Text version
For Official Use Only
2. DATE ISSUED 3. DATE OPENED PAGE OF PAGES
02Aug2018 05Sep2018 1 2
DATE SIGNED
7A. ITEM
NO 7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY D. UNIT E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT D. UNIT PRICE E. ESTIMATED AMOUNT
0001 Mob & DeMob 1 JOB $172,215.00 $172,215.00 $163,600.00 $163,600.00 $549,600.00 $549,600.00
0002AA First 18,900 CY 18,900 CY $11.23 $212,247.00 $13.90 $262,710.00 $19.00 $359,100.00
0002AB Over 18,900 CY 21,900 CY $8.32 $182,208.00 $13.00 $284,700.00 $19.00 $416,100.00
0003AA First 5,400 Cubic Yards 5,400 CY $11.89 $64,206.00 $10.90 $58,860.00 $12.00 $64,800.00
0003AB Over 5,400 Cubic Yards 7,300 CY $8.62 $62,926.00 $10.90 $79,570.00 $12.00 $87,600.00
0004AA First 4,700 Cubic Yards 4,700 CY $12.22 $57,434.00 $10.90 $51,230.00 $12.00 $56,400.00
0004AB Over 4,700 Cubic Yards 8,300 CY $8.49 $70,467.00 $10.90 $90,470.00 $12.00 $99,600.00
$566,670.00 $711,010.00 $1,324,800.00
Total Amount of All Options (Items 0003 and 0004)
Total Amount of Option One (1) (Item 0003) $127,132.00 $138,430.00
Required Dredging, Rouge River MI to 21.0 ft below L.W.D.
between C.S. 157+00 and C.S. 136+50
Option 1 Dredging Rouge River, MI to 21.0 ft below L.W.D.
between C.S. 136+50 and C.S. 125+00
$127,901.00 $141,700.00 $156,000.00
Total Amount of Base Bid (Items 0001 and 0002)
$152,400.00
B. REASONABLE CONTRACT (Without Profit)
C. REASONABLE CONTRACT (Including Profit)
B. BID SECURITY (Type and Amount) 20% Bid
C. AMENDMENTS ACKNOWLEDGED
6. NUMBER OF AMENDMENTS ISSUED
FY 18 Maintenance Dredging at Rouge River, MI
X
5. PROJECT TITLE 8. GOVERNMENT ESTIMATE 9. OFFERS
B. BID SECURITY (Type and Amount) 20% Bid
C. AMENDMENTS ACKNOWLEDGED
A. HIRED LABOR
A. OFFEROR: Luedtke Engineering A. OFFEROR: Great Lakes and Materials L.L.
Robert W. Austin, Contractng Officer I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation. SIGNATURE
(Check A, B, or C and complete D, E, and F)
ABSTRACT OF OFFERS - CONSTRUCTION 1. SOLICITATION NUMBER
W911XK-18-B-0011
4. ISSUING OFFICE NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)
NO. 1 NO. 2
US Army Corps of Engineers Detroit District
Option 2 Dredging Rouge River, MI to 21.0 ft below L.W.D.
between C.S. 125+00 and C.S. 96+50
Total Amount of Option Two (2) (Item 0004)
Total Amount of Base and All Options (Items 0001 through 0004)
$255,033.00 $280,130.00 $308,400.00
$821,703.00 $991,140.00 $1,633,200.00
For Official Use Only
09/05/2018
PAGE OF PAGES
2 2
7A. ITEM
NO 7B. DESCRIPTION OF OFFERED ITEM 7C. EST.
QUANTITY D. UNIT E. UNIT PRICE F. ESTIMATED AMOUNT D. UNIT
PRICE E. ESTIMATED AMOUNT D. UNIT
PRICE E. ESTIMATED AMOUNT D. UNIT
PRICE E. ESTIMATED AMOUNT
0001 Mob & DeMob 1 JOB $127,000.00 $127,000.00
0002AA First 18,900 CY 18,900 CY $13.00 $245,700.00 0002AB Over 18,900 CY 21,900 CY $7.00 $153,300.00
0003AA First 5,400 Cubic Yards 5,400 CY $10.00 $54,000.00 0003AB Over 5,400 Cubic Yards 7,300 CY $7.00 $51,100.00
0004AA First 4,700 Cubic Yards 4,700 CY $10.00 $47,000.00 0004AB Over 4,700 Cubic Yards 8,300 CY $7.00 $58,100.00
$526,000.00
Total Amount of Base and All Options (Items 0001 through 0004) $736,200.00
$210,200.00 Total Amount of All Options (Items 0003 and 0004)
Total Amount of Option One (1) (Item 0003) $105,100.00
NO. 3 NO. 4
3. CONTRACT ITEMS
A. OFFEROR:
FY 18 Maintenance Dredging at Rouge River, MI
4. OFFERS (Continued)
NO. 6
A. OFFEROR:
B. BID SECURITY (Type and Amount)
C. AMENDMENTS ACKNOWLEDGED
B. BID SECURITY (Type and Amount)
20%
INSTRUCTIONS - Attach this form to OF 1419, Abstract of Offers - Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF 1419. Use additional OF 1419s for contract items in excess of 14 and attach additional Continuation Sheets (OF 1419A) as needed.
ABSTRACT OF OFFERS - CONSTRUCTION CONTINUATION SHEET
1. SOLICITATION NUMBER
W911XK-18-B-0011
C. AMENDMENTS ACKNOWLEDGED C. AMENDMENTS ACKNOWLEDGED
A. OFFEROR:
NO. 5
2. PROJECT TITLE
A. OFFEROR:
B. BID SECURITY (Type and Amount)
C. AMENDMENTS ACKNOWLEDGED
B. BID SECURITY (Type and Amount) Ryba Marine Construction
Option 2 Dredging Rouge River, MI to 21.0 ft below L.W.D.
between C.S. 125+00 and C.S. 96+50
Total Amount of Option Two (2) (Item 0004) $105,100.00
Required Dredging, Rouge River MI to 21.0 ft below L.W.D.
between C.S. 157+00 and C.S. 136+50
Option 1 Dredging Rouge River, MI to 21.0 ft below L.W.D.
between C.S. 136+50 and C.S. 125+00
Total Amount of Base Bid (Items 0001 and 0002)