This document is an Amendment to Solicitation W911XK25Q0006 for asbestos removal services at the Sault Sainte Marie Project Office in Michigan. The amendment provides responses to questions received from potential offerors regarding the project details, including information about the size of the transite panels, site access, and equipment requirements. The government indicates the work needs to be performed from ladders, portable scaffolding, or ground level, as equipment access is not feasible. Dumpster space can be arranged near the site. Offerors are advised to plan mobilization and demobilization via foot or electric carts that can fit through the lock gates. The amendment does not change any other terms and conditions of the original solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Plumbing Vent Box.jpg | JPG image | |
| Stair Structure.jpg | JPG image | |
| Asbestos Panels.jpg | JPG image | |
| Solicitation W911XK25Q0006.pdf | ||
| Combined Synopsis Solicitation Asbestos Disposal Sault Sainte Marie Project Office.pdf | ||
| Sault Ste. Marie Project Site Access Instructions for Contractors.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
Sault Sainte Marie Project Off ice Asbestos Removal
The purpose of Amendment 0001 is to provide Government responses to questions received through October 9, 2024.
All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 10-Oct-2024
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK25Q0006
X 9B. DATED (SEE ITEM 11)
07-Oct-2024
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
10-Oct-2024
CODE
U.S.ARMY ENGINEER DISTRICT, DETROIT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK25Q0006
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 30 - BLOCK 14 CONTINUATION PAGE
The following have been added by full text:
REQUESTS FOR INFORMATION
1. When do you plan to do this project?
GOVERNMENT RESPONSE: As soon as possible.
2. We did a project with OCCI a couple of years back on 2 surge arrestor buildings. Are the transite panels the about the same size 4’x10’?
GOVERNMENT RESPONSE: The panels are approximately 48” x 108”.
3. Do you have pictures, or can we have an onsite visit before quote?
GOVERNMENT RESPONSE: Pictures are provided in the attached document within the solicitation posting on SAM.gov. A site visit may be arranged. Site visits may be scheduled by contacting Stacey Swanson via email at stacey.l.swanson@usace.army.mil or via phone at 906-632-2595.
4. Is there anything special that we would need to do to get equipment (lifts, telehandler), dumpster and materials to the project site?
GOVERNMENT RESPONSE: Work needs to take place from ladders, portable scaffolding, ground level, etc. Equipment access is not feasible. Dumpster is only feasible land side, space for a dumpster for the duration of the contract can be arranged near the Depot Lot or Storage Yard. Contractor should plan to mobilize and demobilize personnel, equipment, supplies, and waste by foot or utilize electric carts (Cushman, Taylor Dunn, or similar) and wagons that fit across the lock gates, which are slightly less than 48” between handrails width, with 1/3 angled miter at middle.
5. What is the height of the wood box chimney?
GOVERNMENT RESPONSE: The plumbing stack box is approximately 16” wide, 12” deep and 8’ tall, the structure around the vent box is 7’ across the bottom, 7’ tall and 36” deep.
(End of Summary of Changes)