Amendment 0001 - W911XK-17-R-0004
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
FY17 Poe Lock Quoin and Miter Block Replacement at Sault Ste. Marie, Michigan
1. See the attached SECTION SF 30 BLOCK 14 CONTINUATION PAGE for a complete description of document changes.
2. The proposal due date is UNCHANGED.
3. All other requirements, provisions, and clauses remain UNCHANGED
CONTRACTING BRANCH
USACE DETROIT DISTRICT
477 MICHIGAN AVENUE, 7TH FLOOR
DETROIT MI 48226-4523
See Item 6
J
W56MES63236692
W911XK-17-R-0004
1 10
06/14/2017
05/17/2017
W911XK-17-R-0004
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT NO. 0001
CHANGES TO THE SOLICITATION DOCUMENT
Section 00120 – Evaluation Factors for Award
The text of Paragraph 6.1.2.A, last sentence, is changed
FROM:
Additionally, proficiency in key construction areas 1 through 4 must be demonstrated in the combined submitted projects.
TO:
Additionally, proficiency in key construction areas “a” through “d” must be demonstrated in the combined submitted projects.
The text of Paragraph 6.2.2.B.iv. is changed
Narratives that explain the offeror’s management approach for Field COQ and the team supporting them will be considered a strength.
TO:
Narratives that explain the offeror’s management approach for Field CQC and the team supporting them will be considered a strength.
Section 00800 – Special Contract Requirements
The applicable Construction Wage Determination is changed
General Decision Number: MI170033 02/03/2017 MI33
TO:
General Decision Number: MI170033 05/26/2017 MI33
CHANGES TO THE SPECIFICATION
Section 01 32 01.00 10 – Project Schedule
The text of Subpart 3.1 General Requirements is changed
Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15, SCHEDULES FOR CONSTRUCTION CONTRACTS. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of is the responsibility of the Contractor. Contractor management personnel must actively participate in its development. working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules.
Prepare each Project Schedule using the Precedence Diagram Method (PDM).
TO:
Prepare for approval a Project Schedule, as specified herein, pursuant to FAR Clause 52.236-15, SCHEDULES FOR CONSTRUCTION CONTRACTS. Show in the schedule the proposed sequence to perform the work and dates contemplated for starting and completing all schedule activities. The scheduling of the entire project is required. The scheduling of is the responsibility of the Contractor. Contractor management personnel must actively participate in its development. Subcontractors and suppliers working on the project must also contribute in developing and maintaining an accurate Project Schedule. Provide a schedule that is a forward planning as well as a project monitoring tool. Use the Critical Path Method (CPM) of network calculation to generate all Project Schedules. Prepare each Project Schedule using the Precedence Diagram Method (PDM).
The text of Subpart 3.4.2 Periodic Schedule Updates, first sentence, is changed
Update the Project Schedule on a regular basis, monthly at a minimum.
Update the Project Schedule on a regular basis, every two weeks at a minimum.
Section 01 35 13 – Special Project Procedures
The text of Subpart 1.4.2, last sentence, is changed
This will restrict access to the north side of the Poe Lock to foot traffic only via the top of the dewatering bulkheads on the east and west ends of the lock.
TO:
This will restrict access to the north side of the Poe Lock to foot traffic only via the top of the dewatering bulkhead west end of the lock, and the top of Gate 4.
Specification Section 01 45 00.15 10 – Resident Management System Contractor Mode (RMS CM)
ADD:
Specification Section 01 45 00.15 10 – Resident Management System Contractor Mode (RMS CM)
Specification Section 35 20 16.33 – Miter Gates
DELETE:
Existing Specification Section 35 20 16.33 – Miter Gates
REPLACE WITH:
Attached Specification Section 35 20 16.33 – Miter Gates – Amdt 0001
CHANGES TO THE DRAWINGS
Drawing G-004
The text of the hatched area callout is changed
APPROX. LOCATION & DIMENSIONS OF RESTRICTED WORK AREA SEE NOTE 4.
APPROX. LOCATION & DIMENSIONS OF RESTRICTED WORK AREA SEE NOTE 3.
Drawing G-006
DELETE Note 1 and Note 2
Drawing G-007
Drawing G-008
Drawing S-101
DELETE:
Existing Drawing S-101
REPLACE WITH:
Attached Drawing S-101 – Revision Note Amendment 001
Drawing S-203
DELETE existing Drawing S-203
REPLACE WITH attached Drawing S-203 – Revision Note Amendment 001
SECTION 00800 - SPECIAL CONTRACT REQUIREMENTS
The following have been added by full text:
WAGE DETERMINATION UPDATE
General Decision Number: MI170033 05/26/2017 MI33
Superseded General Decision Number: MI20160033
State: Michigan
Construction Type: Heavy
County: Chippewa County in Michigan.
