC

T

N O

R

FO

LK

, V

A W

7B

EL113

N

EW

W O

R K

PL

AN

AR

EA

'D

BU

IL

D

IN

G

SHEET 29OF

SHEET ID

M O

D

ER

N

IZ

E H

IG

H

-B A

Y

LI

G H

TI

N

G

VE

H

IC

LE

M

A

IN

TE

N

A N

C E

B U

IL

D

IN

G

S D

R

AW

N B

Y:

D

ES

IG

N

ED

B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

C H

EC

KE

D B

Y:

x3

KJ

N

ER

T

KJ

N

KJ

N

N O

VE

M

BE

R

5, FI

LE

N

AM

E:

IS

SU

E D

AT

E:

C O

N

TR

AC

T

N O

SO

LI

C

IT

AT

IO

N N

O

FI

LE

N U

M

BE

R

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

1 2 3 4 5

D

C

B

A

FO

R

T

LE

E, V

IR

G

IN

IA

U S

A R

M Y

C O

R

PS

O F

EN

G

IN

EE

R S

N O

R

FO

LK

D

IS

TR

IC

T

N O

R

FO

LK

, V

A W

7B

EL501

LI

G

H

TI

N G

D

ET

AI

LS

File details come from the government source that posted it.