Abstract of Bids (Monroe Harbor).pdf
PDF 116 KB Posted
- Attached to
- FY20 Maintenance Dredging Monroe Harbor, MI
- Solicitation number
- W911XK20B0010
About this file
This abstract of bids is for a firm-fixed price construction contract to perform maintenance dredging of Monroe Harbor in Michigan. Six contractors submitted bids by the July 27th deadline to mobilize equipment, dredge 73,000 cubic yards of material within project limits, and place dredged material in designated confined disposal facilities. Pricing was provided for base dredging work and optional additional dredging quantities. Total bid prices ranged from $1,342,948 to $3,348,000. The low bidder, Luedtke Engineering Company, proposed prices of $1,342,948 for the base work and $1,661,700 including all options. This opportunity is set aside 100% for small businesses with a North American Industry Classification System Code of 237990 and an estimated value between $1,000,000 to $1,500,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FY20 MD Monroe - Specifications - Certified Final RTA.pdf | ||
| FY20 MD Monroe - Plans - Certified Final RTA.pdf | ||
| W911XK20B0010.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
6/26/20 7/27/20 1 2
0001 MOBILIZATION &
DEMOBILIZATION 1 Job $ 113,052.00 $ 113,052.00 $ 225,000.00 $ 225,000.00 $ 476,500.00 $ 476,500.00
0002 BASE DREDGING
0002AA FIRST 17,400 CY 17,400 CY $ 14.22 $ 247,428.00 $ 14.00 $ 243,600.00 $ 11.00 $ 191,400.00
0002AB OVER 17,400 CY 55,600 CY $ 8.63 $ 479,828.00 $ 14.00 $ 778,400.00 $ 10.50 $ 583,800.00
$ 840,308.00 $ 1,247,000.00 $ 1,251,700.00
0003AA FIRST 6,000 CY 6,000 CY $ 14.80 $ 88,800.00 $ 47.75 $ 286,500.00 $ 10.00 $ 60,000.00
0003AB OVER 6,000 CY 16,000 CY $ 9.43 $ 150,880.00 $ 47.75 $ 764,000.00 $ 9.50 $ 152,000.00
$ 239,680.00 $ 1,050,500.00 $ 212,000.00
0004AA FIRST 6,000 CY 6,000 CY $ 16.20 $ 97,200.00 47.75$ 286,500.00$ 9.00$ 54,000.00$
0004AB OVER 6,000 CY 16,000 CY $ 10.36 $ 165,760.00 47.75$ 764,000.00$ 9.00$ 144,000.00$
$ 262,960.00 1,050,500.00$ 198,000.00$
$ 502,640.00 $ 2,101,000.00 $ 410,000.00
$ 1,342,948.00 $ 3,348,000.00 $ 1,661,700.00
C.Reasonable Contract (With Profit)
X B. Reasonable Contract (Without Profit)
7A. ITEM
NO
7C. EST.
QUANTIT
Y7B. DESCRIPTION OF OFFERED ITEM
D. UNIT
6. Number of Amendments Issued
A. OFFEROR:
9. OFFERS
NO. 1 NO. 2
A. OFFEROR:
NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
Walter Kamad, Contracting Officer
I CERTIFY that I have opened, read, and recorded on this abstract all timely offers received in response to the solicitation.
