Attachment_3_Bid_Schedule.pdf
PDF 15 KB Posted
- Attached to
- James River Streambank Stabilization Project (JRSSP) Federal contract opportunity
- Solicitation number
- W91236-18-B-0003
About this file
Attachment 3_Bid_Schedule.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BRRO-18-082_Combined_Stormwater_Management_and_Erosion_Sediment_Plan.pdf | ||
| Attachment_9_CORRECTED_Wingina_Nutrient_Bank_Sales_Quote_Letter_7.6.18.pdf | ||
| Attachment_8_References_PS_Amendment_1.pdf | ||
| Attachment_5_Wingina_Nutrient_Bank_Sales_Quote_Letter_7.6.18.pdf | ||
| Attachment_6_Q&A.pdf | ||
| Attachment_2_Plan.pdf | ||
| Attachment_7_JRSSP_Site_Visit_Participant_List.pdf | ||
| Attachment_4_Wingina_Nutrient_Bank_Credit_Availability_Letter__7.6.18.pdf | ||
| Attachment_1_Solicitation_Amendment_0001.pdf | ||
| Attachment_2b_Specifications.pdf | ||
| Attachment_1_Solictation.pdf | ||
| Attachment_3_Bid_Schedule.pdf | ||
| Attachment_2a_Final_Drawings.pdf | ||
| Attachment_2a_Final_Drawings.pdf | ||
| Attachment_2b_Specifications.pdf | ||
| Attachment_3_Bid_Schedule.pdf | ||
| Attachment_1_Solictation.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT_3_BID_SCHEDULE_V2.DOCX 10-JUL-18
IFB NUMBER: ________________________________
OFFEROR’S NAME: ____________________________
CONTRACT LINE ITEM SCHEDULE
Item No. Description Quantity Unit Line Item Price Amount
SCHEDULE I – BASE BID
0001 Mobilization and demobilization, complete, including all work incidental thereto, as shown on the drawings and specified, excluding items 0002 thru
0007. 1 LS XXX $_____________
0002 Mussel survey and mussel relocation, complete, including all work incidental thereto, as shown on the drawings and specified, excluding item 0001 and items 0003 thru 0007. 1 LS XXX $_____________
0003 All Sitework, complete, including all work incidental thereto, as shown on the drawings and specified, excluding items 0001, 0002, and items 0004 thru 0007. 1 LS XXX $_____________
0004 Marine Filter Mattress, complete, including all work and specified, excluding items 0001 thru 0003, and 0005 thru 0007. 1 LS XXX $_____________
0005 Gabion stone, complete, including all work and specified, excluding items 0001 thru 0004 0006 and 0007. 3,638 TONS $$$/TON $_____________
0006 VDOT Class II Armor Stone, complete, including all work incidental thereto, as shown on the drawings and specified, excluding items 0001 thru 0005 and 0007. 7,154 TONS $$$/TON $_____________
0007 VDOT #21A Stone for construction road, complete, including all work incidental thereto, as shown on the drawings and specified, excluding items 0001 thru 0006. 1,350 TONS $$$/TON $_____________
TOTAL SCHEDULE I – BASE BID