Heavy, Includes Water, Sewer Lines and Excavation (Excludes Hazardous Waste Removal; Coal, Oil, Gas, Duct and other similar Pipeline Construction)
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/06/2017 1 02/03/2017 2 05/26/2017
BRMI0006-002 05/01/2016
Rates Fringes
BRICKLAYER.......................$ 27.47 18.60
CARP1510-002 06/01/2016
Rates Fringes
CARPENTER, Includes Form Work....$ 23.42 19.33
ELEC1070-003 06/01/2014
Rates Fringes
ELECTRICIAN
Contracts $135,000 and under.......................$ 29.75 18.12 Contracts over $135,000.....$ 31.75 18.20
ENGI0325-021 06/01/2016
POWER EQUIPMENT OPERATORS: Underground Construction (Including Sewer) Rates Fringes
POWER EQUIPMENT OPERATOR
GROUP 1.....................$ 29.87 22.85
GROUP 2.....................$ 24.89 22.85
GROUP 3.....................$ 24.48 22.85
GROUP 4.....................$ 24.20 22.85
POWER EQUIPMENT OPERATOR CLASSIFICATIONS
GROUP 1: Backhoe/ Excavator, Boring Machine, Bulldozer, Crane, Scraper, Loader, Trencher (over 8 ft. digging capacity)
GROUP 2: Trencher (8-ft digging capacity and smaller)
GROUP 3: Boom Truck (non-swinging, non- powered type boom)
GROUP 4: Broom/ Sweeper, Fork Truck, Tractor
ENGI0326-006 05/01/2016
EXCLUDES UNDERGROUND CONSTRUCTION
Rates Fringes OPERATOR: Power Equipment Crane, main boom & jib 120' or longer..............$ 28.81 22.55 Crane, main boom & jib 140' or longer..............$ 29.06 22.55 Crane, main boom & jib 220' or longer..............$ 29.31 22.55
GROUP 1 -
Backhoe/Excavator;
Bulldozer; Crane;
Compactor; Scraper; Loader..$ 28.31 22.55 GROUP 2 - Boom truck (non-swing)......................$ 25.06 22.55 GROUP 3 - Oiler.............$ 23.54 22.55
FOOTNOTES: Premium rate: main boom and jib 300 feet or longer is $1.50 per hour above the 220 ft. boom and jib rate. Main boom and jib 400 feet or longer is $3.00 per hour above the 220 ft. boom and jib rate.
IRON0008-009 05/01/2015
Rates Fringes
IRONWORKER, REINFORCING AND
STRUCTURAL
Contracts $10,000,000 or greater.....................$ 26.52 24.35 Contracts less than $10,000,000.................$ 23.11 24.35
Paid Holidays: New Year's Day, Memorial Day, July 4th, Labor Day, Thanksgiving Day & Christmas Day.
LABO0334-002 09/01/2014
SCOPE OF WORK:
OPEN CUT CONSTRUCTION: Excavation of earth and sewer, utilities, and improvements, including underground piping/conduit (including inspection, cleaning, restoration, and relining)
Rates Fringes
LABORER
(1) Common or General.......$ 19.86 12.75
(2) Mason Tender- Cement/Concrete.............$ 20.00 12.75
(4) Grade Checker...........$ 20.18 12.75
(5) Pipelayer...............$ 20.23 12.75
* LABO1329-002 05/01/2017
EXCLUDES OPEN CUT CONSTRUCTION
Rates Fringes
LABORER
Common or General; Mason Tender - Cement/Concrete....$ 22.39 12.88 Pipelayer...................$ 22.81 12.88
PLAS0016-035 04/01/2014
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 20.17 10.13
PLUM0111-009 06/01/2016
Rates Fringes
PLUMBER/PIPEFITTER...............$ 32.19 21.28
TEAM0007-010 06/01/2016
Rates Fringes
TRUCK DRIVER
Lowboy/Semi-Trailer Truck...$ 25.15 .50 + a+b
FOOTNOTE:
a. $438.45 per week.
b. $61.90 daily.
SUMI2010-031 11/09/2010
Rates Fringes
LABORER: Landscape..............$ 10.89 1.74
OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 12.98 6.12
OPERATOR: Grader/Blade..........$ 16.63 5.85
OPERATOR: Roller................$ 13.74 7.93
TRUCK DRIVER: Dump Truck........$ 12.63 1.25
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
(End of Summary of Changes)
File details come from the government source that posted it. Updated .