8. GOVERNMENT ESTIMATE
SIGNATURE DATE SIGNED
ABSTRACT OF BIDS - Construction 1. SOLICITATION NUMBER
W911XK20B00010
4. ISSUING OFFICE
A. Hired Labor
5. PROJECT TITLE
US Army Corp of Engineers Contracting Branch, Detroit District
FY20 M/D Monroe Harbor, MI
20%
N/A
B. BID SECURITY (TYPE AND AMOUNT)
C. AMENDMENTS ACKNOWLEDGED
Luedtke Engineering CompanyMCM Marine Inc
B. BID SECURITY (TYPE AND AMOUNT)
20%
C. AMENDMENTS ACKNOWLEDGED
N/A
D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT
TOTAL AMOUNT OF BASE BID
TOTAL AMOUNT OF OPTIONS
TOTAL AMOUNT OF BASE AND ALL OPTIONS
E. UNIT PRICE F. ESTIMATED
AMOUNT
TOTAL AMOUNT OF OPTION 1
TOTAL AMOUNT OF OPTION 2
OPTION 1: DREDGING
OPTION 2: DREDGING
28-Jul-2020
1. SOLICITATION NUMBER PAGE OF PAGES
2 2
0001 MOBILIZATION &
DEMOBILIZATION 1 Job $ 132,646.74 $ 132,646.74 $ 200,000.00 $ 200,000.00 $ 220,000.00 $ 220,000.00
0002 BASE DREDGING
0002AA FIRST 17,400 CY 17,400 CY $ 18.59 $ 323,466.00 $ 20.00 $ 348,000.00 $ 13.00 $ 226,200.00 $ -
0002AB OVER 17,400 CY 55,600 CY $ 18.59 $ 1,033,604.00 $ 17.00 $ 945,200.00 $ 13.00 $ 722,800.00 $ -
$ 1,489,716.74 $ 1,493,200.00 $ 1,169,000.00 $ -
0003AA FIRST 6,000 CY 6,000 CY $ 18.59 $ 111,540.00 $ 12.00 $ 72,000.00 $ 7.00 $ 42,000.00 $ -
0003AB OVER 6,000 CY 16,000 CY $ 18.59 $ 297,440.00 $ 10.00 $ 160,000.00 $ 7.00 $ 112,000.00 $ -
$ 408,980.00 $ 232,000.00 $ 154,000.00 $ -
0004AA FIRST 6,000 CY 6,000 CY $ 18.59 $ 111,540.00 $ 8.00 $ 48,000.00 $ 6.00 $ 36,000.00 $ -
0004AB OVER 6,000 CY 16,000 CY $ 18.59 $ 297,440.00 $ 8.00 $ 128,000.00 $ 6.00 $ 96,000.00 $ -
$ 408,980.00 $ 176,000.00 $ 132,000.00 $ -
$ 817,960.00 $ 408,000.00 $ 286,000.00 $ - $ 2,307,676.74 $ 1,901,200.00 $ 1,455,000.00 $ -
N/A
C. AMENDMENTS ACKNOWLEDGED
N/A
6. Number of Amendments Issued C. AMENDMENTS ACKNOWLEDGED
N/A
B. BID SECURITY (TYPE AND AMOUNT)
2. PROJECT TITLE
B. BID SECURITY (TYPE AND AMOUNT) B. BID SECURITY (TYPE AND AMOUNT)
20% 20% 20%
A. OFFEROR:
NO. 5
A. OFFEROR:
The King Co., Inc
C. AMENDMENTS ACKNOWLEDGEDC. AMENDMENTS ACKNOWLEDGED
Y/N
INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Commercial, when more than 2 offers are received.
Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419’s for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
ABSTRACT OF BIDS - CONSTRUCTION
W911XK20B0010
B. BID SECURITY (TYPE AND AMOUNT)
A. OFFEROR:
Dean Marine & Excavating Inc. Morrish Wallace Construction, Inc.
dba Ryba Marine Construction Co.
A. OFFEROR:
NO. 6NO. 3 NO. 4
4. OFFERS
FY20 M/D Monroe Harbor, MI
E. ESTIMATED
AMOUNT
Total Amount of Base Bid
D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE E. ESTIMATED
AMOUNT D. UNIT PRICE7A. ITEM
NO
7B. DESCRIPTION OF
OFFERED ITEM
D. UNIT
7C. EST.
QUANTIT
Y
E. ESTIMATED
AMOUNT
TOTAL AMOUNT OF OPTION 1
OPTION 2: DREDGING
TOTAL AMOUNT OF OPTIONS
TOTAL AMOUNT OF BASE AND ALL OPTIONS
D. UNIT PRICE
OPTION 1: DREDGING
TOTAL AMOUNT OF OPTION 2
File details come from the government source that posted it. Updated .