Bid_Abstract.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Charleroi L/D Conductor Rail Replacement Federal contract opportunity
- Solicitation number
- W911WN18B8004
About this file
Bid Abstract on Bids Received.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Bid_Results.pdf | ||
| W911WN18B8004-0002.pdf | ||
| AO37_LCH_0-121-A.pdf | ||
| 01_35_00.00_08.pdf | ||
| W911WN18B8004-0001.pdf | ||
| AO37_LCH_11-050-A.pdf | ||
| Bid_Schedule.xls | XLS spreadsheet | |
| Sign-In_Sheet,_Attendees,_Site_Visit,_7-13-18.pdf | ||
| Constracting_Discussion_and_Agenda,_Site_Visit,_7-13-18.pdf | ||
| Attachment_1,_Technical_Specifications,_Certified_Final,_April_2018.pdf | ||
| W911WN18B8004.pdf | ||
| Attachment_3,_Wage_Determination,_PA180004_06-15-2018_PA4.pdf | ||
| Attachment_2,_Drawings_Certified_Final,_April_2018.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 8/8/18
| Rail System Replacement |
| Charleroi Locks and Dam |
| W911WN18B8004 |
IGE without Profit PERMADUR INDUSTRIES, INC., dba SISSCO KOVILIC CONSTRUCTION CO., INC. ADVANCED INTEGRATION GROUP, INC. (AIG)
ITEM NO. LINE ITEM DESCRIPTION QTY U/M Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost Unit Price Total Cost
| 0001 | Reimbursement for Actual Performance and Payment Bonds Premiums | 1 | JOB | $_____.__ | $_____.__ |
| 0002 | Digital Progress Images | 6 | SETS | $_____.__ | $_____.__ |
| 0003 | Mobilization and Demobilization | 1 | JOB | $_____.__ | $_____.__ |
| 0004 | Protection and Maintenance of Traffic During Construction | 1 | JOB | $_____.__ | $_____.__ |
| 0005 | Erosion and Sediment Controls | 1 | JOB | $_____.__ | $_____.__ |
| 0006 | Field Survey and Bench Marks | 1 | JOB | $_____.__ | $_____.__ |
| 0007 | Sediment Sampling and Testing | 1 | JOB | $_____.__ | $_____.__ |
| 0008 | Temporary Cofferdam / Stream Diversion | 1 | JOB | $_____.__ | $_____.__ |
| 0009 | Removal and Disposal of Clean Material and Sediment, Sta. 17+75 to Sta. 18+75 | 1,480 | CUBIC YARD | $_____.__ | $_____.__ |
| 0010 | Removal and Disposal of Regulated Material and Sediment, Sta. 17+75 to Sta. 18+75 | 400 | CUBIC YARD | $_____.__ | $_____.__ |
| 0011 | Clearing of Vegetation, Slope Repair | 1 | JOB | $_____.__ | $_____.__ |
| 0012 | Bank Grading and Placement of Fill, Slope Repair | 670 | CUBIC YARD | $_____.__ | $_____.__ |
| 0013 | Geotextile, Slope Repair | 1,330 | SQUARE YARD | $_____.__ | $_____.__ |
| AASHTO #3 Gravel, Slope Repair | |||||
| 0014 | PDT R-6 Stone, Slope Repair | 890 | CUBIC YARD | $_____.__ | $_____.__ |
| 0015 | Seeding and Mulching, Slope Repair | 1 | JOB | $_____.__ | $_____.__ |
| 0016 | Demolition, Removal and Disposal of Floor and Chute Blocks, Ramp Repair | 2 | CUBIC YARD | $_____.__ | $_____.__ |
| 0017 | Steel Reinforcing and Dowels, Ramp Repair | 360 | POUNDS | $_____.__ | $_____.__ |
| Excavation, Ramp Repair | 230 | CUBIC YARD | $_____.__ | $_____.__ | |
| Geotextile, Ramp Repair | 240 | SQUARE YARD | $_____.__ | $_____.__ | |
| AASHTO #3 Gravel Fill, Ramp Repair | 50 | CUBIC YARD | $_____.__ | $_____.__ | |
| 0019 | PDT R-4 Stone, Ramp Repair | 180 | CUBIC YARD | $_____.__ | $_____.__ |
| 0018 | Concrete, Ramp Repair | 30 | CUBIC YARD | $_____.__ | $_____.__ |
| 0020 | Excavation, Scour Repair | 10 | CUBIC YARD | $_____.__ | $_____.__ |
| 0021 | PDT R-6, Scour Repair | 30 | CUBIC YARD | $_____.__ | $_____.__ |
| 0022 | Clearing of Vegetation, Scour Repair | 1 | JOB | $_____.__ | $_____.__ |
| 0023 | Demolition, Removal, and Disposal Portion of Existing Stone Wall | 210 | CUBIC YARD | $_____.__ | $_____.__ |
| 0024 | Design and Certification of Precast Concrete Block Retaining Wall | 1 | JOB | $_____.__ | $_____.__ |
| 0025 | Precast Concrete Block Wall Retaining Wall, Including Foundation, Drainage, Select and Structural Backfill (Complete) | 1 | JOB | $_____.__ | $_____.__ |
| 0026 | PDT R-6 Stone, Precast Concrete Block Retaining Wall | 100 | SQUARE YARD | $_____.__ | $_____.__ |
| 0027 | Concrete Grouting, Precast Concrete Block Retaining Wall | 9 | CUBIC YARD | $_____.__ | $_____.__ |
| 0028 | Railing Replacement, Precast Concrete Block Retaining Wall | 100 | LINEAR FEET | $_____.__ | $_____.__ |
| 0030 | Gravel Surface Restoration, Precast Concrete Block Retaining Wall | 8 | CUBIC YARD | $_____.__ | $_____.__ |
| TOTAL, ITEMS 0001 THROUGH 0030 | $_____.__ |
| 0001 | REIMBURSEMENT FOR ACTUAL PERFORMANCE AND PAYMENT BONDS | 1 | JOB | $8,060.00 | $8,060.00 | $5,379.00 | $5,379.00 | $9,000.00 | $9,000.00 | $18,591.84 | $18,591.84 |
| 0002 | PROGRSS IMAGES | 4 | SET | $445.00 | $1,780.00 | $1,000.00 | $4,000.00 | $1,000.00 | $4,000.00 | $1,316.70 | $5,266.80 |
| 0003 | DEMOLITION OF EXISTING RAIL SYSTEM | 1 | JOB | $77,760.00 | $77,760.00 | $139,504.00 | $139,504.00 | $80,000.00 | $80,000.00 | $50,039.14 | $50,039.14 |
| 0004 | FURNISH AND INSTALL NEW RAIL SYSTEM | 1 | JOB | $267,830.00 | $267,830.00 | $212,182.00 | $212,182.00 | $704,000.00 | $704,000.00 | $453,442.85 | $453,442.85 |
| 0005 | REPLACE RAIL MAINTENANCE PLATFORM | 1 | JOB | $71,100.00 | $71,100.00 | $128,000.00 | $128,000.00 | $70,000.00 | $70,000.00 | $110,979.37 | $110,979.37 |
TOTAL, ITEMS 0001 THROUGH 0005 $426,530.00 $489,065.00 $867,000.00 $638,320.00
Sheet2
Sheet3
File details come from the government source that posted it.