Timbers Amendment 1.pdf
PDF 19 KB Posted
- Attached to
- Fender Timbers Alanson Lock
- Solicitation number
- W911XK-10-T0034
About this file
Amendment 1 - must be signed and returned with quote
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Timbers Amendment 2.pdf | ||
| RFI Timbers Alanson 1-22-10 .pdf | ||
| RFI Timbers Alanson .pdf | ||
| solicitationtimbers.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W56MES93502953
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to update and revise the scope of w ork and specifications. The due date for quotes has been extended.
Contractors must sign and return a copy of this amendment w ith their quote.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 2
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 25-Jan-2010
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W911XK-10-T-0034
X 9B. DATED (SEE ITEM 11)
14-Jan-2010
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
25-Jan-2010
CODE
CONTRACTING DIVISION
DETROIT DISTRICT, USAED
P.O. BOX 1027
DETROIT MI 48231-1027
W911XK 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W911XK-10-T-0034
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 28-Jan-2010 02:00 PM to 04-Feb-2010 02:00 PM.
The following have been added by full text:
SCOPE OF WORK AND SPECS
TECHNICAL SPECIFICATION
FOR
FENDER TIMBERS FOR CROOKED RIVER LOCK
ITEMS REQUIRED
Contractor will supply 90 ea. plastic fender timbers. Specifications are as follows:
Material: Ultra high molecular weight polyethylene ultraviolet stabilized.
Color: Black.
Size: 3”(±1/4”) X 12”(±1/4”) X 120”(-0”+6”).
Minimum Izod Impact Resistance: 24 lbf/in using test method A in accordance with ASTM D 4020 and ASTM D 256.
Minimum Density: 0.93 g/cm3, tested in accordance with ASTM D 792.
Minimum Durometer Hardness: D65 using type D durometer method in accordance with ASTM D 2240.
DELIVERY
Certified test reports are required upon delivery for all materials.
Fender timbers must be received by the Soo Area Office within 90 days of award.
Fender timbers must be delivered to the Soo Area Office, 119 E. Water St. Sault Sainte Marie, MI 49783.
(End of Summary of Changes)
File details come from the government source that posted it. Updated .