W911XK-12-R-0012 Amendment 0004.pdf

PDF 20 KB Posted

Attached to
FY12 Compressed Air Distribution System, Sault Ste Marie, MI
Solicitation number
W911XK-12-R-0012
Issued by

About this file

Amendment 0004

View the file

Other files

File Type Posted
W911XK-12-R-0012 Soo Compressed Air Amendment 0006.pdf PDF
Soo Compressed Air Q A 06132012.pdf PDF
W911XK-12-R-0012 Soo Compressed Air Amendment 0005.pdf PDF
Soo Compressed Air Q A 06082012.pdf PDF
W911XK-12-R-0012 Soo Compressed Air Amendment 0003.pdf PDF
W911XK-12-R-0012 Soo Compressed Air Amendment 0002.pdf PDF
Soo Compressed Air Q A Version II dated 05302012.pdf PDF
Soo Compressed Air Q A 05302012.pdf PDF
Piping Plans.zip ZIP file
Building Plans.zip ZIP file
Generation Plans.zip ZIP file
220000.pdf PDF
0122000010.pdf PDF
MP-127.pdf PDF
332000.pdf PDF
CU-101.pdf PDF
W911XK-12-R-0012 Amendment 0001.pdf PDF
MP-101.pdf PDF
Soo Compressed Air Distribution System Q A 05232012.pdf PDF
plans.maxfr —
SOO_AIR_BLDG_M-104.cal —
SOO_AIR_BLDG_P-102.cal —
SOO_AIR_BLDG_M-601.cal —
SOO_AIR_BLDG_P-101.cal —
J A Soo Compressed Air Distribution System.pdf PDF
SOO_AIR_BLDG_E-108.cal —
SOO_AIR_BLDG_E-001.cal —
SOO_AIR_BLDG_E-106.cal —
S102 3 4 5 6 7-S107.cal —
SOO_AIR_BLDG_M-101.cal —
SOO_AIR_BLDG_E-109.cal —
SOO_AIR_BLDG_M-102.cal —
S102 3 4 5 6 7-S105.cal —
SOO_AIR_BLDG_E-105.cal —
S102 3 4 5 6 7-S106.cal —
SOO_AIR_BLDG_M-103.cal —
SOO_AIR_BLDG_E-107.cal —
SOO_AIR_BLDG_E-616XXX.cal —
E-DG013.cal —
E-DT201.cal —
S102 3 4 5 6 7-S102.cal —
E-DT300.cal —
E-DG014.cal —
plans.maxfr.maxFR —
E-EU003.cal —
E-DG011.cal —
S102 3 4 5 6 7-S103.cal —
E-EU001.cal —
E-EU000.cal —
E-EU004.cal —
Show 40 more

Latest 50 of 129 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W56MES20191746

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

FY12 Soo Locks Compressed Air Distribution Systems

The purpose of this modification is to:

1. Update clause 52.211-10; see follow ing pages for additional information.

2. CHANGE the proposal due date from 12 June 2012 to 14 June 2012.

All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 08-Jun-2012

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-12-R-0012

X 9B. DATED (SEE ITEM 11)

01-May-2012

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

08-Jun-2012

CODE

CONTRACTING DIVISION

DETROIT DISTRICT

477 MICHIGAN AVE

RM 700

DETROIT MI 48226-2550

W911XK 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W911XK-12-R-0012

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 12-Jun-2012 02:00 PM to 14-Jun-2012 02:00 PM.

The following have been added by full text:

AMENDMENT 0004

Solicitation Amendment No. 0004 For Solicitation No. W911XK-12-R-0012 FY12 Soo Lock Compressed Air Generation System, Sault Ste. Marie, MI

CHANGES TO SOLICITATION:

SECTION 700 CONTRACT CLAUSES, Clause 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

DELETE: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 400 calendar days after the notice to proceed for the base, an additional 100 calendar days for Option 1, and 50 additional days for Option 2. The time stated for completion shall include final cleanup of the premises.

ADD: The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 400 calendar days after the notice to proceed for the base, an additional 100 calendar days for Option 1 & Option 3, and 50 additional days for Option 2. The time stated for completion shall include final cleanup of the premises.

END OF AMENDMENT

SECTION 00700 - CONTRACT CLAUSES

The following have been modified:

52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)

W911XK-12-R-0012

The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 400 calendar days after the notice to proceed for the base, an additional 100 calendar days for Option 1 & Option 3, and 50 additional days for Option 2. The time stated for completion shall include final cleanup of the premises.

(End of clause)

(End of Summary of Changes)